Loading...
HomeMy WebLinkAboutH101 - First Floor HVAC Plans1 F G F.9 G.1 .9 1 1 1 1 2 1 1 4 3 TYP. E.5 225 CFM 250 CFM 250 CFM 300 CFM 400 CFM 200 CFM 250 CFM 130 CFM 110 CFM 315 CFM 315 CFM 250 CFM 250 CFM 250 CFM VAV-48 6 400 CFM 110 CFM 400 CFM 2 E-20 VAV-47 VAV-46 VAV-45 3 3 3 1 F G F.9 G.1 .9 5 TYP. E.5 TT T T T E-20 VAV-47 VAV-45 VAV-48 5 5 8 7 5 5 5 1 F G F.9 G.1 .9 E.5 VAV-47 E-20 VAV-46 VAV-48 VAV-45 6 6 6 7 5 4 11 4 4 4 10 26 28 2 8 2 5 10 R1 D1-30 D1-70 6"ø 3 14 15 9 16 2 15 R1 1 F G F.9 G.1 .9 1 E.5 T T TT 1 1 1 1 1 12 12 12 12 T 13VAV-45 E-20 VAV-47 VAV-48 VAV-46 NORTH www.studio3design.net Phone: (317) 595.1000 8604 Allisonville Road, Suite 330 Indianapolis, IN 46250 A B C D E 1 2 3 4 5 6 7 A B C D E THESE DRAWINGS ARE THE PROPERTY OF STUDIO 3 DESIGN, INC. ALL RIGHTS RESERVED PROJECT NUMBER: DATE: CERTIFICATION: SHEET DESCRIPTION: SHEET NUMBER: REVISION SCHEDULE: 1 2 3 4 5 6 7 21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IKEY PLAN -NOT TO SCALE AREA OF WORK April 9, 2021 First Floor HVAC Plans H10110300 N. ILLINOIS ST.INDIANAPOLIS, IN 462901/8" = 1'-0"1 First Floor HVAC Ductwork Demolition Plan 1/8" = 1'-0"2 First Floor HVAC Piping Demolition Plan DEMOLITION PLAN NOTES 1 PRIOR TO ANY DEMOLITION WORK CONDUCT AIRFLOW TESTING ON TERMINAL BOXES AND ASSOCIATED DIFFUSERS. 2 DISCONNECT EXISTING LINEAR DIFFUSER AND PREPARE FOR RECONNECTION. 3 REMOVE EXISTING RETURN GRILLE WITH LINED TRANSFER AIR BOOT AND PREPARE FOR RECONNECTION. 4 DEMO EXISTING EXHAUST DUCT, CEILING GRILLE, AND ASSOCIATED HANGERS. PREPARE FOR NEW CONNECTION. 5 EXISTING FINNED TUBE RADIATION IS TO REMAIN AND NO WORK IN PROJECT SCOPE, PROTECT DURING CONSTRUCTION FROM DAMAGE AND DEBRIS. 6 EXISTING TRANSFER DUCT TO REMAIN. 7 EXISTING TEMPERATURE SENSOR SHALL BE DISCONNECTED AND PREPARED FOR REINSTALLATION. 8 PROTECT EXISTING TEMPERATURE SENSOR DURING CONSTRUCTION. 1/8" = 1'-0"3 First Floor HVAC Ductwork Plan 1/8" = 1'-0"4 First Floor HVAC Piping Plan PLAN NOTES 1 EXISTING FINNED TUBE RADIATION IS TO REMAIN AND NO WORK IN PROJECT SCOPE, PROTECT DURING CONSTRUCTION FROM DAMAGE AND DEBRIS. 2 CLEAN LINEAR DIFFUSER AND REINSTALL IN NEW CEILING GRID. SEE DETAIL 2 ON H901 FOR LINEAR SLOT DIFFUSER DETAIL. 3 EXHAUST GRILLE RELOCATED FROM DEMOLISHED PATIENT RESTROOM AND REINSTALL IN NEW CEILING GRID. BALANCE TO 80 CFM. 4 CLEAN RETURN AIR GRILLE AND REINSTALL IN NEW CEILING GRID. 5 BALANCE DIFFUSER TO 260 CFM. 6 BALANCE DIFFUSER TO 250 CFM. 7 REVISE AIRFLOW SETPOINTS FOR TERMINAL BOX VAV-47 TO MAXIMUM: 1000 CFM, MINIMUM: 500 CFM. 8 BALANCE DIFFUSER TO 130 CFM. 9 REVISE AIRFLOW SETPOINTS FOR TERMINAL BOX VAV-46 TO MAXIMUM: 520 CFM AND MINIMUM: 370 CFM. 10 BALANCE DIFFUSER TO 300 CFM. 11 BALANCE DIFFUSER TO 140 CFM. 12 EXISTING TEMPERATURE SENSOR TO REMAIN. VERIFY CONTROL TEMPERAURE SETPOINTS AND ADJUST TO HEATING SETPOINT: 70 DEG F AND COOLING SETPOINT TO 74 DEG F. SOME TEMPERATURE SENSORS WITHIN THE GI SUITE HAD DEFAULT TEMPERATURE TO 76 DEG F AND CONTROL SETPOINTS WILL NEED CORRECTED WITHIN THE SCOPE OF THIS PROJECT. 13 RELOCATE EXISTING TEMPERATURE SENSOR CONTROLLING TERMINAL BOX E-20. VERIFY CONTROL TEMPERATURE SETPOINTS AND ADJUST HEATING SETPOINT TO 70 DEG F AND COOLING SETPOINT TO 74 DEG F. 14 24"X8" TRANSFER DUCT ABOVE FINISHED CEILING. LINE TRANSFER DUCT WITH 3/4" ARMAFLEX INSULATION. SIZE NOTED IS FREE AREA IN TRANSFER DUCT. 15 SEE DETAIL 1 ON H901 FOR RETURN GRILLE WITH SOUND BOOT. 16 REVISE VAV-45 BOX AIRFLOWS, MAXIMUM: 600 CFM AND MINIMUM: 350 CFM. 17 VERIFY AIRFLOW SETPOINTS ON TERMINAL BOX VAV-48 MAXIMUM: 630 CFM, MINIMUM: 315 CFM. 18 VERIFY AIR FLOW SETPOINTS ON TERMINAL BOX E-20 HAS AIRFLOW SET TO CONSTANT VOLUME OF 240 CFM. 17 18 # Revision Description Date Issued 06/08/21