Loading...
HomeMy WebLinkAboutE604 - ELECTRICAL SCHEDULESProject Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 2/11/2021 10:05:52 AM E604 ELECTRICAL SCHEDULES 2019.00780 11.5.2020 CONSTRUCTION DOCUMENTS CARMEL MEDICAL ARTS PAVILION 12174 N. Meridian Street Carmel, Indiana 46032 Remarks: Spare 16400 VA 100.00% 16400 VA Receptacle 49560 VA 65.00% 32214 VA Total Est. Demand Current: 222 A Motor 500 VA 100.00% 500 VA Total Conn. Current: 249 A Lighting 258 VA 100.00% 258 VA Total Est. Demand: 184982 VA Kitchen Equipment - Non-Dwelling Unit 12480 VA 65.00% 8112 VA Total Conn. Load: 206696 VA HVAC 127500 VA 100.00% 127500 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Load Sumamry: Total Load: 61.2 kVA 74.5 kVA 71.0 kVA 83 29.5 84 81 33 82 79 25.5 3 150 A T-3L1 80 77 78 75 76 73 74 71 72 69 70 67 68 65 66 63 64 61 62 59 60 57 58 55 56 53 54 51 52 49 50 47 48 45 46 43 44 41 42 39 40 37 38 35 3.3 3.9 36 33 3.3 3.9 34 31 VAV-306A, VAV-307A 20 A 3 3.3 3.9 3 20 A VAV-300, VAV-336, VAV-338, VAV-340 32 29 2.8 1.8 30 27 2.8 1.8 28 25 VAV-309A 20 A 3 2.8 1.8 3 20 A VAV-322, VAV-323, VAV-326 26 23 3.1 4 24 21 3.1 4 22 19 VAV-316, VAV-317 20 A 3 3.1 4 3 20 A INFRARED PERGOLA HEATERS 20 17 2 4 18 15 2 4 16 13 VAV-331 20 A 3 2 4 3 20 A INFRARED PERGOLA HEATERS 14 11 2.3 4.4 12 9 2.3 4.4 10 7 VAV-330, VAV-340A, VAV-340B 20 A 3 2.3 4.4 3 20 A VAV-313A, VAV-314A 8 5 6 3.8 6 3 WATER HEATER 40 A 2 6 3.8 4 1 Core Lighting 20 A 1 0.3 3.8 3 20 A VAV-311A 2 Circuit Number Circuit Description Trip Poles A B C Poles Trip Circuit Description Circuit Number General Panel Comments: Enclosure Type: Type 1 Ground: Yes Main Rating: 400A Mounting: Surface Wire: 4 Main Type: MLO Supplied From: MDP Phase: 3 A.I.C. Rating: Location: Voltage: 480/277 Wye Branch: Normal Branch Panel: 3H1 Remarks: Spare 16400 VA 100.00% 16400 VA Total Est. Demand Current: 184 A Receptacle 49560 VA 65.00% 32214 VA Total Conn. Current: 244 A Motor 500 VA 100.00% 500 VA Total Est. Demand: 66226 VA Kitchen Equipment - Non-Dwelling Unit 12480 VA 65.00% 8112 VA Total Conn. Load: 87940 VA HVAC 9000 VA 100.00% 9000 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Load Sumamry: Total Load: 25.5 kVA 33.0 kVA 29.5 kVA 83 8.2 0 84 81 PANEL 3LE1 VIA ATS 100 A 2 8.2 0 82 79 SPARE 20 A 1 0 0 3 50 A PANEL 3L2 80 77 SPARE 20 A 1 0 0.9 1 20 A Receptacle 78 75 BATTERY CHARGER 20 A 1 0.1 0.7 1 20 A Receptacle 76 73 ENGINE BLOCK HEATER 20 A 1 1.5 0.5 1 20 A Receptacle 74 71 Receptacle 20 A 1 0.5 0.7 72 69 SmartPergola heater control panel 20 A 1 0.2 0.7 70 67 Receptacle 20 A 1 1.2 0.7 3 20 A Furniture system 68 65 Receptacle 20 A 1 0.2 0.9 1 20 A Receptacle 66 63 Receptacle 20 A 1 0.8 1.3 1 20 A Receptacle 64 61 Receptacle 20 A 1 1.5 1.1 1 20 A Receptacle 62 59 Receptacle 20 A 1 0.5 0.5 1 20 A Receptacle 60 57 Receptacle 20 A 1 1.7 0.9 1 20 A Receptacle 58 55 Receptacle 20 A 1 1.5 0.6 1 20 A Receptacle 56 53 