Loading...
HomeMy WebLinkAboutM100LVR-1 LVR-2 LVR-3 10x10 EF-1 12x12 4 See A-sheets for exact locations of all Louvers. Louvers installed by GC. BDD BDD 24x24 TEF-1 10x10 EWH-2 2 KW EWH-2 2 KW EWH-2 2 KW EWH-1 1.5 KW EWH-2 2 KW EWH-2 2 KW EF-3 11 6 11 3 3 T TT T T EF-1 and EF-3 hung below ceiling. Top of fan not higher than 8'0" AFF. Connect ducts from EFs to plenum behind LVR-2. Plenum face to be 30x24 and shall extend till inside face of wall. BDD 5 ER-1 75 ER-1 75 2 2 2 2 6x66x68x8 3 3 4 EF-2 8x84 3 4 8x8 6x6 10x10ER-1 75 ER-1 75 ER-1 75 6x6 8x8 8x8 8x8 6x6 Provide tamper proof wall mounted T-stat in space for this Electric Wall heater (EWH). Provide VCS3 damper to match register neck size. Balance to CFM indicated. 6x6 aluminum exhaust duct down to +6" AFF. All ducts, accessories and fittings serving EF-2 shall be Aluminum. 8x8 Aluminum ductwork connected to EF-2. All ducts, accessories and fittings serving EF-2 shall be Aluminum. The Back Draft Damper (BDD) needs to be enirely inside the wall opening and must not stick out of the wall. Field verify size of BDD prior to ordering. Provide BDD of smaller face size if required, Slope lower of edge of louver connection to drain moisture out. Tamper proof integral T-stat for heater to prevent adjustment by unauthorized personnel. 2NCP0QVGU )GPGTCN0QVGU 1.These plans are diagrammatic in nature, and do not represent every necessary offset and fitting. Contractor shall install his work in a manner that will conform with the structure. Contractor shall avoid obstructions, preserve head room and maintain maximum clearance without additional cost to the owner. 2.Conceal all linesets, piping, power wiring, control wiring and control components unless otherwise noted. If concealment is not possible, contact Engineer for alternatives prior to fabrication. 3.Sheet metal supply ductwork in concealed spaces shall be insulated with 112" thick, .75 PCF density, fiberglass ductwrap. All ductwork in unconditioned spaces shall be insulated with 2" thick, 1.0 PCF density, fiberglass ductwrap. (Min R6) 4.Phenolic duct by Pal-Duct or Kool-Duct is an acceptable alternative to sheetmetal duct and insulation in concealed spaces. Use flanged joints. 5.Keep all ductwork, duct system and equipment openings covered with adhesive duct protective wrap like VentureTape 1512, until system start-up. This is to prevent intrusion of construction dirt and debris into the duct system, and HVAC equipment. 6.If any questions arise concerning the HVAC requirements of these documents, please contact The Engineering Collaborative at (317) 636-3941, prior to bidding, fabrication or installation of equipment. 7.Sheet metal transitions by Sheet Metal Contractor. 8.Refer to detail sheets M700 for additional requirements and information that applies to this project. 1 2 3 4 5 6 10 9abcd 8 7 6efgh109876 REVISIONS AND ISSUES5 4 3 2 1 PREPARED FOR:PROJECT NO. SHEET NO.abcd5 4 3 2 CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1 ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netfhgSection 1, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaW200371CARMEL, IN 46033W20062003/05/2021LAWRENCE W. INLOW PARKPHASE II IMPROVEMENTSPROF E SSIONA L E N G NIEERSA M U E L L.HU R TINDIA N A 0 N EP1 6 .o 01087 ATS FOET R E TEGIS D ER Exp. 7.31.2022 Genesis Design, Inc.GNIBMULP·LACITCELE·LACINAHCEM R2410 Executive Drive - Suite 100 Indianapolis, Indiana 46241 317.636.3941 YYY6'%Ä/'2EQO THEENGINEERINGC O L L A B OR A T I VEKnow what's below. before you dig.Call R AKSLHAK