Loading...
HomeMy WebLinkAboutG001 SHEET INDEXEARTH NOTE:PATTERNS SHOWN REPRESENT CUT MATERIALS IN PLAN OR SECTION, UNLESS NOTED GRANULAR FILL OTHERWISE. CONCRETE, CAST-IN-PLACE CONCRETE, PRECAST/CAST STONE CONCRETE MASONRY UNIT BRICK MASONRY STONE: LIMESTONE, GRANITE, MARBLE OR AS NOTED METAL: TYPE AS NOTED METAL: ROLLED SHAPES WOOD FRAMING / BLOCKING: CONTINOUS WOOD SHIM WOOD/FINISHED, SHOWN CUT AND ELEVATION PLYWOOD PARTICLEBOARD EIFS SPRAYED FIREPROOFING SHOWN ON ROLLED SHAPE BATT INSULATION: THERMAL OR ACOUSTICAL, UNO RIGID INSULATION: THERMAL, ACOUSTICAL, OR SAFING SHEATHING: GYPSUM, OR AS NOTED GYPSUM WALL BOARD TILE: CERAMIC, QUARRY, UNO RESINOUS FLOORING: TERRAZO, TROWEL-ON, UNO ACOUSTICAL CEILING TILE GRATING (PLAN) INSULATED GLASS: (SMALL SCALE) GRATING (SECTION) MEMBRANE: WATERPROOF, ROOF, DAMPPROOFING AIR BARRIER SYSTEM INSULATED GLASS: (DETAIL) TERRA COTTA, STRUCTURAL CLAY TILE CARPET, CARPET TILE (DETAIL) SAND, GROUT AS NOTED GLASS FIBER REINFORCED CONCRETE SIDING OR TRIM WOOD/ENGINEERED: GLUE LAMINATED PLASTER ON METAL LATH WOOD FLOOR, WOOD SHINGLES, OR SIDING ENLARGED DRAWING REFERENCE ELEVATION DATUM REFERENCE NORTH ARROW DRAWING NUMBER SHEET NUMBER BUILDING SECTION CUT REFERENCE SF27 101 A101 1 SIM 1 1 W3 N 1 KEYED NOTE REVISION REFERENCE STOREFRONT/CURTAINWALL/WINDOW TAG DOOR TAG ROOM NAME AND NUMBER COLUMN GRID NEW A DRAWING NUMBER SHEET NUMBER WALL SECTION CUT REFERENCE DRAWING NUMBER SHEET NUMBER EXTERIOR ELEVATION REFERENCE WALL TYPE REFERENCE (REFERENCE INTERIOR PARTITION LEGEND) COLUMN GRID EXISTING 1 EQUIPMENT TAG X XX X XX 1 Ref XX Room 101 A. SEE SHEET G001 FOR GRAPHIC SYMBOL LEGEND. B. SEE SHEET A000 FOR GENERAL PARTITION NOTES. C. SEE SHEET A701 FOR GENERAL FINISH NOTES D. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION. E. ALL DIMENSIONS ARE TO GRID LINES, FACE OF STUD FRAMING, FINISHED FACE OF EXISTING WALL SURFACE, OR FACE OF CONCRETE / MASONRY UNITS UNLESS NOTED OTHERWISE. F. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR SHALL FURNISH ALL NECESSARY PERMITS. G. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.) INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY REGULATIONS AND HAZARDOUS WASTE LAWS, ETC. H. