Loading...
HomeMy WebLinkAbout52_P10727 28 30 31 32 33 35 36 37 39 40 41 42 43 WH-1 WH-2 2 2 1 FCU-202 1 1 2"Cond down along wall. Route to discharge floor drain. FCU-203 6 STAIR A STA-2 PRICING COORDINATOR 202 CORRIDOR 201 203 OFFICE 204 MECH/ UTILITY 205 NETWORK/ TELCO WATER HEATER 204A WH-1 2 3 FD-1 FCU-204 A. All fittings, piping, fixtures, materials, etc. to meet the current Safe Drinking Water Act with all of its amendments and the Reduction of Lead in Drinking water Act. B. All work shall comply with all national, state, local codes and ordinances pertaining to the work in this project. C. All plumbing fixtures shall be supplied with individual water supply stops and code approved traps. Exposed piping shall be chrome plated. D. All plumbing fixtures shall be installed with approved backflow prevention devices. E. No piping shall pass directly over electrical power distribution cabinets, panelboards, etc. Contractor to coordinate panel locations prior to piping installation. F. All plumbing vents to be a minimum of 10'-0" from any air intake. Coordinate locations with HVAC plans. G. Single runouts to plumbing fixtures shall be the same size as on the plumbing fixture schedule unless otherwise noted. H. Concealed gas piping shall be constructed in accordance with code without unions, tubing fittings or running threads. I. Gas lines run on roof to be supported by Roof Top Blox or similar and equal. DO NOT USE LUMBER FOR GAS PIPING SUPPORT. J. Dry-pipe fire protection system shall be used in all areas subject to freezing. K. All waste, water, vent, gas and condensate lines shown to be connected to their associated fixture/equipment, unless noted otherwise. All equipment and systems shown must be complete and usable upon completion of project. )GPGTCN0QVGU Hot water recovery tank to be connected to refrigeration compressor system by others. Provide aquastat controlled 3-way valve to prevent overheating water. Coordinate refrigeration connection with Refrigeration Contractor prior to start of work. Connect new water heater and heat recovery tanks and all associated accessories to existing piping serving removed water heaters. Field verify exact size, location, material and condition of existing water lines; prior to installation. Connect new 2"W to nearest active waste line of equal or larger size. Field verify exact size, location, elevation, material and condition of existing waste line; prior to start of work. 2NCP0QVGU 1 2 3 6 P R O F E S S I O N A L E N G N I E E R S A M U E L L. H U R T I N D I A N A 0 N P E 1 6 o . 10 0 87 S T A T E O F R E T E G I S D E R Exp. 7.31.2022 PROJECT NUMBER: 2020-007 CERTIFICATION: SITE ARCHITECTURE architecture + landscape architecture ARCHITECT: SITE ARCHITECTURE architecture + landscape architecture BRAD SMITH, RA | LEED AP 13144 EAST 186TH STREET NOBLESVILLE, IN. 46060 PH: 317.374.8720 E-MAIL: brad@site-architecture.com PROJECT CONTACT: These drawings are intended for construction. DATE ISSUED: 12.23.2020 REVISIONS ISSUED: CARMEL, IN 46033 NEEDLER'S FRESH MARKET 4755 EAST 126TH STREET TENANT FINISH IMPROVEMENTS THE ENGINEERING COLLABORATIVE SAM HURT, P.E. 2410 EXECUTIVE DRIVE, SUITE 100 INDIANAPOLIS, IN. 46241 PH: 317.636.3941 E-MAIL: sam@tec-mep.com PROJECT CONTACT: MEP ENGINEER: CONSTRUCTION ISSUE SET #6 - 3.5.2021 SECOND FLOOR PLUMBING - ENLARGED PLAN 1 SCALE: 3/16" = 1'-0" N P107 SECOND FLOOR PLUMBING - ENLARGED PLAN 05/06/21