HomeMy WebLinkAboutGN010.0#1
of 9
Date:
2.9.21
Sheet:
Revision:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been
prepared by Case Design &
Remodeling solely for its use and
should not be reproduced or relied
upon by any other parties.
Dimensions shown or scaled are
subject to change per actual job
condition and must be verified.
Materials are to be supplied as
specified as equal or standard
when not uniquely specified.
Installed materials may vary in
appearance from drawings.
Reference manufacturer's product
data for actual appearance and
specifications.
Briscoe Residence
Master Bath Remodel
Susie and William
5038 Huntington Drive
Carmel, Indiana 46033
Approved By:
Date:
Jennifer Norrington
Lead Designer
jnorrington@caseindy.com
317.205.4398(c)
G002
FINAL
Maggie Smith
Designer
msmith@caseindy.com
GENERAL / CONSTRUCTION NOTES
DDEEMMOOLLIITTIIOONN NNOOTTEESS PPLLUUMMBBIINNGG NNOOTTEESS
FURNISH AND INSTALL (2) NEW SINKS AND 2 NEW FAUCETS IN EXISTING LOCATIONS
FURNISH AND INSTALL NEW FREE STANDING TUB WITH DECK MOUNT FAUCET ON PARTIAL
KNEE WALL
FURNISH AND INSTALL NEW TOILET IN EXISTING LOCATION FOR MASTER BATH
RELOCATE SHOWER DRAIN TO BE CENTERED
RELOCATE/ADD NEW PLUMBING LINES FOR NEW SHOWERHEAD, HANDHELD, ON/OFF AND
DIVERTER VALVES AND TRIMS
RELOCATE ADJACENT HALL BATH FORWARD AND REINSTALL EXISTING TOILET
EELLEECCTTRRIICC NNOOTTEESS
TERMINATE SWITCH FOR EXISTING JETTED TUB
INSTALL (2) NEW H.O. SUPPLIED VANITY LIGHTS IN EXISTING LOCATIONS ON 1 NEW DIMMER
SWITCH; SWITCH IN EXISTING LOCATION
INSTALL (1) NEW H.O. SUPPLIED WALL LIGHT IN EXISTING LOCATION ON 1 NEW DIMMER SWITCH;
SWITCH IN EXISTING LOCATION
FURNISH AND INSTALL (2) NEW GFCI OUTLETS IN EXISTING LOCATIONS AT VANITIES
FURNISH AND INSTALL (1) NEW LED RECESSED CAN LIGHT IN SHOWER ON 1 NEW SWITCH;
SWITCH LIGHT WITH CAN/FAN LIGHT
FURNISH AND INSTALL (1) NEW CAN FAN IN SHOWER ON 2 NEW SWITCHES; SWITCH LIGHT WITH
RECESSED CAN LIGHT
FIELD VERIFY IF SMOKE/CARBON DETECTORS NEED UPGRADED; ADDRESS WITH CHANGE ORDER
OR DIRECT WITH ON SITE ELECTRICIAN
SALVAGE ADJACENT HALLWAY BATHROOM TOILET FOR REINSTALLATION
BATHROOM VINYL FLOORING TO REMAIN
VANITY MIRROR TO REMAIN
MASTER BATH VANITY CABINETS AND HARDWARE TO REMAIN
DEMO WALLS PER PLANS BETWEEN ADJACENT HALL BATH AND MASTER BATH TOILET ROOM; FLOOR
TO BE MODIFIED AND REMAIN IN HALL BATH ((ASSUME SOME EXTRA PIECES AVAILABLE FROM H.O.))
