HomeMy WebLinkAboutC30510 9abcd 8 7 6efgh109876 REVISIONS AND ISSUES5 4 3 2 1 PREPARED FOR:PROJECT NO.
SHEET NO.abcd5 4 3 2
CHECKED BY:DRAWN BY:DESIGNED BY:DWG NAME:PROJECT NO.:DATEBYeDATE:1
ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netfhAPPROVAL PENDING NOT FORCONSTRUCTIONKnow what's below.
before you dig.Call
R gSection 1, Township 17 North, Range 3 East, Clay Township, Hamilton County, IndianaW200365CLAY TOWNSHIP/CARMEL-CLAY BOARD OF PARKS AND RECREATIONAQW20036508/31/2020MKMKRIVER HERITAGE PARK PHASE IIMPROVEMENTSC305SWPPP DETAILSKnow what's
Call
below.
before you dig.
TEMPORARY CONSTRUCTION
ENTRANCE DETAIL
NOT TO SCALE
8"FABRICFIL
L
S
L
O
P
E
FILTER FABRIC
1-1/4" X 1-1/4" POSTS
FLOW
GENERAL NOTES:
1.FILTER FABRIC FENCE SHALL BE A MINIMUM OF 36"
IN WIDTH.
2.TURN SILT FENCE UP SLOPE AT ENDS.
3.TRAINED INSPECTOR TO EXAMINE THE SILT FENCE
WEEKLY AND AFTER EACH 1
2" STORM EVENT.
ANCHOR SKIRT 4"
MINIMUM
Textile Strength @ 20% elongation........................ 50 lbs. per linear inch
UV Resistance ..................................................... > 85 %
Filtering efficiancy.................................................... 85%
Slurry Flow Rate...................................................... 4.5 gpm/sq. ft
Water Flow Rate....................................................... 220 gpm/square ft
SILT FENCE
Silt Fence shall be of a non-woven geotextile fabric design.
All stakes shall be 1 1/4" X 1 1/4" hardwood 36" tall with 24" tall
lath stapled to stakes over fabric as reinforcement.
TEMPORARY SILT FENCE
NOT TO SCALE
6' WITHOUT WIRE BACKING
1'-0" 1-1/4" X 1-1/4" POST
NON-WOVEN FILTER FABRIC
SILT FENCE JOINT WRAP
DETAIL
NPDES SWP3 POSTING BOX
12" MIN.
42"
36" MIN.
WOOD POST &
METAL BRACKET
(SEE POST DETAIL)
NPDES POSTING BOX
(MAILBOX)
MIN. SIZE 10"w x 18"d
NPDES POSTING BOX (MAILBOX)
MIN. SIZE 10"w x 18"d
NOMINAL 4"x4"
POST (TREATED)
GALVANIZED HARDWARE
PAINTED, GALVANIZED
ALUMINUM HARDWARE
BRACKET
PAINTED,
GALVANIZED
ALUMINUM
NOTES:
1. NPDES POSTING BOX SHALL
CONTAIN ALL APPROVED NPDES
PERMIT DOCUMENTS, PLANS, SPECS
AND OPERATION AND MAINTENANCE
MANUALS.
END VIEW SIDE VIEW
SCALE: NONE
PAV
E
D
R
O
A
D
STABILIZE FOUNDATION
GEOTEXTILE FABRIC TO
8" MIN.
TEMPORARY DITCH CULVERT
15
0
'
M
I
N
.
O
R
A
S
SI
T
E
A
L
L
O
W
S
INDOT #2
AGGREGATE
20' MI
N.
