Loading...
HomeMy WebLinkAbout40_A801A801 FIRST FLOOR FINISH PLAN FIRST FLOOR FINISH PLAN SCALE: 3/32" = 1'-0"1N PROJECT NUMBER: 2020-007 CERTIFICATION:SITE ARCHITECTUREarchitecture + landscape architectureARCHITECT: SITE ARCHITECTURE architecture + landscape architecture BRAD SMITH, RA | LEED AP 13144 EAST 186TH STREET NOBLESVILLE, IN. 46060 PH: 317.374.8720 E-MAIL: brad@site-architecture.com PROJECT CONTACT: These drawings are intended for construction. 12.23.2020DATE ISSUED: REVISIONS ISSUED: CONSTRUCTION ISSUE SET CARMEL, IN 46033NEEDLER'S FRESH MARKET4755 EAST 126TH STREETTENANT FINISH IMPROVEMENTSTHE ENGINEERING COLLABORATIVE SAM HURT, P.E. 2410 EXECUTIVE DRIVE, SUITE 100 INDIANAPOLIS, IN. 46241 PH: 317.636.3941 E-MAIL: sam@tec-mep.com PROJECT CONTACT: MEP ENGINEER: VESTIBULE A 101 PRODUCE 102 FLORAL 103 CHECK OUT 104 VESTIBULE B 111 COFFEE SHOP SEATING 105 COFFEE SHOP SERVICE 106 CUSTOMER SERVICE 107 CASH OFFICE 108 BREAK ROOM 109 FROZEN 113 GENERAL SHELVING 114 DAIRY 120 BEER/ WINE 115 BAKERY 119 DELI 118 MEAT 117 RACKING 122 COOLER 123 FREEZER 124 UTILITY 125 RECEIVING 126 BALER 127 CORRIDOR 128 COMPRESSOR RACK B 156 BAKERY/DELI FREEZER 130 BAKERY COOLER 129 BAKERY PREP 131 WASH 132 DELI PREP 133 134 DELI COOLER 135 CORR 136MEN RR 137 WOMEN RR 138 CORR 139 SEAFOOD PREP 140 SEAFOOD COOLER 141 MEAT COUNTER 142 MEAT FREEZER 143 MEAT COOLER 144 MEAT PREP 145 PRODUCE DISPLAY 146 CHOP SHOP 147 CORR 148 JANITOR 151 PRODUCE PREP 150 CORR 155 PRODUCE COOLER 154 STAIR A STA-1 AREA NOT IN SCOPE AREA NOT IN SCOPE JANITOR 112 CHEESE ISLAND 116 NETWORK/ TELCO 110 DSD OFFICE 121 MGR/LOSS PREV. OFFICE 152 DELI STOR UP PT-01 PC-01 RB-01 TL-01 TL-01 WP-02 TL-01 WP-01 WP-01 PT-01 PC-01 RB-01 PT-01 RB-01 LAM-01 WP-03 A802 1 A802 2 F1 F1 F1 F1 F1 F1 LAM-01 PT-01 PC-01 RB-01 PT-01 PC-01 RB-01 F1 F2 F2 F2 F2 F2 TL-01 TL-01 TL-01 TL-01 PT-01 LAM-01 RB-01 RB-01 RB-01 RB-01 RB-01 GENERAL FINISH NOTES: FINISH PLAN SYMBOLS: X FINISH PLAN NOTES: FX WALL FINISH TAG (DENOTES DIFFERENT WALL FINISH LOCATIONS) FLOORING TRANSITION ROOM FINISH TAG WALL FINISH BASE FINISH XXX XXX XXX XX-00 F5. BREAK ROOM MILLWORK: BASE CABINET: LAM-01 UPPER CABINET: LAM-01 COUNTER: SS1 TOE KICK: BLACK LAMINATE A. PROVIDE FINISH SAMPLE