HomeMy WebLinkAboutA2.1N
FP1
SECOND FLOOR FINISH PLAN SCALE
3/32" = 1' - 0"
8
A
1 2 3 4 5 6 7
B
C
D
E
F
A
B
C
D
E
F
G G
4.4 5
PLANK DIRECTION
PLANK DIRECTION
PLANK DIRECTION
PLANK DIRECTION
PLANK DIRECTION
C-2
C-3
TS-27
TS-4
VF-28
D1
A12.11d
C-1
OPEN TO
BELOW
OPEN TO
BELOW
X-LVT2
205
GOLF
SIMULATOR
BORDER
3-SIDES
BASE BID - INFILL AREAS OF
DEPARTMENT (FORMER ROOM
LOCATIONS) WITH LVT
FLOORING TO MATCH EXISTING
ALTERNATE BID - REPLACE
SHADED AREA WITH NEW CARPET
14'-6"
10'-3" 23'-1
5
8"
9'-113
4" 34'-3
1
8" 24'-10
3
8" 5'-0"
102'-6" ALTERNATE BID FLOORING
33'-41
2" ALT. BID
FLOORING
25'-31
2" ALT. BID
FLOORING
EXISTING AISLE FLOORING
TO REMAIN TYP.
EXISTING AISLE FLOORING
TO REMAIN TYP.
VF-28
VF-28
TS-27
TS-27
X-LVT2
X-LVT2
X-LVT2
VF-27
FIELD & BORDER
VF-27
VF-27
VF-27
VF-27
201c
FITTING
ROOM
201d
FITTING
ROOM
201f
FITTING
ROOM
201e
FITTING
ROOM
X-CT
X-LVT1
X-LVT1 X-CT
X-CT
C-1
C-1
22'-6"
23'-103
4"
VF-27
FIELD & BORDER
VF-27
FIELD & BORDER
VF-27
FIELD & BORDER
X-LVT2
X-LVT2 X-LVT2 EXIST.
BORDER
X-LVT1
203i
DISPLAY
203g
DISPLAY
200a
STAIRS
X-CT
VF-28 200b
STAIRS
203a
DISPLAY
203c
DISPLAY
203d
DISPLAY
203f
DISPLAY
X-LVT2
X-LVT2
X-LVT2
CS
CS
CS
INFILL AREAS OF DEPARTMENT
(FORMER ROOM LOCATIONS) WITH
CARPET TO MATCH EXISTING
NO WORK IN OFFICE
COMPLEX AREA
NO WORK IN
STOCK AREA
X-LVT1 X-LVT1
X-LVT1
X-LVT1 X-LVT1
X-LVT1
203e
DISPLAY
203b
DISPLAY
203h
DISPLAY
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
X-LVT2
VF-28
C-1
X-CT
NO WORK IN
THIS AREA
X-LVT1
NOTES:
1. AS AN ALTERNATE FOR PLASTIC LAMINATES, THE GENERAL CONTRACTOR MAY PROVIDE
THERMOFUSED MELAMINE PANEL AS MFGR'D BY VENDOR #1. ALL PANEL COLORS MUST MATCH THOSE
OF THE PLASTIC LAMINATE COLORS LISTED IN FINISH SCHEDULE. ALL PLASTIC LAMINATES AND
MELAMINE FINISHES ARE MATTE (UNLESS OTHERWISE NOTED)
2. SEE DETAILS OF TRANSITION STRIPS ON SHEET A5.1
3. FOR ALL NEW OR RE-WORK, PAINT ALL EXPOSED CEILING AREAS TO MATCH EXISTING CEILING COLOR
IN A FLAT FINISH. ALL EXPOSED DUCTWORK, WIRING, CABLES, ELECTRICAL BOXES, ETC., IN THESE
AREAS PAINTED TO MATCH.
4. ALL EDGES OF ALL TRIM BOARDS AT EDGES OF SLATWALL THROUGHOUT STORE ARE TO BE PAINTED
BLACK. ALL OTHERS TO MATCH FINISH ON FACE OF TRIM BOARDS.
5. INSTALLATION OF SLATWALL TO ADHERE TO MANUFACTURERS RECOMMENDATIONS AND
MAINTENANCE SPECIFICATIONS.
6. NO COLOR OR MATERIAL SELECTIONS (INCLUDING FLOORING, CARPETING, PAINT, PLASTIC LAMINATE,
METAL FINISHES, ETC.) ARE TO BE SUBSTITUTED WITHOUT PRIOR WRITTEN APPROVAL OF DICK'S.
7. REFER TO SPECIFICATIONS FOR PAINT FINISHES OF ALL MATERIALS AND SURFACES.
8. PAINT 2" GREEN STRIPE (P-34) IN BOPIS STOCK ROOM @ 12'-0" A.F.F. TO BOTTOM OF STRIPE AROUND
ENTIRE PERIMETER. ALL GYP. BD. WALLS IN STOCK AREAS TO HAVE LEVEL 2 FINISH ONLY. NO PAINT
OTHER THAN THE STRIPE. REFER TO A11.0 & A11.1 FIXTURE PLANS.
9. PAINT ALL WALL LOUVERS TO MATCH ADJACENT WALL FINISHES.
10. PREPARE EXISTING AND NEW CONCRETE SLABS FOR INSTALLATION OF NEW WOOD, RESILIENT TILE,
CARPET AND EXPOSED CONCRETE FLOORS. GRIND OFF ALL HIGH SPOTS. FILL ALL LOW SPOTS, HOLES
AND CRACKS WITH CEMENT -BASED, POLYMER MODIFIED, SELF LEVELING PRODUCT THAT CAN BE
APPLIED IN THICKNESSES FROM 1/8" AND THAT CAN BE FEATHERED AT EDGES TO MATCH ADJACENT
FLOOR ELEVATIONS. COMPRESSIVE STRENGTH NOT LESS THAN 4000 PSI.
