HomeMy WebLinkAboutP003 - Plumbing Specifications and SchedulesPLUMBING FIXTURE SCHEDULE
FIXTURE REFERENCE
MANUFACTURE REFERENCE MODEL WATER USAGE
CONNECTION SIZES
NOTES
WASTE VENT HOT
WATER
COLD
WATER
TEPID
WATER
WC-1 (FIXTURE)AMERICAN
STANDARD 3461.001 - 3" 2" - - -
AMERICAN DISABILITIES ACT (ADA)
INSTALL PER THE REQUIREMENTS OF THE ACCESSIBILITY
GUIDELINES
WC-1
(FLUSH VALVE)SLOAN 8111 1.6 GPM - - - 1" - -
PLUMBING SYSTEMS PIPING
PART 1 -GENERAL
1.1 SUMMARY
A. SECTION INCLUDES:
1. PLUMBING SYSTEMS TO BE INSTALLED AND UTILIZED FOR DOMESTIC WATER
SYSTEMS.
PART 2 -PRODUCTS
2.1 PIPING MATERIALS
A. POTABLE-WATER PIPING AND COMPONENTS SHALL COMPLY WITH NSF 14 AND NSF 61-
G. PLASTIC PIPING COMPONENTS SHALL BE MARKED WITH "NSF-PW.", WITH SOLDER
JOINTS.
2.2 COPPER TUBE AND FITTINGS -FOR DOMESTIC WATER SYSTEMS
A. HARD COPPER TUBE: ASTM B 88, TYPE L ASTM B 88M, TYPE B WATER TUBE, DRAWN
TEMPER.
B. SOLDER FILLER METALS: ASTM B 32, LEAD-FREE ALLOYS.
C. FLUX: ASTM B 813, WATER FLUSHABLE.
D. SAFETY VALVES: ASME BOILER AND PRESSURE VESSEL CODE: SECTION VIII,
"PRESSURE VESSELS," CONSTRUCTION; NATIONAL BOARD CERTIFIED, LABELED, AND
FACTORY SEALED
1. PRESSURE SETTINGS: HIGHER THAN DISCHARGE PRESSURE AND SAME OR
LOWER THAN RECEIVER PRESSURE RATING.
PART 3 -EXECUTION
3.1 PIPING INSTALLATION
A. ALL PLUMBING AND PIPING SYSTEMS SHALL BE INSTALLED PER THE LOCAL AND STATE
PLUMBING CODE, WITH NO EXCEPTIONS.
B. INSTALL COPPER TUBING ACCORDING TO CDA'S "COPPER TUBE HANDBOOK."
C. INSTALL ALL FIXTURES, DRAINS AND EQUIPMENT COMPLETE TO CREATE A COMPLETE
AND OPERATIONAL SYSTEM. THIS CONTRACTOR SHALL PROVIDE AND INSTALL ALL
MATERIALS AND ACCESSORIES AS REQUIRED AS PART OF THIS CONTRACT.
D WHEN INSTALLING PIPING ADJACENT TO EQUIPMENT AND MACHINES, ALLOW SPACE
FOR SERVICE AND MAINTENANCE.
E. CONNECT DOMESTIC WATER PIPING TO WATER-SERVICE PIPING WITH SHUTOFF
VALVE; EXTEND AND CONNECT TO THE FOLLOWING:
1. WATER HEATERS: COLD-WATER INLET AND HOT-WATER OUTLET PIPING IN SIZES
INDICATED, BUT NOT SMALLER THAN SIZES OF WATER HEATER CONNECTIONS.
3. PLUMBING FIXTURES: COLD-AND HOT-WATER-SUPPLY PIPING IN SIZES
INDICATED, BUT NOT SMALLER THAN THAT REQUIRED BY PLUMBING CODE.
4. EQUIPMENT: COLD-AND HOT-WATER-SUPPLY PIPING AS INDICATED,BUT NOT
SMALLER THAN EQUIPMENT CONNECTIONS. PROVIDE SHUTOFF VALVE AND UNION
FOR EACH CONNECTION. USE FLANGES INSTEAD OF UNIONS FOR NPS 2-1/2 AND
LARGER.
3.2 INDOOR PIPING INSULATION SCHEDULE
A. DOMESTIC HOT AND COLD WATER, PROCESS COLD AND PROCESS SOFT COLD WATER:
INSULATION SHALL BE ONE OF THE FOLLOWING:
1. REFER TO PLUMBING INSULATION SCHEDULE.
3.3 FIELD QUALITY CONTROL
A. PERFORM FIELD TESTS AND INSPECTIONS.
B. TESTS AND INSPECTIONS:
1. PIPING LEAK TESTS: TEST NEW AND MODIFIED PARTS OF EXISTING PIPING. CAP
AND FILL WITH WATER AT A PRESSURE OF 50 PSIG ABOVE SYSTEM OPERATING
PRESSURE, BUT NOT LESS GREATER THAN 125 PSIG. ISOLATE TEST SOURCE AND
LET STAND FOR THIRTY MINUTES; HOLD FOR TWO HOURS WITH NO DROP IN
PRESSURE.
