Loading...
HomeMy WebLinkAboutA014 - 3GOFIN. MAIN LEVEL FIN. UPPER LEVEL FINISHED BASEMENT LEVEL T.O. PLATE (MAIN) T.O. FOUNDATION T.O. PLATE (UPPER)14" / 12"8" 12" 8" 12" 8" 12" 5/4 x 6 TRIM BOARD w/METAL DRIP EDGE w/RUBBER THRU FLASHING 1 X 8 CORNER BOARDS TYP. 1 X 6 TRIM WRAP TYP. 1 X 8 FRIEZE BOARD TYP. 1X8 FASCIA BOARD TYP. 1X2 BATTENS OVER HARDIE PANEL SIDING @ 16" O.C. TYP. 8" 12"9' - 1 1/8"10' - 1 1/8" 8' - 8" TO BOTTOM OF HEADER8' - 0"5/4" X 8" TRIM WITH METAL DRIP EDGETOP OF GUTTER BOARD9' - 0"TOP OF GUTTER BOARD9' - 0"8" 12"14" / 12"5/4 x 6 TRIM BOARD w/METAL DRIP EDGE VERTICAL 1X2 BATTENS OVER HARDIE PANEL SIDING @ 16" O.C. TYP. 1x8 RAKE BOARD, TYP. 1x8 RAKE FRIEZE BOARD, TYP. LAP SIDING PER SPECS VERTICAL 1X2 BATTENS OVER HARDIE PANEL SIDING @ 16" O.C. TYP. 5/4 x 6 TRIM BOARD w/METAL DRIP EDGE CUSTOMER:PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:Wedgewood Building Co., LLC32 First Street NECarmel, IN 46032 317.669.6300 www.wedgewoodbc.com Copyright © 2021 Wedgewood Building Co. LLC. All rights reserved. This material may not bereproduced and/or modified without the expressprior written permission of the copyright holder. Forpermission contact gcradick@wedgewoodbc.com5/4/2021 12:50:35 PM A4LIPS RESIDENCELot #3 - Gray Oaks14297 McCormick Circle, Carmel, IN 46033EXTERIOR ELEVATIONS ABL, SS1/4" = 1'-0"1 LEFT ELEVATION 2 LEFT 13LEFT 2 Rev.No. Date DescriptionBy Andrew Lund at 1:04 pm, May 04, 2021 05/14/21