Loading...
HomeMy WebLinkAboutCorrespondenceGrouping Cycle Ref #Complete?Status Department Snapshot File Markup Name Changemark Subject Changemark Details Markup Date Updated By Applicant Response Main Workflow 1 12 True Resolved Engineering CRC Architectural Review 2020-10-22 Packet (Magnolia) - Site Plans.pdf AJ Please provide further information We will need the following provided with the next submittal: - pre and post construction SWPPP sheets - SWPPP narrative - storm sewer plan and profile - street plan and profile for all public streets - detail sheets - operation and maintenance manual 10/22/2020 2:56 PM Alex Jordan See the uploaded civil set for the pre & post SWPPP, SWPPP narrative, storm sewer plan & profiles and detail sheets. The O&M Manual is enclosed. 13 True Resolved Engineering CRC Architectural Review 2020-10-22 Packet (Magnolia) - Site Plans.pdf AJ Please show all initial storm water controls on this sheet All initial storm water controls will need to be provided on this sheet or a note will need to be provided stating that all controls on the pre- construction SWPPP need to be provided prior to demo. 10/22/2020 2:56 PM Alex Jordan See Pre-Construction Erosion Control Plan (sheet 900 of civil set 14 False UnResolved Engineering CRC Architectural Review 2020-10-22 Packet (Magnolia) - Site Plans.pdf AJ Board of Public Works and Safety approval required for new curb cut Please provide a BPW request email or letter for this new curb cut to Caleb Warner in our office. 10/22/2020 2:56 PM Alex Jordan This comment has been noted. Old Town Design Group will submit new curb cut request as required 15 True Resolved Engineering CRC Architectural Review 2020-10-22 Packet (Magnolia) - Site Plans.pdf AJ This street will need to comply with our standards Please revise this street to comply with all the standards set forth by Section 7.25 of the UDO. 10/22/2020 2:56 PM Alex Jordan See Site Dimension Plan (sheet 300 of civil set). Project Name: Workflow Started: Report Generated: CRC PZ-2020-00074 DP ADLS Magnolia 05/27/2020 1:25 PM 04/12/2021 08:55 PM Changemarks Report Grouping Cycle Ref #Complete?Status Department Snapshot File Markup Name Changemark Subject Changemark Details Markup Date Updated By Applicant Response Main Workflow 1 16 True Resolved Engineering CRC Architectural Review 2020-10-22 Packet (Magnolia) - Site Plans.pdf AJ How many units are proposed with this development? Will one access to the development allow for proper ingress/egress for the residents and appropriate access for emergency personnel? 10/22/2020 2:56 PM Alex Jordan The proposed development will contain 20 residential units upon completion of Phase 1. When Phase 2 is completed in the future, the total unit count will be 30 residential units. It should be noted that completion of Phase 2 will include a second access point to 126th Street per the conceptual layout approved by CRC 17 True Resolved Engineering CRC Architectural Review 2020-10-22 Packet (Magnolia) - Site Plans.pdf AJ Please show the existing and proposed right-of-way for 126th Street 10/22/2020 2:56 PM Alex Jordan Existing and proposed ROW is shown on the plans. 18 True Resolved Engineering CRC Architectural Review 2020-10-22 Packet (Magnolia) - Site Plans.pdf AJ Please clarify which phase the detention will be installed with It is unclear which phase the detention will be installed with. Please clarify when this will be installed. 10/22/2020 2:56 PM Alex Jordan Phase 1 will include detention as shown on the Drainage Plan (sheet 600 of civil set). 19 True Resolved Engineering CRC Architectural Review 2020-10-22 Packet (Magnolia) - Site Plans.pdf AJ How will storm from Phase 1 be detained? It appears that the storm from Phase 1 is discharged directly to the City's right-of-way. Is there an agreement that this section doesn't need to be detained? 10/22/2020 2:56 PM Alex Jordan Although some direct discharge is anticipated, Phase 1 will include detention as shown. Please refer to the Drainage Plan (sheet 600 of civil set) and Stormwater Calculations. 