HomeMy WebLinkAboutE1-1LAVATORY HAND DRYER RECEPTACLE LOCATION.
ELEC. CONTRACTOR TO INSTALL DEVICE BOXES AND CONDUIT
TO ABOVE CEILING. ELEC. CONTRACOR TO PROVIDE ALL PHONE & DATA CABLEING,
JACKS AND COVER PLATES, BACK TO SERVER ROOM SHOWN. TEST ALL CABLES.
PATCH PANELS, RACKS, AND FINAL CONNECTION TO SERVER ELECTRICAL ROOM
BY OWNER.
TV OUTLET AND DATA CONNECTION, VERIFY HIEGHT AND EXACT RECEPTACLE
LOCATION WITH OWNER. FOR FUTURE TV.
ALL HVAC THERMOSTATS, SENSORS AND CONTROL PANELS ARE BY THE
MECHANICAL CONTRACTOR.
ELECTRICAL NOTES
ELECTRICAL CONTRACTOR TO INCLUDE IN THE BID PRICE 8, 20 AMP DUPLEX RECP.
& 6 DATA JACK WITH CABLEING AND JACKS.
LIGHTS AND EXHAUST FANS TO BE OPERATED BY OCCUPANCY SENSORS.
ALL ELECTRICAL WORK TO BE DONE IN STRICT ACCORDANCE
WITH THE LATEST VERSION OF THE NATIONAL ELECTRICAL
CODE. ALL LOCAL CODES & NFPA.
REVISIONS TO SECURITY SYSTEM ARE BY OWNER, ELEC. CONTRACTOR TO
COORDINATE W/ OWNER. ALL DEVICES FOR CAMERA SECURITY SYSTEM ARE
SHOWN IN GENERAL LOCATIONS. THE FINAL LOCATIONS QUANITY & TYPE ARE BY
THE OWNER & SECURITY SYSTEMS SUPPLIER. ALL GLASS BREAKS, MOTION
SENSORS ETC. TO BE DESIGNED & INSTALLED OWNERS SECURITY SYSTEM
CONTRACTOR.
COORDINATE ELECTRICAL REQUIREMENTS WITH EQUIPMENT SUPPLIER
& OWNER.
OPEN CLOSE ATM SIGN LOCATED ON UNDER SIDE OF SOFFIT. SEE
LIGHTING PLAN FOR TYPE. ONE SWITCH PER SIGN.
LOW VOLTAGE DOOR CONTACTS. ACCESS KEY PAD @ DOORS SHOWN.
RECEPTACLE FOR WINDOW DEFROST.
13
15
16
17
18
ADA LOW VOLTAGE PUSH BUTTON DOOR ACTIVATOR.
FLOOR BOXES SHOWN TO BE 1 DUPLEX RECEPTACLE & 2 DATA JACKS.
EXISTING RECEPTACLES OR DATA JACKS TO REMAIN. REMOVE & REINSTALL
COVER PLATE FOR NEW WALL COVERING. ALL RECP. MARKED ETR.
COORDINATE WITH CABINET MAKER ON EXACT LOCATION OF RECP.
& DATA JACKS.
ON ALL ELECTRICAL DEVICES, REUSE EXTG. CIRCUITING AND WIRING IF
POSSIBLE. ADD CIRCUITS IN THE EXTG. ELEC. PANELS AS NEEDED. EC
RESPONSIBLE FOR ELEC. LOADS AND WIRING SIZING AND ROUTES OF
CONDUIT OF WIRING FOR NEW OR EXTG.ELECTRICAL ITEMS. CONNECT
NEW DEVICES INTO THE CLOSEST ELECTRICAL PANEL. USE THE NEW
ELECTRICAL PANEL AS NEEDED FOR ANY NEW CIRCUITS.
FIELD VERIFY ALL EXISTING ELECTRICAL EQUIPMENT IN THIS ROOM ON
THE WALLS & CEILING THAT ARE GOING TO BE REMOVED, EQUIPMENT
SHALL INCLUDE BUT NOT LIMITED TO. LIGHT FIXTURES. RECEPTACLES,
CEILING SPEAKERS. VOICE / DATA OUTLETS. ETC. REMOVE AS NEEDED.
8
7
6
5
4
3
2
1
9
10
11
12
14
19 POWER FOR OVERHEAD SCREEN.
20 MICROWAVE IN CABINETRY COORDINATE WITH CABINET MAKER ON
LOCATION. IN BASE CABINETS.
21 PROVIDE TWO 1, 120 VOLT CONNECTION FOR THE NEW ENTRY DOOR
ACTUATOR. CONNECT TO EXTG. POWERT CLOSE TO DOOR.
22 REMOVE EXTG. DMARK PHONE SERVICE. REUSE EXTG. INCOMING SERVICE
LINE. COORDINATE W/ BANK IT DEPT. ON NEW PHONE SERVICE.
