Loading...
HomeMy WebLinkAboutE1-1LAVATORY HAND DRYER RECEPTACLE LOCATION. ELEC. CONTRACTOR TO INSTALL DEVICE BOXES AND CONDUIT TO ABOVE CEILING. ELEC. CONTRACOR TO PROVIDE ALL PHONE & DATA CABLEING, JACKS AND COVER PLATES, BACK TO SERVER ROOM SHOWN. TEST ALL CABLES. PATCH PANELS, RACKS, AND FINAL CONNECTION TO SERVER ELECTRICAL ROOM BY OWNER. TV OUTLET AND DATA CONNECTION, VERIFY HIEGHT AND EXACT RECEPTACLE LOCATION WITH OWNER. FOR FUTURE TV. ALL HVAC THERMOSTATS, SENSORS AND CONTROL PANELS ARE BY THE MECHANICAL CONTRACTOR. ELECTRICAL NOTES ELECTRICAL CONTRACTOR TO INCLUDE IN THE BID PRICE 8, 20 AMP DUPLEX RECP. & 6 DATA JACK WITH CABLEING AND JACKS. LIGHTS AND EXHAUST FANS TO BE OPERATED BY OCCUPANCY SENSORS. ALL ELECTRICAL WORK TO BE DONE IN STRICT ACCORDANCE WITH THE LATEST VERSION OF THE NATIONAL ELECTRICAL CODE. ALL LOCAL CODES & NFPA. REVISIONS TO SECURITY SYSTEM ARE BY OWNER, ELEC. CONTRACTOR TO COORDINATE W/ OWNER. ALL DEVICES FOR CAMERA SECURITY SYSTEM ARE SHOWN IN GENERAL LOCATIONS. THE FINAL LOCATIONS QUANITY & TYPE ARE BY THE OWNER & SECURITY SYSTEMS SUPPLIER. ALL GLASS BREAKS, MOTION SENSORS ETC. TO BE DESIGNED & INSTALLED OWNERS SECURITY SYSTEM CONTRACTOR. COORDINATE ELECTRICAL REQUIREMENTS WITH EQUIPMENT SUPPLIER & OWNER. OPEN CLOSE ATM SIGN LOCATED ON UNDER SIDE OF SOFFIT. SEE LIGHTING PLAN FOR TYPE. ONE SWITCH PER SIGN. LOW VOLTAGE DOOR CONTACTS. ACCESS KEY PAD @ DOORS SHOWN. RECEPTACLE FOR WINDOW DEFROST. 13 15 16 17 18 ADA LOW VOLTAGE PUSH BUTTON DOOR ACTIVATOR. FLOOR BOXES SHOWN TO BE 1 DUPLEX RECEPTACLE & 2 DATA JACKS. EXISTING RECEPTACLES OR DATA JACKS TO REMAIN. REMOVE & REINSTALL COVER PLATE FOR NEW WALL COVERING. ALL RECP. MARKED ETR. COORDINATE WITH CABINET MAKER ON EXACT LOCATION OF RECP. & DATA JACKS. ON ALL ELECTRICAL DEVICES, REUSE EXTG. CIRCUITING AND WIRING IF POSSIBLE. ADD CIRCUITS IN THE EXTG. ELEC. PANELS AS NEEDED. EC RESPONSIBLE FOR ELEC. LOADS AND WIRING SIZING AND ROUTES OF CONDUIT OF WIRING FOR NEW OR EXTG.ELECTRICAL ITEMS. CONNECT NEW DEVICES INTO THE CLOSEST ELECTRICAL PANEL. USE THE NEW ELECTRICAL PANEL AS NEEDED FOR ANY NEW CIRCUITS. FIELD VERIFY ALL EXISTING ELECTRICAL EQUIPMENT IN THIS ROOM ON THE WALLS & CEILING THAT ARE GOING TO BE REMOVED, EQUIPMENT SHALL INCLUDE BUT NOT LIMITED TO. LIGHT FIXTURES. RECEPTACLES, CEILING SPEAKERS. VOICE / DATA OUTLETS. ETC. REMOVE AS NEEDED. 8 7 6 5 4 3 2 1 9 10 11 12 14 19 POWER FOR OVERHEAD SCREEN. 20 MICROWAVE IN CABINETRY COORDINATE WITH CABINET MAKER ON LOCATION. IN BASE CABINETS. 21 PROVIDE TWO 1, 120 VOLT CONNECTION FOR THE NEW ENTRY DOOR ACTUATOR. CONNECT TO EXTG. POWERT CLOSE TO DOOR. 22 REMOVE EXTG. DMARK PHONE SERVICE. REUSE EXTG. INCOMING SERVICE LINE. COORDINATE W/ BANK IT DEPT. ON NEW PHONE SERVICE. 