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN EACH BUILDING COMPONENT LOCATION. BRING ANY DISCREPANCIES TO THE ARCHITECT'S ATTENTION IN WRITING IMMEDIATELY. I. BUILDING FIRST FLOOR IS REFERENCE ELEVATION 100'-0". REFERENCE CIVIL DRAWINGS FOR U.S.G.S. ELEVATION. J. ALL WORK SHALL BE PERFORMED IN A SKILLED WORKMANSHIP TYPE AND MANNER ACCEPTABLE TO THE ARCHITECT AND OWNER. K. CAULK INTERSECTION BETWEEN DIFFERENT MATERIALS. L. CAULK TOILET FIXTURES AND COUNTERTOP SPLASHES TO FINISH SURFACE IN ACCORDANCE WITH SEALANT SCHEDULE IN SPECIFICATIONS. M. EXISTING CONDITIONS SHALL BE FIELD VERIFIED PRIOR TO BIDDING OR BEGINNING OF WORK. ANY ERRORS OR OMISSIONS SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION IN WRITING IMMEDIATELY. N. COVER ALL RETURN AIR AND EXHAUST GRILLES WITH FILTER MEDIA FOR DURATION OF JOB AND CHANGE REGULARLY. O. THE MECHANICAL, ELECTRICAL AND PLUMBING SCOPE INDICATED ON THE CONSTRUCTION DOCUMENTS IS INTENDED TO DEPICT GENERAL DESIGN INTENT ONLY. ACTUAL WORK IS TO BE DESIGNED, PERMITTED AND EXECUTED BY A QUALIFIED DESIGN-BUILD CONTRACTOR UNDER THE SUPERVISION OF THE GENERAL CONTRACTOR. THE RESPONSIBLE CONTRACTOR SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY REGULATIONS AND HAZARDOUS WASTE LAWS, ETC. 1. THE MECHANICAL, ELECTRICAL AND PLUMBING SCOPES OF WORK ARE LIMITED TO BASIC DESIGN-BUILD ALTERATIONS WHICH ARE OUTLINED IN THESE PLANS. THE DESIGN- BUILD CONTRACTORS FOR EACH TRADE MUST NOTIFY THE ARCHITECT IF THEY FIND THAT THE SCOPE OF WORK EXCEEDS THE LEVEL OF MECHANICAL, ELECTRICAL OR PLUMBING WORK INDICATED ON THESE DRAWINGS SO THAT ANY NECESSARY ENGINEERING CAN OCCUR AND ADDITIONAL PLANS CAN BE FILED, OR IF ADDITIONAL INFORMATION IS NEEDED IN ORDER TO DO THE WORK IN THE FIELD. THE MECHANICAL, ELECTRICAL AND PLUMBING DESIGN-BUILD CONTRACTORS SHALL COMPLY WITH ALL APPLICABLE STATE AND LOCAL BUILDING CODES. FIRE SUPPRESSION AND FIRE ALARM SYSTEMS SHALL BE INSTALLED BY THE APPROPRIATE DESIGN-BUILD CONTRACTOR AND MUST COMPLY WITH ALL APPLICABLE STATE AND LOCAL BUILDING CODES. FIRE SUPPRESSION AND FIRE ALARM DESIGN-BUILD CONTRACTORS ARE RESPONSIBLE FOR COMPLETING AND FILING THEIR PLANS AND OBTAINING THEIR PERMITS. 2. MECHANICAL WORK IS LIMITED TO A DESIGN-BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS. NO NEW MAIN MECHANICAL APPLIANCES OR MAIN EQUIPMENT ARE BEING PROVIDED. ALL MECHANICAL WORK IS LIMITED TO RELOCATION OF DIFFUSERS AND FLEX DUCT PER NEW WALL LAYOUT. NO NEW HARD DUCTWORK OR EQUIPMENT IS BEING ADDED; MECHANICAL CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY WITH THE INDIANA MECHANICAL CODE AND ALL OTHER APPLICABLE CODES. 