Loading...
HomeMy WebLinkAbout18-0128_North End Phase 1 - C8.3 CONST DETAILSPond 1 830 835 840 845 850 855 860 830 835 840 845 850 855 860 1+00846.3846.322+00846.4846.432+50 ELEV:840.50 Bottom of Pond ELEV:846.00 Top of Bank 1"=30" H; 1"=5' V ELEV:842.14 2-Year ELEV:842.63 5-Year ELEV:843.00 10-Year ELEV:843.54 25-Year ELEV:844.00 50-Year ELEV:844.50 100-Year Pond 2 820 825 830 835 840 845 850 820 825 830 835 840 845 850 1+00830.2830.212+00834.0834.002+50 ELEV:827.00 Bottom of Pond ELEV:832.00 Top of Bank 1"=30" H; 1"=5' V ELEV:827.82 2-YearELEV:828.22 5-Year ELEV:828.60 10-Year ELEV:829.23 25-Year ELEV:829.78 50-Year ELEV:830.39 100-Year CHECKED BY: PROJECT NO.:DATE: DRAWN BY: SHEET TITLE: SHEET NO.:4/6/2020 9:32 AM, Ron Richardson|S:\Project Files\2018\18-0128\CADD\Design\Sheet Sets\North End\18-0128_Construction Details.dwgTOTAL SHEETS:NO.DATEDESCRIPTIONCOPYRIGHTED BY SHREWSBERRY AND ASSOCIATESREVISIONS RDR KMB 02/19/2020 18-0128 ----HAMILTON COUNTYCARMEL, INDIANANORTH END - PHASE 17321 SHADELAND STATION, INDIANAPOLIS IN 46256 (p) 317.841.4799   (f) 317.841.4790 shrewsusa.com DRAWING STATUS: CONSTRUCTION PLANS IIND ANA T DE RE RE G I S 10302164 STATE OF No. PR ELI MI N A R Y NO T F O R CO N S T R U C TI O N102/19/20INITIAL CONSTRUCTION PLAN SUBMITTAL TO CARMEL FOR REVIEW204/06/20CITY OF CARMEL RESUBMITTALC8.3 CONSTRUCTION DETAILS BICYCLE RACK 3/4" = 1'-0"3'-0" UNLESSNOTED OTHERWISE2'-0" FROM EDGE OF PAVEMENT OR WALL FINISH GRADE PLAN SIDE ELEVATION END ELEVATION BIKE RACK SURFACE MOUNT WITH EMBEDDED ANCHORS P-NE-02 1