HomeMy WebLinkAboutA12.44x8 4x8
3x1 3x1
3x1
3x2
4x1
60/
19 19
60/
19-19
60/
60/
19 19
60/
19-19
60/
48/120/19
P
4x1 4x1 4x1
4x1 4x1 4x1
4x2 4x2 3x2
4x1 4x1
4x1 4x1
3x2
4x1
4x1
3x1
3x1
48/120/19
P
48/120/19
P
48/120/19
P
36/120/19
P
36/120/19
P
GR-TBD
GR-TBD
GR-TBD
2
48/120/19
P
48/120/19
P
48/120/19
P
48/120/19
P
48/120/19
P
36/120/19
P
KP1
FIRST FLOOR KEY PLAN
MENS ADIDAS
SCALE
INTERIOR FINISH SCHEDULE SCALE FS NTS
NTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
A
B
C
D
E
F
G G
4.4 5
D
FP1
FIRST FLOOR PLAN
MENS ADIDAS
SCALE
1/4" = 1' - 0"
N
E1
A12.4
7
N
8
REFER TO SHEET A12.3
FOR CONTINUATION
E2
A12.4
E
D
E1
INTERIOR ELEVATION
MENS ADIDAS
SCALE
1/4" = 1' - 0"
7
E2
INTERIOR ELEVATION
MENS ADIDAS
SCALE
1/4" = 1' - 0"
111
115
FOOTWEAR
STOCK
3'-6"
FIN. FLOOR
ELEV. 0'-0" AFF
B.O. DECK
ELEV. 19'-10" AFF
PAINT BREAK
ELEV. 15'-0" AFF
PAINT BREAK
ELEV. 16'-0" AFF
BY VENDOR #1
P-164
LOZIER CORNER FILL
T.O. FIXTURE
ELEV. 10'-0" AFF
BY VENDOR #1
P-164
BACK PANEL (TYP.)
LOZIER FIXTURE
BY VENDOR #1
NO GYP. BEHIND
LOZIER (TYP. AT NEW
WALL CONSTRUCTION)
6"
GYP. BD. STARTS
EXISTING CLEAR ANODIZED
STOREFRONT SYSTEM AND
AUTOMATIC DOORS TO REMAIN, TYP.
BY VENDOR #1
P-34
WD TRIM
9
A12.15
5
A12.15
EXISTING CLEAR ANODIZED
STOREFRONT SYSTEM
BEYOND TO REMAIN, TYP.
TO DECK
P-163
P-34
P-164
TO DECK
P-163
B-73
INTERIOR FINISH SCHEDULE
PAINT - WHITE FLOUR LOWELL ASH
PAINT - HARTFORD (DSG) GREEN GRAVEYARD OF THE ATLANTIC
PAINT - CUSTOM BRICK 2 GOLF TRIM
PAINT - IRON ORE BOPIS PANEL
PAINT - BLACK MAGIC OAK MANTEL
PAINT - NATUREL PECAN
PAINT - MEGA GREIGE BRICK MURAL (RED)
PAINT - ZIRCON BRICK MURAL (WHITE)
PAINT - GRAY SHINGLE CHEVRON WC
BASE - CHARCOAL
ACROVYN CORNER GUARD
COLOR - #929 OYSETER GRAY
MELAMINE - WHITE FIBER REINFORCED PANEL
FRT PLYWOOD - (1/2" x 4' x 8') MEDIUM DENSITY FIBER BOARD
P-10
P-34
NOTE: REFER TO ROOM FINISH SCHEDULE FOR ADDITIONAL FINISHES.