SUBMITTALS AND PRODUCT DATA FOR ALL NEW FINISH ITEMS FOR ARCHITECT/DESIGNER/OWNER APPROVAL PRIOR TO ORDERING/INSTALLATION/FABRICATION. B. LEVEL ALL EXISTING FLOORS TO 1/4" IN 12'-0" TOLERANCE. C. ALL NEW DOORS SHALL MATCH EXISTING. PROVIDE FINISH SAMPLES TO ARCHITECT FOR VERIFICATION PRIOR TO ORDERING /INSTALLATION. C. ALL PAINT FINISH LOCATIONS TO BE THREE COAT SYSTEM: 1 (ONE) COAT PRIMER 2 (TWO) COATS FINISH -CEILINGS - FLAT -DRYWALL - EGGSHELL -DOOR FRAMES - SEMI-GLOSS D. VERIFY COLOR OF UNDERSIDE OF ALL NEW BULKHEADS WITH ARCHITECT PRIOR TO FINISH PAINT. E. REFER TO DOOR/FRAME SCHEDULE FOR FRAME TYPE AND FINISH. F. FOR ALL NEW FINISH MATERIALS - CAREFULLY FOLLOW ALL MANUFACTURER INSTALLATION INSTRUCTIONS FOR HIGHEST QUALITY WORKMANSHIP AVAILABLE. INSTALLATIONS NOT MEETING ARCHITECT/DESIGNER/OWNER APPROVAL WILL BE REJECTED. G. NOTIFY ARCHITECT OF ANY DIMENSIONAL OR PHYSICAL DISCREPANCIES BETWEEN EXISTING CONDITIONS AND REPRESENTATIONS IN THE DRAWINGS FOR CLARIFICATION PRIOR TO PROCEEDING WITH WORK IN THE AFFECTED AREA. H. PROVIDE A MAINTENNCE MANUAL FOR ALL FINISH GROUTS AND SEALERS AS INSTALLED PRIOR TO OWNER OCCUPANCY. TWO COPIES BOUND AND INDEXED FOR OWNER USE. I. WHERE DISSIMILAR FLOORING MATERIALS MEET THEY SHALL DO SO UNDER CENTERLINE OF DOOR UNLESS NOTED OTHERWISE. J. ALL VERTICAL FACES OF BULKHEADS TO MATCH ADJACENT WALL FINISH UNLESS NOTED OTHERWISE. K. GYPSUM WALLBOARD AT WP-02, WP-03, WP-04, AND UPPER GRAPHICS ABOVE COFFEE SHOP 106 AND CUSTOMER SERVICE 107 TO RECEIVE A LEVEL 5 FINISH. ALL OTHER GYPSUM WALLBOARD TO RECEIVE A LEVEL 4 FINISH UNLESS SPECIFIED OTHERWISE. FLOOR FINISH XX-00 XX-00 F1. -CLEAN EXISTING CMU WALLS, COOLER WALLS, AND COOLER CEILINGS. -PAINT EXISTING CMU WALLS PT-01. -PAINT EXISTING COOLER WALLS AND CEILINGS PT-01 COLOR, BUT USE PRIMER AND FINISH COAT APPROPRIATE FOR METAL SURFACE/COOLER WALLS. -REMOVE EXISTING METAL BASE AT ALL COOLER WALLS. INSTALL NEW BREAK METAL BASE - ATTACH WITH SCREWS TO EXISTING COOLER WALLS. PAINT TO MATCH COOLER WALLS. -IN AREAS WHERE QUARRY TILE HAS BEEN REMOVED FOR UNDERSLAB PLUMBING/ELECTRICAL WORK - INFILL WITH QUARRY TILE TO MATCH EXISTING - FINISH FLUSH WITH ADJACENT QUARRY TILE. -IN AREAS WHERE CONCRETE FLOOR REMAINS AS FINISH - CLEAN AND SEAL CONCRETE. F2. FLOOR FINISH TO BE PC-01. F3. CUSTOM MILLWORK, SEE FLOOR PLAN, EQUIPMENT SCHEDULE, AND INTERIOR ELEVATIONS. F4. 