9 True Resolved Planning & Zoning CRC Architectural Review 2020-10-22 Packet (Magnolia) - Site Plans.pdf RMK Street connection Please provide a street connection for Middle Drive to the New Street. 10/20/2020 7:05 PM Rachel Keesling The plans have been revised to include a connection to New Street as requested. 10 True Resolved Planning & Zoning CRC Architectural Review 2020-10-22 Packet (Magnolia) - Site Plans.pdf RMK Sidewalk connection Please provide a sidewalk connection which would provide access through the middle of the site from New Street to Pawnee Road. The dimensions appear to be wide enough to allow for a 5' sidewalk. 10/20/2020 7:05 PM Rachel Keesling The plans have been revised to include sidewalk along Middle Drive as requested. Changemarks Report Grouping Cycle Ref #Complete?Status Department Snapshot File Markup Name Changemark Subject Changemark Details Markup Date Updated By Applicant Response Main Workflow 1 11 True Resolved Planning & Zoning CRC Architectural Review 2020-10-22 Packet (Magnolia) - Site Plans.pdf RMK Pedestrian access points Do these doors have sidewalk access to the path along City Center Drive? If not, please add the connection. 10/20/2020 7:05 PM Rachel Keesling No, the doors facing 126th Street are for the riser rooms so access to the sidewalk is not necessary. 1 False UnResolved Addressing OTC_Magnolia_Site LayoutPackage_Ph ase1_05222020.pdf David McCoy Street names The streets within the apartment area will probably need to be named to facilitate addressing. 10/19/2020 10:44 AM Dave McCoy Coordination of street names in process 2 72 True Resolved Engineering C1001 Misc Utility Details.pdf AJ Please provide details for the detention and water quality unit in the plans 02/10/2021 12:05 PM Alex Jordan Please refer to the Drainage Plan (sheet 600) for all detention details including isolator row details. Refer to the Miscellaneous Utility Details (sheet 1001) for the water quality unit, diversion manhole and underground chamber inspection port details. 71 True Resolved Engineering C901 Pre-con Erosion Control Plan.pdf AJ Please clearly call out all BMPs on this sheet Please show the water quality unit and the isolator rows on this sheet. This will need to be placed within a BMP easement as well if they will not be within the City's right-of-way. 02/10/2021 11:35 AM Alex Jordan The Post-Construction (Please note that it was uploaded with title PRE during v.1, so kept misnamed for v. 2 upload, still sheet #901) Erosion Control Plan (sheet 901) has been revised accordingly. 69 True Resolved Engineering C900 Pre-con Erosion Control Plan.pdf AJ Please extend the construction entrance to be 150' long 02/10/2021 11:30 AM Alex Jordan The Pre-Construction Erosion Control Plan (sheet 900) has been revised accordingly. 70 True Resolved Engineering C900 Pre-con Erosion Control Plan.pdf AJ Please provide a gap in the silt fence for the construction entrance Please have the silt fence turned into the site on both sides of the entrance. 02/10/2021 11:30 AM Alex Jordan The Pre-Construction Erosion Control Plan (sheet 900) has been revised accordingly 68 True Resolved Engineering C702 Storm Plan and Profile.pdf AJ Please show the sumps on the profiles 02/10/2021 10:57 AM Alex Jordan The Storm Plan and Profiles (sheets 700-706) have been revised to show structure sumps as needed Changemarks Report Grouping Cycle Ref #Complete?Status Department Snapshot File Markup Name Changemark Subject Changemark Details Markup Date Updated By Applicant Response Main Workflow 2 67 True Resolved Engineering C600 Drainage Plan.pdf AJ Please provide the critical elevations of the detention on this sheet 02/10/2021 10:42 AM Alex Jordan The Drainage Plan (sheet 600) has been revised to include the critical elevations in the plan view. 65 True Resolved Engineering C300 Site Dimension Plan.pdf AJ We do not allow detention within the right-of-way Please work with the City Engineer to discuss this and if he will allow the detention to be located in the right-of-way or if it will need to be relocated. 