Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A021 Floor and Roof Assemblies
ARCHITECTCLIENTPROJECTDRAWING TITLESEALSHEETPROJECT INFO REVISIONS20022NOVEMBER 11, 2020#DESCRIPTIONDATEMAGNOLIA CONDOMINIUMS CARMEL, IN100% CONTRACT SETGC/CMUL DESIGN - UL L563 (1 HOUR)STC RATING - 50 MINIIC RATING - 50 MINA021FLOOR AND ROOF ASSEMBLIESCEMENTITIOUS UNDERLAYMENT,1 12" MINIMUM38" SOUND MATSHEATHING, REF. STRUCTURALDWGS. FOR ADDITIONAL INFO.24" OPEN WEB FLOOR TRUSS,REF. STRUCTURAL DWGS. FORADDITIONAL INFO.12" RESILIENT CHANNEL@ 12" O.C.58" TYPE 'C' GYPSUM BOARDSCALE:FLOOR ASSEMBLYF11 1/2" = 1'-0"6 MIL UNDERSLABVAPOR RETARDERCOMPACTED SUB-GRADE,SEE CIVIL DWGS.CONCRETE SLAB PERSTRUCTURAL DWGS. &STRUCTURAL SPECSFOR FINISH INFO.SCALE:FLOOR ASSEMBLYF21 1/2" = 1'-0"USE: SLAB ON GRADEUSE: 1 HOUR RATEDTYPICAL UPPER FLOORSCALE:ROOF ASSEMBLYR11 1/2" = 1'-0"60 MIL TPO ROOFING ADHERED/FASTENED TO TAPERED INSULATIONPER MANUFACTURER'S REQUIREMENTSPOLYISOCYANURATE ROOF INSULATIONTO ACHIEVE MINIMUM R-20 R-VALUE.ONE LAYER OF 58"TYPE 'C' GYPSUM BOARDRESILIENT CHANNELS@ 12" O.C.WOOD SHEATHING PERSTRUCTURAL DWGS.ROOF TRUSS PERSTRUCTURAL DWGS., TOPOF TRUSSES SLOPED TOACHIEVE POSITIVE DRAINAGEUSE: 1 HOUR RATEDFLAT ROOFUL DESIGN - UL P522 (1 HOUR)NOTE: SEE A030 SERIES FOR UL ASSEMBLY INFORMATION.NOTE: ENSURE CEMENTITIOUS UNDERLAYMENT ISPOURED UNDER TUB/SHOWERS AND IN DEAD AIRCAVITIES.SCHEDULED FINISHSCALE:ROOF ASSEMBLYR21 1/2" = 1'-0"USE: 1 HOUR RATEDROOF OVER ELEVATOR SHAFTUL DESIGN - GA-FC-5406 (1 HOUR)TWO LAYERS OF 58"TYPE 'C' GYPSUM BOARD60 MIL TPO ROOFINGADHERED/ FASTENED TOTAPERED INSULATIONPER MANUFACTURER'SPOLYISOCYANURATE ROOFINSULATION TO ACHIEVE R-20R-VALUE, TAPER TO ACHIEVEPOSITIVE DRAINAGEWOOD SHEATHING PERSTRUCTURAL DWGS.2X WOOD FRAMING PERSTRUCTURAL DWGSSCALE:FLOOR ASSEMBLYF31 1/2" = 1'-0"UL DESIGN - UL L563 (1 HOUR)STC RATING - 50 MINIIC RATING - 50 MINUSE: 1 HOUR RATEDUPPER FLOOR OVER GARAGECEMENTITIOUS UNDERLAYMENT,1 12" MIN.38" SOUND MATSHEATHING, REF. STRUCTURALDWGS. FOR ADDITIONAL INFO.24" OPEN WEB FLOOR TRUSS,REF. STRUCTURAL DWGS. FORADDITIONAL INFO.R-30 BLOWN-IN OR BATTFIBERGLASS INSULATION12" RESILIENT CHANNEL@ 12" O.C.58" TYPE 'C' EXTERIORGRADE GYPSUM BOARDSCHEDULED FINISHSCALE:FLOOR ASSEMBLYB11 1/2" = 1'-0"12" RESILIENT CHANNEL@ 12" O.C.58" TYPE 'C' EXTERIOR GYPSUMBOARDINTERLOCKING WOODDECK TILES OR DECKING WITHINTEGRATED DRAINAGE LAYER,SET DIRECTLY ON TPOFLEXIBLE TPO SHEETROOFING SYSTEMSHEATHING, REF. STRUCTURALDWGS. FOR ADDITIONAL INFO.USE: 1 HOUR RATEDPRIVATE ROOF DECKNOTE: ENSURE CEMENTITIOUS UNDERLAYMENT ISPOURED UNDER TUB/SHOWERS AND IN DEAD AIRCAVITIES.TAPERED