Loading...
HomeMy WebLinkAboutA381 Wall SectionsARCHITECTCLIENTPROJECTDRAWING TITLESEALSHEETPROJECT INFO REVISIONS20022NOVEMBER 11, 2020#DESCRIPTIONDATEMAGNOLIA CONDOMINIUMS CARMEL, IN100% CONTRACT SETGC/CMA381WALL SECTIONSSCALE:01SECTION DETAIL3" = 1'-0"SCALE:02SECTION DETAIL3" = 1'-0"SCALE:03SECTION DETAIL3" = 1'-0"SCALE:04SECTION DETAIL3" = 1'-0"SCALE:05SECTION DETAIL3" = 1'-0"SCALE:06SECTION DETAIL3" = 1'-0"SCALE:07SECTION DETAIL3" = 1'-0"SCALE:08SECTION DETAIL3" = 1'-0"SCALE:09SECTION DETAIL3" = 1'-0"SCALE:10SECTION DETAIL3" = 1'-0"SCALE:11SECTION DETAIL3" = 1'-0"SCALE:12SECTION DETAIL3" = 1'-0"SCALE:13SECTION DETAIL3" = 1'-0"WM1MORTAR NETCONTINUOUS SELF ADHERINGMEMBRANE OVER STAINLESSSTEEL DRIP EDGEBRICK WEEPSTAINLESS STEEL DRIP EDGEFINISH GRADE2" EXTRUDED POLYSTERENEINSULATION TO ACHIEVE R-10.PROVIDE INSULATIONPROTECTION IF EXPOSED4"4"51 2"71 4"SCHEDULED WINDOWGYPSUM WALL BOARDVERTICAL SIDINGMETAL KICK-OUT FLASHINGBY FIBER CEMENTINSTALLER, EXTEND VERT.LEG UP FACE OFSHEATHING MIN. 5 INCHESMETAL COPINGTO SLOPE FORPOSITIVEDRAINAGECONTINUOUS SEALANT1'-0"WM1STAINLESS STEEL DRIP EDGEBRICK WEEPMORTAR NETCONTINUOUS SELF ADHERINGMEMBRANE OVER STAINLESSSTEEL DRIP EDGEWM1CONTINUOUS SEALANTMETAL COPING SLOPE FORPOSITIVE DRAINAGETPO ROOFING MEMBRANE TOWRAP TOP OF PARAPET AND RUNDOWN VERTICAL FACE BEHINDMETAL COPING MIN. 3 INCHES4"34" EXTERIOR GRADEPLYWOODWOOD BLOCKINGCONTINUOUS SEALANTTPO ROOFINGMEMBRANE TO RUNVERTICALLY UP ANDOVER PARAPETWFc1METAL KICK-OUT FLASHINGBY FIBER CEMENT INSTALLERWFc151 4"2'-7 1 2"51 4"51 4"WM1WFc1CONTINUOUS SEALANTTPO ROOFING MEMBRANE TORUN VERTICALLY UP ANDOVER PARAPETTPO ROOFING MEMBRANE TOWRAP TOP OF PARAPET AND RUNDOWN VERTICAL FACE BEHINDMETAL COPING MIN. 3 INCHESMETAL COPING SLOPE FORPOSITIVE DRAINAGECONTINUOUS SEALANTBACKER ROD & SEALANTWOOD BLOCKING ASREQUIREDWOOD BLOCKING ASREQUIREDBRICK SOLDIER COURSEBRICK WEEPSMORTAR NETSTEEL LINTEL: SEESTRUCTURALSTAINLESS STEELDRIP EDGESTEEL TUBE: SEE STRUCTURALMETAL FINISH TRIM BYOVERHEAD DOOR MFG.SCHEDULE INSULATED OVERHEADDOORWFc1METAL KICK-OUT FLASHINGBY FIBER CEMENT INSTALLERWM1BRICK SOLDIER COURSETREATED WOOD BLOCKINGBRICK SOLDIER COURSECONTINUOUS SEALANTMETAL COPING SLOPE FORPOSITIVE DRAINAGETREATED WOOD BLOCKINGBUILT-UP 2X WOOD STUD STACKTO FINISH FLOOR LEVELWM1PRE-MANUFACTURED,PRE-ENGINEERED METAL RAILINGWITH VERTICAL PICETS MAXIMUM4" O.C.WFc1METAL KICK-OUT FLASHINGBY FIBER CEMENT INSTALLERSCHEDULE WINDOW: SEE A050FOR ADDITIONAL INFO.BUILT-UP BEAM, SEESTRUCTURALWFc1METAL KICK-OUT FLASHINGBY FIBER CEMENT INSTALLERFIBER CEMENT SMOOTHPANELWFc1METAL COPING SLOPE FORPOSITIVE DRAINAGESEALANTPRE-MANUFACTURED,PRE-ENGINEERED METAL RAILINGWITH VERTICAL PICETS MAXIMUM4" O.C.BUILT-UP 2X WOOD STUD STACKTO FINISH FLOOR LEVEL1'-0"WFc1METAL KICK-OUT FLASHINGBY FIBER CEMENT INSTALLERFIBER CEMENT SMOOTHPANELWFc151 4"1'-2"8"CONTINUOUS SEALANTBACKER ROD & SEALANTCONTINUOUS SEALANTTPO ROOFING MEMBRANE RUNHORIZOTALLY UNDERNEATH ANDVERTICALLY BEHIND GRAVEL STOPGRAVEL STOPTOP OF PARAPETEL: 13'-0" A.F.F. (4TH)8"412"412"3"5"234"412"234"412"12"12"412"412"12"FIBER CEMENT VERTICALPANELSEALANT1100% CONTRACT SET 11-11-20201