Receptacle 20 A 1 1.5 4.1 54 51 Receptacle 20 A 1 0.7 4.1 2 50 A Electric cooktop 52 49 Receptacle 20 A 1 1.7 0.6 1 20 A Receptacle 50 47 Receptacle 20 A 1 0.4 1.2 1 20 A Receptacle 48 45 Receptacle 20 A 1 1.1 0.4 1 20 A Receptacle 46 43 Receptacle 20 A 1 0.8 1.9 1 20 A Receptacle 44 41 0.7 0.6 1 20 A Receptacle 42 39 0.7 1.1 1 20 A Receptacle 40 37 Furniture system 20 A 3 0.7 1.1 1 20 A Receptacle 38 35 Receptacle 20 A 1 0.5 1.5 1 20 A Receptacle 36 33 Receptacle 20 A 1 1.8 0 1 20 A SPARE 34 31 Receptacle 20 A 1 1.1 1.7 1 20 A Receptacle 32 29 Receptacle 20 A 1 0.5 1.2 1 20 A Receptacle 30 27 Exam light 20 A 1 0.2 1.9 1 20 A Receptacle 28 25 SPARE 20 A 1 0 1.9 1 20 A Receptacle 26 23 SPARE 20 A 1 0 1.1 1 20 A Receptacle 24 21 SPARE 20 A 1 0 1.5 1 20 A Receptacle 22 19 SPARE 20 A 1 0 0.7 1 20 A Receptacle 20 17 SPARE 20 A 1 0 0.2 1 20 A Receptacle 18 15 SPARE 20 A 1 0 0.2 1 20 A Receptacle 16 13 SPARE 20 A 1 0 1.1 1 20 A Receptacle 14 11 SPARE 20 A 1 0 1.5 12 9 Lab 322 - Refrigerator 20 A 1 1.2 1.5 2 20 A Third Floor Electrcal Room DS-3 10 7 Kitchen Hood 20 A 1 0.5 1.5 8 5 Roof Receptacles 20 A 1 0.4 1.5 2 20 A Second Floor Electrcal Room DS-2 6 3 Core Receptacles 20 A 1 0.7 1.5 4 1 Telecom DEMARC Receptacle 20 A 1 0.2 1.5 2 20 A First Floor Electrcal Room DS-1 2 Circuit Number Circuit Description Trip Poles A B C Poles Trip Circuit Description Circuit Number General Panel Comments: Enclosure Type: Type 1 Ground: Yes Main Rating: 300A Mounting: Surface Wire: 4 Main Type: MCB Supplied From: T-3L1 Phase: 3 A.I.C. Rating: Location: Voltage: 120/208 Wye Branch: Normal Branch Panel: 3L1 Remarks: Total Est. Demand Current: 35 A Total Conn. Current: 35 A Total Est. Demand: 12498 VA Other 54 VA 100.00% 54 VA Total Conn. Load: 12498 VA Lighting 12446 VA 100.00% 12446 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Load Sumamry: Total Load: 4.1 kVA 5.0 kVA 3.4 kVA 29 30 27 28 25 26 23 PROVISION -- -- 0 0 -- -- PROVISION 24 21 Third Floor Lighting 20 A 1 1.1 0 -- -- PROVISION 22 19 Third Floor Lighting 20 A 1 0.9 0 -- -- PROVISION 20 17 Third Floor Lighting 20 A 1 1.4 0 -- -- PROVISION 18 15 Third Floor Lighting 20 A 1 1.1 0 -- -- PROVISION 16 13 Third Floor Lighting 20 A 1 1.2 0 -- -- PROVISION 14 11 Third Floor Lighting 20 A 1 0.9 0 -- -- PROVISION 12 9 Third Floor Lighting 20 A 1 1.4 0 -- -- PROVISION 10 7 Third Floor Lighting 20 A 1 1.1 0 -- -- PROVISION 8 5 Third Floor Lighting 20 A 1 1.1 0 1 20 A SPARE 6 3 Third Floor Lighting 20 A 1 1.4 0 1 20 A SPARE 4 1 Third Floor Lighting 20 A 1 0.9 0 1 20 A SPARE 2 Circuit Number Circuit Description Trip Poles A B C Poles Trip Circuit Description Circuit Number General Panel Comments: Enclosure Type: Type 1 Ground: Yes Main Rating: 100A Mounting: Surface Wire: 4 Main Type: MLO Supplied From: Phase: 3 A.I.C. Rating: Location: Voltage: 120/208 Wye Branch: Normal Branch Panel: 3L2 REVISION SCHEDULE NO. DESCRIPTION DATE