HomeMy WebLinkAboutHD1.01 2 3
4 5
6 7 8
A
B
C
D
E
F
A
B
C
D
E
F
G G
4.4 5
1
SCALE: 3/32" = 1'-0"
ΕΝΝΣς∆≅Θ
Θ∆Β∆ΗΥΗΜΦ
Λ≅ΗΜ ΡΣΝΒϑ
Υ∆ΡΣΗΑΤΚ∆
Ρ≅Κ∆Ρ
ΕΝΝΣς∆≅Θ ΡΣΝΒϑ
ΕΝΝΣς∆≅Θ ΡΣΝΒϑ
Υ∆ΡΣΗΑΤΚ∆
'X' 30x14, OVAL 'X' 30x14, OVAL
Υ∆ΡΣΗΑΤΚ∆
CUH
6X
CUH
5X
CUH
4X
CUH
3X
CUH
8X
CUH
7X
'X' SUPPLY AIR DUCT DROP DOWN FROM 2ND FLOOR
'X' SUPPLY AIR DUCT DROP DOWN FROM 2ND FLOOR
'X' SUPPLY AIR DUCT DROP DOWN FROM 2ND FLOOR
'X' SUPPLY AIR DUCT DROP DOWN FROM 2ND FLOOR
EF
6X
EF
3X
'X' 24" 'X' 32"
'X' 24"
UH
2X
UH
'X' 24"
'X' 24" 'X' 24"
'X' 24" 'X' 24"
'X' 32" 'X' 32"
'X' 32"
CUH
CUH
2X
'X' 24"
'X' SUPPLY
REGISTER
TYP.
'X' SUPPLY
REGISTER
TYP.
REGISTER 'XRL' SUPPLY 3
A. THIS CONTRACTOR SHALL COMPLETE ALL DEMOLITION OF
EXISTING MECHANICAL SYSTEMS AS INDICATED ON MECHANICAL
AND ARCHITECTURAL PLANS OR AS NECESSARY FOR THE PROJECT.
REMOVE FROM SITE AND DISPOSE OF ALL MATERIAL AND DEBRIS
FROM THIS WORK IN A CODE AND EPA APPROVED MANNER.
B. DEMOLITION DRAWINGS ARE GENERAL IN NATURE SHOWING
THE GENERAL SCOPE OF DEMOLITION WORK. CONTRACTOR SHALL
VISIT SITE PRIOR TO BID AND BECOME FAMILIAR WITH ALL EXISTING
MECHANICAL SYSTEMS AND PROVIDE ALL DEMOLITION REQUIRED
FOR THE PROJECT.
C. DEMOLITION WORK INCLUDES THE REMOVAL OF ALL UNUSED
EQUIPMENT, SUPPORTS, HANGERS, CONTROL WIRING, DUCTWORK,
PIPING, ETC. ALL PIPING SHALL BE REMOVED BACK TO ACTIVE
MAINS AND CAPPED WATERTIGHT.
D. DISCONNECT, DISASSEMBLE, CAP, PLUG AND REMOVE ALL
PIPING, DUCTS AND EQUIPMENT INDICATED ON THE DRAWINGS OR
NOT REQUIRED FOR THE PROJECT. ALL OPENINGS ON PIPING AND
DUCTS THAT REMAIN SHALL BE CAPPED AND PROPERLY SECURED.
VERIFY ALL DEMOLITION WORK IN FIELD.
E. OWNER SHALL DESIGNATE ANY ITEMS TO BE SALVAGED BY
CONTRACTOR PRIOR TO START OF DEMOLITION. CONTRACTOR
SHALL PROTECT AND TURN OVER TO OWNER ALL SALVAGED ITEMS
AT AN OWNER DESIGNATED LOCATION ON SITE.
F. DEMOLITION TO BE DONE IN A MANNER SO AS NOT TO DAMAGE
SHOPPING CENTER OR ADJACENT SHOPPING CENTER TENANTS OR
TENANT OPERATIONS AND SHALL NOT AFFECT THE OPERATION OF
SYSTEMS TO REMAIN IN USE OR CAUSE ANY DISRUPTION TO OTHER
TENANT OPERATIONS. ANY ITEM TO REMAIN THAT IS DAMAGED BY
THE CONTRACTOR SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
G. REPAIR ANY OPENINGS IN FIRE RATED CONSTRUCTION CAUSED
BY THE DEMOLITION WORK TO MATCH EXISTING CONSTRUCTION
AND MAINTAIN FIRE RATING.
H. PATCH ALL HOLES IN WALLS, CEILINGS AND FLOORS THAT
RESULT FROM THE DEMOLITION WORK FOR NEW SURFACE FINISH.
I. COORDINATE TIMES TO WORK IN SPECIFIC AREAS OF THE
EXISTING BUILDING WITH OWNER'S REPRESENTATIVE. IF AFTER
HOURS WORK IS REQUIRED, CONTRACTOR SHALL INCLUDE ALL
PREMIUM TIME IN BID.
