Dear Mr. Fuller:
We have processed your order to remove the meter and service for demo for the address 14330 Shelborne
Rd. Westfield, IN 46074.
The work order number 39551955 to remove meter number 318593118 and service was completed on
01/26/2021.
The work order number 39551829 to remove meter number 318593172 and service was completed on
01/25/2021.
The work order number 39551896 to remove the outdoor light Pole # 085-359 has not been completed yet.
If you have any questions, you may call 800.774.0246 or reply to this email. Our Service Installation
Specialists are available Monday through Friday from 7 a.m. to 7 p.m.
Best regards,
Erin
Service Installation Specialist
Duke Energy
From:"David Fuller" <dave@renascentinc.com>
Sent:February 10, 2021 at 9:39 AM
To:avaya_INSvcInstall@duke-energy.com
Cc:"IN Service Installation@duke-energy.com" <INServiceInstallation@duke-energy.com>
Subject:[EXTERNAL] RE: Total Service Retirement Request
*** CAUTION! EXTERNAL SENDER *** STOP & THINK! Do you know and trust this sender? Were you
expecting this email? Are grammar and spelling correct? Does the content make sense? If suspicious, then do
not click links, open attachments or enter your ID or password.
Follow up on this request for 14330 Shelborne Rd, Carmel. Has the retirement been completed? I
need an email confirmation. Thank you.
David Fuller
Business Development Manager
Direct 317.710.7406
Email dave@renascentinc.com
1David FullerFrom:NewService <newservice@centerpointenergy.com>Sent:Friday, January 22, 2021 2:03 PMTo:David FullerSubject:FW: [External Email] Total Service Retirement RequestGood Afternoon, At first look, we do not have a record of service listed under this address. Have you found evidence of natural gas onsite i.e. gas meter, riser or appliances? We can send someone out to double check but I’m thinking since it’s so far off the road and we don’t have a gas main on Shelborne that they probably had a different heat source. Please let us know what you find onsite and if we need to investigate further. Thank you, Vectren New Service 1‐800‐990‐1930 From: David Fuller <dave@renascentinc.com> Sent: Friday, January 22, 2021 11:44 AM To: NewService <newservice@centerpointenergy.com> Subject: [External Email] Total Service Retirement Request EXTERNAL EMAIL For demolition of structure purposes, please immediately begin the total disconnection of service to the following residential structures in Carmel/Westfield, IN area. 14330 Shelborne Rd, Westfield, IN Once completed, please email me with a confirmation of completion. Do not hesitate to call or email me at the below contact info if there are any questions, delays or problems with this request. And a confirmation of the receipt of this request would be greatly appreciated too…
CITY OF CARMEL
RIGHT OF WAY PERMIT
PERMIT #: RW-2021-00061
1/26/2021
PROJECT NAME: ROW permit needed for Construction Entrance - Demolition of Structures
PROJECT LOCATION: 14330 SHELBORNE RD, CARMEL, 46074
PROJECT DESCRIPTION:
Applicant:
David Fuller
935 Troy Ave
Indianapolis, IN 46225
dave@renascentinc.com
Project Contact:
Renascent, Inc
935 W Troy Ave
Indianapolis, IN 46225
317-710-7406
dave@renascentinc.com
The City of Carmel has approved a Right of Way permit for the project and applicant shown above. Any changes to the scope of
work after permit issuance impacting city rights-of-way or dedicated easements may require additional approvals and must be
coordinated with the Engineering Department prior to performing the work. This includes, but is not limited to, pavement cuts ,
lane/street closures, path/sidewalk closures, easement encroachments, and new utility poles or aerial service lines.
CONDITIONS OF RIGHT-OF-WAY PERMIT
1. The applicant/contractor is required to post and maintain a valid License and Permit bond with the City of Carmel for the
duration of the project.
2. Indiana’s “Call Before You Dig” law (IC 8-1-26) requires everyone that digs to contact Indiana 811 at least two (2) full
working days before starting their project in order to have existing underground facilities properly identified and located.
3. The City Engineer’s office (317-571-2441) is to be notified before the start of a Right of Way pavement repair so that a
City Inspector can observe the placement of patch materials. A minimum of two (2) hours of notice is required. Failure
to notify may result in removing and replacing the repair.
4. Asphalt pavements that are required to be removed shall be saw cut, and then carefully removed to minimize pavement
damage. The cut must be repaired with flowable fill with 12” of concrete and 1 1/2” of surface asphalt. All seams shall
be tack coated and shall be ironed as necessary to provide a perfect joining of the patch with the surrounding pavement .
No cold mix asphalt is to be used except as temporary patches.
5. Concrete pavement shall be saw cut and then carefully removed to minimize pavement damage. The new concrete
patch shall be placed using at least 4000psi concrete for driveway aprons and sidewalks, and Class A concrete for road
cuts. The edges of the adjoining pavement shall be coated with an epoxy adhesive intended for concrete patching. The
patched area shall be properly barricaded for at least seven (7) days and the patch shall be treated with two (2) coats of
a curing compound or a curing membrane.
6. All excavations in grassed areas shall be capped with a minimum of 6” of topsoil and seeded with high quality bluegrass
seed equal to other existing grass. All excavations within 5’ of the edge of pavement shall be filled with a granular fill
material and topped with at least 6” of topsoil. All ditches disturbed by excavation shall be properly restored and
sodded.
7. Upon completion of all repairs, the Applicant shall request inspection from the City Engineer’s office. Upon inspection if
all repairs are satisfactory the Inspector shall release the permit.
8. The City of Carmel will hold the Applicant directly responsible for all work performed under this permit.
9. If the City Engineer and/or his Inspector determine that the workmanship is incomplete or unacceptable, the City
reserves the right to withhold release of the permit for up to one year.
Right of Way Inspector Contact
Aaron Hoover
Office:317-571-2677 Cell: 317-714-8908