HomeMy WebLinkAboutA050 -DEMOLITION PLAN1 2
E.5
F
G
F.9
G.1
.9
D1
D1
D1
D1
D2
D2
D2D2
D2
D2
D2
D2
D2
D3
TYP.
D3
TYP.
D3D3
D3
TYP.
D3
D3D3
D3D3
D3 D3D3D3
D3D3
D3D3
D4D4
D5
D5
D5
D5
D6ETRLVT1 ETRLVT1
ETRLVT1
D12
D1
D2
D5D8
D8
D8
D8
D8
D9D9
D10
D11
D11 D7D7
D16
1 2
E.5
F
G
F.9
G.1
.9
R1R1
R1R1
R1
R1
R2
R1
R1
R1
R1
R2
R2R2
R3
R3
R3
R4R4
R4R4
R4R4
R4R4R4R4 R4R4
R4
R3
R3
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
DEMOLITION
PLAN 10300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290GENERAL DEMOLITION NOTES
A. SEE GENERAL NOTES ON CUTTING AND PATCHING OUTLINED ON SHEET
A001 FOR ADDITIONAL INFORMATION.
B. PERFORM ALL WORK UNDER ESTABLISHED PROJECT GUIDELINES.
C. FIELD VERIFY EXISTING CONDITIONS AND COORDINATE DEMOLITION OR
REMOVAL WORK WITH CORRESPONDING NEW CONSTRUCTION WORK AND
APPROPRIATE TRADES PRIOR TO STARTING DEMOLITION WORK. IF
DISCREPANCIES ARE FOUND BETWEEN CONTRACT DOCUMENTS AND
ACTUAL FIELD CONDITIONS, NOTIFY ARCHITECT IMMEDIATELY.
D. DASHED LINES INDICATE EXISTING ITEMS TO BE REMOVED. UNLESS
OTHERWISE NOTED, CONTRACTOR SHALL BE RESPONSIBLE FOR THE
OFF-SITE DISPOSAL OF ALL DEMOLITION ITEMS.
E. REMOVE ALL CONSTRUCTION DEBRIS FROM SITE DAILY. DO NOT ALLOW
REFUSE TO BLOCK CORRIDORS, STAIRS, OR ANY OTHER TRAFFIC AREAS.
F. PROVIDE TEMPORARY FIRE AND LIFE SAFETY PROTECTION THROUGHOUT
DURATION OF PROJECT.
G. PATCH AND REPAIR ALL ADJACENT SURFACES DISTURBED/DAMAGED BY
CONSTRUCTION. CLEAN ALL FLOOR SURFACES OF ADHESIVE AND OR
GROUT RESIDUE PRIOR TO INSTALLATION OF NEW FLOORING MATERIAL.
H. PROTECT ADJACENT EXISTING TO REMAIN CONSTRUCTION THROUGHOUT
DURATION OF PROJECT. PROVIDE SHORING, BRACING OR SUPPORT AS
REQUIRED TO PREVENT MOVEMENT OR SETTLEMENT OF EXISTING
CONSTRUCTION.
I. PROVIDE CONSTRUCTION BARRIER PARTITIONS BETWEEN AREAS OF WORK
AND OCCUPIED SPACES (IF APPLICABLE). PARTITIONS TO REMAIN INTACT
THROUGHOUT CONSTRUCTION, INCLUDING COMPLETED WORK AND WORK
UNDER CONSTRUCTION.
J. NEGATIVE PRESSURE MONITORED CONTINUOUSLY, SHALL BE PROVIDED AT
ALL DUST BARRIERS WHEN REQUIRED BY BUILDING/PROJECT STANDARDS
AND OR MANDATED INFECTION CONTROL REQUIREMENTS.
K. WHERE BLOCKING AND/OR ELECTRICAL WORK IS REQUIRED IN EXISTING
WALL CONSTRUCTION, CONTRACTOR TO CAREFULLY CUT-OUT GYPSUM
BOARD AT APPROPRIATE LOCATION. PATCH AND FINISH AREA PER CUTTING
AND PATCHING/FINISHING NOTES ON SHEET A001.
L. REMOVE ALL EXISTING CONSTRUCTION ITEMS AND FINISHES MADE
OBSOLETE BY OR IN CONFLICT WITH NEW CONSTRUCTION. VERIFY WITH
ARCHITECT AND/OR OWNER'S REPRESENTATIVE. REMOVE WIRING BACK TO
SOURCE AT ALL OUTLETS, ETC. MADE OBSOLETE BY WALL REMOVAL OR
ANY OTHER NEW CONSTRUCTION.
