Loading...
HomeMy WebLinkAboutA021 Floor and Roof AssembliesARCHITECTCLIENTPROJECTDRAWING TITLESEALSHEETPROJECT INFO REVISIONS20022NOVEMBER 11, 2020#DESCRIPTIONDATEMAGNOLIA CONDOMINIUMS CARMEL, IN100% CONTRACT SETGC/CMUL DESIGN - UL L563 (1 HOUR)STC RATING - 50 MINIIC RATING - 50 MINA021FLOOR AND ROOF ASSEMBLIESCEMENTITIOUS UNDERLAYMENT,1 12" MINIMUM38" SOUND MATSHEATHING, REF. STRUCTURALDWGS. FOR ADDITIONAL INFO.24" OPEN WEB FLOOR TRUSS,REF. STRUCTURAL DWGS. FORADDITIONAL INFO.12" RESILIENT CHANNEL@ 12" O.C.58" TYPE 'C' GYPSUM BOARDSCALE:FLOOR ASSEMBLYF11 1/2" = 1'-0"6 MIL UNDERSLABVAPOR RETARDERCOMPACTED SUB-GRADE,SEE CIVIL DWGS.CONCRETE SLAB PERSTRUCTURAL DWGS. &STRUCTURAL SPECSFOR FINISH INFO.SCALE:FLOOR ASSEMBLYF21 1/2" = 1'-0"USE: SLAB ON GRADEUSE: 1 HOUR RATEDTYPICAL UPPER FLOORSCALE:ROOF ASSEMBLYR11 1/2" = 1'-0"60 MIL TPO ROOFING ADHERED/FASTENED TO TAPERED INSULATIONPER MANUFACTURER'S REQUIREMENTSPOLYISOCYANURATE ROOF INSULATIONTO ACHIEVE MINIMUM R-20 R-VALUE.ONE LAYER OF 58"TYPE 'C' GYPSUM BOARDRESILIENT CHANNELS@ 12" O.C.WOOD SHEATHING PERSTRUCTURAL DWGS.ROOF TRUSS PERSTRUCTURAL DWGS., TOPOF TRUSSES SLOPED TOACHIEVE POSITIVE DRAINAGEUSE: 1 HOUR RATEDFLAT ROOFUL DESIGN - UL P522 (1 HOUR)NOTE: SEE A030 SERIES FOR UL ASSEMBLY INFORMATION.NOTE: ENSURE CEMENTITIOUS UNDERLAYMENT ISPOURED UNDER TUB/SHOWERS AND IN DEAD AIRCAVITIES.SCHEDULED FINISHSCALE:ROOF ASSEMBLYR21 1/2" = 1'-0"USE: 1 HOUR RATEDROOF OVER ELEVATOR SHAFTUL DESIGN - GA-FC-5406 (1 HOUR)TWO LAYERS OF 58"TYPE 'C' GYPSUM BOARD60 MIL TPO ROOFINGADHERED/ FASTENED TOTAPERED INSULATIONPER MANUFACTURER'SPOLYISOCYANURATE ROOFINSULATION TO ACHIEVE R-20R-VALUE, TAPER TO ACHIEVEPOSITIVE DRAINAGEWOOD SHEATHING PERSTRUCTURAL DWGS.2X WOOD FRAMING PERSTRUCTURAL DWGSSCALE:FLOOR ASSEMBLYF31 1/2" = 1'-0"UL DESIGN - UL L563 (1 HOUR)STC RATING - 50 MINIIC RATING - 50 MINUSE: 1 HOUR RATEDUPPER FLOOR OVER GARAGECEMENTITIOUS UNDERLAYMENT,1 12" MIN.38" SOUND MATSHEATHING, REF. STRUCTURALDWGS. FOR ADDITIONAL INFO.24" OPEN WEB FLOOR TRUSS,REF. STRUCTURAL DWGS. FORADDITIONAL INFO.R-30 BLOWN-IN OR BATTFIBERGLASS INSULATION12" RESILIENT CHANNEL@ 12" O.C.58" TYPE 'C' EXTERIORGRADE GYPSUM BOARDSCHEDULED FINISHSCALE:FLOOR ASSEMBLYB11 1/2" = 1'-0"12" RESILIENT CHANNEL@ 12" O.C.58" TYPE 'C' EXTERIOR GYPSUMBOARDINTERLOCKING WOODDECK TILES OR DECKING WITHINTEGRATED DRAINAGE LAYER,SET DIRECTLY ON TPOFLEXIBLE TPO SHEETROOFING SYSTEMSHEATHING, REF. STRUCTURALDWGS. FOR ADDITIONAL INFO.USE: 1 HOUR RATEDPRIVATE ROOF DECKNOTE: ENSURE CEMENTITIOUS UNDERLAYMENT ISPOURED UNDER TUB/SHOWERS AND IN DEAD AIRCAVITIES.TAPERED