12" DEEP WHITE MELAMINE SHELVING ON ADJUSTABLE STANDARDS. PROVIDE TWO (2) SHELVES. F6. FRP PANELS ABOVE COOLER AREAS TO BEGIN AT 7'-0" A.F.F. AND END AT 14'-6" A.F.F. VERIFY HEIGHTS ON SITE WITH OWNER PROVIDED EQUIPMENT AND COORDINATION WITH ARCHITECT ON BOTTOM OF JOIST ELEVATION. F7. LAM-01 WALL PANELS MOUNTED ON Z CLIPS TO A HEIGHT OF 9'-0" A.F.F. COORDINATE LAYOUT OF SEAMS/REVEALS WITH ARCHITECT DURING SHOP DRAWING PHASE. WP-03 FROM 9'-0" A.F.F. TO 1X2 STRIP AT 14'-6" A.F.F. SEE INTERIOR ELEVATION. F8. LAM-01 WALL PANELS MOUNTED ON Z CLIPS TO A HEIGHT OF 4'-0" A.F.F. COORDINATE LAYOUT OF SEAMS/REVEALS WITH ARCHITECT DURING SHOP DRAWING PHASE. PT-01 FROM 4'-0" A.F.F. TO CEILING ABOVE. INSTALL A WOOD 1X2 STRIP AT 4'-0" A.F.F (TOP OF LAMINATE PANEL - TO BE PAINTED PT-01. F9. FINISH CHANGE TO ALIGN WITH EDGE OF COOLERS. F10. 2"X2" FULL HEIGHT STAINLESS STEEL CORNER GUARD. F11. STAINLESS STEEL WALL PANEL TO EXTEND FROM FLOOR TO BOTTOM OF EXHAUST HOOD. F12. INSTALL NEW RUBBER STAIR TREAD/RISERS - JOHNSONITE OR SIMILAR - COLOR TO BE SELECTED FROM MANUFACTURER STANDARD RANGE OF COLORS. F13. INSTALL STANDARD WHITE FRP PANELS IN MOP SINK AREA. FROM FLOOR TO 5'-0" A.F.F. - EXTEND HORIZONTALLY 2'-0" PAST FACE OF MOP SINK IN BOTH DIRECTIONS. F6 F6 F6 F6 F6 TB-01 TB-01 TB-01 LAM-01 F7 F7LAM-01 F8 F8 WP-01 RB-01 PT-02 RB-01 F9F9 PT-02 RB-01 BREAK ROOM 153 PT-01 PC-01 RB-01 PT-01 PC-01 RB-01 PT-01 PC-01 RB-01 F11F11 F11 #1 - 1.8.2021 1 TB-01 TB-01 TB-01 PT-01 RB-01 SS-01 TB-01 F12 F13 F13 THIS AREA IS INTENDED TO HAVE ARTWORK/DISPLAY AREA BY OTHERS TO BE BUILT AROUND AND INTEGRATED WITH TV DISPLAY MONITORS. THIS INSTALLATION IS BY THE ARTWORK PROVIDER - GC TO COORDINATE WITH OWNER AND ARTWORK PROVIDER ON BLOCKING AND PLACEMENT OF POWER/INFRASTRUCTURE FOR MONITORS IN THIS AREA. PT-01 PT-01 PT-01 LAM-02 WP-02 RB-01 WP-03 #2 - 1.18.2021 2 STANDARD WHITE FRP F1 F1 F1 2 THIS AREA OF PARTIAL HEIGHT WALL TO HAVE WHITE FRP FINISH. 6 #6 - 3.5.2021 THIS AREA TO HAVE WHITE FRP FINISH. 6 THIS AREA TO HAVE WHITE FRP FINISH. 6 THIS AREA TO HAVE WHITE FRP FINISH. 6 05/06/21