Loading...
HomeMy WebLinkAboutA702 2ND FL FINISH1 2 3 4 5 D E C B A CONFERENCE 204 EXST EXST VB-1 OFFICE 205 EXST EXST VB-1 OFFICE 203 EXST EXST VB-1 OFFICE 202 EXST EXST VB-1 OFFICE 201 EXST EXST VB-1 OFFICE 212 CPT-1 EXST VB-1 OPEN OFFICE 206 EXST EXST VB MECH 211 EXST EXST EXST OFFICE 207 CPT-1 P-1 VB-1 RR 210 SC-1 PWT-2/P-1 - RR 209 SC-1 PWT-2/P-1 - OFFICE 208 CPT-1 P-1 VB-1 STAIR ST-2 CPT-2 P-1/VWC-1 VB-1 VWC-1 1 P-2 P-2 P-2 P-2 P-2 P-2 P-2 P-2 2 P-2 P-2 P-2 P-2 3 3 4 4 4 4 ROOM NAME ROOM # FLOOR BASE WALLS A. ALL GENERAL FINISHES ARE NOTED ON FINISH ROOM TAG U.N.O. B. REFERENCE REFLECTED CEILING PLAN FOR ADDITIONAL CEILING INFO. C. ALL NEW INTERIOR FINISHES, INCLUDING FLOOR, WALL, AND CEILING MATERIALS, SHALL BE IN ACCORDANCE WITH FLAME SPREAD AND SMOKE DEVELOPMENT REQUIREMENTS FOUND IN THE CURRENT EDITION OF THE INTERNATIONAL BUILDING CODE. D. CONTRACTOR TO SUBMIT A MINIMUM OF (3) THREE SAMPLES OF EACH FINISH TO DESIGNER FOR APPROVAL PRIOR TO ORDERING. ALTERNATES WILL NOT BE ACCEPTED WITHOUT WRITTEN APPROVAL OF ARCHITECT. E. CONTRACTOR TO IMMEDIATELY NOTIFY ARCHITECT IF A SPECIFIED FINISH ITEM BECOMES UNAVAILABLE. F. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL NEW INTERIOR WALL AND CEILING FINISHES WILL BE CLASS B MINIMUM, WITH A FLAME SPREAD RATING OF 75 MAXIMUM AND A SMOKE DEVELOPED INDEX OF 450 MAXIMUM PER IBC SECTION 803 G. PREPARE ALL FLOOR AND WALL CONSTRUCTION, NEW AND/OR EXISTING, TO RECEIVE NEW FINISHES IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDED INSTALLATION METHODS AND MATERIALS FOR ALL FINISHES. H. PRIOR TO INSTALLATION OF NEW FINISHES, CONTRACTOR SHALL INSPECT ALL SUBSTRATES. IF A SUBSTRATE IS DEEMED UNACCEPTABLE, THE CONTRACTOR SHALL TAKE THE NECESSARY STEPS TO RECTIFY THE SITUATION OR CONTACT THE ARCHITECT WITH THE CONCERN. PROCEEDING WITH THE INSTALLATION OF FINISHES WILL BE INDICATION THAT THE INSTALLER / FINISHER ACCEPTS CONDITION OF SUBSTRATE. I. USE MANUFACTURER'S RECOMMENDED INSTALLATION METHODS AND MATERIALS FOR ALL FINISHES. J. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE PROVIDED AND INSTALLED BY FLOORING CONTRACTOR K. FLOORING CONTRACTOR TO LEVEL SUBSTRATE AS REQUIRED TO ACCEPT NEW FLOORING MATERIAL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION. FOR CARPET REQUIRING SEAMING, PROVIDE SEAM DIAGRAM LAYOUT FOR DESIGNER APPROVAL PRIOR TO INSTALLATION. L. CARPET SEAMS TO BE LOCATED AT CENTERLINE OF DOOR WHEN DOOR IS IN CLOSED POSITION M. ALL FLOORING TRANSITIONS SHALL COMPLY WITH ADA GUIDELINES. FLOORING CONTRACTOR TO SUBMIT A DIAGRAM SHOWING FLOORING TRANSITION LOCATIONS FOR DESIGNERS APPROVAL PRIOR TO INSTALLATION. N. ALL TRANSITION/REDUCER STRIPS AND OTHER THRESHOLDS TO BE LOCATED AT CENTERLINE OF DOOR WHEN IN CLOSED POSITION O. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT AT DOORS, U.N.O. P. FINISH LEVEL OF GYP. BD. WALLS AND SOFFITS TO BE LEVEL 4, U.N.O. Q. ALL PAINTED SURFACES SHALL RECEIVE A MINIMUM OF (1) ONE BASE COAT AND (2) TWO FINISH COATS R. PAINTED SHEEN LEVEL TO BE SATIN/EGG-SHELL FOR ALL WALLS, U.N.O. SHEEN FOR ALL WET AREA WALLS, METAL DOORS AND METAL FRAMES TO BE SEMI-GLOSS. S. ALL METAL DOORS, STAIR RAILINGS, STRINGERS AND FRAMES TO BE PAINTED P-3. Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 4/7/2021 1:37:07 PM A702 SECOND FLOOR FINISH PLAN 2021.00173 04/05/2021 CONSTRUCTION DOCUMENTS ARTISTIC COMPOSITE PALLETS - PHASE 1 4518 WEST 99TH STREET CARMEL, IN 46032 N 3/32" = 1'-0" A702 1 SECOND FLOOR FINISH PLAN FINISH ROOM TAG KEY GENERAL FINISH NOTES FINISH KEY PLAN KEY NUMBER KEYNOTE DESCRIPTION 1 PAINT EXISTING STAIR RAILINGS AND STRINGERS P-3. 2 PAINT EXISTING DUCTWORK P-2. 3 REFINISH EXISTING CONCRETE FLOOR TO MATCH ADJACENT CONCRETE FLOORS. 4 INFILL EXSITING CARPET TILE WITH SALVAGED CARPET TILE FROM CONFERENCE AND OPEN OFFICE. SALVAGE REMAINDER FOR ATTIC STOCK. 5 FIRST FLOOR LANDING TO BE OWNER FURNISHED TILE. REVISION SCHEDULE NO. DESCRIPTION DATE 04/26/21