Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A8-2
NARROW 'H' CHANNEL SCHD. FRAME SCHEDULED GLAZING 4 1/2" 2" SCHD. FRAME SCHD. FLOOR CAULK WITH COLOR-MATCHED CAULK OR PROVIDE MATCHING ALUM COVER STRIP TO HIDE SHIMS SHIMS BACKER ROD & SEALANT 2" 4 1/2" SCHD. FRAME SCHD. WALL CAULK WITH COLOR-MATCHED CAULK OR PROVIDE MATCHING ALUM COVER STRIP TO HIDE SHIMS BACKER ROD & SEALANT 4 1/2" 2" SCHED. FRAME SCHD. GLAZING SCHEDULED GLAZING 4 1/2" 2" BACKER ROD & SEALANT SCHD. FRAME SCHD. GLAZING 2" 4 1/2" CAULK WITH COLOR-MATCHED CAULK OR PROVIDE MATCHING ALUM COVER STRIP TO HIDE SHIMS SCHD. FRAME SCHD. GLAZING SCHD. DOOR SCHD. GLAZING SCHD. FRAME SCHD. DOOR 1/8" SCHEDULED DOOR FIRST FLOOR 0" 2 A6-1 9'-8" 1'-8" 1'-8" SCHED REF DOOR 8'-8" 7'-0" IGU-1 IGU-1 IGU-1 IGU-1 IGU-1 IGU-1 IGU-1 T T T RUN POWER SUPPLY TO ADA OPERATOR WITHIN SF FRAMING FIRST FLOOR 0" IGU-1 IGU-1 1'-0" 6'-0" 5'-1" EQ EQ T T 2 A6-2 SIM FIRST FLOOR 0" 1'-0" 5'-11" 3'-0" T IGU-1 1 A6-3 SIM FIRST FLOOR 0" 5 A6-2 IGU-1 3'-4" 3'-4" 3'-0" FIRST FLOOR 0" VG-2 VG-2 T T WF-1 9'-6 1/2" 2'-6" SCHED REF DOOR 4'-0" 2'-0" 23 A8-2 20 A8-2 RUN POWER SUPPLY TO ADA OPERATOR WITHIN SF FRAMING FIRST FLOOR 0" T VG-2 T VG-2 T VG-2 9'-5" EQ EQ EQ 8'-0" 23 A8-2 20 A8-2 FIRST FLOOR 0" T VG-2 T VG-2 7'-7 3/4" SCHED REF DOOR EQ EQ 23 A8-2 20 A8-2 FIRST FLOOR 0" SPG-1 SPG-1 1'-6" 6'-6" 6'-7" EQ EQ 23 A8-2 20 A8-2 LOCATE REMOTE TRANSFORMER IN ACCESSIBLE LOCATION ABOVE WINDOW. RUN POWER SUPPLY AT MIDPOINT OF EACH GLASS PANEL WITHIN STOREFRONT FRAMING. 1 A7-1 2 A7-1 FIRST FLOOR 0" VG-2 VG-2 WF-1 WF-1 10'-6" EQ SCHED REF DOOR EQ T T 8'-0" 1'-6" 4'-6" 23 A8-2 20 A8-2 FIRST FLOOR 0" T VG-2 8'-0" 6'-2 1/2" SCHED REF DOOR 23 A8-2 20 A8-2 BASEMENT -10'-4" 12'-6" EQ SCHED REF DOOR EQ 7'-4" 3'-4" 2'-0" T VG-2 T VG-2 23 A8-2 20 A8-2 WF-1 WF-1 BASEMENT -10'-4" 6'-4" 7'-4" 23 A8-2 BASEMENT -10'-4" 1 A6-3 3'-0" 5'-0" 3'-0" IGU-1 BACKER ROD & SEALANT SCHD. FRAME SCHD. GLAZING CAULK WITH COLOR-MATCHED CAULK OR PROVIDE MATCHING ALUM COVER STRIP TO HIDE SHIMS 2" 4 