Loading...
HomeMy WebLinkAboutA010.0R R R 15'-6 3/4"9'-6 1/4" 5'-1 5/8" 4'-11"6'-3 1/4"2'-9 3/4"5'-5 1/2"2'-9" 3'-2" 1/4" 3'-0 7/8"3'-2 1/4" 5" 3'-2 1/4" 2'-4" 1'-8 3/4"10'-8 3/4" 4'-4 1/4" 5 3/4"1'-9"8'-4"5'-5 1/2"4'-0 13/16""REMOVE AND HAUL WINDOW DEMO NON-STRUCTURAL WALL REMOVE AND HAUL DOORS AND HARDWARE MASTER CLOSET FRONT BEDROOM CLOSET MASTER BATH MASTER CLOSET 2: TO REMAIN AS IS MASTER BEDROOM TO REMAIN AS IS FRONT BEDROOM TO REMAIN AS IS FRONT BATHROOM TO REMAIN AS IS PERMIT #1 of 10 Date: 4.7.21 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications.Keller ResidenceJulia Keller13857 Kickapoo TrailCarmel, Indiana 46033Approved By: Date: EXISTING/DEMOLITION PLAN D101 Maggie Smith Designer msmith@caseindy.com #2 4.27.21 #3 5.4.21 Sydney Spurgeon Lead Designer sspurgeon@caseindy.com SCALE: 1/2" = 1' 05/20/21