NOTE: MUCH OF THE INTERIOR
DEMOLITION WORK HAS BEEN
COMPLETED. BIDDERS SHALL VISIT THE
SITE TO BECOME FAMILIAR WITH THE
EXISTING CONDITIONS. THE DEMOLITION
SCOPE SHALL INCLUDE WORK REQUIRED
TO COMPLETE NEW WORK.
6
6 6
14
21
22
23
STORAGE
MECH/ELEC
RISER
11
6
24
3
14
6
14
11
14
14
14
14
1
15
14
6
6
3 3
5
KITCHEN 5
RR
RR
3
3
2
20
24
1
3
A5-1
1
A5-1
3
A9-1
16
16
16
16
16
16
16
16
17
17
17
17
16
18
19 19
OFFICE
OFFICE
OFFICE
TELLER
VAULT
RR
18
19
16
2
S2-0
OFFICE
WORKROOM
STORAGE
MECH/ELEC
KITCHEN
RR
CIRC
RISER
OFFICE
RR
16
16
16 16
16
16
16
16
17 16
16
GENERAL NOTES - DEMOLITION
PLAN
A. SEE GENERAL NOTES ON CUTTING AND PATCHING OUTLINED
ON SHEET A001 FOR ADDITIONAL INFORMATION.
B. PERFORM ALL WORK UNDER ESTABLISHED PROJECT
GUIDELINES.
C. FIELD VERIFY EXISTING CONDITIONS AND COORDINATE
DEMOLITION OR REMOVAL WORK WITH CORRESPONDING
NEW CONSTRUCTION WORK AND APPROPRIATE TRADES
PRIOR TO STARTING DEMOLITION WORK. IF DISCREPANCIES
ARE FOUND BETWEEN CONTRACT DOCUMENTS AND ACTUAL
FIELD CONDITIONS, NOTIFY ARCHITECT IMMEDIATELY.
D. DASHED LINES INDICATE EXISTING ITEMS TO BE REMOVED.
UNLESS OTHERWISE NOTED, CONTRACTOR SHALL BE
RESPONSIBLE FOR THE OFF-SITE DISPOSAL OF ALL
DEMOLITION ITEMS.
E. REMOVE ALL CONSTRUCTION DEBRIS FROM SITE DAILY. DO
NOT ALLOW REFUSE TO BLOCK CORRIDORS, STAIRS, OR ANY
OTHER TRAFFIC AREAS.
F. PROVIDE TEMPORARY FIRE AND LIFE SAFETY PROTECTION
THROUGHOUT DURATION OF PROJECT.
G. PATCH AND REPAIR ALL ADJACENT SURFACES
DISTURBED/DAMAGED BY CONSTRUCTION. CLEAN ALL FLOOR
SURFACES OF ADHESIVE AND OR GROUT RESIDUE PRIOR TO
INSTALLATION OF NEW FLOORING MATERIAL.
H. PROTECT ADJACENT EXISTING TO REMAIN CONSTRUCTION
THROUGHOUT DURATION OF PROJECT. PROVIDE SHORING,
BRACING OR SUPPORT AS REQUIRED TO PREVENT
MOVEMENT OR SETTLEMENT OF EXISTING CONSTRUCTION.
I. PROVIDE CONSTRUCTION BARRIER PARTITIONS BETWEEN
AREAS OF WORK AND OCCUPIED SPACES (IF APPLICABLE).
PARTITIONS TO REMAIN INTACT THROUGHOUT
CONSTRUCTION, INCLUDING COMPLETED WORK AND WORK
UNDER CONSTRUCTION.
J. SEE M.E.P. DOCUMENTS FOR EXTENT OF
DEMOLITION/REMOVAL OF PIPING/DUCTWORK/ELECTRICAL
THAT WILL OCCUR IN PREPARATION FOR NEW
CONSTRUCTION.
K. WHERE BLOCKING AND/OR ELECTRICAL WORK IS REQUIRED
IN EXISTING WALL CONSTRUCTION, CONTRACTOR TO
CAREFULLY CUT-OUT GYPSUM BOARD AT APPROPRIATE
LOCATION. PATCH AND FINISH AREA PER CUTTING AND
PATCHING/FINISHING NOTES ON SHEET A001.
L. REMOVE ALL EXISTING CONSTRUCTION ITEMS AND FINISHES
MADE OBSOLETE BY OR IN CONFLICT WITH NEW
CONSTRUCTION. VERIFY WITH ARCHITECT AND/OR OWNER'S
REPRESENTATIVE. REMOVE WIRING BACK TO SOURCE AT ALL
OUTLETS, ETC. MADE OBSOLETE BY WALL REMOVAL OR ANY
OTHER NEW CONSTRUCTION.
M. REMOVE ALL ITEMS IN THEIR ENTIRETY UNLESS OTHERWISE
NOTED. DESCRIPTION OF PRIMARY ITEMS TO BE REMOVED IS
GENERAL IN NATURE, AND REMOVAL OF SECONDARY
COMPONENTS SUCH AS BLOCKING, SUPPORTS, ANCHORS,
TRIM, ADHESIVE, PIPING, WIRING, ETC., RELATED TO PRIMARY
ITEMS SHALL BE INCLUDED.
