HomeMy WebLinkAboutM001.2106
VACANT
105
GARBANZO
104
RESTORE HYPER
WELLNESS
103
RISE 'N ROLL
102
DRY CLEANER
101
TROPICAL SMOOTHIE
CAFE
A
B
1 2 3 4 5 6
1 2 3 4 5 6
SCALE: 3/32" = 1'-0"
1
M1.1
MECHANICAL PLAN
ROOFTOP HVAC UNIT SCHEDULE
TAG SERVICE MFR MODEL No.
NOMINAL
TONS
EER
MIN OA
(CFM)
SUPPLY FAN DATA DX COOLING DATA GAS HEATING DATA UNIT CHARACTERISTICS
AIR FLOW NOTES/ACCESSORIES
(CFM)
ESP
(IN WC)
MOTOR
(HP)
FAN
(RPM)
EAT °DB/°WB
(°F)
LAT °DB/°WB
(°F)
SENSIBLE
(MBH)
TOTAL
(MBH)
COOLING
STAGES
EAT/LAT
(°F)
OUTPUT
(MBH)
HEATING
STAGES
VOLTAGE
(V-ɸ-Hz)
UNIT MCA UNIT MOCP
OPERATING
WEIGHT
(LBS)
RTU-1 TROPICAL SMOOTHIE TRANE YSC120 10 11.2 200 4000 0.75 2.75 1465 80.0/67.0 58.8/58.0 96.8 116.3 MOD 50.0/87.8 81.0 2 208-3-60 29.0 40.0 880 1-18
RTU-2 DRY CLEANER TRANE YSC036 3 12.0 60 1200 0.75 0.75 1061 80.0/67.0 59.3/57.9 29.2 37.0 MOD 50.0/112.7 81.0 2 208-3-60 20.0 30.0 850 1-18
RTU-3 RISE AND ROLL TRANE YSC048 4 12.0 80 1600 0.75 1.00 1181 80.0/67.0 58.8/57.6 37.9 48.9 MOD 50.0/97.1 81.0 2 208-3-60 26.0 35.0 850 1-18
RTU-4 RESTORE HYPER WELLNESS TRANE YSC060 5 12.0 100 2000 0.75 1.00 1150 80.0/67.0 59.7/58.3 48.2 59.9 MOD 50.0/87.8 81.0 2 208-3-60 29.0 40.0 880 1-18
RTU-5 RESTORE HYPER WELLNESS TRANE YSC060 5 12.0 100 2000 0.75 1.00 1150 80.0/67.0 59.7/58.3 48.2 59.9 MOD 50.0/87.8 81.0 2 208-3-60 29.0 40.0 880 1-18
RTU-6 GARBANZO TRANE YSC060 5 12.0 110 2100 0.75 1.50 1147 80.0/67.0 60.2/58.7 49.6 60.3 MOD 50.0/86.0 81.0 2 208-3-60 30.0 45.0 880 1-18
RTU-7 GARBANZO TRANE YSC060 5 12.0 110 2100 0.75 1.50 1147 80.0/67.0 60.2/58.7 49.6 60.3 MOD 50.0/86.0 81.0 2 208-3-60 30.0 45.0 880 1-18
RTU-8 TENANT TRANE YSC060 5 12.0 100 2000 0.75 1.00 1150 80.0/67.0 59.7/58.3 48.2 59.9 MOD 50.0/87.8 81.0 2 208-3-60 29.0 40.0 880 1-18
RTU-9 TENANT TRANE YSC060 5 12.0 100 2000 0.75 1.00 1150 80.0/67.0 59.7/58.3 48.2 59.9 MOD 50.0/87.8 81.0 2 208-3-60 29.0 40.0 880 1-18
