HomeMy WebLinkAboutL100 Street Tree Planting Plan----------
°
E 125TH STREET (CITY CENTER DRIVE)
P-02
P-02
d
--------------------------- -- - —
------
--- - Dil
_____=T4*
-1
I I I
I II
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —
I II I.
I I
II d.
I II nl
I I I I I
I II I I d
d I II I I
A.
BLDG #
1 BLDG 2
441
� d
°
Id
1 d
4.
1 ° l
L----- 1 1 11 1
1
d d —LJ
11 1 1 °
I 1 I j1 1 I
d i I j1
I 11 I I
1 j1 I I 1
1 dl 1
a BLDG #3
1 j1
11 1
BLDG #4 li
I 11 1 11 1 I
I j1
-- PHASE 2
I 11
- I II I 1 I •
I 11 I 11 I I d
e. i li I 1
-'------------__
1 j1 -I I
e. I
II---�1---------------------------------------------
----
I
I
I 11 I 11 I I 1
I
it - - - - - - - - - - - - - - - - - - - -- ° -------------------
a ' 1
-A° 1
1 11 a
1 j1 i__i I n •
BLDG # 5 F--�
BLDG 6 c
e.. 1 .
i I i1 d:
I
1 I
I
I 1
I
I
I
1 I I
FUTURE PHASE
------------------------------------------------------------------------------------------------------ -------------
I 1
i
i
1 I I
I 1
1 I
1 � I
d
P-01
P-02
P-01
P-01
O
w
Lu
Z
Q
a
4%mader
design
integrating people and nature
N
Z
J ro 0
52 uU
aoZz�z
0 0�
orwC�w
p,Zxc9 a
Z� w✓�
aaMW
m o
N� w
W N
G
GENERAL PLANTING NOTES
A. PLANT MATERIAL SHALL BE INSTALLED AND MAINTAINED BY A
QUALIFIED AND EXPERIENCED LANDSCAPE CONTRACTOR.
B. LOCATE AND VERIFY ALL PUBLIC AND PRIVATE UTILITIES
PRIOR TO STARTING LANDSCAPE WORK.
NORTH
0 10, 2040C. STAKE AND CONFIRM ALL DIMENSIONS, GRADES, AND PLANT
Scale: 1" = 20'-0" LAYOUT PRIOR TO STARTING WORK. REPORT ANY
DISCREPANCIES TO LANDSCAPE ARCHITECT IMMEDIATELY.
Z)
CD
D. SEED ALL AREAS DISTURBED BY CONTRACTOR'S OPERATIONS,
INCLUDING AREAS BEYOND.
E. PLANTING BEDS SHALL RECEIVE SPADE EDGE UNLESS
a
OTHERWISE NOTED.
O
F. CONTRACTOR SHALL PROVIDE PLANT MATERIAL IN
QUANTITIES AND SPECIES SHOWN ON PLANS. SUBSTITUTIONS
SHALL NOT BE ALLOWED UNLESS SUBMITTED IN WRITING AT
Q
LEAST 10 DAYS PRIOR TO BID DATE AND APPROVED VIA
ADDENDUM BY LANDSCAPE ARCHITECT.
Z
O
G. AMEND OR INSTALL TOPSOIL MEETING ASTM D5268
STANDARDS, TOPSOIL SHALL BE FREE OF DELETERIOUS
=
MATERIALS OR EXTRANEOUS MATERIALS LARGER THAN 1".
VERIFY DEPTH AND QUALITY OF TOPSOIL PRIOR TO PLANT
INSTALLATION. LAWN AREAS SHALL HAVE A MIN. OF 4"
uj
TOPSOIL, AND PLANTING BEDS A MIN. OF 12". TOPSOIL SHALL
uj
BE STOCKPILED AND REUSED ON SITE. WHERE QUANTITIES
ARE INSUFFICIENT, TOPSOIL MAY BE IMPORTED FROM OFF
SITE. DO NOT OBTAIN FROM BOGS, MARSHES, WETLANDS, OR
AGRICULTURAL LAND. APPLY INORGANIC AMENDMENTS,
z
o
z
O
ORGANIC AMENDMENTS, AND FERTILIZERS AS NEEDED FOR
a
LONG TERM PLANT HEALTH.
z
o
0
H. ROOT BALL SHALL MEET OR EXCEED SIZES SET FORTH IN
CURRENT 'AMERICAN STANDARDS FOR NURSERY STOCK.
uj
I. PROVIDE 3" SHREDDED HARDWOOD MULCH IN ALL PLANTING
1 1
W
O
CN
o
N
BEDS AND IN 6' DIA AROUND ALL TREES UNLESS OTHERWISE
NOTED.
w
m
J. PROVIDE PRE -EMERGENT HERBICIDE ON PLANTING BEDS AT
:m
w
RATES PER MANUFACTURER'S DIRECTIONS.
