Loading...
HomeMy WebLinkAboutD1-1UP REF. 11 2 3 4 5 6 7 7 8 9 9 9 9 9 10 10 6 1 11 11 12 12 12 6 6 1 1 6 4 4 4 4 4 4 4 4 4 13 13 13 3 3 3 3 3 1 D4-1 3 D4-1 2 D4-1 4 D4-1 NOTE: MUCH OF THE INTERIOR DEMOLITION WORK HAS BEEN COMPLETED. BIDDERS SHALL VISIT THE SITE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THE DEMOLITION SCOPE SHALL INCLUDE WORK REQUIRED TO COMPLETE NEW WORK. 6 6 6 14 21 22 23 STORAGE MECH/ELEC RISER 11 6 24 3 14 6 14 11 14 14 14 14 1 15 14 6 6 3 3 5 KITCHEN 5 RR RR 3 3 2 20 24 1 3 A5-1 1 A5-1 3 A9-1 16 16 16 16 16 16 16 16 17 17 17 17 16 18 19 19 OFFICE OFFICE OFFICE TELLER VAULT RR 18 19 16 2 S2-0 OFFICE WORKROOM STORAGE MECH/ELEC KITCHEN RR CIRC RISER OFFICE RR 16 16 16 16 16 16 16 16 17 16 16 GENERAL NOTES - DEMOLITION PLAN A. SEE GENERAL NOTES ON CUTTING AND PATCHING OUTLINED ON SHEET A001 FOR ADDITIONAL INFORMATION. B. PERFORM ALL WORK UNDER ESTABLISHED PROJECT GUIDELINES. C. FIELD VERIFY EXISTING CONDITIONS AND COORDINATE DEMOLITION OR REMOVAL WORK WITH CORRESPONDING NEW CONSTRUCTION WORK AND APPROPRIATE TRADES PRIOR TO STARTING DEMOLITION WORK. IF DISCREPANCIES ARE FOUND BETWEEN CONTRACT DOCUMENTS AND ACTUAL FIELD CONDITIONS, NOTIFY ARCHITECT IMMEDIATELY. D. DASHED LINES INDICATE EXISTING ITEMS TO BE REMOVED. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL BE RESPONSIBLE FOR THE OFF-SITE DISPOSAL OF ALL DEMOLITION ITEMS. E. REMOVE ALL CONSTRUCTION DEBRIS FROM SITE DAILY. DO NOT ALLOW REFUSE TO BLOCK CORRIDORS, STAIRS, OR ANY OTHER TRAFFIC AREAS. F. PROVIDE TEMPORARY FIRE AND LIFE SAFETY PROTECTION THROUGHOUT DURATION OF PROJECT. G. PATCH AND REPAIR ALL ADJACENT SURFACES DISTURBED/DAMAGED BY CONSTRUCTION. CLEAN ALL FLOOR SURFACES OF ADHESIVE AND OR GROUT RESIDUE PRIOR TO INSTALLATION OF NEW FLOORING MATERIAL. H. PROTECT ADJACENT EXISTING TO REMAIN CONSTRUCTION THROUGHOUT DURATION OF PROJECT. PROVIDE SHORING, BRACING OR SUPPORT AS REQUIRED TO PREVENT MOVEMENT OR SETTLEMENT OF EXISTING CONSTRUCTION. I. PROVIDE CONSTRUCTION BARRIER PARTITIONS BETWEEN AREAS OF WORK AND OCCUPIED SPACES (IF APPLICABLE). PARTITIONS TO REMAIN INTACT THROUGHOUT CONSTRUCTION, INCLUDING COMPLETED WORK AND WORK UNDER CONSTRUCTION. J. SEE M.E.P. DOCUMENTS FOR EXTENT OF DEMOLITION/REMOVAL OF PIPING/DUCTWORK/ELECTRICAL THAT WILL OCCUR IN PREPARATION FOR NEW CONSTRUCTION. K. WHERE BLOCKING AND/OR ELECTRICAL WORK IS REQUIRED IN EXISTING WALL CONSTRUCTION, CONTRACTOR TO CAREFULLY CUT-OUT GYPSUM BOARD AT APPROPRIATE LOCATION. PATCH AND FINISH AREA PER CUTTING AND PATCHING/FINISHING NOTES ON SHEET A001. L. REMOVE ALL EXISTING CONSTRUCTION ITEMS AND FINISHES MADE OBSOLETE BY OR IN CONFLICT WITH NEW CONSTRUCTION. VERIFY WITH ARCHITECT AND/OR OWNER'S REPRESENTATIVE. REMOVE WIRING BACK TO SOURCE AT ALL OUTLETS, ETC. MADE OBSOLETE BY WALL REMOVAL OR ANY OTHER NEW CONSTRUCTION. M. REMOVE ALL ITEMS IN THEIR ENTIRETY UNLESS OTHERWISE NOTED. DESCRIPTION OF PRIMARY ITEMS