NOTES/ACCESSORIES
1. 95° CONDENSING TEMPERATURE
2. REFRIGERANT - R410A
3. REFERENCE ENTHALPY ECONOMIZER WITH FAULT DIAGNOSTIC DETECTION
4. BAROMETRIC RELIEF
5. 14"INSULATED ROOF CURB
6. UNIT MOUNTED NON FUSED DISCONNECT
7. UNPOWERED GFCI RECEPTACLE
8. SUPPLY FAN VFD WITH SINGLE ZONE VAV CONTROLLER
9. THROUGH THE BASE ELECTRICAL
10. HAIL GUARD - WITH TOOL LESS REMOVAL
11. RTU MFANUACTURER'S PROGRAMMABLE SEVEN DAY AUTO CHANGE OVER THERMOSTAT WITH OCCUPANCY OUTSIDE AIR CONTROL.
12. HINGED ACCESS DOORS
13. ONCE THE RTU’S ARE OPERATIONAL - PROVIDE 2” MERV 8 FILTERS. INSPECT FILTERS DAILY. REPLACE AS NEEDED BUT NOT LONGER THAN 7 DAYS UNTIL UNIT IS ADJUSTED BY BALANCE CONTRACTOR. AT THE
DISCRETION OF THE TENANT CONSTRUCTION REPRESENTATIVE THIS FILTER REPLACEMENT CAN BE EXTENDED PAST THE 7 DAY LIMIT. ALL UN-USED FILTERS TO REMAIN ON SITE
FOR FUTURE USE BY TENANT. NEVER OPERATE THE RTU(S) IN COOLING DURING ANY SANDING OR DEMOLITION OR IF ANY TYPE OF FINE PARTICULATE COULD BE AIR BORNE. ALL RETURN AIR GRILLES OPENING IN
RETURN AIR DUCTWORK SHALL BE COVERED WITH CHEESE CLOTH OR A THROW AWAY FILTER (CHEAP CUT TO FIT FILTER ROLL) UNTIL UNITS ARE ADJUSTED BY THE
BALANCING CONTRACTOR. REMOVE THIS CHEESE CLOTH FILTER UPON TESTING BY BALANCE CONTRACTOR.
14. MICRO-PROCESSOR CONTROLS
15. 5 YEAR PARTS AND LABOR COMPRESSOR WARRANTY
16. STAINLESS STEEL HEAT EXCHANGER WITH STAGED HEAT
17. 10 YEAR PARTS WARRANTY ON HEAT EXCHANGER
18. APPROVED ALTERNATES: CARRIER, AAON, YORK/JOHNSON CONTROLS, AND LENNOX
OUTLINE
OF RTU-1
ON ROOF
GENERAL SHEET NOTES
1. EXISTING MECHANICAL INFORMATION IS BASED ON LIMITED EXISTING BUILDING DRAWINGS AND
FIELD WORK. THE CONTRACTOR SHALL FIELD VERIFY THE EXISTING CONDITIONS FOR
ACCURACY. CONTRACTOR SHALL NOTIFY OWNER, ARCHITECT AND ENGINEER OF ANY
SITUATIONS THAT MODIFY OR INCREASE THE SCOPE OF WORK FROM THAT IS DESCRIBED IN
THE DOCUMENTS.
2. ANYTHING NOT NOTED AS EXISTING IS TO BE FURNISHED AND INSTALLED AS PART OF THIS
PROJECT.
3. REFER TO DRAWINGS AND PROJECT SPECIFICATIONS OF OTHER DISCIPLINES FOR ADDITIONAL
PROJECT INFORMATION AND REQUIREMENTS. NOTIFY ENGINEER OF ANY CONFLICTS BETWEEN
THE INFORMATION PRESENTED AND FIELD CONDITIONS.
4. PRIOR TO ANY ISOLATION OF SYSTEMS, SHUTDOWNS OR DEMOLITION THE CONTRACTOR SHALL
PROVIDE NECESSARY INVESTIGATION AND NOTIFY THE FACILITIES ENGINEERING/MAINTENANCE
PERSONNEL OF WORK TO BE PERFORMED SO AS TO AVOID ANY DETRIMENTAL SHUTDOWN OF
SYSTEMS TO ADJACENT SPACES.
5. PROTECT EQUIPMENT, FIXTURES, PIPING, DUCTWORK, ETC. INDICATED TO REMAIN AGAINST
DAMAGE AND SOILING DURING SELECTIVE DEMOLITION. WHEN PERMITTED BY THE ARCHITECT,
ITEMS MAY BE REMOVED TO A SUITABLE, PROTECTED STORAGE LOCATION DURING SELECTIVE
DEMOLITION AND THEN CLEANED AND REINSTALLED IN THEIR ORIGINAL LOCATIONS.
6. WHERE PIPE, DUCTWORK, INSULATION, FIXTURES OR EQUIPMENT TO REMAIN IS DAMAGED OR
DISTURBED, REMOVE THE DAMAGED PORTIONS AND INSTALL NEW PRODUCTS OF EQUAL
CAPACITY AND QUALITY. WHERE IDENTICAL MATERIALS ARE UNAVAILABLE OR CANNOT BE
USED, USE MATERIALS WHOSE INSTALLED PERFORMANCE EQUALS OR SURPASSES THAT OF
THE EXISTING MATERIALS.
7. MAINTAIN AND RESTORE, IF INTERRUPTED BY DEMOLITION OR IN THE PATH OF NEW
CONSTRUCTION, ALL UTILITIES PASSING THROUGH AND SERVING OUTSIDE OF DEMOLITION
AREA.
8. MECHANICAL SYSTEMS INSTALLATION MUST MAINTAIN INTEGRITY OF WALLS, PARTITIONS AND
FLOORS DESIGNATED AS EITHER FIRE RATED OR "SMOKE TIGHT". SEAL AROUND ALL
PENETRATIONS THROUGH RATED OR SMOKE TIGHT ASSEMBLIES. COORDINATE
W/ARCHITECTURAL PLANS AND GENERAL CONTRACTOR.