POLYISOCYANURATEROOF INSULATION TO ACHIEVEPOSITIVE DRAINAGE TOINTERNAL ROOF DRAINSSCALE:FLOOR ASSEMBLYB21 1/2" = 1'-0"18" OPEN WEB JOIST, REF.STRUCTURAL DWGS. FORADDITIONAL INFO.12" RESILIENT CHANNEL@ 12" O.C.58" TYPE 'C' GYPSUM BOARDINTERLOCKING WOODDECK TILES OR DECKING WITHINTEGRATED DRAINAGE LAYER,SET DIRECTLY ON TPOFLEXIBLE TPO SHEETROOFING SYSTEMSHEATHING, REF. STRUCTURALDWGS. FOR ADDITIONAL INFO.USE: 1 HOUR RATEDPRIVATE ROOF DECKTAPERED POLYISOCYANURATEROOF INSULATION TO ACHIEVEPOSITIVE DRAINAGE TOINTERNAL ROOF DRAINSSCALE:FLOOR ASSEMBLYB31 1/2" = 1'-0"18" OPEN WEB JOIST, REF.STRUCTURAL DWGS. FORADDITIONAL INFO.12" RESILIENT CHANNEL@ 12" O.C.58" TYPE 'C' GYPSUM BOARDSYNTHETIC TURF WITH DRAINAGECOURSE (SYNTHETIC GRASSWAREHOUSE AS BASIS OF DESIGN)FLEXIBLE TPO SHEETROOFING SYSTEMSHEATHING, REF. STRUCTURALDWGS. FOR ADDITIONAL INFO.USE: 1 HOUR RATEDPRIVATE ROOF DECKTAPERED POLYISOCYANURATEROOF INSULATION TO ACHIEVER-20 R-VALUE. POSITIVEDRAINAGE TO INTERNAL ROOFDRAINSUL DESIGN - UL P522 (1 HOUR)UL DESIGN - UL P522 (1 HOUR)UL DESIGN - UL P522 (1 HOUR)SOUND ATTENUATIONBATT INSULATION18" OPEN WEB JOIST, REF.STRUCTURAL DWGS. FORADDITIONAL INFO.MINIMUM R-38 BLOWN-INOR BATT FIBERGLASS INSULATIONINSTALLED AT TOP OF TRUSSES,ARCHITECT RECOMMENDS FILLINGTRUSS SPACE WITH INSULATION.(ALT.: SPRAY INSULATION)PROVIDE VENTS TO ENSURE AIRCIRULATION OF FLOOR CAVITY,ALTERNATE IS TO FILL FLOORCAVITY WITH INSULATIONMINIMUM R-38 BLOWN-INOR BATT FIBERGLASS INSULATIONINSTALLED AT TOP OF TRUSSES,ARCHITECT RECOMMENDS FILLINGTRUSS SPACE WITH INSULATION.(ALT.: SPRAY INSULATION)SCALE:FLOOR ASSEMBLYB41 1/2" = 1'-0"18" OPEN WEB JOIST, REF.STRUCTURAL DWGS. FORADDITIONAL INFO.12" RESILIENT CHANNEL@ 12" O.C.58" TYPE 'C' EXTERIOR GYPSUMBOARDSYNTHETIC TURF WITH DRAINAGECOURSE (SYNTHETIC GRASSWAREHOUSE AS BASIS OF DESIGN)FLEXIBLE TPO SHEETROOFING SYSTEMSHEATHING, REF. STRUCTURALDWGS. FOR ADDITIONAL INFO.USE: 1 HOUR RATEDPRIVATE ROOF DECKTAPERED POLYISOCYANURATEROOF INSULATION TO ACHIEVER-20 R-VALUE. POSITIVEDRAINAGE TO INTERNAL ROOFDRAINSUL DESIGN - UL P522 (1 HOUR)SCALE:ROOF ASSEMBLYR31 1/2" = 1'-0"60 MIL TPO ROOFING ADHERED/FASTENED TO TAPERED INSULATIONPER MANUFACTURER'S REQUIREMENTSPOLYISOCYANURATE ROOF INSULATIONTO ACHIEVE MINIMUM R-20 R-VALUE.ONE LAYER OF 58"TYPE 'C' EXTERIOR GYPSUMBOARDRESILIENT CHANNELS@ 12" O.C.WOOD SHEATHING PERSTRUCTURAL DWGS.ROOF TRUSS PERSTRUCTURAL DWGS., TOPOF TRUSSES SLOPED TOACHIEVE POSITIVE DRAINAGEUSE: 1 HOUR RATEDFLAT ROOFUL DESIGN - UL P522 (1 HOUR)MINIMUM R-38 BLOWN-INOR BATT FIBERGLASS INSULATION(ALT.: SPRAY INSULATION1100% CONTRACT SET 11-11-20201111111