Loading...
HomeMy WebLinkAboutA12.44x8 4x8 3x1 3x1 3x1 3x2 4x1 60/ 19 19 60/ 19-19 60/ 60/ 19 19 60/ 19-19 60/ 48/120/19 P 4x1 4x1 4x1 4x1 4x1 4x1 4x2 4x2 3x2 4x1 4x1 4x1 4x1 3x2 4x1 4x1 3x1 3x1 48/120/19 P 48/120/19 P 48/120/19 P 36/120/19 P 36/120/19 P GR-TBD GR-TBD GR-TBD 2 48/120/19 P 48/120/19 P 48/120/19 P 48/120/19 P 48/120/19 P 36/120/19 P KP1 FIRST FLOOR KEY PLAN MENS ADIDAS SCALE INTERIOR FINISH SCHEDULE SCALE FS NTS NTS 1 2 3 4 5 6 7 8 A B C D E F A B C D E F G G 4.4 5 D FP1 FIRST FLOOR PLAN MENS ADIDAS SCALE 1/4" = 1' - 0" N E1 A12.4 7 N 8 REFER TO SHEET A12.3 FOR CONTINUATION E2 A12.4 E D E1 INTERIOR ELEVATION MENS ADIDAS SCALE 1/4" = 1' - 0" 7 E2 INTERIOR ELEVATION MENS ADIDAS SCALE 1/4" = 1' - 0" 111 115 FOOTWEAR STOCK 3'-6" FIN. FLOOR ELEV. 0'-0" AFF B.O. DECK ELEV. 19'-10" AFF PAINT BREAK ELEV. 15'-0" AFF PAINT BREAK ELEV. 16'-0" AFF BY VENDOR #1 P-164 LOZIER CORNER FILL T.O. FIXTURE ELEV. 10'-0" AFF BY VENDOR #1 P-164 BACK PANEL (TYP.) LOZIER FIXTURE BY VENDOR #1 NO GYP. BEHIND LOZIER (TYP. AT NEW WALL CONSTRUCTION) 6" GYP. BD. STARTS EXISTING CLEAR ANODIZED STOREFRONT SYSTEM AND AUTOMATIC DOORS TO REMAIN, TYP. BY VENDOR #1 P-34 WD TRIM 9 A12.15 5 A12.15 EXISTING CLEAR ANODIZED STOREFRONT SYSTEM BEYOND TO REMAIN, TYP. TO DECK P-163 P-34 P-164 TO DECK P-163 B-73 INTERIOR FINISH SCHEDULE PAINT - WHITE FLOUR LOWELL ASH PAINT - HARTFORD (DSG) GREEN GRAVEYARD OF THE ATLANTIC PAINT - CUSTOM BRICK 2 GOLF TRIM PAINT - IRON ORE BOPIS PANEL PAINT - BLACK MAGIC OAK MANTEL PAINT - NATUREL PECAN PAINT - MEGA GREIGE BRICK MURAL (RED) PAINT - ZIRCON BRICK MURAL (WHITE) PAINT - GRAY SHINGLE CHEVRON WC BASE - CHARCOAL ACROVYN CORNER GUARD COLOR - #929 OYSETER GRAY MELAMINE - WHITE FIBER REINFORCED PANEL FRT PLYWOOD - (1/2" x 4' x 8') MEDIUM DENSITY FIBER BOARD P-10 P-34 NOTE: REFER TO ROOM FINISH SCHEDULE FOR ADDITIONAL FINISHES. P-67 P-89 FRP-1 CG-2 MDF PL-44 PL-76 WD-35 WD-37 P-78 WC-6 WC-7 P-154 P-163 P-164 B-73 ML-1 PLY-1 WC-11 P-159 PL-81 PL-82 FIN. FLOOR ELEV. 0'-0" AFF B.O. DECK ELEV. 19'-10" AFF PAINT BREAK ELEV. 15'-0" AFF PAINT BREAK ELEV. 16'-0" AFF BY VENDOR #1 P-164 LOZIER CORNER FILL T.O. FIXTURE ELEV. 10'-0" AFF LIFT AND DROP GRAPHIC BY VENDOR #8 LIFT AND DROP GRAPHIC BY VENDOR #8 LIFT AND DROP GRAPHIC BY VENDOR #8 P-34 P-164 TO DECK P-163 P-34 TO DECK P-163 P-164 115 FRAME ONLY P-164 B-73 B-73 EXISTING DUCTWORK TO REMAIN AS-IS E4 A12.4 E5 A12.4 E3 A12.4 INTERIOR ELEVATION E3 MENS ADIDAS SCALE 1/4" = 1' - 0" FIN. FLOOR ELEV. 0'-0" AFF B.O. DECK ELEV. 19'-10" AFF PAINT BREAK ELEV. 15'-0" AFF PAINT BREAK ELEV. 16'-0" AFF P-34 P-164 TO DECK P-163 B-73 E4 INTERIOR ELEVATION MENS ADIDAS SCALE 1/4" = 1' - 0" FIN. FLOOR ELEV. 0'-0" AFF B.O. DECK ELEV. 19'-10" AFF T.O. WALL ELEV. 12'-8" AFF D 9 A12.15 5 A12.15 WC-6 BY VENDOR #8 GR-TBD GRAPHICS PROVIDED & INSTALLED BY VENDOR #8, LEVEL 5 GYP. BD. FINISH REQUIRED BY VENDOR #1 P-34 4" WD TRIM BY VENDOR #1 P-34 6" WD TRIM OPEN ABOVE INTERIOR ELEVATION E5 MENS ADIDAS SCALE 1/4" = 1' - 0" 2'-5" 71 4" 4 1 4" 20'-81 4'-9 2" 3 8" 65 8" 71 8'-10 4" 1 4" ±33'-9 5 L 8" C 5 A12.15 1'-11" CLR. A FIN. FLOOR ELEV. 0'-0" AFF B.O. DECK ELEV. 19'-10" AFF PAINT BREAK ELEV. 15'-0" AFF PAINT BREAK ELEV. 16'-0" AFF T.O. WALL ELEV. 12'-8" AFF P-34 P-164 TO DECK P-163 B-73 BY VENDOR #1 P-164 BACK PANEL (TYP.) LOZIER FIXTURE BY VENDOR #1 NO GYP. BEHIND LOZIER (TYP. AT NEW WALL CONSTRUCTION) 6" GYP. BD. STARTS 22'-0" FIXTURE LENGTH 23'-0" FIXTURE LENGTH 2'-01 2" 1'-10 3 8" Drawn By: Project No.: Date Issue SPORTING GOODS CLAY TERRACE 14350 CLAY TERRACE BLVD. CARMEL, IN 46032 Design and construction documents as instruments of service are given in confidence and remain the property of MCG Architects. The use of this design and these construction documents for purposes other than the specific project named herein is strictly prohibited without expressed written consent of MCG Architects, Incorporated. STORE # 183 21042.10 Issued for Bid-Permit 03-26-21 TWK C MCG ARCHITECTS 2021 ALL RIGHTS RESERVED **With exception of the National Account Vendors that DSG is purchasing directly from as noted on the vendor matrix, all work, materials, and systems shown in these plans and specifications is the sole responsibility of the General Contractor to purchase and install complete as shown and referenced. The General Contractor is required to coordinate, schedule and supervise all National Account Vendors as well as their subcontractors. The Tenant (Dick's Sporting Goods) has no scope of work and/or responsibility shown in these plans and/or specifications.** A12.4 MENS ADIDAS PLAN & ELEVATIONS 05/11/21