Loading...
HomeMy WebLinkAboutC101 SWPPP DETAILSWOOD OR METAL STAKES TO SECURE THE STRAW BALES (TWO PER BALE) 10 MIL. PLASTIC LINING STRAW BALE (TYP) SECTION LINE STRAW BALE (TYP) BINDING WIRE WOOD OR METAL STAKES (TYP) - 2 PER NATIVE MATERIAL (OPTIONAL) BALE POLYETHYLENE LINING 10 MIL. EXTENDING OVER BALES TYPE "ABOVE GRADE (NO SCALE) W/ STRAW BALES" 4" WOOD OR METAL STAKES TO SECURE THE STRAW BALES (TWO PER BALE) POLYETHYLENE LINING 10 MIL. EXTENDING OVER BALES METAL PINS OR STAPLES TO SECURE THE POLYETHYLENE LINING TO THE STRAW BALES METAL PINS OR STAPLES TO SECURE THE POLYETHYLENE LINING TO THE STRAW BALES CONCRETE WASHOUT WOOD POST 3"x3"x8' BLACK LETTER 6" HEIGHT 3/8" TREATED PLYWOOD 48"x24" PAINTED WHITE 0.5" LAG SCREWS INSTALLATION 1. UTILIZE AND FOLLOW THE DESIGN IN THE STORM WATER POLLUTION PREVENTION PLAN TO INSTALL THE SYSTEM. 2. DEPENDENT UPON THE TYPE OF SYSTEM, EITHER EXCAVATE THE PIT OR INSTALL THE CONTAINMENT SYSTEM. 3. A BASE SHALL BE CONSTRUCTED AND PREPARED THAT IS FREE OF ROCKS AND OTHER DEBRIS THAT MAY CAUSE TEARS OR PUNCTURES IN THE POLYETHYLENE LINING. 4. INSTALL THE POLYETHYLENE LINING. FOR EXCAVATED SYSTEMS, THE LINING SHOULD EXTEND OVER THE ENTIRE EXCAVATION. THE LINING FOR BERMED SYSTEMS SHOULD BE INSTALLED OVER THE POOLING AREA WITH ENOUGH MATERIAL TO EXTEND THE LINING OVER THE BERM OR CONTAINMENT SYSTEM. THE LINING SHOULD BE SECURED WITH PINS, STAPLES, OR OTHER FASTENERS. 5. PLACE FLAGS, SAFETY FENCING, OR EQUIVALENT TO PROVIDE A BARRIER TO CONSTRUCTION EQUIPMENT AND OTHER TRAFFIC. 6. PLACE A NON-COLLAPSING, NON-WATER HOLDING COVER OVER THE WASHOUT FACILITY PRIOR TO A PREDICTED RAINFALL EVENT TO PREVENT ACCUMULATION OF WATER AND POSSIBLE OVERFLOW OF THE SYSTEM (OPTIONAL). 7. INSTALL SIGNAGE THAT IDENTIFIES CONCRETE WASHOUT AREAS. 8. POST SIGNS DIRECTING CONTRACTORS AND SUPPLIERS TO DESIGNATED LOCATIONS. 9. WHERE NECESSARY, PROVIDE STABLE INGRESS AND EGRESS (SEE TEMPORARY CONSTRUCTION INGRESS/EGRESS PAD ON PAGE 17) OR ALTERNATIVE APPROACH PAD FOR CONCRETE WASHOUT SYSTEMS. 10. USE A 10 MIL. POLYETHYLENE LINED DUMPSTER AS AN ALTERNATE. C101 SWPPP DETAILS w200705-C103 swppp det 3' 3' PLAN 1. ACTUAL LAYOUT DETERMINED IN FIELD. 2. THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30FT. OF THE TEMP. CONCRETE WASHOUT FACILITY. SECTION CONCRETE WASHOUT NOTES: 1. THE SWPPP INFORMATION SIGN MUST BE LOCATED NEAR THE CONSTRUCTION EXIT OF THE SITE, SUCH THAT IT IS ACCESSIBLE AND VIEWABLE BY THE GENERAL PUBLIC, BUT NOT OBSTRUCTING VIEWS AS TO CAUSE A SAFETY HAZARD. 2. ALL POSTED DOCUMENTS MUST BE MAINTAINED IN A CLEARLY READABLE CONDITION AT ALL TIMES THROUGHOUT CONSTRUCTION AND UNTIL THE NOTICE-OF-TERMINATION (NOT) IS FILED FOR THE PERMIT. 