02/10/2021 12:14 PM Alex Jordan Per our coordination with Jeremy Kashman, the detention may remain within public right-of-way. Please refer to the revised O&M Manual for maintenance of traffic operations/considerations during inspection and maintenance activities. 66 True Resolved Engineering C300 Site Dimension Plan.pdf AJ Only this east/west road was to be right-of-way After discussing with the City Engineer, he was under the impression that only the east/west road was to be right-of-way and all other streets would be private. Please work with him and the CRC to determine what will be the City's. 02/10/2021 12:14 PM Alex Jordan The construction plans have been revised such that only the east/west street, to be known as Livingston Drive, will be public right-of-way. 73 True Resolved Engineering C300 Site Dimension Plan.pdf AJ Please provide street plan and profiles for all streets that will be within right-of-way 02/10/2021 12:14 PM Alex Jordan The construction plans have been revised to include the Road Plan and Profile (sheet 501) for the proposed E-W connection from Pawnee Road to Livingstone Drive (future street) which is the only proposed public right-of-way. 63 False UnResolved Engineering C200 Topo Survey and Demo Plan.pdf AJ Board of Public Works approval required BPW approval will be required for all lanes and path closures or restrictions and street cuts. Please provide a request letter to Caleb Warner in our office requesting all of these approvals. 02/10/2021 9:12 AM Alex Jordan Old Town Design Group submitting the letter. Changemarks Report Grouping Cycle Ref #Complete?Status Department Snapshot File Markup Name Changemark Subject Changemark Details Markup Date Updated By Applicant Response Main Workflow 2 64 False UnResolved Engineering C200 Topo Survey and Demo Plan.pdf AJ Vacation of these drives will need to be requested from the BPW Please include the vacation of these drives in the BPW request letter. 02/10/2021 9:12 AM Alex Jordan Old Town Design Group submitting the vacation requests 51 True Resolved Planning & Zoning SECONDARY PLAT.pdf AVC interior "streets"Please clarify if the internal "streets" are going to be private streets, driveways, or public streets. 02/05/2021 4:47 PM Angie Conn The proposed E-W connection from Pawnee Road to Livingstone Drive (future street) will be a public street in dedicated right-of-way. All others will be private alleys located in common areas. The Secondary Plat has been revised accordingly. 52 True Resolved Planning & Zoning SECONDARY PLAT.pdf AVC HPR vs. Secondary Plat This condo project might need to be an HPR /Condominium Plat, rather than a Secondary Plat. Here is a website link to an example of a residential Condominium Plat, called Monon Farms. It is docket no. 05060001 HPR: http://cocdocs.carmel.in.g ov/WebLink/Browse.aspx ? id=307429&dbid=0 &repo=CityofCarmel . It will give you an idea of what an HPR document looks like and what needs to be included within it. Also, here are web links to two other examples of Condominiums/HPRs: The Commons at City Center Condominiums (docket no. 08060003 HPR) http://cocdocs.carmel.in.g ov/WebLink/Browse.aspx 02/05/2021 4:47 PM Angie Conn As discussed with Angie Conn, both an HPR and SP application have been submitted Changemarks Report ? id=264906&dbid=0 &repo=CityofCarmel; and Village of WestClay Prudentia Building (docket no. 10040017 HPR)- http://cocdocs.carmel.in.g ov/WebLink/Browse.aspx ? id=394210&dbid=0 &repo=CityofCarmel . Last but not least, an Example HPR document was also uploaded to the Documents section of this ProjectDox project. 53 True Resolved Planning & Zoning SECONDARY PLAT.pdf AVC HPR or SP docket no. This plat will need a separate application filing and docket no. for a Horizontal Property Regime / Condominium plat, or for a Secondary Plat. 02/05/2021 4:47 PM Angie Conn Both a SP (PZ-2021-00051SP) and an HPR (PZ-2021- 00050HPR)application have been filed & assigned the noted Docket #s. 54 True Resolved Planning & Zoning SECONDARY PLAT.pdf AVC original plat Please upload a copy of the original plat of Newark/ Newark Village. 