COURSE
8' WITH WIRE BACKING
TYPICAL TOPSOIL STOCKPILE
TOPSOIL S
T
O
C
K
P
I
L
E
TYPICAL10' ±
SILT FENCE
STORMWATER POLLUTION PREVENTION SCHEDULE
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
WEEKLY, AFTER STORM EVENTS AND AS NEEDED
EROSION CONTROL MEASURE
TREE PROTECTION
EXISTING INLET PROTECTION
SILT FENCE
STONE ENTRANCE
TEMPORARY SEEDING
PERMANENT SEEDING
EROSION CONTROL MATTING
INLET PROTECTION
SEED, SOD & LANDSCAPE AROUND
REMOVAL OF INLET PROTECTION
REMOVAL OF SILT FENCE
WATER AS NEEDED
WATER AS NEEDED
WATER AS NEEDED
AS NEEDED
N/A
N/A
MAINTENANCE INSTALLATION SEQUENCE
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED
AFTER FINISHED GRADING AROUND FINISHED UNITS
AFTER FINISH GRADING
AFTER EACH INLET IS PLACED
PRIOR TO CLEARING AND GRADING
PRIOR TO CLEARING AND GRADING
PRIOR TO CLEARING AND GRADING
AFTER ROUGH GRADING
AFTER FINISH GRADING
PRIOR TO CLEARING AND GRADING
COIR FIBER
MAT INLET
PROTECTION
NOT TO SCALE
INSTALLATION KIT
INCLUDES:
8 ZIP TIES
8 HOLD-DOWN PADS
AND INSTRUCTIONS.
THE HOLD-DOWN PADS SPREAD
THE PRESSURE FROM
TIGHTENED ZIP TIES. SKETCHES
SHOW PROPER INSTALLATION.
FLAT STREET OR PAVING GRATE
8 ZIP TIES
AND HOLD-DOWN PADS
BEEHIVE INLET GRATE
8 ZIP TIES
AND HOLD-DOWN PADS
STREET CURB INLET
GRATE
7 ZIP TIES
AND HOLD-DOWN PADS
BEEHIVE INLET GRATE
WITH OVERFLOW CUT-OUT
8 ZIP TIES
AND HOLD-DOWN PADS
1.REMOVE SEDIMENT, DEBRIS, ICE
AND SNOW FROM THE INLET GRATE
SURFACE AND SURROUNDING AREA.
2.VERIFY FIT BY PLACING FILTER
OVER INLET GRATE TO ENSURE THAT
INLET FILTER EXTENDS AT LEAST
ONE INCH BEYOND THE CASTING
EDGES. THE OVERLAP SLOWS
WATER FLOW AND STARTS
FILTERING SEDIMENT AND DEBRIS
BEFORE WATER DROPS INTO THE
INLET. THE USER IS RESPONSIBLE
FOR PROPER INSTALLATION.
3. POSITION THE MAT. PLACE INLET
FILTER ON GRATE WITH THE NET
SIDE DOWN, FLUSH TO THE BACK
EDGE AND EXTENDING BEYOND THE
GRATE OPENING ON THE FRONT AND
BOTH SIDES. THE ZIP TIES ATTACH
INLET FILTER TO THE INLET GRATE
COVER WITHOUT LIFTING THE
GRATE COVER.
4. INSERT ZIP TIES. LIFT INLET
FILTER SLIGHTLY TO ENABLE YOU
TO SEE THE FIRST GRATE BAR FROM
THE EDGE OF THE GRATE COVER.
PUSH THE POINTED END OF A
SCREWDRIVER THROUGH INLET
FILTER TO CREATE A PILOT HOLE TO
THE SIDE OF THE GRATE BAR. PUSH
THE POINTED END OF ZIP TIE
THROUGH HOLE IN HOLD-DOWN PAD
AND THEN THROUGH THE INLET
FILTER. BEND ABOUT 3" OF THE END
OF THE ZIP TIE BACK ON ITSELF AND
STEP ON THE FOLD TO FORM A HOOK
SHAPE. THE HOOK SHAPE MAKES IT
EASIER TO GRAB THE END AFTER
LOOPING UNDER THE GRATE BAR.
NOW LOOP THE ZIP TIE UNDER THE
GRATE BAR AND PULL UP: INSERT
POINTED END OF TIE IN BOTTOM OF
INLET FILTER ABOUT 2 INCHES FROM
THE FIRST ENTRY POINT AND PUSH
UP AND THROUGH FILTER AND
SECOND HOLE IN HOLD-DOWN PAD.
