Loading...
HomeMy WebLinkAboutBuilding PlansS P MAAP ZVB OXYGEN SOURCE EQUIPMENT O2: 2" O2: 2" O2: 1" O2 VENT: 1 1 2" 12 TRASH DUMPSTER ENCLOSURE 2" PIPE IN PVC SLEEVE ROUTED ON FACE OF BRICK WALL 1 MG-3 6 MG-3 2, 3, 5 MG-3 1, 6 MG-2 2, 5, 6 MG-2 5 MG-2 3 MG-2 7 MG-3 4 MG-2 13 11 3 13 6 7 8 4 5 12 1 13 810 9 5 MG-2 13 2 O2: 1" 1. OXYGEN PAD, ENCLOSURE, AND SOURCE EQUIPMENT, BY OTHERS. 2. 2" SOURCE AND AUXILIARY VALVES WITHIN OXYGEN ENCLOSURE. 3. 2" TYPE "L" COPPER TAKEOFF FROM AUXILIARY VALVE RISING AND INSTALLED TO EXTERIOR FACE OF DUMPSTER ENCLOSURE IN PROTECTIVE PVC SLEEVE. PIPING EXTENDS ACROSS FACE OF ENCLOSURE TO BUILDING, RISES AND PENETRATES EXTERIOR BUILDING WALL INTO INTERIOR OF BUILDING ABOVE CEILING HEIGHT. CORING BY OTHERS. COPPER PIPING SLEEVED THROUGH WALL PENETRATION. PENETRATION SEALED ON EXTERIOR AND INTERIOR OF BUILDING WITH FIRESTOP CAULK. 4. 2" MAIN OXYGEN SHUTOFF VALVE FOLLOWED DOWNSTREAM BY OXYGEN HIGH/LOW PRESSURE SWITCH WITH 0-100 PSI ANALOG PRESSURE GAUGE, INSTALLED WITH GAS SPECIFIC DISS FITTING WITH DEMAND CHECK. 5. 2" TYPE "L" OXYGEN PIPING CONTINUES ABOVE CEILING HEIGHT TO LOCATION OF NEW ZONE VALVE BOX. (REFER TO DETAIL 5, MG-2) 6. 2" TYPE "L" OXYGEN PIPING CONTINUES DOWN IN WALL TO NEW 2" ZONE VALVE AND, ON DOWNSTREAM SIDE OF ZONE VALVE RISES IN WALL TO ABOVE CEILING HEIGHT. 7. PRESSURE SENSOR AND 0-100 PSI PRESSURE GAUGE INSTALLED TO EZBACK FITTING INSIDE OF ZONE VALVE BOX ON DOWNSTREAM SIDE OF ZONE VALVE. 8. 2" TYPE "L" OXYGEN PIPING CONTINUES ABOVE CEILING HEIGHT TO NEAR SINGLE-CHAMBER HYPERBARIC HEADWALL, TURNS AND EXTENDS TO NEAR DUAL-CHAMBER HYPERBARIC HEADWALL WITH 1" TYPE "L" COPPER PIPING TAKEOFF AT TURN EXTENDING TO SINGLE-CHAMBER HYPERBARIC HEADWALL, MAKING CONNECTION TO 1" OXYGEN PIPING RISER ABOVE CEILING HEIGHT AT TOP OF HEADWALL. (FOR HEADWALL DETAIL REFER TO DETAIL 1, 2, & 3 MG-2) 9. 2" PIPING EXTENDS TO NEAR DUAL CHAMBER HEADWALL, REDUCES TO 1" AND EXTENDS AND MAKES CONNECTION TO TWO 1" OXYGEN PIPING RISERS ABOVE CEILING HEIGHT AT TOP OF DUAL CHAMBER HEADWALL. 10. EACH HYPERBARIC CHAMBER IS INDIVIDUALLY VENTED TO THE EXTERIOR OF THE BUILDING, WITH 1 1 2" TYPE "L" COPPER PIPING THROUGH AND OUT THE BUILDING WEST EXTERIOR WALL FROM THE 1 1 2" COPPER PIPE CHAMBER VENT RISERS LOCATED AT THE TOP OF EACH HEADWALL; TWO (2) FROM THE DOUBLE AND ONE (1) FROM THE SINGLE-CHAMBER HEADWALL. 