3. CONTRACTOR SHALL POST OTHER STORM WATER AND/OR EROSION AND SEDIMENT CONTROL RELATED PERMITS ON THE SIGN AS REQUIRED BY THE GOVERNING AGENCY. 4. SIGN SHALL BE LOCATED OUTSIDE OF PUBLIC RIGHT-OF-WAY AND EASEMENTS UNLESS APPROVED BY THE GOVERNING AGENCY. 5. CONTRACTOR IS RESPONSIBLE FOR ENSURING STABILITY OF THE SWPPP SWPPP INFORMATION SIGN INFORMATION SIGN. COPY OF NOI COPY OF IDEM NOTICE OF SUFFICIENCY SWPPP INFORMATION DETAILED DESCRIPTION OF THE LOCATION OF THE SWPPP DOCUMENTATION (BINDER AND SITE MAPS) ON THE SITE. SIGN TO BE CONSTRUCTED OF A RIGID MATERIAL, SUCH AS PLYWOOD OR OUTDOOR SIGN BOARD. SIGN MUST BE CONSTRUCTED IN A MANNER TO PROTECT DOCUMENTS FROM DAMAGE DUE TO WEATHER (WIND, SUN, MOISTURE, ETC.). "SWPPP INFORMATION" MUST BE DISPLAYED PROMINENTLY ACROSS THE TOP OF THE SIGN, AS SHOWN IN THE DETAIL. 3" MIN. 3" MIN. COPY OF DRAINAGE APPROVAL LETTER COPY OF CONSTRUCTION SITE NOTICE AS APPLICABLE COPY OF CONSTRUCTION SITE NOTICE AS APPLICABLE COPY OF CONSTRUCTION SITE NOTICE AS APPLICABLE (NO SCALE) ALTERNATE CONTRACTOR MAY USE A 10 MIL. POLYETHYLENE LINED DUMPSTER FOR CONCRETE WASHOUT. SHEET 1 OF 1 DRAWN CHECKED QA MFG APPROVED SIZE DWG NO SCALE REV REPLACEABLE SEDIMENT BAGS WITH GEOTEXTILE FILTER FABRIC LIFT HANDLES STAINLESS STEEL CLAMPING BAND REAR CURB GUARD FLAP WITH MAGNETIC TIE-DOWNS ALL PRODUCTS MANUFACTURED BY INLET & PIPE PROTECTION, INC DISTRIBUTED BY ADS WWW.INLETFILTERS.COM (866) 287-8655 PH (630) 355-3477 FX INFO@INLETFILTERS.COM INSTALLATION: 1. 2. REMOVE GRATE DROP FLEXSTORM INLET FILTER ONTO LOAD BEARING LIP OF CASTING OR CONCRETE STRUCTURE 3. REPLACE GRATE STANDARD 2" OVERFLOW AREA 11 GAUGE STEEL SUSPENSION SYSTEM IPP TABLE 1. TEMPORARY SEEDING SPECIFICATIONS AUG. 1 - SEPT. 1 GERMAN MILLET WHEAT OR RYE 150 LBS. 1 TO 1½ INCHES SEPT. 15 - OCT. 30 SPRING OATS 100 LBS. 1 INCH MARCH 1 - APRIL 15 ANNUAL RYEGRASS 40 LBS. ¼ INCH MARCH 1 - MAY 1 40 LBS. 1 TO 2 INCHES MAY 1 - JUNE 1 SUDANGRASS 35 LBS. MAY 1 - JULY 30 BUCKWHEAT 60 LBS. APRIL 15 - JUNE 1 CORN (BROADCAST) 300 LBS. MAY 11 - AUG. 10 SORGHUM 35 LBS. MAY 1 - JULY 15 1 TO 2 INCHES 1 TO 2 INCHES 1 TO 2 INCHES 1 TO 2 INCHES 1. PERENNIAL SPECIES MAY BE USED AS A TEMPORARY COVER, ESPECIALLY IF THE AREA TO BE SEEDED WILL REMAIN IDLE FOR MORE THAN ONE YEAR. 2. SEEDING DONE OUTSIDE THE OPTIMUM SEEDING DATES INCREASES THE CHANCES OF SEEDING FAILURE. DATES MAY BE EXTENDED OR SHORTENED BASED ON THE LOCATION OF THE PROJECT SITE WITHIN THE STATE. NOTES 1. MULCH ALONE IS AN ACCEPTABLE TEMPORARY COVER AND MAY BE USED IN LIEU OF TEMPORARY SEEDING, PROVIDED THAT IT IS APPROPRIATELY ANCHORED. 