HomeMy WebLinkAboutA101 1ST FL PLAN1 2 3 4 5
D
E
C
B
A
OFFICE
113
OFFICE
114
RR
134
WOMEN'S RR
105
OFFICE
107
OFFICE
111
BREAK
110
IT
106
VESTIBULE
120
BREAK
ROOM
121
STORAGE
122
MEN'S
RESTROOM
123
STORAGE
125
WOMEN'S
RESTROOM
124
OFFICE
108
MEN'S RR
109
CONFERENCE
104
OFFICE
115
STOR.
112
RECEPTION
103
W1
109
LOBBY
102
VEST.
101
A401
1
15' - 9" 10' - 1 1/2"
160.00°
2 2
2 2
1
STAIR
ST-1
2 2
2
B6S
9
NO WORK THIS
AREA UNDER
PHASE 1
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
4/7/2021 1:36:58 PM
A101
FIRST FLOOR PLAN
2021.00173
04/05/2021
CONSTRUCTION DOCUMENTS
ARTISTIC COMPOSITE
PALLETS - PHASE 1
4518 WEST 99TH
STREET CARMEL, IN
46032
N
3/32" = 1'-0"
A101
1 FIRST FLOOR ARCHITECTURAL PLAN
KEYED FLOOR PLAN NOTES (NOTED WITH 1 )
1 INFILL OPENING WHERE DOOR/WINDOW WAS REMOVED.
2 ALIGN FINISHED FACE OF EXISTING WALL WITH FINISHED FACE OF
NEW WALL.
3 RELOCATED EXISTING PLUMBING FIXTURE,
4 RELOCATED EXISTING TOILET ACCESSORY.
5 AMERICAN STANDARD URINAL 6515001.020 WITH AMERICAN
STANDARD FLUSH VALVE 6145013.002.
6 AMERICAN STANDARD TOILET 3455.001.020 WITH AMERICAN
STANDARD FLUSH VALVE 6147162.002
7 AMERICAN STANDARD WALL HUNG SINK 9134008EC.020 WITH
AMERICAN STANDARD FAUCET 7105.801.002.
8 AMERICAN STANDARD UNDERMOUNT SINK 18SB.8171700.075 WITH
AMERICAN STANDARD FAUCET 4803410.002.
9 ADD LINTEL AS NECESSARY.
REVISION SCHEDULE
NO. DESCRIPTION DATE
04/26/21