M. REMOVE ALL ITEMS IN THEIR ENTIRETY UNLESS OTHERWISE NOTED.
DESCRIPTION OF PRIMARY ITEMS TO BE REMOVED IS GENERAL IN NATURE,
AND REMOVAL OF SECONDARY COMPONENTS SUCH AS BLOCKING,
SUPPORTS, ANCHORS, TRIM, ADHESIVE, PIPING, WIRING, ETC., RELATED TO
PRIMARY ITEMS SHALL BE INCLUDED.
N. RELOCATED ITEMS SHALL BE CLEANED AND PLACED IN STORAGE PER
OWNER'S DIRECTIONS UNTIL ITEMS ARE READY TO BE REINSTALLED. IF
ITEM IS DAMAGED DURING DEMOLITION OR RELOCATION, IT SHALL BE
REPAIRED WITH NEW ITEM AS APPROVIDED BY OWNER AT NO EXPENSE TO
OWNER.
O. AT OWNER'S REQUEST, SALVAGED ITEMS SHALL BE TURNED OVER TO THE
OWNER OR STORED IN AN AREA DESIGNATED BY THE OWNER.
P. IF EXISTING ITEMS TO BE REMOVED OR DISTURBED ARE SUSPECTED OR
DISCOVERED TO CONTAIN ASBESTOS OR OTHER HAZARDOUS MATERIALS,
STOP DEMOLITION AND NOTIFY OWNER IMMEDIATELY.
Q. SEE M.E.P. DOCUMENTS FOR EXTENT OF DEMOLITION/REMOVAL OF
PIPING/DUCTWORK/ELECTRICAL THAT WILL OCCUR IN PREPARATION FOR
NEW CONSTRUCTION.
DEMO PLAN NOTES
D9 REMOVE EXISTING TOILET, GRAB BARS, WALL MOUNTED SINK, MIRROR, SOAP AND
PAPER TOWEL DISPENSER. SALVAGE FOR REINSTALLATION.
D10 REMOVE EXISTING WINDOW AND TRANSACTION COUNTER COMPLETE.
D11 REMOVE PORTION OF WALL AS REQUIRED FOR INSTALLATION OF NEW TRANSACTION
WINDOW. SEE NEW PLAN AND ELEVATIONS.
D12 REMOVE PORTION OF WALL UP TO 7'-8". PREP TO BECOME NEW BULKHEAD. SEE NEW
REFLECTED CEILING PLAN.
D16 REMOVE PORTION OF WALL AS INDICATED TO CREATE NEW OPENING.
DEMO PLAN NOTES
D1 REMOVE PORTION OF WALL COMPLETE AS INDICATED
D2 REMOVE CASEWORK AND COUNTERTOP COMPLETE.
D3 REMOVE EXISTING FLOOR FINISH, WALL BASE, ADHESIVES, ETC, COMPLETE. PREP
FLOOR TO RECIEVE NEW FINISH AS SCHEDULED
D4 REMOVE EXISTING WALL PANELING COMPLETE. PREP WALL TO RECEIVE NEW FINISH
AS SCHEDULED.
D5 REMOVE EXISTING DOOR, FRAME AND HARDWARE COMPLETE. SALVAGE FOR
REINSTALLATION WHEREVER POSSIBLE. ANY DOORS, FRAMES OR HARDWARE NOT
REINSTALLED SHALL BE DISPOSED OF BY CONTRACTOR.
D6 REMOVE PORTION OF WALL AS SHOWN FOR INSTALLATION OF NEW DOOR AND
FRAME. SEE NEW FLOOR PLAN AND DOOR SCHEDULE.
D7 REMOVE WALLCOVERING. PREP WALL TO RECEIVE NEW FINISH AS SCHEDULED
D8 REMOVE PLUMBING FIXTURE. COORDINATE WITH MEP DRAWINGS.
NORTH
3/16" = 1'-0"A050
LEVEL 1 - DEMOLITION PLAN - GI
CLINIC1
NORTH
3/16" = 1'-0"A050
LEVEL 1 - DEMO REFLECTED
CEILING PLAN - GI CLINIC2
NORTH
KEY PLAN - NOT TO SCALE
AREA
OF
WORK
# Revision Description
Date
Issued
DEMO RCP NOTES
R1 REMOVE EXISTING CEILING GRID AND TILE COMPLETE. COORDINATE WITH MEP
DRAWINGS. SALVAGE CEILING TILES FOR REINSTALLATION.
R2 REMOVE PORTION OF CEILING TO ALLOW FOR NEW WALL CONSTRUCTION. SEE NEW
PLAN.
R3 REMOVE EXISTING DRYWALL BULKHEAD COMPLETE.
R4 EXISTING TO REMAIN CEILING