HomeMy WebLinkAboutA030.01'-0" 2'-0" 1'-0" 2'-0" 1'-0"
2'-1" 3'-8"5'-4" CL FIELD VERIFY8'-0"2'-8" 4"FRAME MIRRORS TO MATCH
CABINETRY
FIELD VERIFY FINAL LIGHT
INSTALL HEIGHT WITH H.O.
FIELD VERIFY ALL
ACCESSORY INSTALL
HEIGHT LOCATIONS
2'-5" 2'-5"4'-8 7/16"1'-9"8'-0"DRYWALL
QUARTZ SHOWER PARTS
DRYWALL OUTSIDE OF
SHOWER FLOOR TO
CEILING AND INSTALL NEW
BASE/SHOE
INSTALL TILE ON SIDES OF
SHOWER WALL; USE
BRUSHED NICKEL TRIM FOR
ALL EXPOSED EDGES/
CORNERS
FIELD VERIFY PLUMBING
FIXTURE INSTALL
HEIGHTS
2'-0"1'-9"4'-0" 2'-0"INSTALL WALL TILE
THROUGHOUT NICHE; FRAME
WITH BRUSHED NICKEL TRIM
INSTALL CORIAN QUARTZ
SHOWER PARTS
INSTALL 12X24 SHOWER WALL
TILE 4 ROWS UP UNDERNEATH
NICHE
PERMIT
#1
of
10
Date:
4.7.21
Sheet:
Revision:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been
prepared by Case Design &
Remodeling solely for its use and
should not be reproduced or relied
upon by any other parties.
Dimensions shown or scaled are
subject to change per actual job
condition and must be verified.
Materials are to be supplied as
specified as equal or standard
when not uniquely specified.
Installed materials may vary in
appearance from drawings.
Reference manufacturer's product
data for actual appearance and
specifications.Keller ResidenceJulia Keller13857 Kickapoo TrailCarmel, Indiana 46033Approved By:
Date:
A502
Maggie Smith
Designer
msmith@caseindy.com
#2 4.27.21
#3 5.4.21
AA
CC
PROPOSED ELEVATIONS
SCALE: 1/2" = 1'
PROPOSED ELEVATIONS
Sydney Spurgeon
Lead Designer
sspurgeon@caseindy.com
BB
DD
05/20/21