11. THE INDIVIDUAL CHAMBER VENTS EXTEND OUT BUILDING EXTERIOR WALL, ARE TURNED DOWN AND SCREENED FOR VERMIN. (REFER TO DETAIL 6, MG-3) . CORING BY OTHERS. COPPER PIPING SLEEVED THROUGH WALL PENETRATION. PENETRATION SEALED ON EXTERIOR AND INTERIOR OF BUILDING WITH FIRESTOP CAULK. 12. MEDICAL AIR CYLINDER WALL RESTRAINT BRACKETS ARE INSTALLED AT THE FOOT OF EACH CHAMBER. WALL BACKING BY OTHERS. (REFER TO DETAIL 4 & 5, MG-2) MEDICAL AIR CYLINDERS BY OTHERS. 13. LOW VOLTAGE SHIELDED, PLENUM RATED ALARM CABLE EXTENDS IN 1" CONDUIT A) FROM OXYGEN SOURCE EQUIPMENT LIQUID LEVEL LOW SWITCH, RESERVE-IN-USE SWITCH, AND RESERVE-LEVEL-LOW SWITCH TO COMBINATION MASTER/ALARM PANEL, B) FROM HIGH/LOW PRESSURE SWITCH, AND C) FROM AREA PRESSURE SENSOR TO COMBINATION MASTER/AREA ALARM PANEL LOCATED IN DUAL-CHAMBER HEADWALL. ALARM CONDUITS AND LANDING ALARM SIGNALS ON SOURCE EQUIPMENT BY OTHERS. POWER TO ALARM PANEL BY OTHERS. INTERIOR AND EXTERIOR CONDUITS, WHERE REQUIRED, ARE BY OTHERS. KEYED NOTES INDICATED BY NUMBER WITHIN HEXAGON =OXYGEN [02] O2 MEDICAL GAS SYMBOLS PRELIMINARY DRAWING NOT TO BE USED FOR CONSTRUCTION WITHOUT SEAL O2 VENT =OXYGEN [02] VENT ZONE VALVE BOX MASTER & AREA ALARM PANEL S PRESSURE SENSOR PRESSURE SWITCH VALVE ALARM SIGNAL WIRING P DIRECTION OF FLOW GAUGE PIPE RISE PIPE DROP INSTALLATION NOTE: PIPING ROUTES MAY VARY DEPENDING ON BUILDING DESIGN AND EXISTING CONDITIONS. EXACT ROUTING TO BE DETERMINED AT TIME OF INSTALLATION. CONTINUATION ZVB POINT OF CONNECTION 1. THESE DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH OTHER TRADES AND RE-ROUTING PIPING AS REQUIRED TO AVOID CONFLICTS WITH OTHER TRADES. 2. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE STATE, LOCAL AND FEDERAL LAWS, CODES AND SPECIFICATIONS. 3. ALL EQUIPMENT AND PIPING SHOWN ON THESE DRAWINGS SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE STATE, LOCAL AND FEDERAL CODES. 4. CONTRACTOR SHALL COORDINATE OWNER FURNISHED AND CONTRACTOR FURNISHED EQUIPMENT ROUGH-INS AND CONNECTIONS WITH EQUIPMENT DRAWINGS AND SUPPLIER. 5. CONTRACTOR SHALL PROVIDE MEDICAL GAS DEVICES AT LOCATIONS, QUANTITIES AND TYPE PER THE ARCHITECTURAL DRAWINGS AND ELEVATIONS, AND THE MEDICAL GAS DRAWINGS. WHERE DISCREPANCIES MAY EXIST, USE THE MORE STRINGENT OF THE TWO. ALL DEVICES ARE TO BE INSTALLED, TO INCLUDE NECESSARY PIPING OR WIRING, AS REQUIRED FOR INTENDED OPERATION. 