9. SPACE ABOVE CEILING IS INDICATED TO BE A RETURN AIR PLENUM. CONSTRUCTION MATERIALS
ABOVE CEILING SHALL BE NONCOMBUSTIBLE, OR HAVE A MAXIMUM 25 FLAME SPREAD AND 50
SMOKE DEVELOPMENT FINISH RATING. WIRING SHALL BE LABELED PLENUM RATED PER NFPA
70.
10. LIMITED ABOVE CEILING CLEARANCES EXIST. COORDINATE LOCATION AND ELEVATION OF
MECHANICAL WORK WITH ALL DUCTWORK, SPRINKLERS, LIGHT FIXTURES, AND OTHER CEILING
BUILT-IN FIXTURES. CONTACT ENGINEER OR ARCHITECT IMMEDIATELY SHOULD ANY CONFLICT
ARISE.
11. ALL ROOF PENETRATIONS, PATCHING AND FLASHING SHALL BE PERFORMED BY A LANDLORD
APPROVED ROOFING CONTRACTOR AT THIS CONTRACTOR'S EXPENSE. COORDINATE ROOF
PENETRATIONS AND ROOFTOP EQUIPMENT LOCATIONS WITH LANDLORD AND GENERAL
CONTRACTOR.
12. NOTHING IS PERMITTED TO BE ATTACHED TO, SUSPENDED FROM, OR PENETRATE THE ROOF
DECK. CONTRACTOR MAY ATTACH TO OR SUSPEND FROM THE TOP CHORD OF THE JOIST OR
THE STRUCTURAL STEEL WHICH EXISTS ABOVE THE SPACE.
13. COORDINATE FINAL ROOFTOP UNIT LOCATIONS WITH LANDLORDS STRUCTURAL ENGINEER.
ROOFTOP UNITS AND MAKE-UP AIR UNIT TO BE LOCATED WITHIN STRUCTURAL BAY. PROVIDE 10'
CLEARANCE FROM UNIT OUTSIDE AIR INTAKE TO ANY EXHAUST/VENTS ON ROOF.
14. GENERAL CONTRACTOR TO LABEL ALL ROOFTOP EQUIPMENT WITH TENANT NAME, SPACE
NUMBER AND EQUIPMENT IDENTIFICATION (RTU-1, ETC.), PER MALL SPECIFICATIONS AND
STANDARDS.
15. REFER TO MALL CRITERIA MANUAL FOR ADDITIONAL STANDARDS AND REQUIREMENTS.
16. COORDINATE ALL THERMOSTAT AND SENSOR LOCATIONS WITH FURNITURE LAYOUT AND
ARCHITECTURAL PLANS. DEVICES ARE TO BE INSTALLED AND WIRED BY THE HVAC
CONTRACTOR, MOUNT PER ADA REQUIREMENTS.
17. ALL EXPOSED DUCTWORK TO BE PAINTED. REFER TO ARCHITECTURAL PLANS.
18. CHANGES IN DUCT SIZES SHALL BE MADE BY UNIFORM TAPER SECTION WITH A MAXIMUM
INCLUDE ANGLE OF DIVERGENCE OF 15 DEGREE.
19. DUCT SIZES INDICATED REPRESENT EXTERNAL SHEET METAL DIMENSIONS AND INCLUDE
ALLOWANCE FOR INTERNAL INSULATION.
20. ALL SUPPLY AND MAKE-UP AIR DUCTWORK NOT EXPOSED SHALL BE EXTERNALLY INSULATED.
21. BRANCH DUCTS SERVING DIFFUSERS SHALL BE SIZED TO MATCH DIFFUSER NECK SIZE
INDICATED UNLESS NOTED OTHERWISE.
22. PROVIDE A STRAIGHT INLET LENGTH TO THE VAV BOX OF A MINIMUM (4) DUCT DIAMETERS.
REFER TO DETAIL FOR ADDITIONAL INFORMATION.
23. PROVIDE ACCESS HATCHES (24"x24") FOR ALL MECHANICAL EQUIPMENT LOCATED ABOVE A HARD
CEILING. COORDINATE W/ ARCHITECTURAL CEILING PLANS.
24. PITCH POCKETS ARE NOT PERMITTED ON THE ROOF FOR CONDENSATE DRAINS, POWER OR
CONTROL WIRING. ALL CONNECTIONS ARE TO BE MADE INSIDE THE EQUIPMENT CURB OR
THROUGH PRE-MANUFACTURED PIPING CURB.
