Loading...
HomeMy WebLinkAboutHD1.01 2 3 4 5 6 7 8 A B C D E F A B C D E F G G 4.4 5 1 SCALE: 3/32" = 1'-0" ΕΝΝΣς∆≅Θ Θ∆Β∆ΗΥΗΜΦ Λ≅ΗΜ ΡΣΝΒϑ Υ∆ΡΣΗΑΤΚ∆ Ρ≅Κ∆Ρ ΕΝΝΣς∆≅Θ ΡΣΝΒϑ ΕΝΝΣς∆≅Θ ΡΣΝΒϑ Υ∆ΡΣΗΑΤΚ∆ 'X' 30x14, OVAL 'X' 30x14, OVAL Υ∆ΡΣΗΑΤΚ∆ CUH 6X CUH 5X CUH 4X CUH 3X CUH 8X CUH 7X 'X' SUPPLY AIR DUCT DROP DOWN FROM 2ND FLOOR 'X' SUPPLY AIR DUCT DROP DOWN FROM 2ND FLOOR 'X' SUPPLY AIR DUCT DROP DOWN FROM 2ND FLOOR 'X' SUPPLY AIR DUCT DROP DOWN FROM 2ND FLOOR EF 6X EF 3X 'X' 24" 'X' 32" 'X' 24" UH 2X UH 'X' 24" 'X' 24" 'X' 24" 'X' 24" 'X' 24" 'X' 32" 'X' 32" 'X' 32" CUH CUH 2X 'X' 24" 'X' SUPPLY REGISTER TYP. 'X' SUPPLY REGISTER TYP. REGISTER 'XRL' SUPPLY 3 A. THIS CONTRACTOR SHALL COMPLETE ALL DEMOLITION OF EXISTING MECHANICAL SYSTEMS AS INDICATED ON MECHANICAL AND ARCHITECTURAL PLANS OR AS NECESSARY FOR THE PROJECT. REMOVE FROM SITE AND DISPOSE OF ALL MATERIAL AND DEBRIS FROM THIS WORK IN A CODE AND EPA APPROVED MANNER. B. DEMOLITION DRAWINGS ARE GENERAL IN NATURE SHOWING THE GENERAL SCOPE OF DEMOLITION WORK. CONTRACTOR SHALL VISIT SITE PRIOR TO BID AND BECOME FAMILIAR WITH ALL EXISTING MECHANICAL SYSTEMS AND PROVIDE ALL DEMOLITION REQUIRED FOR THE PROJECT. C. DEMOLITION WORK INCLUDES THE REMOVAL OF ALL UNUSED EQUIPMENT, SUPPORTS, HANGERS, CONTROL WIRING, DUCTWORK, PIPING, ETC. ALL PIPING SHALL BE REMOVED BACK TO ACTIVE MAINS AND CAPPED WATERTIGHT. D. DISCONNECT, DISASSEMBLE, CAP, PLUG AND REMOVE ALL PIPING, DUCTS AND EQUIPMENT INDICATED ON THE DRAWINGS OR NOT REQUIRED FOR THE PROJECT. ALL OPENINGS ON PIPING AND DUCTS THAT REMAIN SHALL BE CAPPED AND PROPERLY SECURED. VERIFY ALL DEMOLITION WORK IN FIELD. E. OWNER SHALL DESIGNATE ANY ITEMS TO BE SALVAGED BY CONTRACTOR PRIOR TO START OF DEMOLITION. CONTRACTOR SHALL PROTECT AND TURN OVER TO OWNER ALL SALVAGED ITEMS AT AN OWNER DESIGNATED LOCATION ON SITE. F. DEMOLITION TO BE DONE IN A MANNER SO AS NOT TO DAMAGE SHOPPING CENTER OR ADJACENT SHOPPING CENTER TENANTS OR TENANT OPERATIONS AND SHALL NOT AFFECT THE OPERATION OF SYSTEMS TO REMAIN IN USE OR CAUSE ANY DISRUPTION TO OTHER TENANT OPERATIONS. ANY ITEM TO REMAIN THAT IS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. G. REPAIR ANY OPENINGS IN FIRE RATED CONSTRUCTION CAUSED BY THE DEMOLITION WORK TO MATCH EXISTING CONSTRUCTION AND MAINTAIN FIRE RATING. H. PATCH ALL HOLES IN WALLS, CEILINGS AND FLOORS THAT RESULT FROM THE DEMOLITION WORK FOR NEW SURFACE FINISH. I. COORDINATE TIMES TO WORK IN SPECIFIC AREAS OF THE EXISTING BUILDING WITH OWNER'S REPRESENTATIVE. IF AFTER HOURS WORK IS REQUIRED, CONTRACTOR SHALL INCLUDE ALL PREMIUM TIME IN BID. J. CONTRACTOR SHALL MAINTAIN EXISTING ENERGY MANAGEMENT SYSTEM WIRING AND COMPONENTS. ANY ENERGY MANAGEMENT SYSTEM WIRING AND/OR EQUIPMENT THAT IS ACCIDENTALLY REMOVED OR DAMAGED DURING DEMOLITION/CONSTRUCTION SHALL BE REPLACED AT CONTRACTOR'S EXPENSE. K. {PHASING:} CONTRACTOR