Loading...
HomeMy WebLinkAboutA122 2ND FL REFLECTED CEILING1 2 3 4 5 D E C B A 1 1 1 1 4 5 4 5 2 2 CONFERENCE 204 OFFICE 212 OPEN OFFICE 206 MECH 211 STAIR ST-2 OFFICE 205 OFFICE 203 OFFICE 202 OFFICE 201 RR 209 RR 210 OFFICE 208 OFFICE 207 6 6 9 9 9 9 7 7 7 NO WORK THIS AREA UNDER PHASE 1 REFLECTED CEILING PLAN LEGEND A. ALL CEILINGS TO BE ACT-1 U.N.O. B. ALL A.C.T. CEILINGS TO BE 9'-0" A.F.F. USING 15/16" WHITE METAL TEE GRID. U.N.O. 2'x4' LAY-IN FIXTURE ACT-1 8' - 0" SUPPLY DIFFUSER EXHAUST FAN GRILL 2'x4' SUSPENDED ACOUSTICAL CEILING CEILING IDENTIFICATION CEILING TYPE FINISH HEIGHT (AFF) CEILING TYPE LEGEND ACT-1 -- 2x4 ACOUSTICAL PANELS ('CIRRUS' BY ARMSTRONG) 1'x4' SUSPENDED FIXTURE Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 4/7/2021 1:37:00 PM A122 SECOND FLOOR REFLECTED CEILING PLAN 2021.00173 04/05/2021 CONSTRUCTION DOCUMENTS ARTISTIC COMPOSITE PALLETS - PHASE 1 4518 WEST 99TH STREET CARMEL, IN 46032 N 3/32" = 1'-0" A122 1 SECOND FLOOR REFLECTED CEILING PLAN 1 RELOCATED EXISTING 2x4 LIGHT FIXTURE. 2 RELOCATED EXISTING SUPPLIY GRILLE. 3 RELOCATED EXISTING EXHAUST FAN. 4 NEW 2x4 LIGHT FIXTURE TO MATCH EXISTING. 5 NEW EXHAUST FAN TO MATCH EXISTING. 6 LIGHT FIXTURE AND EXHAUST FAN TO BE ON SAME SWITCH. 7 EXISTING EXPOSED STRUCTURE. 8 PROVIDE NEW 1'-0" X 4'-0" SUSPENDED LED LIGHT FIXTURE. 9 EXISTING CEILING, LIGHT AND DIFFUSERS TO REMAIN. KEYED REF. CEILING PLAN NOTES (NOTED WITH 1 ) REVISION SCHEDULE NO. DESCRIPTION DATE 04/26/21