5.TIGHTEN ZIP TIES. AFTER
ATTACHING ALL OF THE ZIP TIES,
RE-POSITION INLET FILTER TO
COMPLETELY COVER AND OVERLAP
THE GRATE. PULL FREE END OF
ZIP-TIES HAND TIGHT TO ANCHOR
INLET FILTER TO THE GRATE. CUT
OFF FREE END OF ZIP TIES TO LEAVE
A 1" TAIL.
6.EXTREME FLOW INSTALLATION
REQUIRE- MENTS. SOME
MUNICIPALITIES REQUIRE EXPOSED
OVERFLOW. CHECK LOCAL
REGULATIONS. EXPOSING THE
EMERGENCY OVERFLOW ALLOWS
UNFILTERED FLOW WHEN WATER
DEPTH EXCEEDS INLET FILTER
HEIGHT. IF NECESSARY, CUT INLET
FILTER WITH A KNIFE OR SHEARS TO
EXPOSE THE UPPER PORTION OF THE
OVERFLOW SECTION. ALLOW THE
STANDARD OVERLAP ON ALL SIDES
OF INLET FILTER BEFORE CUTTING.
MAINTENANCE INLET FILTER WILL
COLLECT A LOT OF SEDIMENT.
SWEEP TOP AND SIDES OF INLET
FILTER TO REMOVE SEDIMENT AND
DEBRIS AFTER EACH 1/2" RAIN
EVENT. IN CASE OF STANDING
WATER AT INLET, SWEEPING AWAY
BUILT-UP DEBRIS ALLOWS WATER TO
DRAIN THROUGH INLET FILTER.
CUT OUT
DO NOT COVER
TOP OF CURB.
CURB TOP TO ACT
AS OVERFLOW.
PERMANENT STABILIZATION AND RESTORATION SPECIFICATIONS
General
Construction operations shall be carried out in such a manner and sequence that erosion and water pollution will be
minimized and held within acceptable limits. The completed project shall present a workmanlike appearance and
conform to the line, grade and cross section of the project plans. All trees, stumps, brush and similar materials are to be
removed from the site or disposed of in such a way as to have the least detrimental effect on the environment.
Vegetative Establishment
Vegetation will be established on all disturbed areas. Disturbed areas are to be seeded as soon as possible and as
described in the construction sequence on this Sheet.
Maintenance
All seeded lawns shall be maintained for 60 days following final inspection by landscape architect after written request from the contractor.
Maintenance to include watering, weeding, cultivating, mulching, mowing and all other necessary operations required for proper establishment
of lawns.
Seeding
Topsoil shall be de-compacted to a depth of 6 inches and prepared in order to ensure a sufficient planting medium. Select a seed mixture based
on the specifications for permanent seed. Apply 9 pounds of 12-0-12 fertilizer per 1000 sq. ft. in lawn filter strip area ONLY. Do not apply
fertilizer in areas to receive Native Seed. Seed shall be applied with mechanical spreader or seed drill at rates specified per acre. Apply seed
1/2 one direction and 1/2 perpendicular to the first. Lightly rake and roll with 200 lb. roller. Apply hydromulch, straw mulch or erosion control
blanket as specified on plans.
Mulch
Unless otherwise specified, erosion control blanket shall be installed as specified on the plans.
Wood Fiber Hydromulcher: If approved by Owner, wood fiber hydromulch may be applied. Apply wood fiber at at rate of 1 ton/acre. Apply
with a hydromulcher with tacking agent used according to manufacturer's recommendations.
Maintenance
All seeded lawns shall be maintained for 60 days following final inspection by landscape architect after written request from the contractor.
Maintenance to include watering, weeding, cultivating, mulching, mowing and all other necessary operations required for proper establishment
of lawns.
NOT TO SCALE
TREE PROTECTION DETAIL
FLOW
SIGN TO INDICATE THE
LOCATION OF THE
CONCRETE WASH AREA.
