Loading...
HomeMy WebLinkAbout22_A112A112 SECOND FLOOR REFLECTED CEILING PLAN AND DETAILS SECOND FLOOR REFLECTED CEILING PLAN SCALE: 3/32" = 1'-0"1N PROJECT NUMBER: 2020-007 CERTIFICATION:SITE ARCHITECTUREarchitecture + landscape architectureARCHITECT: SITE ARCHITECTURE architecture + landscape architecture BRAD SMITH, RA | LEED AP 13144 EAST 186TH STREET NOBLESVILLE, IN. 46060 PH: 317.374.8720 E-MAIL: brad@site-architecture.com PROJECT CONTACT: These drawings are intended for construction. 12.23.2020DATE ISSUED: REVISIONS ISSUED: CONSTRUCTION ISSUE SET CARMEL, IN 46033NEEDLER'S FRESH MARKET4755 EAST 126TH STREETTENANT FINISH IMPROVEMENTSTHE ENGINEERING COLLABORATIVE SAM HURT, P.E. 2410 EXECUTIVE DRIVE, SUITE 100 INDIANAPOLIS, IN. 46241 PH: 317.636.3941 E-MAIL: sam@tec-mep.com PROJECT CONTACT: MEP ENGINEER: EXIST 8'-0" ACT-01 E-028'-0" ACT-01 PRICING COORDINATOR 202 NETWORK/ TELCO 203 CORRIDOR 201 STAIR A STA-2 MECH/ UTILITY 205 CEILING DETAIL SCALE: 3" = 1'-0" 2 AIRCRAFT CABLE ATTACHED TO STRUCTURE / UNISTRUT ABOVE 2X WOOD BLOCKING PROFILE TO BE FABRICATED BY MILLWORK CONTRACTOR WITH LAM-01 FINISH CEILING DETAIL SCALE: 3" = 1'-0" 3 AIRCRAFT CABLE ATTACHED TO STRUCTURE / UNISTRUT ABOVE 2X WOOD BLOCKING ACT-02 SUSPENDED CEILINGWP-02 WALL COVERING 8"6" 6"8"+10'-0" B.O. WOOD RING +10'-0" B.O. WOOD RING A. PROVIDE ALL ACCESS PANELS REQUIRED FOR MAINTENANCE. ARCHITECT IS TO APPROVE ALL ACCESS PANEL LOCATIONS PRIOR TO INSTALLATION. B. PROVIDE GYPSUM VERTICAL SURFACES FOR ALL BULKHEAD CONDITIONS. VERIFY TRANSITIONS BETWEEN DIFFERENT MATERIALS OR FROM FINISH CEILING AREAS TO EXPOSED CEILINGS WITH ARCHITECT PRIOR TO INSTALLATION. C. REFER TO CEILING PLAN FOR ALL CEILING HEIGHTS. D. THE ARCHITECTURAL CEILING PLANS SHALL GOVERN THE LAYOUT OF ALL CEILING ELEMENTS AND/OR PENETRATIONS. COORDINATE WITH THE ARCHITECT ANY FIELD VERIFIED OR AS BUILT CONDITIONS THAT DIFFER FROM WHAT IS SHOWN ON THE DRAWINGS. E. SEE MEP DRAWINGS FOR LIGHT FIXTURE AND DIFFUSER LOCATIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES. F. PROVIDE PHYSICAL SAMPLES AND SHOP DRAWINGS FOR ALL NEW INTERIOR FINISH MATERIALS TO ARCHITECT FOR REVIEW/APPROVAL PRIOR TO ORDERING/FABRICATION AND INSTALLATION G. LIGHT FIXTURES SHOWN ARE FOR REFERENCE ONLY. CEILING LEGEND: CEILING MATERIAL A CEILING HEIGHT 9'-0" RCP NOTES: C1. BULKHEAD FROM HEIGHT NOTED TO DECK / STRUCTURE ABOVE. FINISH BOTTOM