Loading...
HomeMy WebLinkAboutP1-1REF. DWA. ALL WORK SHALL COMPLY WITH ALL NATIONAL, STATE, LOCAL CODES AND ORDINANCES, INCLUDING BACKFLOW PREVENTION CODES PERTAINING TO THIS PROJECT. LOCAL CODES SHALL PREVAIL. B. ALL FIXTURES SHALL BE SUPPLIED WITH INDIVIDUAL WATER SUPPLY STOPS AND CODE APPROVED TRAPS. ALL EXPOSED PIPING SHALL BE CHROME PLATED. C. ALL PLUMBING FIXTURES SHALL BE INSTALLED WITH APPROVED BACKFLOW PREVENTION DEVICES. D. VACUUM BREAKERS MUST BE INSTALLED ON ALL EXISTING OR PROPOSED HOSE THREAD FITTINGS INCLUDED BUT NOT LIMITED TO HOSE BIBS, WALL/YARD HYDRANTS, AND MOP/SERVICE SINKS. E. A CROSS-CONNECTION CONTROL DEVICE INSPECTOR SHALL TEST ALL BACKFLOW DEVICES AT THE TIME OF INSTALLATION AND SUBMIT REPORTS TO THE LOCAL WATER UTILITY AS REQUIRED. F. ALL MATERIALS INSTALLED WITHIN PLENUM SPACE SHALL HAVE FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING NOT EXCEEDING 50 IN ACCORDANCE WITH STATE CODES. G. ALL WATER LINES 3”AND LARGER MUST BE DISINFECTED. SAMPLES FROM 3 CONSECUTIVE DAYS MUST BE TAKEN TO AN APPROVED TEST LAB. LAB ANALYSIS REPORTS SHALL BE SUBMITTED TO THE LOCAL WATER UTILITY AS REQUIRED FOR COMPLIANCE. H. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS, AND LABOR FOR CORE DRILLING AS REQUIRED FOR INSTALLATION OF PIPING PENETRATING BUILDING CONSTRUCTION. I. COORDINATE EXACT LOCATION OF ROOF DRAINS WITH ARCHITECTURAL AND STRUCTURAL PLANS. J. REFERENCE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS, TYPICAL. K. ALL FLOOR DRAINS IN TOILET ROOMS SHALL HAVE TRAP PRIMERS INSTALLED. L. TYPE ‘K’ COPPER TUBING SHALL BE USED FOR ALL DOMESTIC SUPPLY PLUMBING BELOW SLAB. NO FITTINGS, SUCH AS COUPLINGS, TEES, OR ELBOWS, SHALL BE USED BELOW OR WITHIN THE SLAB. M. THESE NOTES ARE TYPICAL OF ALL PLUMBING PLANS UNLESS OTHERWISE INDICATED SPECIFICALLY ON PLAN NOTES. N. ALL FLOOR DRAINS SHALL BE RE-VENTED. RE-VENTS SHALL BE A MINIMUM OF 2”UNDERGROUND AND 1-1/2”ABOVE GROUND. O. ALL ROOF DRAINS WHICH WILL BE CONCEALED IN WALLS SHALL BE OF METALLIC PIPE. P. ALL VENT LINES SHALL BE INCREASED ONE PIPE SIZE WHEN EXITING THE ROOF. MINIMUM 3”DIAMETER VENT INCREASERS REQUIRED. Q. REFER TO ATTACHED BOUND DOCUMENT: DIVISION 15 –MECHANICAL SPECIFICATIONS, WHICH ARE AN INTEGRAL, FUNCTIONAL, AND GOVERNING PART OF THIS SET OF MECHANICAL AND PLUMBING PLANS. KEYED NOTES AND GENERAL NOTES LISTED DIRECTLY ON DRAWINGS SHALL HAVE PRECEDENCE. ALL PLUMBING PLANS ARE DIAGRAMMATIC AND DO NOT INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. VERIFY ALL SPACE REQUIREMENTS, COORDINATING WITH OTHER TRADES, AND INSTALL THE SYSTEMS IN THE SPACE PROVIDED WITHOUT EXTRA COST TO THE OWNER. R. ALL SANITARY PLUMBING SHALL BE SCHEDULE 40 PVC. S. ALL DOMESTIC WATER PIPING SHALL BE TYPE K COPPER INSULATED. T. ALL COMPRESSED AIR PIPING SHALL BE TRANSAIR ALUMINUM PIPING. U. ALL NATURAL GAS