1/2" U.N.O. SCHED. FRAME SCHEDULED GLAZING 2" 4 1/2" U.N.O. SCHD. FRAME SCHD. WALL CAULK WITH COLOR-MATCHED CAULK OR PROVIDE MATCHING ALUM COVER STRIP TO HIDE SHIMS BACKER ROD & SEALANT SCHD. GLAZING 2" 4 1/2" U.N.O. SCHD. FRAME SCHD. FLOOR CAULK WITH COLOR-MATCHED CAULK OR PROVIDE MATCHING ALUM COVER STRIP TO HIDE SHIMS BACKER ROD & SEALANT SILL PAN SET IN SEALANT, ENSURE POSITIVE DRAINAGE 2" 4 1/2" U.N.O. SCHD. FRAME SCHEDULED GLAZING 4 1/2" U.N.O. 2" FIRST FLOOR 0" 1'-1" 4'-0" 2'-6" WF-1 APPLY FILM OVER EXISTING WINDOW FIRST FLOOR 0" IGU-1 3'-6" 3'-5" 3'-0" 1 A6-3 SIM tel: 765.649.8477 www.krMarchitecture.com ANDERSON INDIANAPOLIS DETROIT DRAWN BY krM JOB NO. DRAWING NO. REVISIONS DRAWING NAME A8-2 FRAME ELEVATIONS & DETAILS KG 20128 02/12/2021 BID SET 4775 E 126th St Carmel IN 46033 STATE BANK 20128 - CARMEL BRANCH BID SET 02/12/2021 SCALE: 6" = 1'-0" 6 FRAMELESS CONNECTION SCALE: 3" = 1'-0" 19 SF VERTICAL SCALE: 3" = 1'-0" 20 SF SILL SCALE: 3" = 1'-0" 21 SF JAMB SCALE: 3" = 1'-0" 22 SF HORIZONTAL SCALE: 3" = 1'-0" 23 SF HEAD SCALE: 3" = 1'-0" 24 ALUM. DOOR JAMB - SIDELITE SCALE: 3" = 1'-0" 25 ALUM. DOOR HEAD - TRANSOM SCALE: 3" = 1'-0" 26 ALUM. DOOR CENTER STILE ALUMINUM DOOR DETAILS EXTERIOR STOREFRONT DETAILS MISC. GLAZING DETAILS INTERIOR STOREFRONT DETAILS AF-4 AF-3 AF-2 AF-1 AF-16 AF-15 AF-14 AF-13 AF-12 AF-11 AF-18 AF-17 AF-5 GLAZING SCHEDULE IGU-1 1", LOW-E INSULATED GLAZING. GUARDIAN SNX 51/23 ON CLEAR. VLT 51%, SHGC .23 SPG-1 7/16" CLEAR LAMINATED SWITCHABLE PRIVACY GLASS. REFERENCE SPEC SECTION 08 88 36.16 VG-1 1/4", VISION GLASS VG-2 1/2", VISION GLASS WF-1 WINDOW FILM, SOLYX SX-C333 OVER SCHEDULED GLASS. WF-2 WINDOW FILM, SOLYX SXJ-0547 OVER SCHEDULED GLASS. SCALE: 3" = 1'-0" 1 EXT SF HEAD SCALE: 3" = 1'-0" 2 EXT SF HORIZONTAL SCALE: 3" = 1'-0" 4 EXT SF JAMB SCALE: 3" = 1'-0" 5 EXT SF SILL SCALE: 3" = 1'-0" 7 EXT SF VERTICAL ALUMINUM-FRAMED EXTERIOR STOREFRONT, 2"x4-1/2" ALUMINUM-FRAMED INTERIOR STOREFRONT, 2"x4-1/2" ETR-1 EXISTING TO REMAIN AF-6 COLOR 1 COLOR 2 05/07/21