02/05/2021 4:47 PM Angie Conn Uploaded under Site Drawings 55 True Resolved Planning & Zoning SECONDARY PLAT.pdf AVC Lots numbers The lot numbers will have to have the suffix -A after the numbers, so they read 1A, 2A, etc. 02/05/2021 4:47 PM Angie Conn The Secondary Plat has been revised accordingly. 56 True Resolved Planning & Zoning SECONDARY PLAT.pdf AVC ROW Will the northern boundary of the 25-ft ROW touch and intersect with the City Center Dr. ROW? 02/05/2021 4:47 PM Angie Conn No, the secondary plat has been revised such that the internal right-of-way in question is now common area for the private alleys 57 True Resolved Planning & Zoning SECONDARY PLAT.pdf AVC south ROW Please make the 25-ft ROW go all the way down to the south property line. 02/05/2021 4:47 PM Angie Conn The secondary plat has been revised such that the internal right-of-way in question is now common area for the private alley. Furthermore, it should be Changemarks Report noted that the elevation change will prohibit the alley from being extended/connected to the property south of the site. 58 True Resolved Planning & Zoning SECONDARY PLAT.pdf AVC total # units Please list the total number of units in the Data Development Summary, and also list the dwelling type (condominiums). 02/05/2021 4:47 PM Angie Conn The Secondary Plat has been revised accordingly. 59 True Resolved Planning & Zoning SECONDARY PLAT.pdf AVC Unit Calls Since these will be for sale condominiums, you will probably also have to insert a few sheets with the Unit Calls to delineate the boundaries of each unit. 02/05/2021 4:47 PM Angie Conn If understanding the process/timeline correctly, the secondary plat will be recorded, and the lots created, before the first building is even constructed. It may be that these unit exhibits would come later? 60 True Resolved Planning & Zoning SECONDARY PLAT.pdf AVC BPW signature block Diana Cordray's name/title should be changed to read "Sue Wolfgang, City Clerk". 02/05/2021 4:47 PM Angie Conn The Secondary Plat has been revised accordingly. 61 True Resolved Planning & Zoning SECONDARY PLAT.pdf AVC Replat The title should also read this this is a replat of Newark ... Lot #s ... 02/05/2021 4:47 PM Angie Conn The Secondary Plat has been revised accordingly. 62 True Resolved Planning & Zoning SECONDARY PLAT.pdf AVC Address List Please add a unit and address list. 02/05/2021 4:47 PM Angie Conn Unit list in process with Nick Mishler, address list coordinated with Dave McCoy and uploaded in site drawings: Map. Magnolia 49 True Resolved Planning & Zoning C300 Site Dimension Plan.pdf AVC interior streets/drives Are these interior paved areas going to be private street, private drives, or public streets/alleys? This labelling needs to be clarified on the plans, please. 02/05/2021 4:26 PM Angie Conn The proposed E-W connection from Pawnee Road to Livingstone Drive will be a public street within dedicated right-of- way. All others will be private alleys located in common areas. The Site Dimension Plan (sheet 300) has been revised accordingly. 50 True Resolved Planning & Zoning C300 Site Dimension Plan.pdf AVC north landscaping Please upload a landscape plan for the northern boundary of the site, along City Center Dr. 02/05/2021 4:26 PM Angie Conn Please refer to the revised Planting Plan, which replaces the Street Tree Plan in its entirety, for all proposed landscaping. Changemarks Report 48 True Resolved Planning & Zoning G002 Site Plan.pdf RMK Updated site plan Please revise this site plan to show the new street connection moved to the south. 02/05/2021 3:34 PM Rachel Keesling Please omit sheet G002 46 True Resolved Planning & Zoning C300 Site Dimension Plan.pdf RMK Concrete stoop Do you plan to install concrete stoops for each of these mechanical (?) rooms? Comment applies to all buildings. 02/05/2021 3:34 PM Rachel Keesling No, concrete stoops are not required for the mechanical rooms per the architect. 47 True Resolved Planning & Zoning C300 Site Dimension Plan.pdf RMK Lot coverage percent Please provide total lot coverage percent in the development summary. 