8 8
5
10
12
6 9 12
10
10
6
4
6
PENNWOOD PROFESSIONAL
CONSTRUCTION PLANS
11585 N. PENNSYLVANIA STREET
CARMEL, INDIANA
DEVELOPER: ENGINEER:
ROGER WARD ENGINEERING, INC.
6555 CARROLLTON AVENUE
INDIANAPOLIS, IN 46220
317-251-1738
Fax-251-1923
Contact: ROGER WARD
email: rward@rw-engineeering.com
DEVELOPMENT AND CONSTRUCTION NOTES
C100
JOB#: SCB.002
COVER SHEET
DATE: 11/06/20
DRAWN BY: RCW
(317) 251-1738 (FAX) 251-1923
INDIANAPOLIS, INDIANA 46220
6555 CARROLLTON AVENUE
www.rw-engineering.com
CIVIL ENGINEERS - LAND SURVEYORS - DEVELOPMENT CONSULTANTS
BY:
11585 N. PENNSYLVANIA STREET
PENNWOOD PROFESSIONAL
CARMEL, INDIANA
17
OFFICE PARK
OFFICE PARK
SC BODNER COMPANY, INC.
9075 N. MERIDIAN ST., SUITE 250
INDIANAPOLIS, IN 46260
317-536-2000
Fax-536-2550
Contact: STEVE BODNER
email: steve@scbodner.com
OPERATING AUTHORITY - CITY OF CARMEL, IN
· BUILDING GROSS SQUARE FOOTAGE = 27,323 SF
· SITE AREA = 3.77 AC+/-
· ZONING = B-5
· FRONT SETBACK = 15 FT
· SIDE SETBACK = 5 FT
· REAR SETBACK = 30 FT
· % LOT COVERAGE = 2.23/ 3.77 = 59.2%
· DISTURBED AREA = 2.81 AC
· NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN INDIVIDUAL LOT
PERMIT.
· IF IT WILL BE NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OF
SUCH RELOCATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. ALL
UTILITY POLES SHALL BE LOCATED WITHIN ONE FOOT OF THE PROPOSED
RIGHT-OF-WAY.
· ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSS
THE FRONTAGE OF THIS DEVELOPMENT ARE INDICATED ON THE PLANS.
PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACE ANY DRAINAGE
STRUCTURES AND BRIDGES AS NECESSARY OR AS REQUESTED BY THE CITY TO
ACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH,
AND ANY OTHER REQUIRED IMPROVEMENTS TO THE PROPERTY OR THE
ROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES
AND BRIDGES WILL BE BORNE BY THE DEVELOPER.
· ALL PAVING WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY SHALL
CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE
CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO
SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S
CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS,
REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW
THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE
EXISTING AND PROPOSED RIGHT-OF-WAY.
PZ-2020-00210 DP AMEND / ADLS AMEND
05/13/21