23 SECURITY SYSTEM & VIDEO RECORDER, POE SWITCH LOCATION. COORDINATE
WITH THE BANKS IT DEPT. ON NEW SYSTEMS
24 BANK MONITOR LOCATION FOR SECURITY SYSTEM. COORDINATE WITH IT DEPT.
ON EXACT LOCATION. TV OUTLET & DATA CONNECTION.
25 COORDINATE WITH BANK IT DEPT. ON SECURITY SYSTEM OUTSIDE ALARM DIALER.
26 DATA & RECEPTACLE ABOVE CEILING FOR WIFI ROUTER.
27 TIE IN EXTG. FIRE SPRINKLER SYSTEM TAMPER SWITCH TO NEW SECURITY
SYSTEM.
28 ELECTRIC HEATER ON CEILING WITH WALL TIMER. REMOVE & REINSTALL EH.
29 RECONNECT EXTG. ALARM DEVICE TO NEW ALARM SYSTEM.
30 PROVIDE UNDER CARPET RACEWAY TO POWER CENTER OF ROOM FLOOR BOX.
CUT IN FLOOR BOX @ APPROXIMATE LOCATION SHOWN.
31 KEYPAD ALARM PANEL @ EACH DOOR.
32 ILLUMINATED SIGN, JUNCTION BOX ELECTRICAL CONNECTION NEMA RATED.
COORDINATE WITH SIGN MANUFACTURER. ACTIVATED BY TIME CLOCK.
33 120 V POWER TO FROSTED WINDOW CONTROLLER.
34 POWER TO BOTTLE COOLER & KEURIG AT MARKET LEADER OFFICE. COORDINATE
WITH OWNER ON EXACT LOCATION.
35 RECEPTACLE FOR POWER TO SINK FAUCET.
35 THE ELECTRICAL WORK FOR REMOVING AND REINSTALLING THE NEW HVAC
EQUIPMENT UNITS 1 & 2 AND THE NEW HEAT PUMP / CONDENSERS ARE TO
BE AN ALTERNATE M1. CHANGE DISCONNECTS AS NEEDED, TIE BACK INTO EXTG.
ELECTRICAL PANEL.
36 REMOVE EXTG. AIR CLEANER. IN BASE BID. RETURN TO OWNER.
37 AIR CLEANER ELECTRICAL CONNECTION. COORDINATE WITH MAN. REQUIREMENTS
TIE INTO CLOSEST ELECTRICAL PANEL.
38 ON OFF SWITCH FOR GARBAGE DISPOSAL.
39 ELECTRICAL CONNECTION FOR DISHWASHER.
CA
HC
EP,A
AD
N
N
N
N
N
N
N
ETR ETR ETR
N N
ETR
N N
N N
ETR
N
ETR
ETR
N
ED
ED
N ETR
ETR
ETR
ETR
ETR
ETR
ETR
ETR
8
8
8
ETR
ETR
10
10
10
10
10
10
10
12
12
12
MARKET LEADER
114
PARTNER OFFICE
113
PARTNER OFFICE
111
BRANCH MANAGER
110
LOUNGE
115
VEST.
100
STAIR
101
LIFT
109
PARTNER OFFICE
102
CUSTOMER
104A
RR
103
VAULT
TELLER 105
106
LOBBY
108
HALL
112
ETR
ETR
ETR ETR ED
ED
ED ED ED
15
16
HC
16
AKP
17
N
N
12
CAM
CAM
CAM
CAM
CAM
CAM
CAM
CAM
CAM
OC
OC
OC
13
13
13
N
N
TUBE
J TUBE
12
J
12
TUBES
2
2
2 2
2
N
N +44"
+44"
N
+44"
N
2
EX
EX
EX
EX
DC
J
21
N
24
1
+72" N
13
3
2
N N
+72"
N N
26
1
N N
26
1
14
14
14
14
14
14
14
14
14
14
14 GB
14
DC
14
MS
14
MS
14
MS
14
MS
14
HUB
14
HUB
14
HUB
14
HUB
HC 16
J
21 N
N
CAM
17
DC
2
2
2
2
2
N
2
2 2
VERIFY
HIEGHT OF
EP PANEL
/TV
BELOW
COUNTER
12
ETR
N
N
2
N N
1
POWER + DATA @
24", POWER + DATA
@ 48" (WILL HOUSE
2 PRINTERS)
29
AKP
17
AKP DC
2 N
+44" N
2 N
J
32
J
32
PNL,E
PNL,E
33
F
+44"
N
N 2
N
N
34
HC 16
35 N
COND
COND
35
35
DISS
DISS
tel: 765.649.8477
www.krMarchitecture.com
ANDERSON
INDIANAPOLIS
DETROIT
DRAWN BY
krM JOB NO.
DRAWING NO.
REVISIONS
DRAWING NAME
E1-1
ELECTRICAL
POWER PLAN
DKM
20128
02/12/2021
BID SET
4775 E 126th St Carmel IN 46033
STATE BANK
20128 - CARMEL BRANCH
BID SET
02/12/2021
SCALE: 1/4" = 1'-0"
1
ELECTRICAL FIRST FLOOR PLAN
05/07/21