Loading...
HomeMy WebLinkAbout51_P106Exist. floor drain Exist. floor drain Exist. floor hydrant Exist. floor drain Exist. floor drain Exist. floor drain Exist. floor drain Exist. floor drain Exist. cleanout Exist. floor drain FS-1 1 1 1 1 1 HD-1 HD-1 2 L-1A 2 L-1A 2 WC-1 WC-1A 2 2 WC-1A UR-1A 2 L-1A 2 L-1A 2 2 EWC-1A 1 1 1 HD-1 HD-1 FS-1 3 4 HD-1 HD-1 HD-1 HD-1 1 1 1 HD-1 1 2"CW up to FH-1. 1 1 HD-1 6 5 FS-1 FS-1 HD-1 HD-1 HD-1 1 1 1 8 8 RPZ-2 EWC-1 10 15 11 12 3 4"CW below slab, minimum 18" cover. 8 8 8 8 8 8 8 8 8 8 8 WHA-A WHA-A 7 9 14 14 CO-1 4"Grease 9 9 2"Grease 2"Grease 9 4"Grease 7 2"Grease 9 9 3"Grease SI-1 3"Grease 9 CO-1 2"W 9 9 2"W 9 2"W 9 2"W 7 9 2"W 2"W 7 9 13 2"Grease 9 13 7 7 3"Grease 9 9 Approximate location of existing 4" Grease Waste Piping. Approximate location of existing 4" Grease Waste Piping. 7 9 FS-1 7 9 Approximate location of existing 4" Grease Waste Piping. 2"W 7 9 2"W 9 3"W 7 9 3"W 9 Approximate location of existing 4" Sanitary Waste Piping. Approximate location of existing 4" Sanitary Waste Piping. 7 9 BAKERY PREP 131 WASH 132 BAKERY 119 CHEESE ISLAND 116 MEAT MEAT 117 COUNTER 142 CORR 139 MEAT COOLER 144 SEAFOOD COOLER 141 SEAFOOD PREP 140 MEN RR 137 WOMEN RR 138 CORR 136 DELI COOLER 135 134 DELI STOR DELI 118 DELI PREP 133 STAIR A STA-1 EXTERIOR EXTERIOR EXTERIOR EXTERIOR EXTERIOR EXTERIOR 2"W 7 9 9 1 2"CW below slab, minimum 18" cover. 9 3 4"CW 3 4"HW 8 SK-1A SK-4 SK-4 SK-1A SK-1A SK-1A SK-1A SK-4 SK-5 SK-7 2"W 7 9 Remove existing grease interceptor in its entirety. Provide and install new GI-1, connect to existing inlet and outlet piping serving removed grease interceptor. 4 FS-1 8 7 9 SK-5 MEAT FREEZER 143 3 4 "CW 8 HB-1, mount above top of cooler. HD-1 7 9 2"W 1 2"CW up to FH-1. 18 18 5 12 1"G 12 1"G 1 1 4"G 5 A. All fittings, piping, fixtures, materials, etc. to meet the current Safe Drinking Water Act with all of its amendments and the Reduction of Lead in Drinking water Act. B. All work shall comply with all national, state, local codes and ordinances pertaining to the work in this project. C. All plumbing fixtures shall be supplied with individual water supply stops and code approved traps. Exposed piping shall be chrome plated. D. All plumbing fixtures shall be installed with approved backflow prevention devices. E. No piping shall pass directly over electrical power distribution cabinets, panelboards, etc. Contractor to coordinate panel locations prior to piping installation. F. All plumbing vents to be a minimum of 10'-0" from any air intake. Coordinate locations with HVAC plans. G. Single runouts to plumbing fixtures shall be the same size as on the plumbing fixture schedule unless otherwise noted. H. Concealed gas piping shall be constructed in accordance with code without unions, tubing fittings or running threads. I. Gas lines run on roof to be supported by Roof Top Blox or similar and equal. DO NOT USE LUMBER FOR GAS PIPING SUPPORT. J. Dry-pipe fire protection system shall be used in all areas subject to freezing. K. All waste, water, vent, gas and condensate lines shown to be connected to their associated fixture/equipment, unless noted otherwise. All equipment and systems shown must be complete and usable upon completion of project. )GPGTCN0QVGU Extend case drain to nearest hub drain. Connect new fixture to nearest existing water, waste and vent pipes serving removed fixture. Adjust/extend existing utilities as required to suit new fixture type/location. Repair floor/wall in kind, ready for finish. 