3. VERIFY HEAT LOADS OF ANY SPECIAL EQUIPMENT IN THE TENANT SPACE, AND PROVIDE ADDITIONAL AIR FLOW IF REQUIRED. CONFIRM WITH OWNER PRIOR TO ANY PURCHASE OF NEW EQUIPMENT. REVISE ZONING IF REQUIRED. DO NOT DESIGN ANY SINGLE OFFICE SPACE TO BE ON A SPLIT ZONE UNLESS APPROVED BY BUILDING OWNER/LANDLORD. 4. RELOCATE AIR-SUPPLY DIFFUSERS AND RETURN-AIR GRILLES AS REQUIRED. PROVIDE PROPER AIR SUPPLY FOR DIFFUSERS AND RETURN AIR FROM RETURN AIR GRILLES. CONTRACTOR IS TO PLACE LOCATION OF DIFFUSERS AND RETURN AIR GRILLES AS REQUIRED BY CODE. 5. POSITION LOCATION OF ALL THERMOSTATS WHERE APPROPRIATE PER MECHANICAL DESIGN. COORDINATE WITH TENANT AND BUILDING OWNER FOR FURNITURE PANEL OR OTHER CONFLICTS. 6. ELECTRICAL WORK IS LIMITED TO A DESIGN-BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS. ALL ELECTRICAL WORK IS LIMITED TO ADDITIONS OR RELOCATIONS OF ELECTRICAL OUTLET DEVICES AND LIGHTING THAT DO NOT EXCEED THE CAPACITY OF THE EXISTING ELECTRICAL SERVICE IN THE BUILDING. ELECTRICAL CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY WITH ALL APPLICABLE CODES. 7. COMPLY WITH THE INDIANA ELECTRICAL AND MECHANICAL CODE AND ALL OTHER APPLICABLE CODES. 8. SIZE AND CIRCUIT ELECTRICAL POWER ITEMS. PROVIDE OR REUSE ELECTRICAL POWER AND DATA OUTLETS AS REQUIRED. 9. ALL ELECTRICAL OUTLETS WITHIN 6'-0" OF WATER ARE TO BE G.F.C.I. 10. AT EACH PHONE AND DATA JACK, PROVIDE PULL STRING FROM ABOVE CEILING TO BOX. TENANT'S DATA CONTRACTOR IS RESPONSIBLE FOR PULLING CONDUCTORS AND PROVIDING APPROPRIATE TERMINALS AT FACE PLATE. 11. PROVIDE COLORED FACEPLATES FOR ELECTRICAL OUTLETS & SWITCHPLATES TO MATCH EXISTING, UNLESS OTHERWISE NOTED. ELECTRICIAN TO FIELD VERIFY PRIOR TO PURCHASE. 12. CONTRACTOR TO COORDINATE WITH TENANT ON WORKSTATION FURNITURE SPECIFICATIONS TO OBTAIN CIRCUITRY REQUIREMENTS PRIOR TO RUNNING ELECTRICAL CONDUITS TO JUNCTION BOXES. 13. IF REQUIRED, AND AS NECESSARY, PROVIDE NEW BALLASTS AND LAMPS IN ALL LIGHTS IN EXISTING SPACES. CONSULT WITH LANDLORD. 14. VERIFY EXISTING LIGHTING CIRCUITING. SIZE NEW CIRCUITS AS REQUIRED. PROVIDE NEW OR REVISE EXISTING CIRCUITING FOR NEW LAYOUT OF LIGHT FIXTURES. 15. ENSURE THAT ALL MOUNTING HEIGHTS OF ELECTRICAL DEVICES MEET A.D.A. REQUIREMENTS. 16. WHERE MULTIPLE SWITCHES ARE SHOWN, PROVIDE (1) GANG BOX WITH A SINGLE COVER PLATE. 17. CENTER CEILING ELEMENTS IN CEILING TILES, INCLUDING RECESSED DOWN LIGHTS, SMOKE DETECTORS, SPRINKLER HEADS, AND EXIT SIGNS UNLESS OTHERWISE NOTED. 