HomeMy WebLinkAboutS100.0EXISTING 2X4 FRAMING
DEMOLITION & FRAMING KEY
NO DEMO IN THIS ROOM
EXISTING 2X6 FRAMING
WALL SECTION TO BE REMOVED
NEW 2x4 FRAMING
NEW 2X6 FRAMING
BULK HEAD / LOWERED CEILING
5068 5068
2459DH
2668
2668
2668
EP
R
R
3
R
R
3
R
R
R
T
R
R R
R
R
R
3
R R R
3 3 3
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R
22'-9"
21'-10 1/2"
5'-6"
15'-2 1/2"
14'-9"
11'-9 1/2"
21'-0 1/2"
6'-6"
21'-6"
21'-8"
7'-1 1/2"
6'-7 1/2"
1'-2"
8'
6'-6"
v
D
D3
D7
D7 D6
D5
D10
D4
D4
D7
D4
KITCHEN
VAULTED CEILING
HARDWOOD
LIVING
VAULTED CEILING
CARPET
FAMILY ROOM
VAULTED CEILING
CARPET
ENTRY
VAULTED CEILING
TILE
HALL
VAULTED CEILING
HARDWOOD
D11
D12
D13
D15
D8
D15
D7
D14
D9
D16
D16
D17
D13
D2
D8
P2
P3
D9
PORCH
BEDROOM 1
VAULTED CEILING
CARPET
BEDROOM 2
VAULTED CEILING
CARPET
BEDROOM 3
VAULTED CEILING
CARPET
HALL
VAULTED CEILING
HARDWOOD
BATH
VAULTED CEILING
TILE
CRAFT ROOM
VAULTED CEILING
TILE
GARAGE
C.H. AFF
SLAB
N
DEMO & PREP PLAN NOTES
NOTE QTY DESCRIPTION
1
INSTALL NECESSARY PLASTIC AND FLOOR PROTECTION IN
AREAS OF HOME NOT INCLUDED IN SCOPE OF WORK.
1 DEMO CABINETS (TRASH)
1 REMOVE EXISTING FLOORING DOWN TO SLAB
3 DEMO EXISTING INTERIOR DOOR AND TRIM (TRASH)
1
DEMO ALL EXISTING BATH FIXTURES (TRASH). DEMO
EXISTING FLOORING DOWN TO CONCRETE SLAB.
1 DEMO EXISTING SHOWER DOWN TO STUDS
4 DEMO NON LOAD BEARING INTERIOR WALLS AS SHOWN
2
DEMO ALL DRYWALL ON WALLS AND CEILOING IN MASTER
BATH
2
FOLLOWING FLOORING REMOVAL, CUT AND REMOVE
CONCRETE SLAB NECESSARY FOR NEW PLUMBING ROUGH
INS AS SHOWN ON PROPOSED PLANS.
1
REMOVE EXISTING FRENCH DOORS AND TRIM (SAVE
SLABS).DEMO OPENING DOWN TO STUDS FOR FRAMING OF
NEW DOORWAY.
1
DEMO EXISTING ISLAND COUNTERTOPS & CABINETS
(TRASH)
1
REMOVE ALL EXISTING APPLIANCES (SAVE IN GARAGE).
DEMO EXISTING PERIMETER COUNTERTOPS & CABINETS
(TRASH).
2 DEMO EXISTING HARDWOODS DOWN TO SUBFLOOR.
1
FOLLOWING FLOORING REMOVAL, CUT AND REMOVE
CONCRETE SLAB NECESSARY FOR NEW ISLAND
MECHANICAL ROUGH INS AS SHOWN ON PROPOSED
PLANS.
2
DEMO DRYWALL NECESSARY FOR MECHANICAL
RELOCATIONS
2 DEMO CARPET AND PAD DOWN TO SLAB (TRASH)
1
DEMO EXISTING TILE FLOORING DOWN TO CONCRETE
SLAB.
