Loading...
HomeMy WebLinkAboutA030.01'-0" 2'-0" 1'-0" 2'-0" 1'-0" 2'-1" 3'-8"5'-4" CL FIELD VERIFY8'-0"2'-8" 4"FRAME MIRRORS TO MATCH CABINETRY FIELD VERIFY FINAL LIGHT INSTALL HEIGHT WITH H.O. FIELD VERIFY ALL ACCESSORY INSTALL HEIGHT LOCATIONS 2'-5" 2'-5"4'-8 7/16"1'-9"8'-0"DRYWALL QUARTZ SHOWER PARTS DRYWALL OUTSIDE OF SHOWER FLOOR TO CEILING AND INSTALL NEW BASE/SHOE INSTALL TILE ON SIDES OF SHOWER WALL; USE BRUSHED NICKEL TRIM FOR ALL EXPOSED EDGES/ CORNERS FIELD VERIFY PLUMBING FIXTURE INSTALL HEIGHTS 2'-0"1'-9"4'-0" 2'-0"INSTALL WALL TILE THROUGHOUT NICHE; FRAME WITH BRUSHED NICKEL TRIM INSTALL CORIAN QUARTZ SHOWER PARTS INSTALL 12X24 SHOWER WALL TILE 4 ROWS UP UNDERNEATH NICHE PERMIT #1 of 10 Date: 4.7.21 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications.Keller ResidenceJulia Keller13857 Kickapoo TrailCarmel, Indiana 46033Approved By: Date: A502 Maggie Smith Designer msmith@caseindy.com #2 4.27.21 #3 5.4.21 AA CC PROPOSED ELEVATIONS SCALE: 1/2" = 1' PROPOSED ELEVATIONS Sydney Spurgeon Lead Designer sspurgeon@caseindy.com BB DD 05/20/21