2. A HIGH POTENTIAL FOR FERTILIZER, SEED, AND MULCH TO WASH EXISTS ON STEEP BANKS, AND CUTS, IN CHANNELS AND AREAS OF CONCENTRATED FLOW. SEEDBED PREPARATION 1. TEST SOIL TO DETERMINE PH AND NUTRIENT LEVELS. 2. APPLY SOIL AMENDMENTS AS RECOMMENDED BY THE SOIL TEST. IF TESTING IS NOT DONE, APPLY 400 TO 600 POUNDS PER ACRE OF 12-12-12 ANALYSIS FERTILIZER, OR EQUIVALENT. 3. WORK THE SOIL AMENDMENTS INTO THE UPPER TWO TO FOUR INCHES OF THE SOIL WITH A DISK OR RAKE OPERATED ACROSS THE SLOPE. SEEDING 1. SELECT A SEED SPECIES OR AN APPROPRIATE SEED MIXTURE AND APPLICATION RATE FROM TABLE 1. 2. APPLY SEED UNIFORMLY WITH A DRILL OR CULTIPACKER SEEDER OR BY BROADCASTING. PLANT OR COVER SEED TO THE DEPTH SHOWN IN TABLE 1. NOTES 1. IF DRILLING OR BROADCASTING THE SEED, ENSURE GOOD SEED-TO-SOIL CONTACT BY FIRMING THE SEEDBED WITH A ROLLER OR CULTIPACKER AFTER COMPLETING SEEDING OPERATIONS. 2. DAILY SEEDING WHEN THE SOIL IS MOIST IS USUALLY MOST EFFECTIVE. 3. IF SEEDING IS DONE WITH A HYDROSEEDER, FERTILIZER AND MULCH CAN BE APPLIED WITH THE SEED IN A SLURRY MIXTURE. 3. APPLY MULCH AND ANCHOR IT IN PLACE. MAINTENANCE 1. INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS. 2. CHECK FOR EROSION OR MOVEMENT OF MULCH AND REPAIR IMMEDIATELY. 3. MONITOR FOR EROSION DAMAGE AND ADEQUATE COVER (80 PERCENT DENSITY); RESEED, FERTILIZE, AND APPLY 4. MULCH WHERE NECESSARY. 4. IF NITROGEN DEFICIENCY IS APPARENT, TOP-DRESS FALL SEEDED WHEAT OR RYE SEEDING WITH 50 POUNDS PER ACRE OF NITROGEN IN FEBRUARY OR MARCH. REFERENCE IN CHAPTER 7 PAGES 31-33 IN THE INDIANA STORM WATER QUALITY MANUAL TEMPORARY SEED TABLE 1. TEMPORARY SEEDING SPECIFICATIONS SEED SPECIES1 RATE PER ACRE PLANTING DEPTH OPTIMUM DATES2 MAINTENANCE 1. INSPECT DAILY AND AFTER EACH STORM EVENT FOR LEAKS, SPILLS, TRACKING OF SOIL BY EQUIPMENT, AND THE POLYETHYLENE LINING FOR FAILURE. 2. ONCE CONCRETE WASTES HARDEN, REMOVE AND DISPOSE OF THE MATERIAL. EXCESS CONCRETE SHOULD BE REMOVED WHEN THE WASHOUT SYSTEM REACHES 50 PERCENT OF THE DESIGN CAPACITY AND SHOULD NOT BE USED UNTIL PROPERLY CLEANED OUT. 3. PLASTIC LINER SHOULD BE REPLACED AFTER EVERY CLEANING, THE REMOVAL OF MATERIAL USUALLY DAMAGES IT. 4. REPAIR OR ENLARGE AS NECESSARY TO MAINTAIN CAPACITY FOR CONCRETE WASTE. 5. IF LIQUIDS DO NOT EVAPORATE IT MAY BE NECESSARY TO VACUUM OR REMOVE THE LIQUIDS AND DISPOSE OF THEM IN AN ACCEPTABLE METHOD. 