U
w
0
K. TREES SHALL NOT BE STAKED EXCEPT WITH APPROVAL FROM
LANDSCAPE ARCHITECT FOR ACCOMMODATION OF
o
ENVIRONMENTAL CONDITIONS.
z
w
0
0
L. INSTALL ALL PLANT MATERIAL IN ACCORDANCE WITH LOCAL
CODES AND ORDINANCES. CONTRACTOR SHALL OBTAIN ALL
REQUIRED PERMITS AS REQUIRED BY LOCAL JURISDICTIONS.
M. PLANT MATERIAL AND WORKMANSHIP SHALL BE WARRANTED
FOR A PERIOD OF 1 YEAR FROM SUBSTANTIAL COMPLETION.
REPLACE ALL PLANTS MORE THAN 1/4 DEAD AS SOON AS
WEATHER CONDITIONS ALLOW THROUGHOUT WARRANTEE
PERIOD.
N. QUANTITIES SHOWN IN PLANT SCHEDULE ARE FOR
LANDSCAPE ARCHITECTS PURPOSES AND FOR LOCAL
REGULATORY REVIEW. CONTRACTOR IS RESPONSIBLE TO
PROVIDE PLANTS IN QUANTITIES AND SPACING AS DEPICTED
ON PLANTING PLANS, IF DISCREPANCIES EXIST QUANTITIES
SHOWN ON PLANS SHALL DICTATE.
CONCEPT PLANT SCHEDULE
a
STREET TREE
Q
Cn
m
REFERENCE NOTES SCHEDULE
PLANTING
SYMBOL DESCRIPTION
P-01 MULCH
P-02 LAWN
PRUNE ONLY CROSSOVER \
LIMBS, CO -DOMINANT PLANT TREE SO
LEADERS AND BROKEN OR THAT TRUNK FLARE
DEAD BRANCHES. DO NOT IS VISIBLE AT THE
REMOVE THE TERMINAL TOP OF THE ROOT
BUDS OF BRANCHES THAT BALL. ROOT FLARE
EXTEND TO THE EDGE OF SHOULD BE 1"-2"
THE CROWN. LIMB UP TO 7' ABOVE ADJACENT
z
WHERE TREES ARE FINISH GRADE. DO
oLn
LOCATED ADJACENT TO NOT COVER THE TOP
WALKS AND DRIVES. OF THE ROOT BALL
Of
REMOVE NO MORE THAN %4 WITH SOIL
OF TREE BRANCHES,
MAINTAINING NATURAL 2" HIGH EARTH
SHAPE OF TREE SAUCER BEYOND
EDGE OF ROOT BALL
FINISH GRADE
3" SHREDDED HARDWOOD
MULCH, MIN. 6' DIA.
MAINTAIN AT LEAST 2'
CLEAR BETWEEN MULCH
AND TREE TRUNK REMOVE ALL TWINE,
\\ ROPE, WIRE BASKET
_
AND BURLAP FROM
TOP HALF OF ROOT
FOR ROOT BALLS UP TO 2' IN BALL
DIA., HOLE DIAMETER SHALL
BE TWICE THE DIA. OF THE
ROOTBALL. HOLE
DIAMETER FOR ROOTBALLS TAMP SOIL AROUND ROOT BALL
GREATER THAN 2' IN DIA. BASE FIRMLY TO PREVENT
SHALL BE 2' LARGER THAN SHIFTING
THE DIA. OF THE BALL. PLACE ROOT BALL ON
UNEXCAVATED OR TAMPED
SOIL
a
0
TREE PLANTING
1
P-CR 1-01
M
°°
r
cD
"'
�
r'
N
z
SHEET