25. COORDINATE EXACT MOUNTING REQUIREMENTS AND LOCATION OF HOOD WITH HOOD SHOP
DRAWINGS AND OWNER REQUIREMENTS.
26. GREASE EXHAUST DUCT ACCESS PANEL CLEANOUT OPENINGS SHALL BE EQUIPPED WITH
TIGHT FITTING DOORS (EQUAL TO THE THICKNESS OF THE DUCT) AND SHALL HOLD TIGHTLY
CLOSED.
27. ALL DUCTWORK, DIFFUSERS AND GRILLES IN POOL AREA SHALL BE ALUMINUM CONSTRUCTION.
28. CONTRACTOR MUST REPLACE ALL AIR FILTERS IN ROOFTOP UNITS WITH NEW CLEAN FILTERS
BEFORE AIR BALANCING AND PRIOR TO FINAL TURNOVER TO TENANT.
SHEET KEYNOTES
1 TRANSITION LINED SUPPLY DUCT IN RISE TO FULL SIZE OF RTU SUPPLY OPENING. CONNECT TO
FULL SIZE OF RTU SUPPLY OPENING WITH FLEX CONNECTION BELOW ROOF DECK. EXTEND SA
DUCTWORK TO BOTTOM OF STRUCTURE WITH FULL OPENING FOR FUTURE CONNECTION.
REFER TO RTU SECTION DETAIL ON SHEET M0.1 FOR ADDITIONAL INFORMATION.
2 TRANSITION LINED RETURN DUCT IN RISE TO FULL SIZE OF RTU RETURN OPENING. CONNECT
TO FULL SIZE OF RTU RETURN OPENING WITH FLEX CONNECTION BELOW ROOF DECK. EXTEND
RA DUCTWORK TO BOTTOM OF STRUCTURE WITH FULL OPENING FOR FUTURE CONNECTION.
REFER TO RTU SECTION DETAIL ON SHEET M0.1 FOR ADDITIONAL INFORMATION.
3 SMOKE DETECTOR MOUNTED IN RETURN DUCT. DETECTOR SHALL BE PROVIDED AND WIRED BY
ELECTRICAL CONTRACTOR, MOUNTED BY MECHANICAL CONTRACTOR. COORDINATE WITH
GENERAL CONTRACTOR TO PROVIDE 24/24 ACCESS PANEL FOR DUCT MOUNTED SMOKE
DETECTOR. ACCESS PANEL MAY BE OMITTED IT DETECTOR IS ACCESSIBLE THROUGH LAY-IN
DIFFUSER, OR IF DETECTOR IS LOCATED IN AREA WITH NO CEILING.
1
2 SD 3
1
2 SD 3
1
2 SD
3
SD 3
1
2
1
2
1
2
3 SD
SD 3
1
2
1
2
1
2 SD
SD 3 SD 3 3
OUTLINE
OF RTU-2
ON ROOF
OUTLINE
OF RTU-3
ON ROOF
OUTLINE
OF RTU-4
ON ROOF
OUTLINE
OF RTU-6
ON ROOF
OUTLINE
OF RTU-8
ON ROOF
OUTLINE
OF RTU-9
ON ROOF
OUTLINE
OF RTU-5
ON ROOF
OUTLINE
OF RTU-7
ON ROOF
KEY PLAN
ISSUE DATE
200275
THIS DRAWING AND THE IDEAS, DESIGNS
AND CONCEPTS CONTAINED HEREIN ARE
THE EXCLUSIVE INTELLECTUAL PROPERTY
OF CURRAN ARCHITECTURE, AND ARE NOT
TO BE USED OR REPRODUCED, WHOLE OR
IN PART, WITHOUT THE WRITTEN
CONSENT OF CURRAN ARCHITECTURE.
C COPYGRIHT 2020, CURRANARCHI TECTURE
PROJECT INFORMATION
CERTIFICATION
ISSUE DATES
NOT FOR CONSTRUCTION
PRELIMINARY
02.12.2021
JDF DEVELOPMENT
THE AVENUE
AT BENNETT FARM
MULTI-TENANT BUILDING
CARMEL, INDIANA
N
PROJECT
LOCATION
WESTON POINTE DRIVE
U.S. HIGHWAY 421
5719 LAWTON LOOP E. DR. #212
INDIANAPOLIS, IN 46216
O :: 317 . 288 . 0681
F :: 317 . 288 . 0753
T E S
tesengineering.com E N G I N E E R I N G
F 440 871 7954
P 440 871 2410
25760 First Street
Cleveland, OH 44145
M1.1
MECHANICAL
PLAN
note to refer to
tenant's plan and
install trunks and
diffusers
note to refer to
tenant's plan and
install trunks and
diffusers
note to refer to
tenant's plan and
install trunks and
diffusers
add a note to install
complete HVAC as
required by tenant's
plans.
05/10/21