Loading...
HomeMy WebLinkAboutHorrey Residence Cover Sheed and General Notes (dragged)COVER SHEET AND GENERAL NOTESHORREY RESIDENCEINDIANAPOLIS, IN 46280A0 10118 SOLACE LANEHORREY RESIDENCEBASEMENT REMODEL2,152 SF (GROSS)1. ALL WORK IS TO BE COMPLETED IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES,ORDINANCES, RULES, REGULATIONS, AND STANDARDS, INCLUDING, BUT NOT LIMITED TO:THE INDIANA BUILDING CODE, THE INDIANA CODES, THE INDIANA FIRE CODES, THEAMERICANS WITH DISABILITIES ACT (ADA), UNIVERSAL BUILDING CODE, AND APPLICABLETRADE STANDARDS. ALL APPLICABLE RULES AND REGULATIONS ARE TO BE THE MOSTCURRENT ADOPTED EDITIONS.2. THE ERRORS AND OMISSIONS DESIGN LIABILITY FOR THE PROJECT SHALL BE LIMITED TOTHE DESIGN COST OF CORRECTING THE DEFICIENCY3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL STATE AND LOCAL PERMITSREQUIRED FOR COMPLETION OF THIS PROJECT.4. DO NOT SCALE DRAWINGS.5. THE CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL CONDITIONS PRIOR TOCOMMENCING WORK. ANY DISCREPANCIES SHALL BE REPORTED TO THE DESIGNER. ANYERRORS AND/OR OMISSIONS SHALL BE NOTED AND SENT TO THE OWNER AND DESIGNTEAM PRIOR TO STARTING THAT PORTION OF WORK AND WITH ADEQUATE TIME TOREVIEW AND RESPOND.6. DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, ALL EXISTING EXITSSHALL BE CONTINUOUSLY MAINTAINED.7. ALL METAL FASTENERS AND OTHER METAL ITEMS IN CONTACT WITH CONCRETE ORMASONRY TO BE GALVANIZED.8. CONTRACTOR IS RESPONSIBLE TO PROTECT EXISTING STRUCTURE AND MEP SYSTEMSUNLESS REQUIRED.9. REPAIR, PATCH AND PAINT ALL CONSTRUCTION DAMAGE TO MATCH EXISTING FINISHES.10.WATER-RESISTANT GYP. BD. SHALL BE USED AT ALL WET LOCATIONS. CEMENT BOARDWITH WATERPROOF MEMBRANE SHALL BE USED AS TILE BACKER BOARD.11.CONTRACTOR TO VERIFY ROUGH-IN PLUMBING LOCATIONS. CONTACT DESIGNER IFTHERE ARE ANY DISCREPENCIES.12.ALL DRAWINGS AND SPECIFICATIONS PROVIDED ARE CONSIDERED TO BECOMPLIMENTARY. ITEMS SHOWN IN ONE LOCATION IN THE DRAWINGS OR INCLUDED INTHE SPECIFICATIONS SHALL BE CONSIDERED PART OF THE WORK AND SHALL APPLY ATSIMILAR LOCATIONS THROUGHOUT THE PROJECT. IN THE EVENT OF INCONSISTENCIESBETWEEN THE DRAWINGS PROVIDED BY THE VARIOUS INVOLVED DISCIPLINES, THECONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE OWNER'SREPRESENTATIVE PRIOR TO THE WORK. WHERE INCONSISTENCIES ARE NOT CLARIFIEDPRIOR TO BIDDING, THE CONTRACTOR SHALL PROVIDE THE GREATER QUALITY OF WORKAS DETERMINED BY THE OWNER'S REPRESENTATIVE.A0 COVER SHEET AND GENERAL NOTESA1 ARCHITECTURAL PLANA2 REFLECTED CEILING PLANA3 ELECTRICAL LOCATION PLANA4 WALL SECTIONSA5 FINISH PLANGENERAL NOTESPROJECT LOCATIONSHEET INDEX 03.09.2021PROJECT LOCATION 03/22/21