D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14
D15
D16
D17
D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14
D15
D16
D17
PLUMBING DEMO/DISCONNECT PLAN NOTES
NOTE QTY DESCRIPTION
1 SEPARATE PLUMBING PERMIT NOT REQUIRED
1
PRIOR TO DEMO, DISCONNECT ALL MASTER BATH
PLUMBING FIXTURES (TRASH) AND CAP LINES, INCLUDING
SHOWER FIXTURES, TOILET AND VANITY.
1
PRIOR TO DEMO, DISCONNECT ISLAND SINK (TRASH) AND
CAP LINES.
P1
P2
P3
P1
P2
P3
ELECTRICAL DEMO/DISCONNECT NOTES
NOTE QTY DESCRIPTION
1 SEPARATE ELECTRICAL PERMIT NOT REQUIRED
1
PRIOR TO DEMOLITION, DISCONNECT ALL ELECTRICAL IN
WALLS TO BE DELETED AS SHOWN.
1
PRIOR TO DEMOLITION, REMOVE ALL DECORATIVE
FIXTURES TO BE DELETED OR RELOCATED AS SHOWN IN
PROPOSED MEP PLANS.
E1
E2
E3
E1
E2
E3
GENERAL NOTES
NOTE QTY DESCRIPTION
1
SITE DUMPSTER AND PORTALET TO BE LOCATED IN
DRIVEWAY. CONFIRM FINAL LOCATION WITH CLIENTS ON
SITE.
1
HOMEOWNERS TO CLEAR OUT A SECTION OF GARAGE FOR
STORAGE OF BUILDING MATERIALS DURING TIME OF
CONSTRUCTION.
GN1
GN2
GN1
GN2
HVAC DEMO/DISCONNECT NOTES
NOTE QTY DESCRIPTION
H1 1 SEPARATE HVAC PERMIT NOT REQUIRED
LAZZARA RESIDENCE
Interior Remodel
308 Woodland Lane
Carmel, IN 46032
Revision: Date:
A2
SHEET OF 8
SIGNATURE / SEAL
DESIGNER: TOM LAZZAARA
E: tom@customlivingusa.com
C: 317.289.5590
Client Initials:
Date:
The plans, including all text, drawings, concepts, and ideas
forming a part of the plans and the selection and arrangement
thereof are Copyright 2018 of Custom Living, Inc., Indianapolis,
IN. ALL RIGHTS RESERVED. The plans shall remain the
property of Custom Living Inc. Any use of the plans or their
content without the prior written permission of Custom Living Inc.
is strictly prohibited.
CUSTOM LIVING
5335 Winthrop Ave
Indianapolis IN 46220
5/21/2021
DATE:
[PRINTS TO SCALE IF PRINTED ON 24" X 36" ]
GENERAL SITE PREP & DEMO NOTES
Install plastic to seal off areas being remodeled
from rest of home as necessary.
Install floor covering for construction path from
door designated as the construction entrance to
locations of remodeling as necessary.
Install additional floor covering or wall protection
as needed over areas close to the areas of
construction activity.
Install dust control measures on HVAC cold air
returns located within the locations of
remodeling.
Custom Living can provide a HEPA Air Scrubber
to aid in airborne dust control from the start of
demolition up to priming of new drywall
depending on site conditions. Homeowner
understands that this will help to reduce airborne
dust; however, it will not mitigate it in its entirety.
Demolition Contractor(s) are responsible for all
labor, for the scope of work specified in the
drawings provided by Custom Living.
Homeowner understands that Custom Living has
only provided a labor and material allowance for
the scope of demolition denoted on the
drawings. Any additional scope added or
uncovered during demolition result in filing a
Change Order during construction.
Homeowners understand that demolition work
will generate dust and noise throughout the
house. Custom Living will provide site protection
measures to reduce where possible, but
Homeowners should not expect 100%
containment.
EXISTING / DEMO PLAN
SCALE: 3/16" = 1'
05/28/21