6. ALL MEDICAL GAS SYSTEMS SHALL BE INSTALLED IN ACCORDANCE TO NFPA 99, INCLUDING ALL REQUIRED VALVES AND PRESSURE SWITCHES & PRESSURE SENSORS CONNECTED TO APPROPRIATE ALARMS. 7. CONTRACTOR TO COORDINATE WITH GENERAL CONTRACTOR AND ELECTRICIAN FOR LOCATING AND INSTALLING ELECTRIC POWER TO SERVICE EACH ALARM PANEL, MEDICAL GAS MANIFOLD AND MEDICAL EQUIPMENT TO INCLUDE MEDICAL AIR AND MEDICAL VACUUM SYSTEMS AS APPLICABLE. 8. THE MEDICAL GAS INSTALLER SHALL FIRE STOP ALL PENETRATIONS TO THE ORIGINAL FIRE RATING. 9. THE MEDICAL GAS INSTALLER SHALL BE CURRENTLY CERTIFIED IN ACCORDANCE WITH ASSE 6010 10. THE MEDICAL GAS INSTALLER SHALL NOT USE THEIR CERTIFICATION TO OVERSEE INSTALLATION BY NON-CERTIFIED PERSONNEL. 11. ALL OXYGEN AND VENT PIPING SHALL BE ASTM B 819 TYPE "L" HARD DRAWN AND SEAMLESS COPPER CLEANED AND CAPPED FOR OXYGEN USE. 12. FITTINGS SHALL BE CLEANED WROUGHT COPPER CAPILLARY FITTINGS COMPLYING WITH ASME B16.22 13. ALL JOINTS SHALL BE BRAZED USING A BRAZING ALLOY EXHIBITING A MELTING TEMPERATURE IN EXCESS OF 1,000 DEGREES FAHRENHEIT. 14. BRAZE JOINTS SHALL BE CONTINUOUSLY PURGED WITH OIL FREE, DRY NITROGEN NF. CONTRACTOR'S NITROGEN REGULATOR SHALL BE EQUIPPED WITH AN OPERATIONAL, AUDIBLE LOW PRESSURE ALARM. 15. PIPING SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE WITH HANGERS AND SUPPORTS COMPLYING WITH AND INSTALLED IN ACCORDANCE WITH MSS-SP58. 16. ELECTRIC POWER, CORE DRILLING, PAINT, FINISHES, WALL, CEILING & ROOF OPENING / CLOSING & REPAIRS, BY OTHERS. 17. MEDICAL GAS DISTRIBUTION SYSTEM EQUIPMENT PROVIDED & INSTALLED BY FRED EVANS MEDICAL GAS CONSULTING (FEMGC) 18. OXYGEN SOURCE EQUIPMENT AND GAS SUPPLY BY OTHERS. 19. MEDICAL GAS DISTRIBUTION INSTALLATION CERTIFICATION BY FEMGC. GENERAL NOTES MAAP 2 fred evans medical gas consulting 405.641.5712 fred@fredevansmedgas.com 1065 Indistrial Drive Yukon, OK, 73099 sholmes@femgc@gmail.com MG-1 PROJECT ID. HYPERBARIC THERAPY CLINIC OF INDIANA, LLC 14555 HAZEL DELL PARKWAY CARMEL, INDIANA 46033 MEDICAL GAS LAYOUT OXYGEN DISTRIBUTION SYSTEM DRAWN BY: CREATED DATE: REVISED: REVISED: REVISED: REVISED: REVISED: S HOLMES 12-07-2020 1 12-08-2020 1 04/05/21