02/05/2021 3:34 PM Rachel Keesling The Title Sheet (sheet 100) and Site Dimension Plan (sheet 300) have been revised accordingly. 42 True Resolved Planning & Zoning A212 Overall Exterior Elevations.pdf RMK Fiber cement between windows Same comment here as the other side facade - now that we see all the paneling here, it just doesn't look right. We either want to see larger windows or remove the paneling and put back brick. 02/05/2021 3:34 PM Rachel Keesling Elevations have been changed back to original design with more brick, less fiber cement. The design team feels this is a better look and keeps brick lintels to manageable lengths. 43 True Resolved Planning & Zoning A212 Overall Exterior Elevations.pdf RMK Paneling between windows detail Same comment here as the other side facade - please provide details on how these panels will be joined and if any detail trim work will also be applied. 02/05/2021 3:34 PM Rachel Keesling Paneling between windows is to be James Hardie Reveal Panel System (images shared previously with staff). The look is meant to be clean and simple, no battens at panel edges. 44 True Resolved Planning & Zoning A212 Overall Exterior Elevations.pdf RMK Window header missing 2 Please add the missing window header for this window. 02/05/2021 3:34 PM Rachel Keesling Header has been added. 45 True Resolved Planning & Zoning A212 Overall Exterior Elevations.pdf RMK Back elevation windows The fiber cement between these windows looks balanced and makes sense. It also appears to have some detail joints/boards around each window. Is this accurate? This kind of detail is not 02/05/2021 3:34 PM Rachel Keesling Paneling between windows is to be James Hardie Reveal Panel System (images shared previously with staff). The look is meant to be clean and simple, no battens at panel edges. Changemarks Report shown on the other elevations. Please provide enhanced trim detail on all facades where fiber cement is used between the windows. 34 True Resolved Planning & Zoning A211 Overall Exterior Elevations.pdf RMK Detail area between windows Please provide a detailed view of the area between these bumped out windows on the front facades. How do the joints match up? What type of installation method will be used? 02/05/2021 3:34 PM Rachel Keesling Paneling between windows is to be James Hardie Reveal Panel System (images shared previously with staff). The look is meant to be clean and simple, no battens at panel edges. 35 True Resolved Planning & Zoning A211 Overall Exterior Elevations.pdf RMK Detail on panel joints Please provide detailed information on what type of joints/channels/etc will be used to install these fiber cement panels (for everywhere they are used on the buildings). Also, is the patterning we see here the actual size/pattern that will be used? We want to make sure that no butt joints will be used and the design we see is accurate. 02/05/2021 3:34 PM Rachel Keesling Paneling between windows is to be James Hardie Reveal Panel System (images shared previously with staff). The look is meant to be clean and simple, no battens at panel edges. 36 True Resolved Planning & Zoning A211 Overall Exterior Elevations.pdf RMK Missing header Please add the missing header on this window. 02/05/2021 3:34 PM Rachel Keesling Header has been added 37 True Resolved Planning & Zoning A211 Overall Exterior Elevations.pdf RMK Fiber cement area Now that I see this area as all fiber cement, I'm sorry to say but it does not look like I thought it would. With the windows being so small, it seems out of place. With the longer windows, it looks purposeful and in proportion. Can we get 02/05/2021 3:34 PM Rachel Keesling Elevations have been changed back to original design with more brick, less fiber cement. The design team feels this is a better look and keeps brick lintels to manageable lengths Changemarks Report larger windows in these locations? Or add a faux window to make the proportions better? If not, I would like to see the area return to brick. 