2. REPAIR LEAKS AND RETEST UNTIL NO LEAKS EXIST.
4.1 CLEANING
A. CLEAN AND DISINFECT POTABLE DOMESTIC WATER PIPING AS FOLLOWS:
1. PURGE NEW PIPING AND PARTS OF EXISTING PIPING THAT HAVE BEEN ALTERED,
EXTENDED, OR REPAIRED BEFORE USING.
2. USE PURGING AND DISINFECTING PROCEDURES PRESCRIBED BY AUTHORITIES
HAVING JURISDICTION; IF METHODS ARE NOT PRESCRIBED, USE PROCEDURES
DESCRIBED IN EITHER AWWA C651 OR AWWA C652
B. SUBMIT WATER SAMPLES IN STERILE BOTTLES TO AUTHORITIES HAVING
JURISDICTION.
WET-PIPE SPRINKLER SYSTEM
PART 1 -GENERAL
1.1 SYSTEM DESCRIPTIONS
A. WET-PIPE SPRINKLER SYSTEM: AUTOMATIC SPRINKLERS ARE ATTACHED TO PIPING
CONTAINING WATER AND THAT IS CONNECTED TO WATER SUPPLY THROUGH ALARM
VALVE. WATER DISCHARGES IMMEDIATLEY FROM SPRINKLERS WHEN THEY ARE
OPENED. SPRINKLERS OPEN WHEN HEAT MELTS FUSIBLE LINK OR DESTROYS
FRANGIBLE DEVICE. HOSE CONNECTIONS ARE INCLUDED IF INDICATED.
B. DRY-PIPE SPRINKLER SYSTEM: AUTOMATIC SPRINKLERS ARE ATTACHED TO A DRY
PIPE FIRE SPRINKLER SYSTEM. THE DRY SYSTEM SHALL BE A UL LISTED, FM
APPROVED SYSTEM CONSISTING OF VALVE, AIR COMPRESSOR, TRIM, ACCESSORIES,
DETECTORS, AND ALL ASSOCIATED INTERCONNECTING WIRE.
1.2 PERFORMANCE REQUIREMENTS
A. STANDARD-PRESSURE PIPING SYSTEM COMPONENT: LISTED FOR THE EXISTING
MINIMUM WORKING PRESSURE OF THIS BUILDING.
B. DELEGATED DESIGN: DESIGN SPRINKLER SYSTEM(S), INCLUDING COMPREHENSIVE
ENGINEERING ANALYSIS BY A QUALIFIED PROFESSIONAL ENGINEER, USING
PERFORMANCE REQUIREMENTS AND DESIGN CRITERIA INDICATED.
C. CONTRACTOR SHALL PERFORM FIRE-HYDRANT FLOW TEST.
D. SPRINKLER SYSTEM DESIGN SHALL BE APPROVED BY AUTHORITIES HAVING
JURISDICTION.
E. SEISMIC PERFORMANCE: SPRINKLER PIPING SHALL WITHSTAND THE EFFECTS OF
EARTHQUAKE MOTIONS DETERMINED ACCORDING TO NFPA 13 AND ASCE/SEI 7.
1.3 ACTION SUBMITTALS
A. PRODUCT DATA: FOR EACH TYPE OF PRODUCT INDICATED.
B. SHOP DRAWINGS: FOR WET-PIPE SPRINKLER SYSTEMS. INCLUDE PLANS,
ELEVATIONS, SECTIONS, DETAILS, AND ATTACHMENTS TO OTHER WORK.
1. WIRING DIAGRAMS: FOR POWER, SIGNAL, AND CONTROL WIRING.
2. DELEGATED-DESIGN SUBMITTAL: FOR SPRINKLER SYSTEMS INDICATED TO
COMPLY WITH PERFORMANCE REQUIREMENTS AND DESIGN CRITERIA, INCLUDING
ANALYSIS DATA SIGNED AND SEALED BY THE QUALIFIED PROFESSIONAL
ENGINEER RESPONSIBLE FOR THEIR PREPARATION.
1.4 INFORMATIONAL SUBMITTALS
A. APPROVED SPRINKLER PIPING DRAWINGS: WORKING PLANS, PREPARED ACCORDING
TO NFPA 13, THAT HAVE BEEN APPROVED BY AUTHORITIES HAVING JURISDICTION,
INCLUDING HYDRAULIC CALCULATIONS IF APPLICABLE.