23 SECURITY SYSTEM & VIDEO RECORDER, POE SWITCH LOCATION. COORDINATE WITH THE BANKS IT DEPT. ON NEW SYSTEMS 24 BANK MONITOR LOCATION FOR SECURITY SYSTEM. COORDINATE WITH IT DEPT. ON EXACT LOCATION. TV OUTLET & DATA CONNECTION. 25 COORDINATE WITH BANK IT DEPT. ON SECURITY SYSTEM OUTSIDE ALARM DIALER. 26 DATA & RECEPTACLE ABOVE CEILING FOR WIFI ROUTER. 27 TIE IN EXTG. FIRE SPRINKLER SYSTEM TAMPER SWITCH TO NEW SECURITY SYSTEM. 28 ELECTRIC HEATER ON CEILING WITH WALL TIMER. REMOVE & REINSTALL EH. 29 RECONNECT EXTG. ALARM DEVICE TO NEW ALARM SYSTEM. 30 PROVIDE UNDER CARPET RACEWAY TO POWER CENTER OF ROOM FLOOR BOX. CUT IN FLOOR BOX @ APPROXIMATE LOCATION SHOWN. 31 KEYPAD ALARM PANEL @ EACH DOOR. 32 ILLUMINATED SIGN, JUNCTION BOX ELECTRICAL CONNECTION NEMA RATED. COORDINATE WITH SIGN MANUFACTURER. ACTIVATED BY TIME CLOCK. 33 120 V POWER TO FROSTED WINDOW CONTROLLER. 34 POWER TO BOTTLE COOLER & KEURIG AT MARKET LEADER OFFICE. COORDINATE WITH OWNER ON EXACT LOCATION. 35 RECEPTACLE FOR POWER TO SINK FAUCET. 35 THE ELECTRICAL WORK FOR REMOVING AND REINSTALLING THE NEW HVAC EQUIPMENT UNITS 1 & 2 AND THE NEW HEAT PUMP / CONDENSERS ARE TO BE AN ALTERNATE M1. CHANGE DISCONNECTS AS NEEDED, TIE BACK INTO EXTG. ELECTRICAL PANEL. 36 REMOVE EXTG. AIR CLEANER. IN BASE BID. RETURN TO OWNER. 37 AIR CLEANER ELECTRICAL CONNECTION. COORDINATE WITH MAN. REQUIREMENTS TIE INTO CLOSEST ELECTRICAL PANEL. 38 ON OFF SWITCH FOR GARBAGE DISPOSAL. 39 ELECTRICAL CONNECTION FOR DISHWASHER. CA HC EP,A AD N N N N N N N ETR ETR ETR N N ETR N N N N ETR N ETR ETR N ED ED N ETR ETR ETR ETR ETR ETR ETR ETR 8 8 8 ETR ETR 10 10 10 10 10 10 10 12 12 12 MARKET LEADER 114 PARTNER OFFICE 113 PARTNER OFFICE 111 BRANCH MANAGER 110 LOUNGE 115 VEST. 100 STAIR 101 LIFT 109 PARTNER OFFICE 102 CUSTOMER 104A RR 103 VAULT TELLER 105 106 LOBBY 108 HALL 112 ETR ETR ETR ETR ED ED ED ED ED 15 16 HC 16 AKP 17 N N 12 CAM CAM CAM CAM CAM CAM CAM CAM CAM OC OC OC 13 13 13 N N TUBE J TUBE 12 J 12 TUBES 2 2 2 2 2 N N +44" +44" N +44" N 2 EX EX EX EX DC J 21 N 24 1 +72" N 13 3 2 N N +72" N N 26 1 N N 26 1 14 14 14 14 14 14 14 14 14 14 14 GB 14 DC 14 MS 14 MS 14 MS 14 MS 14 HUB 14 HUB 14 HUB 14 HUB HC 16 J 21 N N CAM 17 DC 2 2 2 2 2 N 2 2 2 VERIFY HIEGHT OF EP PANEL /TV BELOW COUNTER 12 ETR N N 2 N N 1 POWER + DATA @ 24", POWER + DATA @ 48" (WILL HOUSE 2 PRINTERS) 29 AKP 17 AKP DC 2 N +44" N 2 N J 32 J 32 PNL,E PNL,E 33 F +44" N N 2 N N 34 HC 16 35 N COND COND 35 35 DISS DISS tel: 765.649.8477 www.krMarchitecture.com ANDERSON INDIANAPOLIS DETROIT DRAWN BY krM JOB NO. DRAWING NO. REVISIONS DRAWING NAME E1-1 ELECTRICAL POWER PLAN DKM 20128 02/12/2021 BID SET 4775 E 126th St Carmel IN 46033 STATE BANK 20128 - CARMEL BRANCH BID SET 02/12/2021 SCALE: 1/4" = 1'-0" 1 ELECTRICAL FIRST FLOOR PLAN 05/07/21