Panel "D"
Existing
Panel "D2"
EVAP
+48"
120V.,
20 amp
4
120V.,
20 amp
4 208V.,3Ø
25 amp
#10 wire
4
+85"
+85"
208V.,3Ø
50 amp
#8 wire
4
208V.,3Ø
60 amp
#6 wire
4
(2)
(1)
(1)
+48"
+48"
208V.,3Ø
50 amp
#8 wire
4
+48"
+48"
+48"
+48"
+48"
(1) (1) (1)
(1)
+48" +48" +48"
+48"
120V.,
20 amp
4
120V.,
20 amp
4
120V.,
20 amp
4
120V.,
20 amp
4
120V.,
20 amp
12
12
120V.,
20 amp
4
120V.,
20 amp
4
120V.,
20 amp
4
120V.,
20 amp
4
120V.,
20 amp
4
208V.,3Ø
40 amp
#8 wire
4
12
J
120V.,
20 amp
4
At drop ceiling for
signage, signage by
others
BAKERY
DELI 119
118
BAKERY
PREP
131
WASH
132
DELI PREP
133
134
DELI
COOLER
135
CORR
136
MEN RR
137
WOMEN RR
138
CORR
139
SEAFOOD
PREP
140
SEAFOOD
COOLER
141
MEAT
FREEZER
143
STAIR A
STA-1
CHEESE
ISLAND
116
DELI
STOR
+48"
120V.,
20 amp
4
+48"
120V.,
20 amp
4
+48"
120V.,
20 amp
4
+48"
120V.,
20 amp
4
+48"
+48"
15
J
15
J
16
16
120V.,
20 amp
(Hood controls)
4
208V.,3Ø
15 amp (MAU)
208V.,3Ø
15 amp (Ex. fan)
208V.,3Ø
15 amp (Ex. fan)
208V.,3Ø
50 amp
#8 wire
4
12 208V.,3Ø
50 amp
#8 wire
4
12
120V.,
20 amp
(Hood controls)
4
120V.,
20 amp
(Ex. fan)
4
120V.,
25 amp, #10 wire
(MAU)
4
4
4
4
208V.,3Ø
15 amp 4
4
2NCP0QVGU
Reuse existing gondola circuits in this area.
Circuit to existing Panel "F2". Utilize existing 120 volt, 20
amp circuit breakers abandoned from demolition.
Provide and install new circuit breakers as required.
Circuit to existing Panel "F". Utilize existing 120 volt, 20
amp circuit breakers abandoned from demolition.
Provide and install new circuit breakers as required.
Connect to new equipment location as required. Reuse
existing circuit(s) where applicable or new circuit to
available space in existing 120/208 volt panel.
Ceiling mounted for access point.
Provide and install a 3' plugstrip with single-plex 6" o.c.
above countertop.
Cut, patch and repair floor in-kind for circuit routing
underslab.
Verify equipment electrical connection with owner prior
to rough-in.
Connect to new equipment location as required. Reuse
existing circuit(s) where applicable or new circuit to
available space in existing 120/208 volt panel. 120 volt,
20 amp circuit breaker.
Provide shunt-trip circuit breaker.
Provide GFCI circuit breaker.
Provide hexagon junction box with 1" conduit to above
accessible ceiling for hood emergency pull station.
Refer to hood drawings for detailed wiring requirements
and include all associated work not included by hood
MFR.
1
2
4
5
10
11
)GPGTCN0QVGU
All 120 volt, 20 amp circuits over 60' in length shall be
#10 AWG, over 95' shall be #8, over 145' shall be #6.
Contractor shall coordinate with all other trades to avoid
conflicts of space.
Contractor shall coordinate the exact location of all
devices with all other trades prior to rough-in. Exact
location to be determined in the field.
Contractor shall coordinate with the mechanical and
plumbing contractors for exact locations of equipment
prior to rough-in.
Refer to sheet E701 for details and symbols.
Refer to sheet E601 for light fixture schedule.
Refer to sheet E901 for electrical specifications.
Shared neutrals shall not be permitted.
Note "H" clips are not acceptable for junction box
supporting.
Switches shall be a maximum +48" A.F.F. to the top of
the device unless otherwise noted.
Receptacles, telephone outlets, and television outlets
shall be a minimum of +18" A.F.F. to the bottom of the
device unless otherwise noted.
Where devices are installed in fire walls, the boxes shall
be rated and sealed for installation in a fire wall.
Provide HACR circuit breakers for all HVAC and
refrigeration equipment.
No conduit to be supported from the roof deck.
Coordinate all floor cut means and methods of routing
conduit through floor prior.
A.
B.
C.
D.
E.
F.
G.
H.
J.
K.
L.
M.
N.
P.
Q.
3
6
12
9
14
15
16
4
P
R
O
F
E
S
S
I
O
N
A
L
E
N
G
N
I
E
E
R
S
A
M
U
E
L
L.
H
U
R
T
I
N
D
I
A
N
A
0
N
P E 1 6
o .
10 0 87
S T A T E O F
R
E
T
E
G
I
S
D
E
R
Exp. 7.31.2022
PROJECT NUMBER: 2020-007
CERTIFICATION:
SITE ARCHITECTURE
architecture + landscape architecture
ARCHITECT:
SITE ARCHITECTURE
architecture + landscape architecture
BRAD SMITH, RA | LEED AP
13144 EAST 186TH STREET
NOBLESVILLE, IN. 46060
PH: 317.374.8720
E-MAIL: brad@site-architecture.com
PROJECT CONTACT:
These drawings are intended for construction.
DATE ISSUED: 12.23.2020
REVISIONS ISSUED:
CARMEL, IN 46033
NEEDLER'S FRESH MARKET
4755 EAST 126TH STREET
TENANT FINISH IMPROVEMENTS
THE ENGINEERING
COLLABORATIVE
SAM HURT, P.E.
2410 EXECUTIVE DRIVE, SUITE 100
INDIANAPOLIS, IN. 46241
PH: 317.636.3941
E-MAIL: sam@tec-mep.com
PROJECT CONTACT:
MEP ENGINEER:
CONSTRUCTION ISSUE SET
#4 - 2.17.2021
FIRST FLOOR POWER - AREA 4 ENLARGED PLAN
1 SCALE: 3/16" = 1'-0"
N
E206
FIRST FLOOR POWER -
AREA 4 ENLARGED
PLAN
N KEY PLAN
SCALE: 1/64" = 1'-0"
MATCH LINE MATCH LINE
MATCH LINE
MATCH LINE
AREA 4 AREA 1
AREA 4 AREA 1
AREA 4 AREA 3
AREA 4 AREA 3
05/06/21