HomeMy WebLinkAbout18-0128_North End Phase 1 - C8.3 CONST DETAILSPond 1
830
835
840
845
850
855
860
830
835
840
845
850
855
860
1+00846.3846.322+00846.4846.432+50
ELEV:840.50 Bottom of Pond
ELEV:846.00 Top of Bank
1"=30" H; 1"=5' V
ELEV:842.14 2-Year
ELEV:842.63 5-Year
ELEV:843.00 10-Year
ELEV:843.54 25-Year
ELEV:844.00 50-Year
ELEV:844.50 100-Year
Pond 2
820
825
830
835
840
845
850
820
825
830
835
840
845
850
1+00830.2830.212+00834.0834.002+50
ELEV:827.00 Bottom of Pond
ELEV:832.00 Top of Bank
1"=30" H; 1"=5' V
ELEV:827.82 2-YearELEV:828.22 5-Year
ELEV:828.60 10-Year
ELEV:829.23 25-Year
ELEV:829.78 50-Year
ELEV:830.39 100-Year
CHECKED BY:
PROJECT NO.:DATE:
DRAWN BY:
SHEET TITLE:
SHEET NO.:4/6/2020 9:32 AM, Ron Richardson|S:\Project Files\2018\18-0128\CADD\Design\Sheet Sets\North End\18-0128_Construction Details.dwgTOTAL SHEETS:NO.DATEDESCRIPTIONCOPYRIGHTED BY SHREWSBERRY AND ASSOCIATESREVISIONS
RDR KMB
02/19/2020 18-0128
----HAMILTON COUNTYCARMEL, INDIANANORTH END - PHASE 17321 SHADELAND STATION, INDIANAPOLIS IN 46256
(p) 317.841.4799 (f) 317.841.4790
shrewsusa.com
DRAWING STATUS:
CONSTRUCTION PLANS
IIND ANA
T
DE
RE
RE G I S
10302164
STATE OF
No.
PR
ELI
MI
N
A
R
Y
NO
T F
O
R
CO
N
S
T
R
U
C
TI
O
N102/19/20INITIAL CONSTRUCTION PLAN SUBMITTAL TO CARMEL FOR REVIEW204/06/20CITY OF CARMEL RESUBMITTALC8.3
CONSTRUCTION DETAILS
BICYCLE RACK
3/4" = 1'-0"3'-0" UNLESSNOTED OTHERWISE2'-0" FROM EDGE
OF PAVEMENT
OR WALL
FINISH GRADE
PLAN SIDE
ELEVATION
END
ELEVATION
BIKE RACK
SURFACE MOUNT
WITH EMBEDDED
ANCHORS
P-NE-02
1