Loading...
HomeMy WebLinkAboutA120 -REFLECTED CEILING PLANRECESSED LIGHT NEW 2' X 4' RECESSED FIXTURE NEW CEILING GRID EXISTING CEILING GRID WALL MOUNTED EXIT SIGN CEILING MOUNTED EXIT SIGN HVAC SUPPLY DIFFUSER HVAC RETURN GRILLE SMOKE DETECTORSD EXISTING 2' X 4' RECESSED FIXTURECEILING TYPE MATERIAL/DETAIL VARIATION CEILING HEIGHT CLG1 1' -0" 1 2 E.5 F G F.9 G.1 .9 ETRX2 ETRX ETRX2 ETRX M.E. CLG1 M.E.CLG1 M.E.CLG1 ETRX2 M.E.CLG1 ETRX2 ETRX2 ETRX2 ETRCLG1 RECEPTION 003 WAITING 001 MD NURSE 004 W&M 005 PATIENT RR 006 EXAM 4 011 WORK ALCOVE 012 EXAM 3 009 EXAM 2 008 EXAM 1 007 STORAGE 010 C1 X 8' -0" C2 C3 www.studio3design.net Phone: (317) 595.1000 8604 Allisonville Road, Suite 330 Indianapolis, IN 46250 A B C D E 1 2 3 4 5 6 7 A B C D E THESE DRAWINGS ARE THE PROPERTY OF STUDIO 3 DESIGN, INC. ALL RIGHTS RESERVED PROJECT NUMBER: DATE: CERTIFICATION: SHEET DESCRIPTION: SHEET NUMBER: REVISION SCHEDULE: 1 2 3 4 5 6 7 21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021 REFLECTED CEILING PLAN 10300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290GENERAL REFLECTED CEILING NOTES A. DIMENSIONS ON REFLECTED CEILING PLAN ARE TAKEN FINISHED FACE TO FINISHED FACE. B. SEE ELECTRICAL FOR SWITCHING OPERATION AND LOCATION. C. COORDINATE ALL DUCTWORK AND LIGHTING WITH STRUCTURE, BULKHEAD AND CEILING TO DECK CLEARANCES PRIOR TO STARTING WORK. D. LIGHTS AND DIFFUSERS SHOWN FOR LOCATION. SEE ELECTRICAL AND HVAC PLANS FOR FIXTURE COUNTS AND TYPES. E. UNLESS OTHERWISE NOTED/SHOWN - CENTER NEW GRID EACH DIRECTION IN ROOM. MAINTAIN MINIMUM EDGE TILE AT 6". F. UNLESS OTHERWISE NOTED/SHOWN - PLASTER / GYP. BOARD BULKHEAD SIDES AND UNDERNEATH TO BE PAINTED, PAINT TO BE GENERAL CEILING WHITE. MEP DESIGN BUILD NOTES A. GENERAL CONTRACTOR SHALL COORDINATE ALL TRADES, INCLUDING DESIGN BUILD CONTRACTORS, AND ENSURE MEP SUBCONTRACTORS MEET WITH OWNER, DESIGNER, AND OTHERS TO ENGINEER SYSTEMS TO MEET OWNER'S NEEDS. B. GENERAL CONTRACTOR SHALL PROVIDE MEP DESIGN DOCUMENTS AND DRAWINGS TO OWNER AND DESIGNER FOR REVIEW, COMMENT AND APPROVAL. C. GENERAL CONTRACTOR SHALL ENSURE MEP DESIGN BUILD DOCUMENTS ARE SUBMITTED TO THE STATE AND LOCAL CODE OFFICIAL AS REQUIRED BY STATE STATUE/LAW. D. HVAC SYSTEMS TO BE VENDOR ENGINEERED UNDER SEPERATE CONTRACT. E. ELECTRICAL POWER & DATA SYSTEMS ARE TO BE VENDOR ENGINEERED UNDER SEPERATE CONTRACT. F. LIGHTING SYSTEMS ARE TO BE VENDOR ENGINEERED UNDER SEPERATE CONTRACT. G. PLUMBING SYSTEMS ARE TO BE VENDOR ENGINEERED UNDER SEPERATE CONTRACT. H. G.C. IS RESPONSIBLE TO PROVIDE ALL COORDINATION OF DESIGN AND CONSTRUCTION DISCIPLINES. I. G.C. IS RESPONSIBLE TO PROVIDE ALL DESIGN, MATERIAL AND LABOR UNDER SEPERATE VENDOR CONTRACT AS REQUIRED FOR A COMPLETE INSTALLATION IN COMPLIANCE WITH ALL STATE, LOCAL AND HEALTH DEPARTMENT BUILDING CODES. J. ARCHITECTURAL DOCUMENTS PROVIDE SUGGESTED LIGHTING LOCATIONS AND FIXTURE TYPES. ALL CIRCUITING TO BE VENDOR ENGINEERED BY CONTRACTOR. K. CONTRACTOR SHALL DESIGN AND PROVIDE EMERGENCY LIGHTING AS REQUIRED BY STATE AND LOCAL CODE. L. CONTRACTOR SHALL DESIGN AND INSTALL SALVAGED BUILDING STANDARD FIXTURES AT LOCATIONS INDICATED TO MATCH BUILDING STANDARD FIXTURES AND ONLY PROVIDE NEW FIXTURES WHERE REQUIRED. M. CONTRACTOR SHALL PROVIDE INDEPENDANT SWITCHING FOR EACH AREA AND AT A LOGICAL AREA ENTRY. IN CORRIDORS AND LARGE PUBLIC AREAS, PROVIDE MULTIPLE SWITCH LOCATIONS. N. PROVIDE DIMMABLE SWITCHES AT ALL FIXTURES THAT ARE DIMMABLE. O. CONTRACTOR SHALL DESIGN AND PROVIDE EXIT LIGHTING TO MATCH BUILDING STANDARD AND TO MEET STATE AND LOCAL CODES. REFLECTED CEILING PLAN LEGEND REFLECTED CEILING PLAN NOTES C1 PROVIDE NEW LAYER OF GYP BOARD AT AREA OF DEMOLITION TO CREATE NEW BULKHEAD. C2 INFILL BULKHEAD TO WALL. HEIGHT, SIZE AND FINISH TO MATCH EXISTING. C3 PATCH AND REPAIR CEILING AS REQUIRED TO PROVIDE NEW WALL CONSTRUCTION ABOVE EXISTING TO REMAIN 6'-0"AFF PARTIAL HEIGHT WALL. CEILING TYPE SCHEDULE TAG MANUFACTURER STYLE # COLOR SIZE COMMENTS CLG1 ARMSTRONG .75 NRC MINERAL FIBERBOARD, 35 CAC, ULTIMA, STRAIGHT EDGE 1910HRC WHITE 2'X2' 15/16" GRID X EXISTING TO REMAIN GRID AND TILE X2 EXISTING TO REMAIN GRID WITH NEW TILE TO MATCH CLG1 NORTH 1/8" = 1'-0"A120 LEVEL 1 - NEW REFLECTED CEILING PLAN - GI CLINIC1 NORTH KEY PLAN - NOT TO SCALE AREA OF WORK # Revision Description Date Issued 06/08/21