HomeMy WebLinkAboutH101 - First Floor HVAC Plans1
F
G
F.9
G.1
.9
1 1
1
1
2
1
1
4
3
TYP.
E.5
225 CFM
250 CFM 250 CFM 300 CFM
400 CFM
200 CFM
250 CFM
130 CFM
110 CFM
315 CFM
315 CFM
250 CFM
250 CFM
250 CFM
VAV-48
6
400 CFM
110 CFM
400 CFM
2
E-20
VAV-47
VAV-46
VAV-45
3
3
3
1
F
G
F.9
G.1
.9
5
TYP.
E.5
TT
T
T
T
E-20
VAV-47
VAV-45
VAV-48
5
5
8
7
5
5 5
1
F
G
F.9
G.1
.9
E.5
VAV-47
E-20
VAV-46
VAV-48
VAV-45
6
6
6
7
5
4
11
4
4
4
10
26
28
2 8 2 5 10
R1
D1-30
D1-70
6"ø
3
14
15
9
16
2
15
R1
1
F
G
F.9
G.1
.9
1
E.5 T
T
TT
1 1
1
1
1
12 12
12 12
T
13VAV-45
E-20
VAV-47
VAV-48
VAV-46
NORTH
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IKEY PLAN -NOT TO SCALE
AREA OF WORK
April 9, 2021
First Floor HVAC
Plans
H10110300 N. ILLINOIS ST.INDIANAPOLIS, IN 462901/8" = 1'-0"1 First Floor HVAC Ductwork Demolition Plan
1/8" = 1'-0"2 First Floor HVAC Piping Demolition Plan
DEMOLITION PLAN NOTES
1 PRIOR TO ANY DEMOLITION WORK CONDUCT AIRFLOW TESTING ON TERMINAL BOXES AND ASSOCIATED
DIFFUSERS.
2 DISCONNECT EXISTING LINEAR DIFFUSER AND PREPARE FOR RECONNECTION.
3 REMOVE EXISTING RETURN GRILLE WITH LINED TRANSFER AIR BOOT AND PREPARE FOR RECONNECTION.
4 DEMO EXISTING EXHAUST DUCT, CEILING GRILLE, AND ASSOCIATED HANGERS. PREPARE FOR NEW CONNECTION.
5 EXISTING FINNED TUBE RADIATION IS TO REMAIN AND NO WORK IN PROJECT SCOPE, PROTECT DURING
CONSTRUCTION FROM DAMAGE AND DEBRIS.
6 EXISTING TRANSFER DUCT TO REMAIN.
7 EXISTING TEMPERATURE SENSOR SHALL BE DISCONNECTED AND PREPARED FOR REINSTALLATION.
8 PROTECT EXISTING TEMPERATURE SENSOR DURING CONSTRUCTION.
1/8" = 1'-0"3 First Floor HVAC Ductwork Plan
1/8" = 1'-0"4 First Floor HVAC Piping Plan
PLAN NOTES
1 EXISTING FINNED TUBE RADIATION IS TO REMAIN AND NO WORK IN PROJECT SCOPE, PROTECT DURING
CONSTRUCTION FROM DAMAGE AND DEBRIS.
2 CLEAN LINEAR DIFFUSER AND REINSTALL IN NEW CEILING GRID. SEE DETAIL 2 ON H901 FOR LINEAR SLOT
DIFFUSER DETAIL.
3 EXHAUST GRILLE RELOCATED FROM DEMOLISHED PATIENT RESTROOM AND REINSTALL IN NEW CEILING GRID.
BALANCE TO 80 CFM.
4 CLEAN RETURN AIR GRILLE AND REINSTALL IN NEW CEILING GRID.
5 BALANCE DIFFUSER TO 260 CFM.
6 BALANCE DIFFUSER TO 250 CFM.
7 REVISE AIRFLOW SETPOINTS FOR TERMINAL BOX VAV-47 TO MAXIMUM: 1000 CFM, MINIMUM: 500 CFM.
8 BALANCE DIFFUSER TO 130 CFM.
9 REVISE AIRFLOW SETPOINTS FOR TERMINAL BOX VAV-46 TO MAXIMUM: 520 CFM AND MINIMUM: 370 CFM.
10 BALANCE DIFFUSER TO 300 CFM.
11 BALANCE DIFFUSER TO 140 CFM.
12 EXISTING TEMPERATURE SENSOR TO REMAIN. VERIFY CONTROL TEMPERAURE SETPOINTS AND ADJUST TO
HEATING SETPOINT: 70 DEG F AND COOLING SETPOINT TO 74 DEG F. SOME TEMPERATURE SENSORS WITHIN THE
GI SUITE HAD DEFAULT TEMPERATURE TO 76 DEG F AND CONTROL SETPOINTS WILL NEED CORRECTED WITHIN
THE SCOPE OF THIS PROJECT.
13 RELOCATE EXISTING TEMPERATURE SENSOR CONTROLLING TERMINAL BOX E-20. VERIFY CONTROL
TEMPERATURE SETPOINTS AND ADJUST HEATING SETPOINT TO 70 DEG F AND COOLING SETPOINT TO 74 DEG F.
14 24"X8" TRANSFER DUCT ABOVE FINISHED CEILING. LINE TRANSFER DUCT WITH 3/4" ARMAFLEX INSULATION. SIZE
NOTED IS FREE AREA IN TRANSFER DUCT.
15 SEE DETAIL 1 ON H901 FOR RETURN GRILLE WITH SOUND BOOT.
16 REVISE VAV-45 BOX AIRFLOWS, MAXIMUM: 600 CFM AND MINIMUM: 350 CFM.
17 VERIFY AIRFLOW SETPOINTS ON TERMINAL BOX VAV-48 MAXIMUM: 630 CFM, MINIMUM: 315 CFM.
18 VERIFY AIR FLOW SETPOINTS ON TERMINAL BOX E-20 HAS AIRFLOW SET TO CONSTANT VOLUME OF 240 CFM.
17
18
# Revision Description
Date
Issued
06/08/21