P-67
P-89
FRP-1
CG-2
MDF
PL-44
PL-76
WD-35
WD-37
P-78
WC-6
WC-7
P-154
P-163
P-164
B-73
ML-1
PLY-1
WC-11
P-159
PL-81
PL-82
FIN. FLOOR
ELEV. 0'-0" AFF
B.O. DECK
ELEV. 19'-10" AFF
PAINT BREAK
ELEV. 15'-0" AFF
PAINT BREAK
ELEV. 16'-0" AFF
BY VENDOR #1
P-164
LOZIER CORNER FILL
T.O. FIXTURE
ELEV. 10'-0" AFF
LIFT AND DROP
GRAPHIC BY
VENDOR #8
LIFT AND DROP GRAPHIC
BY VENDOR #8
LIFT AND DROP
GRAPHIC BY
VENDOR #8
P-34
P-164
TO DECK
P-163
P-34
TO DECK
P-163
P-164
115
FRAME ONLY
P-164
B-73 B-73
EXISTING DUCTWORK
TO REMAIN AS-IS
E4
A12.4
E5
A12.4
E3
A12.4
INTERIOR ELEVATION E3
MENS ADIDAS
SCALE
1/4" = 1' - 0"
FIN. FLOOR
ELEV. 0'-0" AFF
B.O. DECK
ELEV. 19'-10" AFF
PAINT BREAK
ELEV. 15'-0" AFF
PAINT BREAK
ELEV. 16'-0" AFF
P-34
P-164
TO DECK
P-163
B-73
E4
INTERIOR ELEVATION
MENS ADIDAS
SCALE
1/4" = 1' - 0"
FIN. FLOOR
ELEV. 0'-0" AFF
B.O. DECK
ELEV. 19'-10" AFF
T.O. WALL
ELEV. 12'-8" AFF
D
9
A12.15
5
A12.15
WC-6
BY VENDOR #8
GR-TBD
GRAPHICS PROVIDED &
INSTALLED BY VENDOR #8,
LEVEL 5 GYP. BD. FINISH
REQUIRED
BY VENDOR #1
P-34
4" WD TRIM
BY VENDOR #1
P-34
6" WD TRIM
OPEN ABOVE
INTERIOR ELEVATION E5
MENS ADIDAS
SCALE
1/4" = 1' - 0"
2'-5"
71
4"
4
1
4"
20'-81
4'-9 2"
3
8"
65
8"
71
8'-10 4"
1
4"
±33'-9
5
L 8"
C
5
A12.15
1'-11"
CLR.
A
FIN. FLOOR
ELEV. 0'-0" AFF
B.O. DECK
ELEV. 19'-10" AFF
PAINT BREAK
ELEV. 15'-0" AFF
PAINT BREAK
ELEV. 16'-0" AFF
T.O. WALL
ELEV. 12'-8" AFF
P-34
P-164
TO DECK
P-163
B-73
BY VENDOR #1
P-164
BACK PANEL (TYP.)
LOZIER FIXTURE
BY VENDOR #1
NO GYP. BEHIND
LOZIER (TYP. AT NEW
WALL CONSTRUCTION)
6"
GYP. BD. STARTS
22'-0"
FIXTURE LENGTH
23'-0"
FIXTURE LENGTH
2'-01
2"
1'-10
3
8"
Drawn By:
Project No.:
Date Issue
SPORTING GOODS
CLAY TERRACE
14350 CLAY TERRACE BLVD.
CARMEL, IN 46032
Design and construction documents as
instruments of service are given in
confidence and remain the property of
MCG Architects. The use of this design
and these construction documents for
purposes other than the specific project
named herein is strictly prohibited
without expressed written consent of
MCG Architects, Incorporated.
STORE # 183
21042.10
Issued for
Bid-Permit
03-26-21
TWK
C MCG ARCHITECTS 2021
ALL RIGHTS RESERVED
**With exception of the National Account Vendors that DSG is purchasing directly from as noted on the vendor
matrix, all work, materials, and systems shown in these plans and specifications is the sole responsibility of the
General Contractor to purchase and install complete as shown and referenced. The General Contractor is required
to coordinate, schedule and supervise all National Account Vendors as well as their subcontractors. The Tenant
(Dick's Sporting Goods) has no scope of work and/or responsibility shown in these plans and/or specifications.**
A12.4
MENS ADIDAS PLAN &
ELEVATIONS
05/11/21