38 True Resolved Planning & Zoning A211 Overall Exterior Elevations.pdf RMK Detail area between windows 2 We would like to see how this area is detailed. How the panels are connected/installed and if any detail trim work will be added to enhance the area. 02/05/2021 3:34 PM Rachel Keesling Paneling between windows is to be James Hardie Reveal Panel System (images shared previously with staff). The look is meant to be clean and simple, no battens at panel edges. 39 True Resolved Planning & Zoning A211 Overall Exterior Elevations.pdf RMK Side facades facing City Center Drive What other enhancements could be done to the two buildings with sides facing City Center Drive? What is proposed does not quite fit - it seems like it should be more architecturally significant and look like a front. Please provide some options for review. 02/05/2021 3:34 PM Rachel Keesling Enhancements have been discussed on calls with staff, landscaping will be provided as much as possible to help screen the building from 126th St. No updates made to building design for this comments. 40 True Resolved Planning & Zoning A211 Overall Exterior Elevations.pdf RMK Material under balconies What is the proposed material for the underside of the balconies? Will these be finished? Or will it just be the wood floor of the balcony above that is visible? 02/05/2021 3:34 PM Rachel Keesling Bottom of balconies to be fiber cement soffit, no exposed framing to view. 41 True Resolved Planning & Zoning A211 Overall Exterior Elevations.pdf RMK Brick detail Please provide a detail view showing if this brick is projecting or recessed and the dimension of that depth. 02/05/2021 3:34 PM Rachel Keesling It appears this comment is in reference to brick banding at first floor. Banding is to be achieved by recessing brick around 1” every six courses. 33 True Resolved Planning & Zoning Photometric Plan CB17919-SITE.pdf RMK Light fixture cut sheet Please provide an image or cut sheet of the proposed lighting fixture for the buildings. 02/05/2021 3:33 PM Rachel Keesling The Photometric Plan has been revised to include the cut sheet. 32 False UnResolved Vectren Energy C400 Utility Plan.pdf Chad Miller Vectren Energy - CenterPoint Please have the developer call the new service center at 1-800- 01/29/2021 2:40 PM Chad Miller The Topographic Survey (sheet 200) and Utility Plan (sheet 400) have both been revised to Changemarks Report 990-1930 or newservice@vectren.com to have the existing gas service and meter set at 730 Pawnee Road retired before they demo the existing home. We might need to setup a meeting on the location of the proposed gas meters. include this note. 30 False UnResolved Transportation Systems C300 Site Dimension Plan.pdf DLj Short term bicycle parking Section 5.29 of the City of Carmel's UDO requires 0.1 short term bicycle parking spaces per bedroom for multi-family developments. Please revise the plans to include short term bicycle parking. 01/28/2021 3:42 PM David Littlejohn Short term bicycle parking has been added to the Site Dimension Plan. Still in communication with David Littlejohn on resolving nearness to bldg entrances and grade changes. See correspondence. Will continue communication and request waiver or variance if needed. 31 True Resolved Transportation Systems C300 Site Dimension Plan.pdf DLj Long term bicycle parking Section 5.29 of the City of Carmel's UDO highly encourages long term bicycle parking at a rate of 0.5 parking space per bedroom for multi-family dwelling uses. Please provide details on how long term bicycle parking will be provided if it will be included with this project. 01/28/2021 3:42 PM David Littlejohn oversized private garages as well as individual storage 1st floor storage for each unit 24 False UnResolved Fire C400 Utility Plan.pdf CFD Comments-L.Ray Relocate FDC to SW Corner Moving to the SW Corner helps get our trucks off of city center while connecting. If we block city center traffic it could block additional resources coming in during an event. 01/21/2021 3:27 PM Carmel Fire Per your coordination with Erik Dirks, the FDC has been moved south around the corner of building #1. Please see the Water Plan (sheet 401) for the revision. 