Loading...
HomeMy WebLinkAboutA050 -DEMOLITION PLAN1 2 E.5 F G F.9 G.1 .9 D1 D1 D1 D1 D2 D2 D2D2 D2 D2 D2 D2 D2 D3 TYP. D3 TYP. D3D3 D3 TYP. D3 D3D3 D3D3 D3 D3D3D3 D3D3 D3D3 D4D4 D5 D5 D5 D5 D6ETRLVT1 ETRLVT1 ETRLVT1 D12 D1 D2 D5D8 D8 D8 D8 D8 D9D9 D10 D11 D11 D7D7 D16 1 2 E.5 F G F.9 G.1 .9 R1R1 R1R1 R1 R1 R2 R1 R1 R1 R1 R2 R2R2 R3 R3 R3 R4R4 R4R4 R4R4 R4R4R4R4 R4R4 R4 R3 R3 www.studio3design.net Phone: (317) 595.1000 8604 Allisonville Road, Suite 330 Indianapolis, IN 46250 A B C D E 1 2 3 4 5 6 7 A B C D E THESE DRAWINGS ARE THE PROPERTY OF STUDIO 3 DESIGN, INC. ALL RIGHTS RESERVED PROJECT NUMBER: DATE: CERTIFICATION: SHEET DESCRIPTION: SHEET NUMBER: REVISION SCHEDULE: 1 2 3 4 5 6 7 21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021 DEMOLITION PLAN 10300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290GENERAL DEMOLITION NOTES A. SEE GENERAL NOTES ON CUTTING AND PATCHING OUTLINED ON SHEET A001 FOR ADDITIONAL INFORMATION. B. PERFORM ALL WORK UNDER ESTABLISHED PROJECT GUIDELINES. C. FIELD VERIFY EXISTING CONDITIONS AND COORDINATE DEMOLITION OR REMOVAL WORK WITH CORRESPONDING NEW CONSTRUCTION WORK AND APPROPRIATE TRADES PRIOR TO STARTING DEMOLITION WORK. IF DISCREPANCIES ARE FOUND BETWEEN CONTRACT DOCUMENTS AND ACTUAL FIELD CONDITIONS, NOTIFY ARCHITECT IMMEDIATELY. D. DASHED LINES INDICATE EXISTING ITEMS TO BE REMOVED. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL BE RESPONSIBLE FOR THE OFF-SITE DISPOSAL OF ALL DEMOLITION ITEMS. E. REMOVE ALL CONSTRUCTION DEBRIS FROM SITE DAILY. DO NOT ALLOW REFUSE TO BLOCK CORRIDORS, STAIRS, OR ANY OTHER TRAFFIC AREAS. F. PROVIDE TEMPORARY FIRE AND LIFE SAFETY PROTECTION THROUGHOUT DURATION OF PROJECT. G. PATCH AND REPAIR ALL ADJACENT SURFACES DISTURBED/DAMAGED BY CONSTRUCTION. CLEAN ALL FLOOR SURFACES OF ADHESIVE AND OR GROUT RESIDUE PRIOR TO INSTALLATION OF NEW FLOORING MATERIAL. H. PROTECT ADJACENT EXISTING TO REMAIN CONSTRUCTION THROUGHOUT DURATION OF PROJECT. PROVIDE SHORING, BRACING OR SUPPORT AS REQUIRED TO PREVENT MOVEMENT OR SETTLEMENT OF EXISTING CONSTRUCTION. I. PROVIDE CONSTRUCTION BARRIER PARTITIONS BETWEEN AREAS OF WORK AND OCCUPIED SPACES (IF APPLICABLE). PARTITIONS TO REMAIN INTACT THROUGHOUT CONSTRUCTION, INCLUDING COMPLETED WORK AND WORK UNDER CONSTRUCTION. J. NEGATIVE PRESSURE MONITORED CONTINUOUSLY, SHALL BE PROVIDED AT ALL DUST BARRIERS WHEN REQUIRED BY BUILDING/PROJECT STANDARDS AND OR MANDATED INFECTION CONTROL REQUIREMENTS. K. WHERE BLOCKING AND/OR ELECTRICAL WORK IS REQUIRED IN EXISTING WALL CONSTRUCTION, CONTRACTOR TO CAREFULLY CUT-OUT GYPSUM BOARD AT APPROPRIATE LOCATION. PATCH AND FINISH AREA PER CUTTING AND PATCHING/FINISHING NOTES ON SHEET A001. L. REMOVE ALL EXISTING CONSTRUCTION ITEMS AND FINISHES MADE OBSOLETE BY OR IN CONFLICT WITH NEW CONSTRUCTION. VERIFY WITH ARCHITECT AND/OR OWNER'S