18. PROVIDE EMERGENCY LIGHTING IN TENANT SPACE AS REQUIRED PER NEMA AND IBC. EMERGENCY BATTERY PACKS OR LIGHTS CONNECTED TO AN EMERGENCY POWER SOURCE ARE REQUIRED IF THE SPACE CONTAINS 50 PERSONS OR MORE. FIXTURES SHOWN ON PLAN ARE FOR REFERENCE ONLY. 19. PROVIDE ALARM NOTIFICATION APPLIANCES (HORNS/STROBES), EMERGENCY SPEAKERS, SMOKE DETECTORS, FIRE PULLS, AND ANY OTHER REQUIRED ALARM & DETECTION SYSTEMS AS NECESSARY TO MEET ALL APPLICABLE CODES (INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE, NFPA). IN RECEPTION AREAS, CONFERENCE ROOMS AND OTHER HIGH PROFILE AREAS WITHIN SUITE, ALL LOCATIONS OF SUCH DEVICES MUST BE APPROVED BY SDI OR TENANT PRIOR TO INSTALLATION. FAILURE TO DO SO MAY RESULT IN CONTRACTOR RELOCATING THESE ITEMS AT THEIR EXPENSE. 20. COORDINATE WITH THE OWNER/TENANT PRIOR TO INSTALLATION OF FIRE DETECTION DEVICES REGARDING ALL DEVICE LOCATIONS TO AVOID CONFLICT WITH FEATURE WALLS (CONFERENCE ROOMS AND RECEPTION AREAS) AND TENANT-INSTALLED ITEMS (I.E. PRESENTATION BOARDS, A/V EQUIPMENT AND PROJECTION SCREENS). Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 4/7/2021 1:37:13 PM G001 SHEET INDEX 2021.00173 04/05/2021 CONSTRUCTION DOCUMENTS ARTISTIC COMPOSITE PALLETS -PHASE 1 4518 WEST 99TH STREET CARMEL, IN 46032 ORIG ORIGINAL P PERM PERMANENT PH PHASE PL PLATE PLAM PLASTIC LAMINATE PLAS PLASTIC PNL PANEL PREFAB PREFABRICATED PREFIN PREFINISHED PRELIM PRELIMINARY PREP PREPARATION PROJ PROJECT PT PRESERVATIVE TREATED PTD PAINTED PTN PARTITION Q QT QUARRY TILE R R RADIUS RD ROOF DRAIN REC RECESSED RECPT RECEPTACLE REF REFER(ENCE) REINF REINFORCE(D)(ING)(M ENT) REQD REQUIRED RESIL RESILIENT RM ROOM RO ROUGH OPENING RTU ROOF TOP UNOT S SAN SANITARY SCW SOLID CORE WOOD SF SQUARE FOOT SPKLR SPRINKLER SS STAINLESS STEEL STD STANDARD STL STEEL STOR or ST STORAGE STRUCT STRUCTURAL SUSP SUSPENDED SYM SYMBOL SYS SYSTEM T T&G TONGUE AND GROOVE T/ TOP OF TEL TELEPHONE TEMP TEMPORARY THRES THRESHOLD TOT TOTAL TYP TYPICAL U UNIF UNIFORM UNO UNLESS NOTED OTHERWISE UR URINAL V VB VINYL BASE VCT VINYL COMPOSITION TILE VERT VERTICAL VIN VINYL VT VINYL TILE VWC VINYL WALL COVERING W W/W WALL TO WALL WC WATER CLOSET WD WOOD WDW WINDOW WH WALL HUNG WT WEIGHT G GALV GALVANIZED GLZ GLAZING GUT GUTTER GYP BD/GWB GYPSUM BOARD H HC HANDICAP(PED) HCW HOLLOW CORE WOOD HDWE/HDW HARDWARE HM HOLLOW METAL HMD HOLLOW METAL DOOR HORIZ HORIZONTAL HT HEIGHT HVAC HEATING, VENTILATION, AIR CONDITIONING I ICF INSULATED CONCRETE FORM ID INSIDE DIAMETER IF INSIDE FACE INCAND INCANDESCENT INDIC INDICATE INSTL INSTALL(ATION) INSUL INSULATION INT INTERIOR J JST JOIST JT JOINT L LAV