SHALL TAKE NOTE THAT NOT ALL DEMOLITION WORK CAN BE PERFORMED AT ONE TIME. CONTRACTOR IS REQUIRED TO COORDINATE THE REMOVAL AND/OR SHUTDOWN OF ANY EXISTING MECHANICAL SYSTEM AND ANY RELATED ELECTRICAL, PLUMBING OR FIRE PROTECTION SYSTEM REQUIRED FOR THIS PROJECT TO MAINTAIN THE EXISTING BUILDING OPERATIONAL THROUGHOUT THE COURSE OF CONSTRUCTION. CONFORM TO THE PROJECT CONSTRUCTION SCHEDULE, PHASING SEQUENCE AND INTENT IDENTIFIED BY THE CONSTRUCTION MANAGER AND ARCHITECT. CONTRACTOR SHALL COORDINATE ALLOWABLE WORKING HOURS IN SPECIFIC AREAS OF THE EXISTING BUILDING WITH THE CONSTRUCTION MANAGER. IF AFTER HOURS WORK IS REQUIRED, PREMIUM TIME SHALL BE INCLUDED IN BID. ANY REQUIRED DEMOLITION, RELOCATION OR SHUTDOWN OF EXISTING SYSTEMS, SHALL BE SUBMITTED FOR APPROVAL A MINIMUM OF TWO (2) WEEKS PRIOR TO PERFORMING THE REQUIRED WORK. NO DEMOLITION WORK AFFECTING EXISTING SYSTEMS TO REMAIN SHALL BE PERFORMED WITHOUT APPROVAL H.V.A.C. GENERAL DEMOLITION NOTES: 'XR' REGISTER 1 'XR' DIFFUSER 1 CAP 'XR' REGISTER 1 'XR' 2 ATD 'XR' 2 ATD 'XR' ATD 2 CAP 1. EXISTING SUPPLY REGISTER/DIFFUSER AND BRANCH DUCTWORK TO BE REMOVED BACK TO SUPPLY DUCT MAIN AND CAPPED AIR TIGHT. {PAINT CAPPED DUCT TO MATCH EXISTING.} { 2. EXISTING AIR TRANSFER DUCT AND GRILLES TO BE REMOVED. 3. EXISTING SUPPLY AIR REGISTER TO BE RELOCATED. REFER TO DRAWING H1.1 FOR NEW LOCATION. CAP DUCT DUCT AIR TIGHT AND PAINT TO MATCH EXISTING.} H.V.A.C. CODED NOTES: NO H.V.A.C. WORK IN HATCHED AREA. Mar 26, 2021 - 17:36:20 DWG Name: D:\Jobs\MCG\Dick's Sporting Goods\IN Carmel\Remodel\01-Bid Permit\12810B_HD1.0,HD1.1.dwg Updated By: rvan HD1.0 LOWER LEVEL H.V.A.C. DEMO PLAN mld CONTRACTOR MUST VERIFY DIMENSIONS ALL CLEARANCES IN AND FIELD Drawn By: Project No.: Date Issue SPORTING GOODS Design and construction documents as instruments of service are given in confidence and remain the property of MCG Architects. The use of this design and these construction documents for purposes other than the specific project named herein is strictly prohibited without expressed written consent of MCG Architects, Incorporated. STORE # 183 21042.10 C MCG ARCHITECTS 2021 ALL RIGHTS RESERVED **With exception of the National Account Vendors that DSG is purchasing directly from as noted on the vendor matrix, all work, materials, and systems shown in these plans and specifications is the sole responsibility of the General Contractor to purchase and install complete as shown and referenced. The General Contractor is required to coordinate, schedule and supervise all National Account Vendors as well as their subcontractors. The Tenant (Dick's Sporting Goods) has no scope of work and/or responsibility shown in these plans and/or specifications.** Issued for Bid-Permit 03-26-21 T F \pxql;216.520.1551 \pxql;216.520.1567 03-26-21 SM CLAY TERRACE 14350 CLAY TERRACE BLVD. CARMEL, IN 46032 05/11/21