PLUMBING SHALL BE SCHEDULE 40 STEEL PIPE , BLACK. INSTALL ALL GAS PIPING BELOW ROOF EXCEPT WHERE INDICATED ON THE PLANS TO BE RUN ON ROOF. WHEN INSTALLED ON ROOF, INSTALL PER INTERNATIONAL FUEL CODE. V. ALL STORM DRAIN PLUMBING PIPING SHALL BE SCHEDULE 40 PVC PIPING. W. PLUMBING CONTRACTOR TO COORDINATE WITH MECHANICAL CONTRACTOR & PROJECT MANAGER FOR ROUTING OF HVAC DUCTWORK AND PLUMBING SYSTEMS, DUCTWORK SHALL TAKE PRECEDENT OVER PLUMBING, ANY CONFLICTS DUE TO FAILURE TO COMMUNICATE BETWEEN TRADES WILL BE THE PLUMBING CONTRACTORS RESPONSIBILITY. NO EXTRAS ALLOWED. X. REFER TO COMPLETE SET OF ARCHITECTURAL DRAWINGS FOR BUILDING DESIGN. REFERENCE BUILDING ELEVATIONS & SECTIONS TO DETERMINE FULL SCOPE OF WORK. PROVIDE COORDINATION DRAWINGS TO CONSTRUCTION MANAGER. GENERAL PLUMBING NOTES PLUMBING PLAN NOTES 1 ALL DOMESTIC WATER PLUMBING SHALL BE ABOVE CEILING AS NEEDED. SEE PIPE HANGER DETAIL. NEW DOWNSPOUTS FROM NEW CANOPY. TIE INTO STORMWATER SYSTEM. SEE CIVIL DRAWINGS. 2 NEW PLUMBING FIXTURES. TIE INTO EXTG. HOT & COLDWATER THIS AREA. COLDWATER INTO REFRIGERATOR.3 EXISTING SINK TO REMAIN.4 5 REMOVE EXTG. PLUMBING FIXTURE. CAP EXTG. LINES AS NEEDED.6 CUT NEW SANITARY LINES IN CONCRETE FLOOR. FIELD VERIFY EXTG. INVERT OF EXTG. PIPE TIEING INTO. 7 REMOVE EXTG. FLOOR DRAIN CAP EXTG. SANITARY LINE.8 CUT IN NEW FLOOR DRAIN.9 NEW 6" CORRUGATED PIPE UNDERGROUND FROM DOWNSPOUTS, TO EMPTY OUT IN LANDSCAPE AREA. SEE SHEET C1-1. 10 NEW 3" CORRUGATED PIPE UNDERGROUND FROM DOWNSPOUTS, TO EMPTY OUT THRU SIDE OF SIDEWALK. 11 SIDEWALL DRAIN @ END OF WINDOW WELL DIPE THRU CONC. WALL W/ 4' PIPE. TURN DOWN & EMPTY OUT ONTO EXTG. SLAB. 12 ALL PLUMBING WORK INVOLVED WITH THE REPLACING THE EXTG, HVAC EQUIPMENT IS TO BE AN ALTERNATE. 13 ADD WATER SHUTOFF VALVE ON MAIN WATER LINE FOR FUTURE WATER SOFTNER.14 WATER LINE TO REFRIGERATOR. 1/4".15 SANITARY & HOTWATER TO DISHWASHER16 RELOCATE EXTG. HOSE BIB TO THIS LOCATION. EXTEND WATER LINES AS NEEDED.17 1 1 2 2 11 6 7 S A B DS DS DS DS DS DS 10 ST ST 10 11 ST ST ST 11 ST11 ST ST ST ST ST 11 RR 103 VEST. 100 TELLER 106 HALL 112 VAULT 105 MARKET LEADER 114 HB HB 17 MDPRACKU1 U2 U3 MDP RACKWH FD SUMP 2 D B A B 4 6 6 6 1/2"HCW 2 7 S 2 7 C FD1 FD 8 9 2" EXTG. DRAIN RR 009 RR 008 13 14 E 15 16 12 F 4" S WC CO CO S LAV LAV WC 3"V 4"VTR 1.5"V 1.5"V SINK S 2"V RECONNECT TO EXISTING VENT RECONNECT TO EXISTING VENT WC LAV 1.5"V RECONNECT TO EXISTING VENT 09 08 103 DISHWASHER tel: 765.649.8477 www.krMarchitecture.com ANDERSON INDIANAPOLIS DETROIT DRAWN BY krM JOB NO. DRAWING NO.REVISIONSDRAWING NAME P1-1 PLUMBING PLAN KRM 20128 02/12/2021 BID SET4775 E 126th St Carmel IN 46033STATE BANK20128 - CARMEL BRANCHBID SET02/12/2021SCALE: 1/8" = 1'-0"1 PLUMBING FIRST FLOOR PLAN SCALE: 1/8" = 1'-0" 2 0 -PLUMBING BASEMENT FLOOR PLAN SCALE: 3/16" = 1'-0"3 Vent Riser Diagram 05/07/21