ABOVE GROUND CONCRETE
WASHOUT AREA
NOT TO SCALE
PROFILE
PLAN
POLYETHYLENE LINING - 10
MIL THICK LINING TO
EXTEND OVER THE BALES
METAL PINS OR STAPLES TO
SECURE THE POLYETHYLENE
TO THE STRAW BALES
POLYETHYLENE LINING - 10 MIL THICK LINING TO
EXTEND OVER THE BALES METAL PINS OR STAPLES
TO SECURE THE POLYETHYLENE
TO THE STRAW BALES
BINDINGS FOR STRAW
BALES TO BE PLACED
PARALLEL TO GROUND
COMPACTED
SOIL TO
PREVENT
PIPING
STAKED
STRAW
BALE
WASHOUT AREA
LENGTH = 20'
WASHOUT AREA
WIDTH = 15'
COMPACTED SOIL
TO PREVENT PIPING
NOTES:
1. CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT
ON SITE.
2. SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA,
AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CONCRETE
WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS.
3. THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT
AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE.
4. AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE
AND DISPOSED OF AT AN APPROVED WASTE SITE.
5. WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE
SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER APPROVED BY THE
INSPECTOR.
NOTE: CONTRACTOR SHALL PROVIDE ADDITIONAL
WASHOUT STRUCTURES OR LARGER STRUCTURES IF
REQURIED
2 WOOD OR METAL
STAKES (TYP) PER BALE
STRAW BALE
ENTRENCHED
4" INTO
GROUND
STRAW BALE
ENTRENCHED 4" INTO
GROUND
VELCRO
CLOSURE
LIFT STRAPS USED FOR
EASY MOVEMENT AND
INSPECTION OF UNIT
STORM SEWER GRATE
DANDY BAG R
STORM SEWER GRATE
DANDY CURB BAG TM
OVERFLOW
GAP
CURB AND
GUTTER INLET
CURB
FILTER
LOW PROFILE WITH
GUTTER FOR SAFETY
AND CURB APPEAL
LIFTING STRAPS
STORM SEWER
GRATE COMPLETELY
COVERED BY
HI-FLOW FABRIC
DANDY BAG R
Ò
Grab Tensile Strength ASTM D 4632 kN (lbs)1.62 (365) X 0.89 (200)
Grab Tensile Elongation ASTM D 4632 %24 X 10
Puncture Strength ASTM D 4833 kN (lbs)0.40 (90)
Mullen Burst Strength ASTM D 3786 kPa (psi)3097 (450)
Trapezoid Tear Strength ASTM D 4533 kN (lbs)0.51 (115) X 0.33 (75)
UV Resistence ASTM D 4355 %90
Apparent Opening Size ASTM D 4751 Mm (US Std Sieve)0.425 (40)
Flow Rate ASTM D 4491 1/min/m (gal/min/ft )5907 (145)
Permittivity ASTM D 4491 Sec 2.1-1
22
Ò
Ò
Ô
Grab Tensile Strength ASTM D 4632 kN (lbs)1.62 (365) X 0.89 (200)
Grab Tensile Elongation ASTM D 4632 %24 X 10
Puncture Strength ASTM D 4833 kN (lbs)0.40 (90)
Mullen Burst Strength ASTM D 3786 kPa (psi)3097 (450)
Trapezoid Tear Strength ASTM D 4533 kN (lbs)0.51 (115) X 0.33 (75)
UV Resistence ASTM D 4355 %90
Apparent Opening Size ASTM D 4751 Mm (US Std Sieve)0.425 (40)
Flow Rate ASTM D 4491 1/min/m (gal/min/ft )5907 (145)
Permittivity ASTM D 4491 Sec 2.1-1
22
Ô
Ô
NOT TO SCALE
INLET SEDIMENT CONTROL DEVICES DETAIL
SITE
BRACKET
PLATFORM
PLATFORM
PLATFORM
NOTE: IF STONE PAVING IS
TO BE USED AS A WHEEL
WASH AREA, ALL RUNOFF
SHALL BE DIRECTED TO A
CONTAINED AREA WHERE
SEDIMENT CAN BE
COLLECTED AND REMOVED.
NO SCALE
SOILS MAP LEGEND
SOILS MAP