LAVATORY LD BRG LOAD BEARING LF LINEAR FOOT LTG LIGHTING LTWT LIGHTWEIGHT LVR LOUVER M MAS MASONRY MATL MATERIAL MAX MAXIMUM MECH MECHANICAL MED MEDICINE (MEDICAL) MET METAL MFG MANUFACTURER (ING) MIN MINIMUM MISC MISCELLANEOUS MLWK MILLWORK MO MASONRY OPENING MTD MOUNTED MTG MOUNTING MULL MULLION MULT MULTIPLE N N/A NOT APPLICABLE NIC NOT IN CONTRACT NOM NOMINAL NTS NOT TO SCALE O O/O OUT TO OUT OA OVERALL OC ON CENTER OD OUTSIDE DIAMETER OF OUTSIDE FACE OFCI OWNER FURNISHED - CONTRACTOR INSTALLED OH OVERHEAD OPNG OPENING OPP OPPOSITE OPT OPTIONAL ORD OVERFLOW ROOF DRAIN A A/E ARCHITECT/ENGINEER ACOUS ACOUSTICAL ACT ACOUSTICAL CEILING TILE ADA AMERICAN'S WITH DISABILITIES ACT ADD ADDENDUM ADJ ADJACENT AFF ABOVE FINISH FLOOR ALT ALTERNATE ALUM ALUMINUM ANOD ANODIZED ARCH ARCHITECT (URAL) B BLDG BUILDING BLK BLOCK BLKG BLOCKING BM BEAM BOT BOTTOM BRG BEARING C C/C CENTER TO CENTER CAB CABINET CB CORNER BEAD CER CERAMIC CF CUBIC FOOT CFCI CONTRACTOR FURNISHED / CONTRACTOR INSTALLED CHAN CHANNEL CJ CONTROL JOINT CL CENTER LINE CLG CEILING CMU CONCRETE MASONRY UNIT CONC CONCRETE CONSTR CONSTRUCTION CONT CONTINUOUS CP/CPT CARPET D DEMO DEMOLITION (ISH) DF DRINKING FOUNTAIN DIFF DIFFUSER DIM DIMENSION DISP DISPENSER DO DOOR OPENING DS DOWNSPOUT DWG DRAWING E EJ EXPANSION JOINT ELEC ELECTRICAL (ELEVATOR) ELEV ELEVATION ENCL ENCLOSURE ENGR ENGINEER EQUIP EQUIPMENT EWC ELECTRICAL WATER COOLER EXST EXISTING F F/F FACE TO FACE FDN FOUNDATION FE FIRE EXTINGUISHER FHC FIRE HOSE CABINET FIN FINISH FIN FL FINISHED FLOOR FLR (FLRG) FLOOR(ING) FLUOR FLUORESCENT FOC FACE OF CONCRETE FOF FACE OF FINISH FOM FACE OF MASONRY FOS FACE OF STUD FR FIRE RATING FT FIRE TREATED FTG FOOTING FURN FURNITURE FURR FURRING ABBREVIATIONS SHEET INDEX SHEET NUMBER SHEET NAME GENERAL G000 COVER SHEET G001 SHEET INDEX G101 FIRST FLOOR LIFE SAFETY PLAN G102 SECOND FLOOR LIFE SAFETY PLAN ARCHITECTURAL DEMOLITION D101 FIRST FLOOR DEMOLITION PLAN D102 SECOND FLOOR DEMOLITION PLAN ARCHITECTURAL A000 WALL TYPES A101 FIRST FLOOR PLAN A102 SECOND FLOOR PLAN A121 FIRST FLOOR REFLECTED CEILING PLAN A122 SECOND FLOOR REFLECTED CEILING PLAN A401 ENLARGED PLANS AND ELEVATIONS A601 DOOR SCHEDULES A701 FIRST FLOOR FINISH PLAN A702 SECOND FLOOR FINISH PLAN A721 ROOM FINISH SCHEDULE AND FINISH DETAILS E101 FIRST FLOOR ELECTRICAL PLAN E102 SECOND FLOOR ELECTRICAL PLAN MATERIALS LEGEND GRAPHIC LEGEND GENERAL NOTES MECHANICAL AND ELECTRICAL NOTES REVISION SCHEDULE NO. DESCRIPTION DATE 04/26/21