Loading...
HomeMy WebLinkAboutGN010.1N EXISTING 2X4 FRAMING DEMOLITION & FRAMING KEY NO DEMO IN THIS ROOM EXISTING 2X6 FRAMING WALL SECTION TO BE REMOVED NEW 2x4 FRAMING NEW 2X6 FRAMING BULK HEAD / LOWERED CEILING 2668 3068 4368 2468 52510 5244 2468 CEILING CEILING CEILING R SD 6' 9'-6 1/2" 5'-2 1/2" 21'-7 3/4" 13'-5 3/4" 21'-10 3/4" 23'-8" 6'-11 3/4" 3'-11" 14'-7 1/2" 7'-6 1/8" 8'-5" GN1 D3 E1 H1 D2 WIC BEDROOM D4 D4 CARPET Ceiling Height 9'0" D5 D1 D6 NO SCOPE NO SCOPE D2 DEMO & PREP PLAN NOTES NOTE QTY DESCRIPTION 1 INSTALL FLOOR PROTECTION FROM FRONT ENTRY DOOR TO LOCATION OF REMODEL. SEAL OFF HALLWAY WITH PLASTIC SIPPER WALLS. 2 TRIM CARPENTER TO REMOVE SELECT SHELVES 1 REMOVE WALL & ADD HEADER TO SUPPORT WEIGHT 2 REMOVE DOOR & SAVE FOR RE-INSTALL 1 FRAME TEMP WALLS & DEMO LOAD BEARING WALL. PREP WALLS FOR NEW STRUCTURAL BEAM 1 ROLL BACK EXISTING CARPET & PAD FOR REWORK & INSTALL D1 D2 D3 D4 D5 D6 D1 D2 D3 D4 D5 D6 ELECTRICAL DEMO/DISCONNECT NOTES NOTE QTY DESCRIPTION 1 REMOVE & DISCONNECT OUTLET & SWITCH PRIOR TO DEMO E1 GENERAL NOTES NOTE QTY DESCRIPTION 1 SIRE DUMPSTER & PORTALET TO BE LOCATED ON DRIVEWAY. SITE VERIFY LOCATION WITH HOMEOWNERS. GN1 HVAC DEMO/DISCONNECT NOTES NOTE QTY DESCRIPTION 1 DISCONNECT EXISTING RETURN DUCT & VENT FOR NEW WALL FRAMING. VENT TO BE RELOCATED AS SHOWN ON PROPOSED PLANS. H1 McCAW RESIDENCE Bedroom Remodels 1808 Milford St Carmel, IN 46032 Revision: Date: A2 SHEET OF 7 SIGNATURE / SEAL Client Initials: Date: The plans, including all text, drawings, concepts, and ideas forming a part of the plans and the selection and arrangement thereof are Copyright 2018 of Custom Living, Inc., Indianapolis, IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans or their content without the prior written permission of Custom Living Inc. is strictly prohibited. CUSTOM LIVING 5335 Winthrop Ave Indianapolis IN 46220 4/18/2021 DATE: [PRINTS TO SCALE IF PRINTED ON 24" X 36" ] DESIGNER: EMMA MAXWELL E: emma@customlivingusa.com C: 574.292.2441 GENERAL SITE PREP & DEMO NOTES Install plastic to seal off areas being remodeled from rest of home as necessary. Install floor covering for construction path from door designated as the construction entrance to locations of remodeling as necessary. Install additional floor covering or wall protection as needed over areas close to the areas of construction activity. Install dust control measures on HVAC cold air returns located within the locations of remodeling. Custom Living can provide a HEPA Air Scrubber to aid in airborne dust control from the start of demolition up to priming of new drywall depending on site conditions. Homeowner understands that this will help to reduce airborne dust; however, it will not mitigate it in its entirety. Demolition Contractor(s) are responsible for all labor, for the scope of work specified in the drawings provided by Custom Living. Homeowner understands that Custom Living has only provided a labor and material allowance for the scope of demolition denoted on the drawings. Any additional scope added or uncovered during demolition result in filing a Change Order during construction. Homeowners understand that demolition work will generate dust and noise throughout the house. Custom Living will provide site protection measures to reduce where possible, but Homeowners should not expect 100% containment. EXISTING/DEMO PLAN SCALE: 1/2" = 1' 04/21/21