6. WHEN CONCRETE WASHOUT SYSTEMS ARE NO LONGER REQUIRED THEY SHALL BE CLOSED AND HOLES, DEPRESSIONS AND OTHER DISTURBANCES ASSOCIATED WITH THE SYSTEM SHOULD BE BACKFILLED, GRADED, AND STABILIZED. NOTES: 1. AN OAT OR WHEAT COMPANION OR NURSE CROP MAY BE USED WITH ANY OF THE ABOVE PERMANENT SEEDING MIXTURES, AT THE FOLLOWING RATES: (A) SPRING OATS - ONE-FOURTH TO THREE-FOURTHS BUSHEL PER ACRE (B) WHEAT - NO MORE THAN ONE-HALF BUSHEL PER ACRE 2. A HIGH POTENTIAL FOR FERTILIZER, SEED, AND MULCH TO WASH EXISTS ON STEEP BANKS, CUTS, AND IN CHANNELS AND AREAS OF CONCENTRATED INSTALLATION 1. GRADE THE SITE TO ACHIEVE POSITIVE DRAINAGE. 2. ADD TOPSOIL OR COMPOST MULCH TO ACHIEVE NEEDED DEPTH FOR ESTABLISHMENT OF VEGETATION. (COMPOST MATERIAL MAY BE ADDED TO IMPROVE SOIL MOISTURE HOLDING CAPACITY, SOIL FRIABILITY, AND NUTRIENT AVAILABILITY.) SEEDBED PREPARATION 1. TEST SOIL TO DETERMINE PH AND NUTRIENT LEVELS. 2. APPLY SOIL AMENDMENTS AS RECOMMENDED BY THE SOIL TEST AND WORK INTO THE UPPER TWO TO FOUR INCHES OF SOIL. IF TESTING IS NOT DONE, APPLY 400 TO 600 POUNDS PER ACRE OF 12-12-12 ANALYSIS FERTILIZER, OR EQUIVALENT. 3. TILL THE SOIL TO OBTAIN A UNIFORM SEEDBED. USE A DISK OR RAKE, OPERATED ACROSS THE SLOPE, TO WORK THE SOIL AMENDMENTS INTO THE UPPER TWO TO FOUR INCHES OF THE SOIL. SEEDING OPTIMUM SEEDING DATES ARE MARCH 1 TO MAY 10 AND AUGUST 10 TO SEPTEMBER 30. PERMANENT SEEDING DONE BETWEEN MAY 10 AND AUGUST 10 MAY NEED TO BE IRRIGATED. SEEDING OUTSIDE OR BEYOND OPTIMUM SEEDING DATES IS STILL POSSIBLE WITH THE UNDERSTANDING THAT RESEEDING OR OVERSEEDING MAY BE REQUIRED IF ADEQUATE SURFACE COVER IS NOT ACHIEVED. RESEEDING OR OVERSEEDING CAN BE EASILY ACCOMPLISHED IF THE SOIL SURFACE REMAINS WELL PROTECTED WITH MULCH. 1. SELECT A SEEDING MIXTURE AND RATE FROM TABLE 1. SELECT SEED MIXTURE BASED ON SITE CONDITIONS, SOIL PH, INTENDED LAND USE, AND EXPECTED LEVEL OF MAINTENANCE. 2. APPLY SEED UNIFORMLY WITH A DRILL OR CULTIPACKER SEEDER OR BY BROADCASTING. PLANT OR COVER THE SEED TO A DEPTH OF ONE-FOURTH TO ONE-HALF INCH. IF DRILLING OR BROADCASTING THE SEED, ENSURE GOOD SEED-TO-SOIL CONTACT BY FIRMING THE SEEDBED WITH A ROLLER OR CULTIPACKER AFTER COMPLETING SEEDING OPERATIONS. (IF SEEDING IS DONE WITH A HYDROSEEDER, FERTILIZER AND MULCH CAN BE APPLIED WITH THE SEED IN A SLURRY MIXTURE.) 3. MULCH ALL SEEDED AREAS AND USE APPROPRIATE METHODS TO ANCHOR THE MULCH IN PLACE. CONSIDER USING EROSION CONTROL BLANKETS ON SLOPING AREAS AND CONVEYANCE CHANNELS MAINTENANCE _ INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS UNTIL THE VEGETATION IS SUCCESSFULLY ESTABLISHED. _ CHARACTERISTICS OF A SUCCESSFUL STAND INCLUDE VIGOROUS DARK GREEN OR BLUISHGREEN SEEDLINGS WITH A UNIFORM VEGETATIVE COVER DENSITY OF 90 PERCENT OR MORE. _ CHECK FOR EROSION OR MOVEMENT OF MULCH. _ REPAIR DAMAGED, BARE, GULLIED, OR SPARSELY VEGETATED AREAS AND THEN FERTILIZE, RESEED, AND