TO BE REMOVED IS GENERAL IN NATURE, AND REMOVAL OF SECONDARY COMPONENTS SUCH AS BLOCKING, SUPPORTS, ANCHORS, TRIM, ADHESIVE, PIPING, WIRING, ETC., RELATED TO PRIMARY ITEMS SHALL BE INCLUDED. N. RELOCATED ITEMS SHALL BE CLEANED AND PLACED IN STORAGE PER OWNER'S DIRECTIONS UNTIL ITEMS ARE READY TO BE REINSTALLED. IF ITEM IS DAMAGED DURING DEMOLITION OR RELOCATION, IT SHALL BE REPAIRED WITH NEW ITEM AS APPROVIDED BY OWNER AT NO EXPENSE TO OWNER. O. AT OWNER'S REQUEST, SALVAGED ITEMS SHALL BE TURNED OVER TO THE OWNER OR STORED IN AN AREA DESIGNATED BY THE OWNER. P. IF EXISTING ITEMS TO BE REMOVED OR DISTURBED ARE SUSPECTED OR DISCOVERED TO CONTAIN ASBESTOS OR OTHER HAZARDOUS MATERIALS, STOP DEMOLITION AND NOTIFY OWNER IMMEDIATELY. SCALE: 1/8" = 1'-0" 1 FIRST FLOOR DEMOLITION PLAN PLAN NOTES - DEMOLITION PLAN 1 REMOVE WALL IN ITS ENTIRETY 2 REMOVE PORTION OF FLOOR SLAB FOR NEW LIFT - COORDINATE WITH NEW WORK DRAWINGS AND DETAILS. 3 REMOVE FLOOR FINISH AND PREP FOR NEW FLOOR FINISH 4 REMOVE WINDOW 5 REMOVE PLUMBING FIXTURES AND EXISTING RESTROOM ACCESORIES 6 REMOVE DOOR AND FRAME 7 REMOVE DOOR, FRAME, AND ADJACENT TRANSOM GLAZING 8 REMOVE CONCRETE STOOP/SLAB, RAMP, AND ANY ASSOCIATED FOUNDATIONS 9 REMOVE COLUMNS, PILLASTERS, AND FRONT CANOPY AND ITS ASSOCIATED FRAMING 10 REMOVE U SHAPE DESK, CASEWORK, AND CONNECTING KNEE WALLS 11 REMOVE MOLDING, TRIM AND RUBBER BASE ON ALL EXTERIOR WALLS. PATCH AND REPAIR GYP AS REQ'D FOR PAINT READY FINISH. 12 REMOVE MOLDING, TRIM AND RUBBER BASE. PATCH AND REPAIR GYP AS REQ'D FOR PAINT READY FINISH. 13 REMOVE CURBING, COLUMNS, ASSOCIATED FOUNDATIONS, AND SURROUNDING CONCRETE. DON'T REMOVE CURBING AGAINST BUILDING AT DRIVE-THROUGH 14 REMOVE SECTION OF WALL FOR NEW OPENING PER NEW WORK DETAILS 15 REMOVE KITCHENETTE, CASEWORK, PLUMBING FIXTURES, AND APPLIANCES 16 REMOVE DROP CEILING, GRID, LOOSE INSULATION, LIGHT FIXTURES IN THEIR ENTIRTY. SEE MEP DRAWINGS FOR DEMO OF EQUIPMENT AND DUCTWORK 17 REMOVE BULKHEAD FINISHES AND FRAMING 18 REMOVE CANOPY AND FRAMING, COORDINATE WITH NEW WORK WHERE THE CANOPY INTERSECTS w/ THE EXISTING BUILDING 19 REMOVE GUTTERS AND DOWNSPOUTS 20 EXCAVATE THIS AREA WHERE REQUIRED FOR NEW WALLS. PROTECT EXISTING ADJACENT FOUNDATIONS. 21 METAL VAULT TO REMAIN, PROTECT DURING CONSTRUCTION 22 REMOVE ATM ENCLOSURE 23 REMOVE ROOF TRUSS SUPPORT BEAM. SHORE EXISTING STRUCTURE TO REMAIN. 24 REMOVE PORTION OF LOAD BEARING WALL. SHORE EXISTING STRUCTURE TO REMAIN. tel: 765.649.8477 www.krMarchitecture.com ANDERSON INDIANAPOLIS DETROIT DRAWN BY krM JOB NO. DRAWING NO. REVISIONS DRAWING NAME D1-1 DEMOLITION FLOOR & REFLECTED CEILING PLANS KK 20128 02/12/2021 BID SET 4775 E 126th St Carmel IN 46033 STATE BANK 20128 - CARMEL BRANCH BID SET 02/12/2021 SCALE: 1/8" = 1'-0" 2 BASEMENT DEMOLITION PLAN SCALE: 1/8" = 1'-0" 3 FIRST FLOOR REFLECTED CEILING PLAN SCALE: 1/8" = 1'-0" 4 BASEMENT - DEMO REFLECTED CEILING PLAN 05/07/21