REPRESENTATIVE. REMOVE WIRING BACK TO SOURCE AT ALL OUTLETS, ETC. MADE OBSOLETE BY WALL REMOVAL OR ANY OTHER NEW CONSTRUCTION. M. REMOVE ALL ITEMS IN THEIR ENTIRETY UNLESS OTHERWISE NOTED. DESCRIPTION OF PRIMARY ITEMS TO BE REMOVED IS GENERAL IN NATURE, AND REMOVAL OF SECONDARY COMPONENTS SUCH AS BLOCKING, SUPPORTS, ANCHORS, TRIM, ADHESIVE, PIPING, WIRING, ETC., RELATED TO PRIMARY ITEMS SHALL BE INCLUDED. N. RELOCATED ITEMS SHALL BE CLEANED AND PLACED IN STORAGE PER OWNER'S DIRECTIONS UNTIL ITEMS ARE READY TO BE REINSTALLED. IF ITEM IS DAMAGED DURING DEMOLITION OR RELOCATION, IT SHALL BE REPAIRED WITH NEW ITEM AS APPROVIDED BY OWNER AT NO EXPENSE TO OWNER. O. AT OWNER'S REQUEST, SALVAGED ITEMS SHALL BE TURNED OVER TO THE OWNER OR STORED IN AN AREA DESIGNATED BY THE OWNER. P. IF EXISTING ITEMS TO BE REMOVED OR DISTURBED ARE SUSPECTED OR DISCOVERED TO CONTAIN ASBESTOS OR OTHER HAZARDOUS MATERIALS, STOP DEMOLITION AND NOTIFY OWNER IMMEDIATELY. Q. SEE M.E.P. DOCUMENTS FOR EXTENT OF DEMOLITION/REMOVAL OF PIPING/DUCTWORK/ELECTRICAL THAT WILL OCCUR IN PREPARATION FOR NEW CONSTRUCTION. DEMO PLAN NOTES D9 REMOVE EXISTING TOILET, GRAB BARS, WALL MOUNTED SINK, MIRROR, SOAP AND PAPER TOWEL DISPENSER. SALVAGE FOR REINSTALLATION. D10 REMOVE EXISTING WINDOW AND TRANSACTION COUNTER COMPLETE. D11 REMOVE PORTION OF WALL AS REQUIRED FOR INSTALLATION OF NEW TRANSACTION WINDOW. SEE NEW PLAN AND ELEVATIONS. D12 REMOVE PORTION OF WALL UP TO 7'-8". PREP TO BECOME NEW BULKHEAD. SEE NEW REFLECTED CEILING PLAN. D16 REMOVE PORTION OF WALL AS INDICATED TO CREATE NEW OPENING. DEMO PLAN NOTES D1 REMOVE PORTION OF WALL COMPLETE AS INDICATED D2 REMOVE CASEWORK AND COUNTERTOP COMPLETE. D3 REMOVE EXISTING FLOOR FINISH, WALL BASE, ADHESIVES, ETC, COMPLETE. PREP FLOOR TO RECIEVE NEW FINISH AS SCHEDULED D4 REMOVE EXISTING WALL PANELING COMPLETE. PREP WALL TO RECEIVE NEW FINISH AS SCHEDULED. D5 REMOVE EXISTING DOOR, FRAME AND HARDWARE COMPLETE. SALVAGE FOR REINSTALLATION WHEREVER POSSIBLE. ANY DOORS, FRAMES OR HARDWARE NOT REINSTALLED SHALL BE DISPOSED OF BY CONTRACTOR. D6 REMOVE PORTION OF WALL AS SHOWN FOR INSTALLATION OF NEW DOOR AND FRAME. SEE NEW FLOOR PLAN AND DOOR SCHEDULE. D7 REMOVE WALLCOVERING. PREP WALL TO RECEIVE NEW FINISH AS SCHEDULED D8 REMOVE PLUMBING FIXTURE. COORDINATE WITH MEP DRAWINGS. NORTH 3/16" = 1'-0"A050 LEVEL 1 - DEMOLITION PLAN - GI CLINIC1 NORTH 3/16" = 1'-0"A050 LEVEL 1 - DEMO REFLECTED CEILING PLAN - GI CLINIC2 NORTH KEY PLAN - NOT TO SCALE AREA OF WORK # Revision Description Date Issued DEMO RCP NOTES R1 REMOVE EXISTING CEILING GRID AND TILE COMPLETE. COORDINATE WITH MEP DRAWINGS. SALVAGE CEILING TILES FOR REINSTALLATION. R2 REMOVE PORTION OF CEILING TO ALLOW FOR NEW WALL CONSTRUCTION. SEE NEW PLAN. R3 REMOVE EXISTING DRYWALL BULKHEAD COMPLETE. R4 EXISTING TO REMAIN CEILING 06/08/21