POLYISOCYANURATEROOF INSULATION TO ACHIEVEPOSITIVE DRAINAGE TOINTERNAL ROOF DRAINSSCALE:FLOOR ASSEMBLYB21 1/2" = 1'-0"18" OPEN WEB JOIST, REF.STRUCTURAL DWGS. FORADDITIONAL INFO.12" RESILIENT CHANNEL@ 12" O.C.58" TYPE 'C' GYPSUM BOARDINTERLOCKING WOODDECK TILES OR DECKING WITHINTEGRATED DRAINAGE LAYER,SET DIRECTLY ON TPOFLEXIBLE TPO SHEETROOFING SYSTEMSHEATHING, REF. STRUCTURALDWGS. FOR ADDITIONAL INFO.USE: 1 HOUR RATEDPRIVATE ROOF DECKTAPERED POLYISOCYANURATEROOF INSULATION TO ACHIEVEPOSITIVE DRAINAGE TOINTERNAL ROOF DRAINSSCALE:FLOOR ASSEMBLYB31 1/2" = 1'-0"18" OPEN WEB JOIST, REF.STRUCTURAL DWGS. FORADDITIONAL INFO.12" RESILIENT CHANNEL@ 12" O.C.58" TYPE 'C' GYPSUM BOARDSYNTHETIC TURF WITH DRAINAGECOURSE (SYNTHETIC GRASSWAREHOUSE AS BASIS OF DESIGN)FLEXIBLE TPO SHEETROOFING SYSTEMSHEATHING, REF. STRUCTURALDWGS. FOR ADDITIONAL INFO.USE: 1 HOUR RATEDPRIVATE ROOF DECKTAPERED POLYISOCYANURATEROOF INSULATION TO ACHIEVER-20 R-VALUE. POSITIVEDRAINAGE TO INTERNAL ROOFDRAINSUL DESIGN - UL P522 (1 HOUR)UL DESIGN - UL P522 (1 HOUR)UL DESIGN - UL P522 (1 HOUR)SOUND ATTENUATIONBATT INSULATION18" OPEN WEB JOIST, REF.STRUCTURAL DWGS. FORADDITIONAL INFO.MINIMUM R-38 BLOWN-INOR BATT FIBERGLASS INSULATIONINSTALLED AT TOP OF TRUSSES,ARCHITECT RECOMMENDS FILLINGTRUSS SPACE WITH INSULATION.(ALT.: SPRAY INSULATION)PROVIDE VENTS TO ENSURE AIRCIRULATION OF FLOOR CAVITY,ALTERNATE IS TO FILL FLOORCAVITY WITH INSULATIONMINIMUM R-38 BLOWN-INOR BATT FIBERGLASS INSULATIONINSTALLED AT TOP OF TRUSSES,ARCHITECT RECOMMENDS FILLINGTRUSS SPACE WITH INSULATION.(ALT.: SPRAY INSULATION)SCALE:FLOOR ASSEMBLYB41 1/2" = 1'-0"18" OPEN WEB JOIST, REF.STRUCTURAL DWGS. FORADDITIONAL INFO.12" RESILIENT CHANNEL@ 12" O.C.58" TYPE 'C' EXTERIOR GYPSUMBOARDSYNTHETIC TURF WITH DRAINAGECOURSE (SYNTHETIC GRASSWAREHOUSE AS BASIS OF DESIGN)FLEXIBLE TPO SHEETROOFING SYSTEMSHEATHING, REF. STRUCTURALDWGS. FOR ADDITIONAL INFO.USE: 1 HOUR RATEDPRIVATE ROOF DECKTAPERED POLYISOCYANURATEROOF INSULATION TO ACHIEVER-20 R-VALUE. POSITIVEDRAINAGE TO INTERNAL ROOFDRAINSUL DESIGN - UL P522 (1 HOUR)SCALE:ROOF ASSEMBLYR31 1/2" = 1'-0"60 MIL TPO ROOFING ADHERED/FASTENED TO TAPERED INSULATIONPER MANUFACTURER'S REQUIREMENTSPOLYISOCYANURATE ROOF INSULATIONTO ACHIEVE MINIMUM R-20 R-VALUE.ONE LAYER OF 58"TYPE 'C' EXTERIOR GYPSUMBOARDRESILIENT CHANNELS@ 12" O.C.WOOD SHEATHING PERSTRUCTURAL DWGS.ROOF TRUSS PERSTRUCTURAL DWGS., TOPOF TRUSSES SLOPED TOACHIEVE POSITIVE DRAINAGEUSE: 1 HOUR RATEDFLAT ROOFUL DESIGN - UL P522 (1 HOUR)MINIMUM R-38 BLOWN-INOR BATT FIBERGLASS INSULATION(ALT.: SPRAY INSULATION1100% CONTRACT SET 11-11-20201111111