Loading...
HomeMy WebLinkAboutDrainage Report  STORMWATER DRAINAGE SUMMARY (UPDATED) Project: Village of West Clay - Uptown Location: Carmel, IN Date: 11/09/2018 HWC Job #: 2016-135-S Stormwater Detention (Updated) Stormwater calculations for this project were submitted on June 8, 2017 and this project received drainage approval from the City of Carmel. Since then a slight change in the layout has been made by the developer. The size of the townhome units is different and this affects the amount of impervious area draining to the detention pond (Pond #6). Calculations will show that the change in the impervious area will not have adverse effects on the detention capacity of Pond #6. In the original design the developed area consisted of three basins that totaled 5.43 acres, and their total impervious area was 3.05 acres. In the updated design the total impervious area is 2.93 acres. This changes the CN value for this project area from 87.5 to 87.0 which will decrease the amount of runoff. Original Master Drainage Report CN = 88 Updated Design (11/8/18) CN = 87.0 87.0 < 88 As in the submitted and approved conditions, the Calculated CN for the site does not exceed the Master Planned Value.