J. CONTRACTOR SHALL MAINTAIN EXISTING ENERGY MANAGEMENT
SYSTEM WIRING AND COMPONENTS. ANY ENERGY MANAGEMENT
SYSTEM WIRING AND/OR EQUIPMENT THAT IS ACCIDENTALLY
REMOVED OR DAMAGED DURING DEMOLITION/CONSTRUCTION
SHALL BE REPLACED AT CONTRACTOR'S EXPENSE.
K. {PHASING:} CONTRACTOR SHALL TAKE NOTE THAT NOT ALL
DEMOLITION WORK CAN BE PERFORMED AT ONE TIME.
CONTRACTOR IS REQUIRED TO COORDINATE THE REMOVAL AND/OR
SHUTDOWN OF ANY EXISTING MECHANICAL SYSTEM AND ANY
RELATED ELECTRICAL, PLUMBING OR FIRE PROTECTION SYSTEM
REQUIRED FOR THIS PROJECT TO MAINTAIN THE EXISTING BUILDING
OPERATIONAL THROUGHOUT THE COURSE OF CONSTRUCTION.
CONFORM TO THE PROJECT CONSTRUCTION SCHEDULE, PHASING
SEQUENCE AND INTENT IDENTIFIED BY THE CONSTRUCTION
MANAGER AND ARCHITECT. CONTRACTOR SHALL COORDINATE
ALLOWABLE WORKING HOURS IN SPECIFIC AREAS OF THE EXISTING
BUILDING WITH THE CONSTRUCTION MANAGER. IF AFTER HOURS
WORK IS REQUIRED, PREMIUM TIME SHALL BE INCLUDED IN BID.
ANY REQUIRED DEMOLITION, RELOCATION OR SHUTDOWN OF
EXISTING SYSTEMS, SHALL BE SUBMITTED FOR APPROVAL A
MINIMUM OF TWO (2) WEEKS PRIOR TO PERFORMING THE
REQUIRED WORK. NO DEMOLITION WORK AFFECTING EXISTING
SYSTEMS TO REMAIN SHALL BE PERFORMED WITHOUT APPROVAL
H.V.A.C. GENERAL DEMOLITION NOTES:
'XR' REGISTER 1
'XR' DIFFUSER 1
CAP
'XR' REGISTER 1
'XR' 2 ATD 'XR' 2 ATD
'XR' ATD 2
CAP
1. EXISTING SUPPLY REGISTER/DIFFUSER AND BRANCH DUCTWORK TO BE
REMOVED BACK TO SUPPLY DUCT MAIN AND CAPPED AIR TIGHT. {PAINT CAPPED
DUCT TO MATCH EXISTING.}
{
2. EXISTING AIR TRANSFER DUCT AND GRILLES TO BE REMOVED.
3. EXISTING SUPPLY AIR REGISTER TO BE RELOCATED. REFER TO DRAWING H1.1
FOR NEW LOCATION. CAP DUCT DUCT AIR TIGHT AND PAINT TO MATCH EXISTING.}
H.V.A.C. CODED NOTES:
NO H.V.A.C. WORK
IN HATCHED
AREA.
Mar 26, 2021 - 17:36:20 DWG Name: D:\Jobs\MCG\Dick's Sporting Goods\IN Carmel\Remodel\01-Bid Permit\12810B_HD1.0,HD1.1.dwg Updated By: rvan
HD1.0
LOWER LEVEL
H.V.A.C. DEMO PLAN
mld
CONTRACTOR MUST VERIFY
DIMENSIONS ALL CLEARANCES IN AND FIELD
Drawn By:
Project No.:
Date Issue
SPORTING GOODS
Design and construction documents as
instruments of service are given in
confidence and remain the property of
MCG Architects. The use of this design
and these construction documents for
purposes other than the specific project
named herein is strictly prohibited
without expressed written consent of
MCG Architects, Incorporated.
STORE # 183
21042.10
C MCG ARCHITECTS 2021
ALL RIGHTS RESERVED
**With exception of the National Account Vendors that DSG is purchasing directly from as noted on the vendor
matrix, all work, materials, and systems shown in these plans and specifications is the sole responsibility of the
General Contractor to purchase and install complete as shown and referenced. The General Contractor is required
to coordinate, schedule and supervise all National Account Vendors as well as their subcontractors. The Tenant
(Dick's Sporting Goods) has no scope of work and/or responsibility shown in these plans and/or specifications.**
Issued for
Bid-Permit
03-26-21
T F
\pxql;216.520.1551
\pxql;216.520.1567
03-26-21
SM
CLAY TERRACE
14350 CLAY TERRACE BLVD.
CARMEL, IN 46032
05/11/21