Loading...
HomeMy WebLinkAboutGN29 8 8 5 10 12 6 9 12 10 10 6 4 6 PENNWOOD PROFESSIONAL CONSTRUCTION PLANS 11585 N. PENNSYLVANIA STREET CARMEL, INDIANA DEVELOPER: ENGINEER: ROGER WARD ENGINEERING, INC. 6555 CARROLLTON AVENUE INDIANAPOLIS, IN 46220 317-251-1738 Fax-251-1923 Contact: ROGER WARD email: rward@rw-engineeering.com DEVELOPMENT AND CONSTRUCTION NOTES C100 JOB#: SCB.002 COVER SHEET DATE: 11/06/20 DRAWN BY: RCW (317) 251-1738 (FAX) 251-1923 INDIANAPOLIS, INDIANA 46220 6555 CARROLLTON AVENUE www.rw-engineering.com CIVIL ENGINEERS - LAND SURVEYORS - DEVELOPMENT CONSULTANTS BY: 11585 N. PENNSYLVANIA STREET PENNWOOD PROFESSIONAL CARMEL, INDIANA 17 OFFICE PARK OFFICE PARK SC BODNER COMPANY, INC. 9075 N. MERIDIAN ST., SUITE 250 INDIANAPOLIS, IN 46260 317-536-2000 Fax-536-2550 Contact: STEVE BODNER email: steve@scbodner.com OPERATING AUTHORITY - CITY OF CARMEL, IN · BUILDING GROSS SQUARE FOOTAGE = 27,323 SF · SITE AREA = 3.77 AC+/- · ZONING = B-5 · FRONT SETBACK = 15 FT · SIDE SETBACK = 5 FT · REAR SETBACK = 30 FT · % LOT COVERAGE = 2.23/ 3.77 = 59.2% · DISTURBED AREA = 2.81 AC · NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN INDIVIDUAL LOT PERMIT. · IF IT WILL BE NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OF SUCH RELOCATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. ALL UTILITY POLES SHALL BE LOCATED WITHIN ONE FOOT OF THE PROPOSED RIGHT-OF-WAY. · ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSS THE FRONTAGE OF THIS DEVELOPMENT ARE INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES AS NECESSARY OR AS REQUESTED BY THE CITY TO ACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS TO THE PROPERTY OR THE ROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES WILL BE BORNE BY THE DEVELOPER. · ALL PAVING WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. PZ-2020-00210 DP AMEND / ADLS AMEND 05/13/21