APPLY AND ANCHOR MULCH. _ IF PLANT COVER IS SPARSE OR PATCHY, EVALUATE THE PLANT MATERIALS CHOSEN, SOIL FERTILITY, MOISTURE CONDITION, AND MULCH APPLICATION; REPAIR AFFECTED AREAS EITHER BY OVERSEEDING OR PREPARING A NEW SEEDBED AND RESEEDING. APPLY AND ANCHOR MULCH ON THE NEWLY SEEDED AREAS. _ IF VEGETATION FAILS TO GROW, CONSIDER SOIL TESTING TO DETERMINE SOIL PH OR NUTRIENT DEFICIENCY PROBLEMS. (CONTACT YOUR SOIL AND WATER CONSERVATION DISTRICT OR COOPERATIVE EXTENSION OFFICE FOR ASSISTANCE.) _ IF ADDITIONAL FERTILIZATION IS NEEDED TO GET A SATISFACTORY STAND, DO SO ACCORDING TO SOIL TEST RECOMMENDATIONS. _ ADD FERTILIZER THE FOLLOWING GROWING SEASON. FERTILIZE ACCORDING TO SOIL TEST RECOMMENDATIONS. _ FERTILIZE TURF AREAS ANNUALLY. APPLY FERTILIZER IN A SPLIT APPLICATION. FOR COOL-SEASON GRASSES, APPLY ONE-HALF OF THE FERTILIZER IN LATE SPRING AND ONE HALF IN EARLY FALL. FOR WARM-SEASON GRASSES, APPLY ONE-THIRD IN EARLY SPRING, ONE-THIRD IN LATE SPRING, AND THE REMAINING ONE-THIRD IN MIDDLE SUMMER. TABLE 1. PERMANENT SEEDING RECOMMENDATIONS THIS TABLE PROVIDES SEVERAL SEED MIXTURE OPTIONS. ADDITIONAL SEED MIXTURES ARE AVAILABLE COMMERCIALLY. WHEN SELECTING A MIXTURE, CONSIDER INTENDED LAND USE AND SITE CONDITIONS, INCLUDING SOIL PROPERTIES (E.G., SOIL PH AND DRAINAGE), SLOPE ASPECT, AND THE TOLERANCE OF EACH SPECIES TO SHADE AND DROUGHT. REFERENCE IN CHAPTER 7 PAGES 35-40 IN THE INDIANA STORM WATER QUALITY MANUAL LAWNS AND HIGH-MAINTENANCE AREAS 1. BLUEGRASS 2. PERENNIAL RYEGRASS (TURF TYPE) 3. TALL FESCUE (TURF TYPE) - BLUEGRASS 170 LBS. 30 LBS. 140 LBS. 5.5 TO 7.0 60 LBS. 90 LBS. 5.6 TO 7.0 5.6 TO 7.5 PERMANENT SEED SEED MIXTURES RATE PER ACRE PURE LIVE SEED OPTIMUM SOIL PH REVISIONS AND ISSUES W20.0705 PREPARED FOR: PROJECT NO. SHEET NO. CHECKED BY: DRAWN BY: RLW DESIGNED BY: DWG NAME: PROJECT NO.: W20.0705 DATE BY 03.29.2021 MLT DATE: RLW Know what'sbelow. Call before you dig. R D.B. KLAIN CONSTRUCTION, LLC VILLAGE OF WEST CLAY SITE PLAN FOR STATE RELEASE 02.03.2021 MLT E N GI N E E R S 317 | 846 - 6611 800 | 452 - 6408 317 | 843 - 0546 fax WEIHE Land Engi Suveryi neeir l ng Ci vi ng | Landscape Architecture ALLAN H. WEIHE, P.E., L.S. - FOUNDER 10505 N. College Avenue Indianapolis, Indiana 46280 weihe.net PART OF BLOCK "F", VILLAGE OF WEST CLAY, CLAY TOWNSHIP, HAMILTON COUNTY, INDIANA Build with conf idence. SM 12755 HORSEFERRY ROAD, CARMEL, INDIANA 46032 RUSSELL L. WEBSTER II, PE No. 11900318 03/29/2021 R U S S E L L L . W E B S T E R I I P R O F E S S I O N A L E N G I N E E R R E G I S T E R E D I N D I A N A No. PE11900318 STATE OF FINAL CONSTRUCTION PLANS 03.29.2021 MLT 04/13/21