Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
broughton floor-roof
CONCRETE SLAB SIDING/SHEATHING 2x TREATED MUDSILL CAST-IN-PLACE ANCHOR BOLT 2x WOOD FRAMING MEMBER SILL SEALER REINFORCING STEEL AS REQUIRED VAPOR BARRIER 4" GRAVEL REINFORCING STEEL AS REQUIRED CMU FOUNDATION CONCRETE FOOTING 20" 8" 32" FINISH ROOFING RAFTER ROOFING MEMBRANE FLASHING TRIM SOFFIT FASCIA BAFFLE VENTED AIRSPACE SOFFIT FURRING SCREENED VENT FINISH SIDING SHEATHING INSULATION 05/17/21