HomeMy WebLinkAbout49_P10434 38 42 44 4645
DIPPERWELLSAFE
GB 9606-0
(20x15x30H)
E0006296
SAFE TL-15CONSTRUCTION(31-1/2x31x74-1/4H)E0006299DROP-IN DUMPSINK W/ FAUCETDROP-IN HANDSINK W/ FAUCETExist.
cleanout
1
1
1
1
1 1
1
1
1
1
1
1
HD-1
HD-1
3
4"CW
3
4"HW 8
MS-1 7HD-1HD-1WHA-A
8
HD-1
2"W
7 92"W
CO-1
2"W 9
2"W7 9
3"Grease 9
13
Approximate location
of existing 4" Sanitary
Waste Piping.
7 9
2"W 7 9SK-2ASK-3ACO-1 FS-11
2"HW below slab,
minimum 18" cover.
17
RPZ-2
SK-9
SK-1A
1
2"CW below slab,
minimum 18" cover.HD-1FS-1
VESTIBULE B
111
LEMON'S
SEATING
105
LEMON'S
CUSTOMER LINE
106
CUSTOMER
SERVICE
107
CASH
OFFICE
108
110
FROZEN
113
JANITOR
112
EXTERIOR
LEMON'S
F.O.H.
SERVICE
109
LEMON'S
B.O.H.
SERVICE
CHECK OUT
104
HD-1 HD-1
CO-1
FD-1
FD-1
4
4
A. All fittings, piping, fixtures, materials, etc. to meet the
current Safe Drinking Water Act with all of its
amendments and the Reduction of Lead in Drinking
water Act.
B. All work shall comply with all national, state, local codes
and ordinances pertaining to the work in this project.
C. All plumbing fixtures shall be supplied with individual
water supply stops and code approved traps. Exposed
piping shall be chrome plated.
D. All plumbing fixtures shall be installed with approved
backflow prevention devices.
E. No piping shall pass directly over electrical power
distribution cabinets, panelboards, etc. Contractor to
coordinate panel locations prior to piping installation.
F. All plumbing vents to be a minimum of 10'-0" from any air
intake. Coordinate locations with HVAC plans.
G. Single runouts to plumbing fixtures shall be the same
size as on the plumbing fixture schedule unless
otherwise noted.
H. Concealed gas piping shall be constructed in accordance
with code without unions, tubing fittings or running
threads.
I. Gas lines run on roof to be supported by Roof Top Blox
or similar and equal. DO NOT USE LUMBER FOR GAS
PIPING SUPPORT.
J. Dry-pipe fire protection system shall be used in all areas
subject to freezing.
K. All waste, water, vent, gas and condensate lines shown
to be connected to their associated fixture/equipment,
unless noted otherwise. All equipment and systems
shown must be complete and usable upon completion of
project.
)GPGTCN0QVGU
Extend case drain to nearest hub drain.
Connect new fixture to nearest existing water, waste and
vent pipes serving removed fixture. Adjust/extend
existing utilities as required to suit new fixture
type/location. Repair floor/wall in kind, ready for finish.
3
4"CW & 3
4"HW down along wall to serve two (2) sinks.
Hold pipes as tight to wall as practical.
3
4"CW & 1
2"HW down along wall. Hold pipes as tight to
wall as practical. Extend 1
2"CW & 1
2"HW to serve sink.
Extend 3
4"CW to below slab
Adjust existing waste stub from below slab to serve new
floor sink. Repair slab in kind, ready for finish.
Connect new fixture to existing water pipes, serving
removed fixture. Adjust/extend existing utilities as
required to suit new fixture type/location.
Connect new waste piping to nearest active waste pipe
of equal or larger size. Field verify exact size, location,
elevation, material and condition of existing waste pipe;
prior to start of work.
Connect new water pipe(s) to nearest active water
pipe(s) of equal or larger size. Field verify exact size,
location, elevation, material and condition of existing
water pipe(s); prior to start of work.
Neatly saw-cut existing slab along entire path of new
utility, verify path prior to start of work. Repair slab in
kind, ready for finish.
Provide 3
4"G down from above. Provide automatic gas
shut-off valve, connected to hood's fire suppression
system. Provide 3
4"G down to serve kitchen equipment.
Provide 1"G down from above. Provide automatic gas
shut-off valve, connected to hood's fire suppression
system. Provide 1"G down to serve kitchen equipment.
Provide 3
4"G line to serve Kitchen Equipment. Provide
48" extra, flexible gas line in a loop behind equipment.
Tether loop to it's respective piece of equipment. See
Kitchen Equipment Supplier's plans for more information.
This waste piping must be Cast Iron.
Repipe existing floor drain to discharge into Sanitary
Grease Waste pipe.
Provide 1"G line to serve Kitchen Equipment. Provide
48" extra, flexible gas line in a loop behind equipment.
Tether loop to it's respective piece of equipment. See
Kitchen Equipment Supplier's plans for more information.
3
4"Condensate down in wall. Stub-out wall below sink and
connect to sink's tailpiece, upstream of p-trap, using a
pre-manufactured fitting.
Provide 1
2"CW & 3
4"HW down in wall. Provide 1
2"CW &
1
2"HW branches to serve hand sink. Provide 1
2"HW branch
down to below slab.
Mount floor hydrant in min. 2' of pea gravel for drainage.
2NCP0QVGU
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
4 PROFESS
IONAL EN G NI EERS A M U EL L.HU
R
TINDIAN A
0
N
EP1 6
.o
01087
ATS FOETRETEGIS
DER
Exp. 7.31.2022
PROJECT NUMBER: 2020-007
CERTIFICATION:SITE ARCHITECTUREarchitecture + landscape architectureARCHITECT:
SITE ARCHITECTURE
architecture + landscape architecture
BRAD SMITH, RA | LEED AP
13144 EAST 186TH STREET
NOBLESVILLE, IN. 46060
PH: 317.374.8720
E-MAIL: brad@site-architecture.com
PROJECT CONTACT:
These drawings are intended for construction.
12.23.2020DATE ISSUED:
REVISIONS ISSUED:CARMEL, IN 46033NEEDLER'S FRESH MARKET4755 EAST 126TH STREETTENANT FINISH IMPROVEMENTSTHE ENGINEERING
COLLABORATIVE
SAM HURT, P.E.
2410 EXECUTIVE DRIVE, SUITE 100
INDIANAPOLIS, IN. 46241
PH: 317.636.3941
E-MAIL: sam@tec-mep.com
PROJECT CONTACT:
MEP ENGINEER:
CONSTRUCTION ISSUE SET
#4 - 2.17.2021
FIRST FLOOR PLUMBING - AREA 2 ENLARGED PLAN
SCALE: 3/16" = 1'-0"1N
P104
FIRST FLOOR
PLUMBING - AREA 2
ENLARGED PLAN
KEY PLANN
SCALE: 1/64" = 1'-0" MATCH LINEMATCH LINE MATCH LINEMATCH LINE
AREA 1 AREA 2
AREA 1 AREA 2
EXTERIOR
MATCH LINE
AREA 3 AREA 2AREA 3 AREA 205/06/21