3 4"CW & 3 4"HW down along wall to serve two (2) sinks. Hold pipes as tight to wall as practical. 3 4"CW & 1 2"HW down along wall. Hold pipes as tight to wall as practical. Extend 1 2"CW & 1 2"HW to serve sink. Extend 3 4"CW to below slab Adjust existing waste stub from below slab to serve new floor sink. Repair slab in kind, ready for finish. Connect new fixture to existing water pipes, serving removed fixture. Adjust/extend existing utilities as required to suit new fixture type/location. Connect new waste piping to nearest active waste pipe of equal or larger size. Field verify exact size, location, elevation, material and condition of existing waste pipe; prior to start of work. Connect new water pipe(s) to nearest active water pipe(s) of equal or larger size. Field verify exact size, location, elevation, material and condition of existing water pipe(s); prior to start of work. Neatly saw-cut existing slab along entire path of new utility, verify path prior to start of work. Repair slab in kind, ready for finish. Provide 1 1 4"G down from above. Provide automatic gas shut-off valve, connected to hood's fire suppression system. Provide 1 1 4"G down to serve kitchen equipment. Provide 1"G down from above. Provide automatic gas shut-off valve, connected to hood's fire suppression system. Provide 1"G down to serve kitchen equipment. Provide 3 4"G line to serve Kitchen Equipment. Provide 48" extra, flexible gas line in a loop behind equipment. Tether loop to it's respective piece of equipment. See Kitchen Equipment Supplier's plans for more information. This waste piping must be Cast Iron. Repipe existing floor drain to discharge into Sanitary Grease Waste pipe. Provide 1"G line to serve Kitchen Equipment. Provide 48" extra, flexible gas line in a loop behind equipment. Tether loop to it's respective piece of equipment. See Kitchen Equipment Supplier's plans for more information. 3 4"Condensate down in wall. Stub-out wall below sink and connect to sink's tailpiece, upstream of p-trap, using a pre-manufactured fitting. Provide 1 2"CW & 3 4"HW down in wall. Provide 1 2"CW & 1 2"HW branches to serve hand sink. Provide 1 2"HW branch down to below slab. Mount floor hydrant in min. 2' of pea gravel for drainage. 2NCP0QVGU 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 5 P R O F E S S I O N A L E N G N I E E R S A M U E L L. H U R T I N D I A N A 0 N P E 1 6 o . 10 0 87 S T A T E O F R E T E G I S D E R Exp. 7.31.2022 PROJECT NUMBER: 2020-007 CERTIFICATION: SITE ARCHITECTURE architecture + landscape architecture ARCHITECT: SITE ARCHITECTURE architecture + landscape architecture BRAD SMITH, RA | LEED AP 13144 EAST 186TH STREET NOBLESVILLE, IN. 46060 PH: 317.374.8720 E-MAIL: brad@site-architecture.com PROJECT CONTACT: These drawings are intended for construction. DATE ISSUED: 12.23.2020 REVISIONS ISSUED: CARMEL, IN 46033 NEEDLER'S FRESH MARKET 4755 EAST 126TH STREET TENANT FINISH IMPROVEMENTS THE ENGINEERING COLLABORATIVE SAM HURT, P.E. 2410 EXECUTIVE DRIVE, SUITE 100 INDIANAPOLIS, IN. 46241 PH: 317.636.3941 E-MAIL: sam@tec-mep.com PROJECT CONTACT: MEP ENGINEER: CONSTRUCTION ISSUE SET #6 - 3.5.2021 FIRST FLOOR PLUMBING - AREA 4 ENLARGED PLAN 1 SCALE: 3/16" = 1'-0" N P106 FIRST FLOOR PLUMBING - AREA 4 ENLARGED PLAN N KEY PLAN SCALE: 1/64" = 1'-0" MATCH LINE MATCH LINE MATCH LINE MATCH LINE AREA 4 AREA 1 AREA 4 AREA 1 AREA 4 AREA 3 AREA 4 AREA 3 05/06/21