REMOVE AND HAUL TUB DECK FRAMING AND TILES, TUB, TUB FAUCET, TERMINATE ELECTRICAL FOR
TUB JETS
REMOVE AND HAUL DOOR TO MASTER BATH TOILET/SHOWER ROOM; SALVAGE HARDWARE FOR
REINSTALLATION
REMOVE AND HAUL MASTER BATH TOILET
DEMO WALLS PER PLANS IN TOILET ROOM AND ADJACENT HALL BATH
REMOVE AND HAUL MASTER BATH VANITY COUNTERTOPS, SPLASH, SINKS AND FAUCETS
REMOVE AND HAUL VANITY LIGHTING AND LIGHT OVER CLOSET DOORWAY
REMOVE AND SALVAGE BATHROOM ACCESSORIES
FRAME FOR NEW WALLS IN MASTER BATHROOM TOILET ROOM AND ADJACENT HALL BATHROOM
FRAME FOR NICHE AND NEW THRESHOLD FOR MASTER SHOWER
FRAME FOR NEW VINYL WINDOW IN SHOWER WALL (30"X24"); SEE ELEVATIONS FOR LOCATION
PATCH DRYWALL WALLS AND CEILING IN SHOWER/TOILET ROOM FROM DEMOLITION
FRAME FOR PARTIAL KNEE WALL BEHIND NEW FREE STANDING TUB LOCATION
INSTALL NEW PEBBLE FLOOR TILES WHERE TUB DECK WAS REMOVED; ASSUME METAL FLOOR
TRANSITION TO FINISH EXPOSED EDGE OF TILE TO EXISTING VINYL FLOOR; TEC SILVERADO GROUT
INSTALL NEW PEBBLE FLOOR TILE FOR MASTER BATH CUSTOM SHOWER PAN; APPLY CLEAR SEALER;
TEC SILVERADO GROUT
FURNISH AND INSTALL NEW QUARTZ COUNTERTOPS AT VANITY; INCLUDES NEW SHOWER PARTS AND
WALL CAP FOR TUB KNEE WALL
FURNISH AND INSTALL NEW DROP IN SINK AND WIDE SPREAD FAUCETS; NO SPLASH
FURNISH AND INSTALL NEW 3X6 GLASS SUBWAY TILES AS BACKSPLASH AT VANITY, BELOW MAKE UP
VANITY, AND AROUND NEW TUB AREA; STOP TILE TO THE RIGHT OF THE TOILET ROOM DOOR; TRIM
WITH BLACK GLOSS PENCILS; TEC SILVERADO GROUT
FURNISH AND INSTALL NEW 3X6 GLASS SUBWAY TILES IN NEW MASTER BATH SHOWER; TRIM NICHE,
TILE ACCENT RUG, WINDOW, AND TILE ENDS WITH BLACK GLOSS PENCIL; TEC SILVERADO GROUT
FURNISH AND INSTALL NEW FREE STANDING TUB WITH DECK MOUNT FAUCET
FURNISH AND INSTALL NEW CLEAR GLASS ENCLOSURE WITH BRUSHED BRONZE HARDWARE
INSTALL MIRROR 2" FRAME ONTO EXISTING MIRROR
INSTALL H.O. PROVIDED TOWEL BAR AND ROBE HOOKS; FIELD VERIFY LOCATIONS
PATCH VINYL FLOORING IN ADJACENT HALL BATHROOM FROM RELOCATION (IF NEEDED WITH H.O.
SUPPLIED FLOORING TO MATCH))
PPRROOPPOOSSEEDD NNOOTTEESS
#2 3.9.21
#3 3.17.21
#4 3.26.21
#5 4.1.21
PPAAIINNTT NNOOTTEESS
TOUCH UP PAINT IN MAIN BATHROOM AREA FROM DEMOLITION OF MIRRORS,LIGHTS, REMOVAL
OF TUB DECK, AND RELOCATION OF LIGHT OPPOSITE OF VANITY WALL
PAINT WALLS AND CEILING IN MASTER TOILET ROOM
PAINT TOILET WALL IN ADJACENT HALL BATH
STAIN CASING FOR NEW WINDOW ON MAIN BATHROOM SIDE
CLEAR COAT EXISTING BASEBOARD AND DOOR CASINGS TO REFRESH STAIN
04/13/21