Loading...
HomeMy WebLinkAboutL1.1 LANDSCAPE DETAILSLAKESIDEAPARTMENTS -PHASE II©NOT APPROVED F OR CONSTRUCTION L1.1LANDSCAPEDETAILSATAPCO REDEVELOPMENT PUD ORDINANCE REQUIREMENT REQUIRED PROVIDED STREET TREES · Shade shall be planted within public street ROW · Street trees shall be planted min. of 25' and max. of 40' o.c. · Section 7.4.B Per City standards, no street trees shall be planted in conflict with drainage or utility easements or structures and underground detention (unless designed for that purpose), or within traffic safety vision clearances. However, where the logical location of proposed utilities would compromise the desired effect, the Controlling Developer may solicit the aid of the City's Urban Forester in mediating an alternative. 541 LF frontage / 40 = 13 hade trees 13 shade trees, see Section 7.4.B of the Atapco PUD FOUNDATION PLANTING · With respect to non-residential buildings, a planting area equal to an area 5' in depth from the building perimeter shall be installed on all sides of the building Planting area equal to 5 foot minimum of depth provided where feasible Planting area equal to 5 foot minimum of depth provided where feasible PARKING LOT INTERIOR · 1 shade tree and 5 shrubs / 15 parking spaces 165 spaces / 15 = 11 11(1) = 11 shade trees 11(5) = 55 shrubs 11 shade trees + 55 shrubs PARKING LOT PERIMETER WITHIN 50' OF PUBLIC RIGHT-OF-WAY · 5' wide perimeter strip on all sides · 4 shade trees and 30 shrubs/grasses per 100 LF 68 LF / 100 = .68 .68(4) = 3 shade trees .68(30) = 20 shrubs/grasses 3 shade trees + 20 shrubs LANDSCAPE BUFFER EAST · 4 trees per 100 LF · 10 shrubs per 100 LF 434 LF / 100 L:F = 4 4 x 4 = 16 shade trees 4 x 10 = 40 shrubs 434 LF / 100 L:F = 4 4 x 4 = 16 shade trees 4 x 10 = 40 shrubs PERMANENT SEEDING AMERITURF FRONTRUNNER BLEND TALL FESCUE; APPLY AT A RATE OF 350 LBS/ACRE (8LBS/1000 SQFT) SEEDING LEGEND LANDSCAPE NOTES 1.THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING MATERIALS AND PLANTS SHOWN ON THE LANDSCAPE PLAN. THE CONTRACTOR IS RESPONSIBLE FOR THE COST TO REPAIR UTILITIES, ADJACENT LANDSCAPE, PUBLIC AND PRIVATE PROPERTY THAT IS DAMAGED BY THE CONTRACTOR OR THEIR SUBCONTRACTOR'S OPERATIONS DURING INSTALLATION OR DURING THE SPECIFIED MAINTENANCE PERIOD. CALL FOR UTILITY LOCATIONS PRIOR TO ANY EXCAVATION AND PLANTING. 2.THE CONTRACTOR SHALL REPORT ANY DISCREPANCY IN PLAN VS. FIELD CONDITIONS IMMEDIATELY TO THE LANDSCAPE ARCHITECT, PRIOR TO CONTINUING WITH THAT PORTION OF WORK. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY OF THEIR TRENCHES OR EXCAVATIONS THAT SETTLE. 4.ALL NURSERY STOCK SHALL BE WELL BRANCHED, HEALTHY, FULL, PRE-INOCULATED AND FERTILIZED. DECIDUOUS TREES SHALL BE FREE OF FRESH SCARS. TRUNKS WILL BE WRAPPED IF NECESSARY TO PREVENT SUN SCALD AND INSECT DAMAGE. THE LANDSCAPE CONTRACTOR SHALL REMOVE THE WRAP AT THE PROPER TIME AS A PART OF THIS CONTRACT. 5.ALL NURSERY STOCK SHALL BE GUARANTEED, BY THE CONTRACTOR, FOR ONE YEAR FROM DATE OF FINAL INSPECTION. 6.AMENDED SOIL SHALL BE PROVIDED AND GRADED BY THE GENERAL CONTRACTOR UP TO A 6" DEPTH BELOW FINISHED GRADE IN TURF AREAS AND A 12" DEPTH IN PLANTING AREAS. 7.PLANTING AREA TOPSOIL SHALL BE AMENDED WITH 25% SPHAGNUM PEATMOSS, 5% HUMUS AND 65% PULVERIZED SOIL FOR ALL SHRUB, ORNAMENTAL GRASS, PERENNIAL AND ANNUAL BEDS. AMENDED TURF AREA SOIL SHALL BE STANDARD TOPSOIL. 8.SEED LIMIT LINES ARE APPROXIMATE. CONTRACTOR SHALL SEED ALL AREAS WHICH ARE DISTURBED BY GRADING WITH THE SPECIFIED SEED MIXES. 9.CONTRACTOR SHALL INSTALL SHREDDED HARDWOOD MULCH AT A 3" DEPTH TO ALL TREES, SHRUB, PERENNIAL, AND GROUNDCOVER AREAS. TREES PLACED IN AREA COVERED BY TURF SHALL RECEIVE A 4 FT WIDE MAXIMUM TREE RING WITH 3" DEPTH SHREDDED HARDWOOD MULCH. A SPADED BED EDGE SHALL SEPARATE MULCH BEDS FROM TURF OR SEEDED AREAS. A SPADED EDGE IS NOT REQUIRED ALONG CURBED EDGES. 10.DO NOT DISTURB THE EXISTING PAVING, LIGHTING, OR LANDSCAPING THAT EXISTS ADJACENT TO THE SITE UNLESS OTHERWISE NOTED ON PLAN. 11.PLANT QUANTITIES SHOWN ARE FOR THE CONVENIENCE OF THE OWNER AND JURISDICTIONAL REVIEW AGENCIES. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL PLANT QUANTITIES AS DRAWN. 12.THE OWNER'S REPRESENTATIVE MAY REJECT ANY PLANT MATERIALS THAT ARE DISEASED, DEFORMED, OR OTHERWISE NOT EXHIBITING SUPERIOR QUALITY. 13.THE CONTINUED MAINTENANCE OF ALL REQUIRED LANDSCAPING SHALL BE THE RESPONSIBILITY OF THE OWNER OF THE PROPERTY ON WHICH SAID MATERIALS ARE REQUIRED. ALL PLANT MATERIALS REQUIRED BY THIS SECTION SHALL BE MAINTAINED AS LIVING VEGETATION AND SHALL BE PROMPTLY REPLACED BY LANDSCAPE CONTRACTOR DURING WARRANTY PERIOD IF THE PLANT MATERIAL HAS DIED PRIOR TO FINAL ACCEPTANCE. PLANTING AREAS SHALL BE KEPT FREE OF TRASH, LITTER, AND WEEDS AT ALL TIMES. NTS TREE PLANTING DETAIL1 NTS SHURB PLANTING DETAIL2 NTS TREE PRESERVATION DETAIL3 NOT APPROVED F OR CONSTRUCTION