HomeMy WebLinkAboutM100LVR-1
LVR-2
LVR-3
10x10
EF-1
12x12
4
See A-sheets for exact locations
of all Louvers. Louvers installed
by GC.
BDD
BDD
24x24
TEF-1
10x10
EWH-2
2 KW
EWH-2
2 KW
EWH-2
2 KW
EWH-1
1.5 KW
EWH-2
2 KW
EWH-2
2 KW
EF-3
11
6
11
3
3
T
TT
T
T
EF-1 and EF-3 hung below
ceiling. Top of fan not higher than
8'0" AFF. Connect ducts from EFs
to plenum behind LVR-2.
Plenum face to be 30x24 and
shall extend till inside face of wall.
BDD 5
ER-1
75
ER-1
75
2 2
2
2 6x66x68x8
3
3
4 EF-2
8x84
3
4
8x8
6x6
10x10ER-1
75
ER-1
75
ER-1
75
6x6
8x8
8x8
8x8
6x6
Provide tamper proof wall mounted T-stat in space for
this Electric Wall heater (EWH).
Provide VCS3 damper to match register neck size.
Balance to CFM indicated.
6x6 aluminum exhaust duct down to +6" AFF. All ducts,
accessories and fittings serving EF-2 shall be Aluminum.
8x8 Aluminum ductwork connected to EF-2. All ducts,
accessories and fittings serving EF-2 shall be Aluminum.
The Back Draft Damper (BDD) needs to be enirely inside
the wall opening and must not stick out of the wall. Field
verify size of BDD prior to ordering. Provide BDD of
smaller face size if required, Slope lower of edge of
louver connection to drain moisture out.
Tamper proof integral T-stat for heater to prevent
adjustment by unauthorized personnel.
2NCP0QVGU
)GPGTCN0QVGU
1.These plans are diagrammatic in nature, and do not
represent every necessary offset and fitting. Contractor
shall install his work in a manner that will conform with
the structure. Contractor shall avoid obstructions,
preserve head room and maintain maximum clearance
without additional cost to the owner.
2.Conceal all linesets, piping, power wiring, control wiring
and control components unless otherwise noted. If
concealment is not possible, contact Engineer for
alternatives prior to fabrication.
3.Sheet metal supply ductwork in concealed spaces shall
be insulated with 112" thick, .75 PCF density, fiberglass
ductwrap. All ductwork in unconditioned spaces shall be
insulated with 2" thick, 1.0 PCF density, fiberglass
ductwrap. (Min R6)
4.Phenolic duct by Pal-Duct or Kool-Duct is an acceptable
alternative to sheetmetal duct and insulation in
concealed spaces. Use flanged joints.
5.Keep all ductwork, duct system and equipment openings
covered with adhesive duct protective wrap like
VentureTape 1512, until system start-up. This is to
prevent intrusion of construction dirt and debris into the
duct system, and HVAC equipment.
6.If any questions arise concerning the HVAC
requirements of these documents, please contact The
Engineering Collaborative at (317) 636-3941, prior to
bidding, fabrication or installation of equipment.
7.Sheet metal transitions by Sheet Metal Contractor.
8.Refer to detail sheets M700 for additional requirements
and information that applies to this project.
1
2
3
4
5
6
10 9abcd 8 7 6efgh109876 REVISIONS AND ISSUES5 4 3 2 1 PREPARED FOR:PROJECT NO.
SHEET NO.abcd5 4 3 2
CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netfhgSection 1, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaW200371CARMEL, IN 46033W20062003/05/2021LAWRENCE W. INLOW PARKPHASE II IMPROVEMENTSPROF
E
SSIONA L E N G NIEERSA M U E L L.HU
R
TINDIA N A
0
N
EP1 6
.o
01087
ATS FOET
R E TEGIS
D
ER
Exp. 7.31.2022
Genesis Design, Inc.GNIBMULP·LACITCELE·LACINAHCEM R2410 Executive Drive - Suite 100
Indianapolis, Indiana 46241
317.636.3941
YYY6'%Ä/'2EQO
THEENGINEERINGC O L L A B OR
A
T
I
VEKnow what's below.
before you dig.Call
R AKSLHAK