HomeMy WebLinkAboutGN010.1N
EXISTING 2X4 FRAMING
DEMOLITION & FRAMING KEY
NO DEMO IN THIS ROOM
EXISTING 2X6 FRAMING
WALL SECTION TO BE REMOVED
NEW 2x4 FRAMING
NEW 2X6 FRAMING
BULK HEAD / LOWERED CEILING
2668
3068
4368
2468
52510
5244
2468
CEILING
CEILING
CEILING
R
SD
6'
9'-6 1/2"
5'-2 1/2"
21'-7 3/4"
13'-5 3/4"
21'-10 3/4"
23'-8"
6'-11 3/4"
3'-11"
14'-7 1/2"
7'-6 1/8"
8'-5"
GN1
D3
E1
H1
D2
WIC
BEDROOM
D4
D4
CARPET
Ceiling Height 9'0"
D5
D1 D6
NO SCOPE
NO SCOPE
D2
DEMO & PREP PLAN NOTES
NOTE QTY DESCRIPTION
1
INSTALL FLOOR PROTECTION FROM FRONT ENTRY DOOR
TO LOCATION OF REMODEL. SEAL OFF HALLWAY WITH
PLASTIC SIPPER WALLS.
2 TRIM CARPENTER TO REMOVE SELECT SHELVES
1 REMOVE WALL & ADD HEADER TO SUPPORT WEIGHT
2 REMOVE DOOR & SAVE FOR RE-INSTALL
1
FRAME TEMP WALLS & DEMO LOAD BEARING WALL. PREP
WALLS FOR NEW STRUCTURAL BEAM
1
ROLL BACK EXISTING CARPET & PAD FOR REWORK &
INSTALL
D1
D2
D3
D4
D5
D6
D1
D2
D3
D4
D5
D6
ELECTRICAL DEMO/DISCONNECT NOTES
NOTE QTY DESCRIPTION
1
REMOVE & DISCONNECT OUTLET & SWITCH PRIOR TO
DEMO
E1
GENERAL NOTES
NOTE QTY DESCRIPTION
1
SIRE DUMPSTER & PORTALET TO BE LOCATED ON
DRIVEWAY. SITE VERIFY LOCATION WITH HOMEOWNERS.
GN1
HVAC DEMO/DISCONNECT NOTES
NOTE QTY DESCRIPTION
1
DISCONNECT EXISTING RETURN DUCT & VENT FOR NEW
WALL FRAMING. VENT TO BE RELOCATED AS SHOWN ON
PROPOSED PLANS.
H1
McCAW RESIDENCE
Bedroom Remodels
1808 Milford St
Carmel, IN 46032
Revision: Date:
A2
SHEET OF 7
SIGNATURE / SEAL
Client Initials:
Date:
The plans, including all text, drawings, concepts, and ideas
forming a part of the plans and the selection and arrangement
thereof are Copyright 2018 of Custom Living, Inc., Indianapolis,
IN. ALL RIGHTS RESERVED. The plans shall remain the
property of Custom Living Inc. Any use of the plans or their
content without the prior written permission of Custom Living Inc.
is strictly prohibited.
CUSTOM LIVING
5335 Winthrop Ave
Indianapolis IN 46220
4/18/2021
DATE:
[PRINTS TO SCALE IF PRINTED ON 24" X 36" ]
DESIGNER: EMMA MAXWELL
E: emma@customlivingusa.com
C: 574.292.2441
GENERAL SITE PREP & DEMO NOTES
Install plastic to seal off areas being remodeled
from rest of home as necessary.
Install floor covering for construction path from
door designated as the construction entrance to
locations of remodeling as necessary.
Install additional floor covering or wall protection
as needed over areas close to the areas of
construction activity.
Install dust control measures on HVAC cold air
returns located within the locations of
remodeling.
Custom Living can provide a HEPA Air Scrubber
to aid in airborne dust control from the start of
demolition up to priming of new drywall
depending on site conditions. Homeowner
understands that this will help to reduce airborne
dust; however, it will not mitigate it in its entirety.
Demolition Contractor(s) are responsible for all
labor, for the scope of work specified in the
drawings provided by Custom Living.
Homeowner understands that Custom Living has
only provided a labor and material allowance for
the scope of demolition denoted on the
drawings. Any additional scope added or
uncovered during demolition result in filing a
Change Order during construction.
Homeowners understand that demolition work
will generate dust and noise throughout the
house. Custom Living will provide site protection
measures to reduce where possible, but
Homeowners should not expect 100%
containment.
EXISTING/DEMO PLAN
SCALE: 1/2" = 1'
04/21/21