Loading...
HomeMy WebLinkAboutCorrected Backflow ReportFrom: Karen Chaudion To: Rhonda Bates Subject: Fwd: We have received your response for City of Carmel Backflow Test Form Date: Tuesday, April 13, 2021 6:35:34 PM Revised backflow for Bach to Rock project in Carmel. Thanks, Karen Chaudion Project Manager Capitol Construction 317-574-5488 ext.107 317-670-3611 cell From: Joshua Line <jline@sandordev.com> Sent: Tuesday, April 13, 2021 6:28:31 PM To: Karen Chaudion <kchaudion@capitolconstruct.com> Subject: Fwd: We have received your response for City of Carmel Backflow Test Form Revised back flow report. Let me know if you have any questions. Josh Line Property Manager Sandor Development 317-524-7903 From: Carmel Backflow <Backflow@carmel.in.gov> Sent: Tuesday, April 13, 2021 6:26:32 PM To: Joshua Line <jline@sandordev.com> Subject: We have received your response for City of Carmel Backflow Test Form Testers Email h2obackflow@yahoo.com Customers Email Select Tester From List MILLER, MARK _BF00-1725 Gauge Information 05122609 Phone Number (317) 626-9441 Calibration Date 12-08-2020 Select Company or Self Self Select Service Use Commercial MANAGER NAME or COMMERCIAL CUSTOMER NAME Sandor Developement Type a question 156488604 DEVICE LOCATION ADDRESS Street name: North Michigan Road House number: 10895 City: Zionsville State: IN Postal code: 46077 Country: United States Existing, New or Replacing Device Existing Device Serial Number 4784549 Manufacturer of device Wilkins Device Size 2” Model Number Of Device 975xl2 Type of protection Containment Type Of Service Domestic Type a question Riser room Hazard Code RP Passed or Failed PASS DC DC Check Valve #1 Held At What PISD Closed Tight Leaked Check Valve #2 Held At What PISD Closed Tight Leaked Date Time DC DC Check Valve #1 Held At What PISD Closed Tight Leaked Check Valve #2 Held At What PISD Closed Tight Leaked Date Time RP RP Check Valve #1 Held At What PISD Closed Tight Leaked Check Valve #2 Held At What PISD Closed Tight Leaked Pressure Differential Relief Valve Opened At What PISD Did NOT Open Date Time RP RP Check Valve #1 Held At What PSID 9.6 Closed Tight Yes Leaked Check Valve #2 Held At What PSID Closed Tight Yes Leaked Pressure Differential Relief Valve Opened At What PSID 3.2 Did NOT Open Passed or Failed PASS Tagged YES Date 03/31/2021 8:20 AM Time PVB PVB Opened At What PSID Did NOT Open Did OPEN Check Valve Held At What PSID Date Time PVB PVB Opened At What PSID Did NOT Open Did OPEN Check Valve Held At What PSID Date Time AIR GAP ONLY Final Test Results Measured vertical inches above overflow rim Supply size diameter Air Gap Date Time Testers Full Name: MILLER, MARK _BF00-1725 Date 04/13/2021 6:20 PM Time