EXPOSED FACES, AND SIDES WITH 5/8" GYPSUM BOARD WITH LEVEL 5 FINISH. WP-01 TO BE APPLIED TO FRONT AND BOTTOM OF BULKHEAD UP TO 14'-6" A.F.F. PAINT BULKHEAD PT-02 BETWEEN 14'-6" A.F.F. AND BOTTOM OF DECK / STRUCTURE. CX CEILING TYPES: 2X2 CEILING GRID - NO TILE GYPSUM BOARD CEILING/BULKHEAD E-01 EXISTING OPEN STEEL STRUCTURE. PAINT PER FINISH SCHEDULE (1 PRIME COAT, 2 FINISH COATS). RCP GENERAL NOTES: GYP-01 5/8" GYPSUM BOARD FINISH CEILING/BULKHEAD. FINISH AND PAINT (1 PRIME COAT, 2 FINISH COATS) - SEE FINISH TAG AND REF FINISH SCHEDULE. 2X2 ACOUSTICAL GRID AND CEILING TILE EXISTING EXPOSED STRUCTURE / DECK COOLER CEILING PANELS C4. DECORATIVE OPEN WOOD FRAME SUSPENDED FROM ROOF STRUCTURE WITH AIRCRAFT CABLE ANCHORED TO UNISTRUT AND STRUCTURE ABOVE. SEE SECTION DETAIL 2/A112. ACT-01 24" X 48" LAY IN VINYL FACED CEILING TILE AND GRID BASIS OF DESIGN: MANUFACTURER: ARMSTRONG PRODUCT: KITCHEN ZONE 673, COLOR - WHITE GRID: PRELUDE 15/16" ACT-02 24" X 24" LAY IN DECORATIVE CEILING TILE AND GRID BASIS OF DESIGN: MANUFACTURER: ARMSTRONG PRODUCT: METALWORKS TIN EXTRA MICROPERFORATED COLOR - TIN WHITE GRID: SUPRAFINE XL 9/16" E-02 EXISTING OPEN STEEL STRUCTURE. CLEAN AS REQUIRED, TO REMAIN UNFINISHED. E-03 EXISTING COOLER PANELS. CLEAN AS REQUIRED AND REPAIR ANY DAMAGED AREAS. C2. BULKHEAD FROM HEIGHT NOTED TO DECK / STRUCTURE ABOVE. FINISH BOTTOM EXPOSED FACES, AND SIDES WITH 5/8" GYPSUM BOARD WITH LEVEL 5 FINISH. WP-02 TO BE APPLIED TO FRONT AND BOTTOM OF BULKHEAD UP TO 14'-6" A.F.F. PAINT BULKHEAD PT-02 BETWEEN 14'-6" A.F.F. AND BOTTOM OF DECK / STRUCTURE. C3. BULKHEAD FROM HEIGHT NOTED TO DECK / STRUCTURE ABOVE. FINISH BOTTOM EXPOSED FACES, AND SIDES WITH 5/8" GYPSUM BOARD WITH LEVEL 5 FINISH. SEE INTERIOR ELEVATIONS FOR FINISHES THIS AREA. C5. OPEN STRUCTURE, CONDUITS, DUCTWORK, ETC., TO BE PAINTED PT-02. C6. A 1X2 WOOD TRIM PIECE TO BE ATTACHED AT 14'-6" A.F.F. AROUND ENTIRE PERIMETER OF GENERAL SHELVING AREA 112. 1X2 TO BE PAINTED PT-02. DRYWALL WALL AREA ABOVE 1X2 TRIM TO BE PAINTED PT-02 TO DECK ABOVE. C7. DECORATIVE OPEN FRAME SUSPENDED FROM ROOF STRUCTURE WITH AIRCRAFT CABLE ANCHORED TO UNISTRUT AND STRUCTURE ABOVE. CEILING PANELS TERMINATE TO FRAME ON INTERIOR SIDE OF FRAME. SEE SECTION DETAIL 3/A112. #5 - 2.25.2021 OFFICE 204 8'-0" ACT-01 7 PROFILE TO BE FABRICATED BY MILLWORK CONTRACTOR WITH LAM-01 FINISH 6 #6 - 3.5.2021 #7 - 3.30.2021 05/06/21