N. RELOCATED ITEMS SHALL BE CLEANED AND PLACED IN
STORAGE PER OWNER'S DIRECTIONS UNTIL ITEMS ARE
READY TO BE REINSTALLED. IF ITEM IS DAMAGED DURING
DEMOLITION OR RELOCATION, IT SHALL BE REPAIRED WITH
NEW ITEM AS APPROVIDED BY OWNER AT NO EXPENSE TO
OWNER.
O. AT OWNER'S REQUEST, SALVAGED ITEMS SHALL BE TURNED
OVER TO THE OWNER OR STORED IN AN AREA DESIGNATED
BY THE OWNER.
P. IF EXISTING ITEMS TO BE REMOVED OR DISTURBED ARE
SUSPECTED OR DISCOVERED TO CONTAIN ASBESTOS OR
OTHER HAZARDOUS MATERIALS, STOP DEMOLITION AND
NOTIFY OWNER IMMEDIATELY.
SCALE: 1/8" = 1'-0"
1
FIRST FLOOR DEMOLITION PLAN
PLAN NOTES - DEMOLITION PLAN
1 REMOVE WALL IN ITS ENTIRETY
2 REMOVE PORTION OF FLOOR SLAB FOR NEW LIFT -
COORDINATE WITH NEW WORK DRAWINGS AND DETAILS.
3 REMOVE FLOOR FINISH AND PREP FOR NEW FLOOR FINISH
4 REMOVE WINDOW
5 REMOVE PLUMBING FIXTURES AND EXISTING RESTROOM
ACCESORIES
6 REMOVE DOOR AND FRAME
7 REMOVE DOOR, FRAME, AND ADJACENT TRANSOM GLAZING
8 REMOVE CONCRETE STOOP/SLAB, RAMP, AND ANY
ASSOCIATED FOUNDATIONS
9 REMOVE COLUMNS, PILLASTERS, AND FRONT CANOPY AND
ITS ASSOCIATED FRAMING
10 REMOVE U SHAPE DESK, CASEWORK, AND CONNECTING
KNEE WALLS
11 REMOVE MOLDING, TRIM AND RUBBER BASE ON ALL
EXTERIOR WALLS. PATCH AND REPAIR GYP AS REQ'D FOR
PAINT READY FINISH.
12 REMOVE MOLDING, TRIM AND RUBBER BASE. PATCH AND
REPAIR GYP AS REQ'D FOR PAINT READY FINISH.
13 REMOVE CURBING, COLUMNS, ASSOCIATED FOUNDATIONS,
AND SURROUNDING CONCRETE. DON'T REMOVE CURBING
AGAINST BUILDING AT DRIVE-THROUGH
14 REMOVE SECTION OF WALL FOR NEW OPENING PER NEW
WORK DETAILS
15 REMOVE KITCHENETTE, CASEWORK, PLUMBING FIXTURES,
AND APPLIANCES
16 REMOVE DROP CEILING, GRID, LOOSE INSULATION, LIGHT
FIXTURES IN THEIR ENTIRTY. SEE MEP DRAWINGS FOR DEMO
OF EQUIPMENT AND DUCTWORK
17 REMOVE BULKHEAD FINISHES AND FRAMING
18 REMOVE CANOPY AND FRAMING, COORDINATE WITH NEW
WORK WHERE THE CANOPY INTERSECTS w/ THE EXISTING
BUILDING
19 REMOVE GUTTERS AND DOWNSPOUTS
20 EXCAVATE THIS AREA WHERE REQUIRED FOR NEW WALLS.
PROTECT EXISTING ADJACENT FOUNDATIONS.
21 METAL VAULT TO REMAIN, PROTECT DURING CONSTRUCTION
22 REMOVE ATM ENCLOSURE
23 REMOVE ROOF TRUSS SUPPORT BEAM. SHORE EXISTING
STRUCTURE TO REMAIN.
24 REMOVE PORTION OF LOAD BEARING WALL. SHORE EXISTING
STRUCTURE TO REMAIN.
tel: 765.649.8477
www.krMarchitecture.com
ANDERSON
INDIANAPOLIS
DETROIT
DRAWN BY
krM JOB NO.
DRAWING NO.
REVISIONS
DRAWING NAME
D1-1
DEMOLITION FLOOR
& REFLECTED
CEILING PLANS
KK
20128
02/12/2021
BID SET
4775 E 126th St Carmel IN 46033
STATE BANK
20128 - CARMEL BRANCH
BID SET
02/12/2021
SCALE: 1/8" = 1'-0"
2
BASEMENT DEMOLITION PLAN
SCALE: 1/8" = 1'-0"
3
FIRST FLOOR REFLECTED CEILING PLAN
SCALE: 1/8" = 1'-0"
4
BASEMENT - DEMO REFLECTED CEILING PLAN
05/07/21