Loading...
HomeMy WebLinkAboutM204 - ROOF MECHANICAL PLANDS-1 DS-1 DS-1 EF-1 AHU-1 AHU-2 1 1/4" G 1 1/2" G 1,500 CFM R 25' - 0" R 25' - 0" 8"ø EF-2 2,000 CFM DSO-2 1 2 3 3 4 5 6 7 7 7 7 7 Certified By: Scale: Date: Checked By: Drawn By: Job Number: Drawing Number: Drawing Name: CARMEL, IN 46032 PRIORITY PHYSICIANS 12.03.2020 Revisions: 12174 N. MERIDIAN SUITE 300 AS NOTED - - PERMIT SET 12.03.2020 M204 ROOF MECHANICAL PLAN SCALE: 1/8" = 1'-0" 1 ROOF MEHANICAL PLAN N PLAN NOTES: - 1. REVISED LOCATION OF EF-1. PROVIDE TEST AND BALANCE FOR ENTIRE EXHAUST SYSTEM. 2. REVISED LOCATION OF EF-2. PROVIDE TEST AND BALANCE FOR ENTIRE EXHAUST SYSTEM. 3. ALL EXHAUST OUTLETS AND PLUMBING VENTS SHALL BE MINIMUM 25'-0" FROM OUTSIDE AIR INTAKE. 4. REFRIGERANT LINESET DOWN. CONFIRM PIPE SIZE WITH MANUFACTURER AND FINAL PIPE LAYOUT. PROVIDE ROOF PENETRATION SUITABLE FOR ROOF CONSTRUCTION. 5. PROVIDE EQUIPMENT RAILS. ANCHOR EQUIPMENT RAILS TO STRUCTURE. ANCHOR CONDENSING UNIT TO RAILS WITH 1" DEFLECTION ISOLATORS AT FOUR CORNERS. 6. 8"Ø RANGE HOOD EXHAUST DOWN. 7. EXISTING TO REMAIN. GENERAL NOTES: A. ALL DUCT DIMENSIONS GIVEN ARE OUTSIDE DIMENSIONED. B. COORDINATE ALL OPENINGS IN FLOORS, ROOF AND WALLS WITH THE GENERAL AND STRUCTURAL CONTRACTORS. C. RUN ALL DUCTS AS HIGH AS POSSIBLE WITH RETURN AND EXHAUST ABOVE SUPPLY AS OFTEN AS POSSIBLE. D. INSULATE ALL SUPPLY AIR AND OUTSIDE AIR DUCTWORK WITH 1.5" FIBERGLASS DUCT WRAP WITH FSK JACKET (R-5 MINIMUM). E. PROVIDE VOLUME BALANCING DAMPERS UPSTREAM OF ALL AIR INLET/OUTLETS UNLESS NOTED OTHERWISE. F. PROVIDE TURNING VANES IN ALL SUPPLY AIR SQUARE THROATED ELBOWS. G. ALL RECTANGULAR SUPPLY AIR BRANCH CONNECTIONS SHALL BE 45° TAKE-OFF FITTINGS AND ROUND SUPPLY AIR BRANCH CONNECTIONS SHALL BE BELLMOUTH FITTINGS. H. FLEXIBLE DUCTS TO DIFFUSERS MAXIMUM LENGTH 5'-0". FLEXIBLE DUCTS ARE NOT TO BE USED AS ELBOWS. I. RETURN DUCTWORK SHALL NOT BE INSULATED UNLESS NOTED OTHERWISE. J. ALL EXHAUST DUCTWORK FROM THE BOTTOM OF THE ROOF CURB TO THE BACK-DRAFT DAMPER SHALL BE EXTERNALLY INSULATED WITH 1.5" FIBERGLASS DUCT WRAP WITH FSK JACKET (R-5 MINIMUM). ALL OTHER EXHAUST DUCTWORK SHALL NOT BE INSULATED.