HomeMy WebLinkAboutMarathon Health S-2021-00120FRONT ELEVATION
206.25"
f---l _3 5"_______,
I
H f---l3_6"_______,
I
f---l _3 6"-------,
lr5 .1 25 "l i 3 5 .,25 · I
WINDOWS = 380.61 Sq Ft. TOTAL
GRAPHICS = 54.59 Sq Ft. TOTAL
232.75"Ii 4 8.125• I f _,25i• I 2 7_ 75• I I 33 _75•If-- _48_ .. ______,1 I �
-- ----------------- ----------------, I ·• • · •Please sign & return drawing/s to FASTSIGNS I *DRAWING IS NOT TO SCALE BUT IS PROPORTIONATE*
I • · ·Signature below indicates approval of BOTH design & placement of sign/51
I . . . X DATE I FIELD VE RIFY ALL ME ASUREME NTS BE FORE BEGINNING ANY WORK.
I_!_ _ _ _ ------------------------------J INSTALLER TO VERIFY MOUNTING SURFACE PRIOR TO INSTALLATION.
FASTSIGNS.
NATIONAL ACCOUNTS
ACCOUNT:
MARATHON
ALE.
228069-ART2
REPRESENTATIVE:
Jaramie Bryant
ADDRESS:
1111 W Main St Ste
120
Carmel IN 46032
ORIGINAL DRAW ING DATE: 04/02/21
SCALE:
NTS
REV. #1 BY:I
REVISION NOTES:
REV. # 2 BY:I
REVISION NOTES:
REV. #3 BY: I
REVISION NOTES:
o,AwN sY, J.Lazo
REVISED BY:
REV. DATE
REV. DATE
REV. DATE
THIS DRAWING IS THE
PROPERTY OF FASTSIGNS
INTERNATIONAL, INC.
THE BORROWER AGREES, IT
SHALL NOT BE REPRODUCED,
COPIED OR DISPOSED OF,
DIRECTLY OR INDIRECTLY,
NOR USED FOR ANY
PURPOSE WITHOUT
13.85%
07/07/21
-I-
--T77'-
o