25 False UnResolved Fire C400 Utility Plan.pdf CFD Comments-L.Ray Relocate FDC to SE Corner Moving to the SE Corner helps get our trucks off of city center while connecting to the FDC. If we block city center traffic 01/21/2021 3:27 PM Carmel Fire Per your coordination with Erik Dirks, the FDC has been moved south around the corner of building #2. Please see the Water Plan (sheet 401) for the Changemarks Report it could block additional resources coming in during an event. revision. 26 False UnResolved Fire C400 Utility Plan.pdf CFD Comments-L.Ray Relocate FDC to NW Corner Concerned that CFD would not have access to the FDC during construction if it is located on the SW corner? Moving it to the NW Corner will make for easier access 01/21/2021 3:27 PM Carmel Fire The future FDC location has been revised as requested (see Water Plan sheet 401). 27 False UnResolved Fire C400 Utility Plan.pdf CFD Comments-L.Ray Move Hydrant to NE corner The proposed location does not assist in fire fighting operations. By moving hydrant to the NE corner it will greatly improve CFD water supply and firefighting operations. 01/21/2021 3:27 PM Carmel Fire The Water Plan (see sheet 401) has been revised accordingly. 28 False UnResolved Fire C400 Utility Plan.pdf CFD Comments-L.Ray Fire Hydrant The last time we spoke there was an existing fire hydrant in this location. Has this hydrant been removed? 01/21/2021 3:27 PM Carmel Fire there may have been some miscommunication. There’s no existing hydrant in this location. The water main shown is a future water main which will be designed and constructed in Phase 2 of the development. The location marked is actually the backside of the existing strip center in the SE corner of 126th and Rangeline. The nearest existing hydrant is HYD48899 per GIS and it’s located on the south side of 126th Street approximately 52’ west of the NE corner of building #1. Said existing hydrant will remain in place upon completion of Phase 1. 29 False UnResolved Fire C400 Utility Plan.pdf CFD Comments-L.Ray Relocate FDC to NE corner Relocate FDC to NE Corner. This will allow CFD to connect from Auman Dr. or new cross street allowing for greater firefighting operations. 01/21/2021 3:27 PM Carmel Fire The FDC location has been revised as requested. Please refer to the Water Plan (sheet 401) for the revisions. Changemarks Report 23 False UnResolved Carmel Water Operations C400 Utility Plan.pdf water Changemark #01 see notes this sheet 01/20/2021 10:31 AM Steve Cook (existing hydrant): no, the nearest existing hydrant along 126th Street is HYD48899 per GIS and it’s located +/-142’ west of the location marked. The existing hydrant is labeled on the plans. Please note that the proposed water plan has been separated from the utility plan in the revised set. Please see Water Plan (sheet 401) for information. (wet tap connection to existing water main) no, the water main shown in this location is a future water main which will be designed and constructed with Phase 2 of the development. The location marked is actually the back side of the existing strip center in the SE corner of 126th and Rangeline. 21 True Resolved Urban Forestry L100 Street Tree Planting Plan.pdf DM street tree Please use a hybrid elm at 2.5" cal size for the street tree. 01/19/2021 4:07 PM Daren Mindham The revised planting plan, which replaces L100 street tree planting plan in its entirety, includes Patriot Elms for street trees. 22 True Resolved Urban Forestry L100 Street Tree Planting Plan.pdf DM detail please use the city standard detail. I have uploaded it into the correspondence folder. 01/19/2021 4:07 PM Daren Mindham The City standard detail has been included in the revised planting plan. 20 True Resolved Urban Forestry L101 Magnolia Condos LA.pdf DM landscaping Please change out the serviceberry to Japanese tree lilac or single stem redbud. Please note the sizes of the plans. For instance 18" or 24" shrubs and 1.5" cal trees. 01/19/2021 4:05 PM Daren Mindham The serviceberry trees have been replaced with magnolia trees (see revised planting plan) Changemarks Report