11. ALL MILLWORK PAINT TOUCH-UP BY G.C.
12. PROVIDE 4' HIGH 3/4" PLYWOOD WAINSCOT IN STOCK ROOMS AND RECEIVING AROUND PERIMETER
EVERYWHERE THERE IS NO SHELVING OR RACKING ON GYP. BD. WALLS. COORDINATE LOCATIONS WITH
VENDOR #15.
13. ALL FLOOR GRAPHICS TO BE VERIFIED WITH DKS'S FIELD REPRESENTATIVE PRIOR TO INSTALLATION.
14. REFER TO THE A12 SERIES SHEETS FOR EXTENT OF BASE.
15. G.C. TO PAINT ALL EXPOSED SALES FLOOR CONDUIT, INCLUDING DROPS FOR BA & CCTV. CONDUIT
PAINT COLOR TO MATCH ADJACENT SURFACE (WALL, CEILING, COLUMN, ETC.) DROPS SUSPENDED FROM
CEILING ON SALES FLOOR AWAY FROM A VERTICAL SURFACE SHALL BE PAINTED TO MATCH CEILING,
UNLESS NOTED OTHERWISE.
16. ALL VISIBLE, INTERIOR SALES FLOOR COLUMNS TO BE PAINTED P-163 UP TO 16'-0" AFF. REMAINDER
OF COLUMN ABOVE TO MATCH DECK COLOR.
17. G.C. TO PREP ALL DRYWALL RECEIVING WALL COVERING AND GRAPHIC MURALS (WHERE NOTED ON
THE A12 SHEETS) WITH A LEVEL 4 FINISH AND PRIMER/SEALER; SEE SPECIFICATION 10 1600.
FLOOR FINISH NOTES 1
ARCHITECTURAL
SCALE
N.T.S.
ROOM FINISH SCHEDULE
ROOM
NO. ROOM NAME FLOOR BASE CEILING COMMENTS
200 2ND FLOOR SALES
200b
REFER TO FLOOR FINISH PLAN FOR FLOOR FINISHES &
REFER TO PLANS & INTERIOR ELEVATIONS FOR MORE INFORMATION
REFER TO
CLNG PLAN
REFER TO
FINISH PLAN
B-73
203a-203i DISPLAY
REFER TO
CLNG PLAN
REFER TO
FINISH PLAN
B-73
STAIRS CS -
EXPOSED
(E.T.R.)
200a STAIRS CS -
EXPOSED
(E.T.R.)
VF-27
SEE INT.
ELEVS
FITTING ROOM
219 PASS. ELEVATOR - - -
220 MECH ROOM CS -
EXPOSED
(E.T.R.)
221 FREIGHT ELEVATOR -
218 ELEV ALCOVE EXIST. LVT B-73 NEW ACT
- -
REFER TO ENLARGED PLAN & INTERIOR ELEVATIONS
FOR MORE INFORMATION
FLOORING TO REMAIN UNLESS NOTED OTHERWISE. EXISTING FLOORING
TO REMAIN SHALL BE CLEANED AND POLISHED IN THE AREAS OF WORK
UPON COMPLETION OF CONSTRUCTION PHASE ACTIVITIES.
201c-201f
EXPOSED
(E.T.R.)
X-LVT2
200
SALES
GOLF SIMULATOR C-1 B-73
EXPOSED
P-89 (FLAT)
SIMULATOR WALLS WILL RECEIVE CARPET OVER FRT PLYWOOD PANELS UP TO
12'-0" - REFER TO INT ELEVS
205
222
STOCK
219
PASS
ELEV
221
FREIGHT
ELEV
220
MECH
218
ELEV ALCOVE
STOCK CS -
EXPOSED
(E.T.R.)
222
PAINT STEEL SALES FLOOR
COLUMNS (TYP.), REF. FLOOR
FINISH NOTE #16/A2.1 CS
202
GOLF
STOCK
202 GOLF STOCK CS -
EXPOSED
(E.T.R.)
NEW GRAPHICS ON
CIRCULAR COLUMNS,
VERIFY SIZE WITH
VENDOR #8. PAINT
COLUMNS ABOVE
GRAPHIC (P-164) UP
TO EXISTING PAINT
BREAK.(TYP. OF 4 ON
THIS FLOOR)
A2.1
SECOND FLOOR
FINISH PLAN
Drawn By:
Project No.:
Date Issue
SPORTING GOODS
CLAY TERRACE
14350 CLAY TERRACE BLVD.
CARMEL, IN 46032
Design and construction documents as
instruments of service are given in
confidence and remain the property of
MCG Architects. The use of this design
and these construction documents for
purposes other than the specific project
named herein is strictly prohibited
without expressed written consent of
MCG Architects, Incorporated.
STORE # 183
21042.10
Issued for
Bid-Permit
03-26-21
TWK
C MCG ARCHITECTS 2021
ALL RIGHTS RESERVED
**With exception of the National Account Vendors that DSG is purchasing directly from as noted on the vendor
matrix, all work, materials, and systems shown in these plans and specifications is the sole responsibility of the
General Contractor to purchase and install complete as shown and referenced. The General Contractor is required
to coordinate, schedule and supervise all National Account Vendors as well as their subcontractors. The Tenant
(Dick's Sporting Goods) has no scope of work and/or responsibility shown in these plans and/or specifications.**
05/11/21