B. FIELD TEST REPORTS AND CERTIFICATES: INDICATE AND INTERPRET TEST RESULTS
FOR COMPLIANCE WITH PERFORMANCE REQUIREMENTS AND AS DESCRIBED IN NFPA
13. INCLUDING "CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR
ABOVEGROUND PIPING."
1.5 CLOSEOUT SUBMITTALS
A. OPERATION AND MAINTENANCE DATA.
1.6 QUALITY ASSURANCE
A. INSTALLER QUALIFICATIONS:
1. INSTALLER'S RESPONSIBILITIES INCLUDE DESIGNING, FABRICATING, AND
INSTALLING SPRINKLER SYSTEM AND PROVIDING PROFESSIONAL ENGINEERING
SERVICES NEEDED TO ASSUME ENGINEERING RESPONSIBILITY. BASE
CALCULATIONS ON RESULTS OF FIRE-HYDRANT FLOW TEST.
a. ENGINEERING RESPONSIBILITY: PREPARATION OF WORKING PLANS,
CALCULATIONS, AND FIELD TEST REPORTS BY A QUALIFIED PROFESSIONAL
ENGINEER.
B. ELECTRICAL COMPONENTS, DEVICES, AND ACCESSORIES: LISTED AND LABELED AS
DEFINED IN NFPA 70, BY A QUALIFIED TESTING AGENCY, AND MARKED FOR INTENDED
LOCATION AND APPLICATION.
C. NFPA STANDARDS: SPRINLER SYSTEM EQUIPMENT, SPECIALTIES, ACCESSORIES,
INSTALLATION, AND TESTING SHALL COMPLY WITH THE FOLLOWING:
1. NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS."
PART 2 -PRODUCTS
2.1 PIPING MATERIALS
A. COMPLY WITH ALL NFPA, STATE AND LOCAL REQUIREMENTS.
2.2 SPRINKLERS
A. GENERAL REQUIREMENTS:
1. STANDARD: UL'S "FIRE PROTECTION EQUIPMENT DIRECTORY" LISTING OR
"APPROVED GUIDE," PUBLISHED BY FM GLOBAL, LISTING.
2. PRESSURE RATING FOR AUTOMATIC SPRINKLERS: 175 PSIG MINIMUM.
3. PRESSURE RATING FOR HIGH-PRESSURE AUTOMATIC SPRINKLER: 250 PSIG.
PART 3 -EXECUTION
3.1 PIPING INSTALLATION
A. LOCATIONS AND ARRANGEMENTS: DRAWING PLANS, SCHEMATICS, AND DIAGRAMS
INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING. INSTALL PIPING AS
INDICATED, AS FAR AS PRACTICAL.
B. PIPING STANDARD: COMPLY WITH REQUIREMENTS FOR INSTALLATION OF SPRINKLER
PIPING IN NFPA 13.
C. INSTALL SEISMIC RESTRAINTS ON PIPING. COMPLY WITH REQUIREMENTS FOR
SEISMIC-RESTRAINT DEVICE MATERIALS AND INSTALLATION IN NFPA 13.
D. INSTALL SPRINKLER SYSTEMS PER NFPA, STATE AND LOCAL CODES.
3.2 PIPING INSTALLATION
A. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND
ARRANGEMENT OF PIPING SYSTEMS. INSTALL PIPING AS INDICATED UNLESS
DEVIATIONS TO LAYOUT ARE REQUIRED BY BUILDING CONSTRUCTION. INDICATE
DEVIATIONS ON COORDINATION DRAWINGS. SUBMIT AS-BUILT DRAWINGS TO BUILDING
OWNER PRIOR TO CERTIFICATE OF OCCUPANCY.
B. INSTALL PIPING IN CONCEALED LOCATIONS UNLESS OTHERWISE INDICATED AND
EXCEPT IN EQUIPMENT ROOMS AND SERVICE AREAS.
C. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND
SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL
RUNS ARE PROHIBITED UNLESS SPECIFICALLY INDICATED OTHERWISE.
D. INSTALL PIPING ABOVE ACCESSIBLE CEILINGS TO ALLOW SUFFICIENT SPACE FOR
CEILING PANEL REMOVAL.
E. INSTALL PIPING TO PERMIT VALVE SERVICING.
F. INSTALL PIPING AT INDICATED SLOPES.
G. INSTALL PIPING FREE OF SAGS AND BENDS.
H. INSTALL FITTINGS FOR CHANGES IN DIRECTION AND BRANCH CONNECTIONS.
I. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
J. MAKE CHANGES IN DIRECTION FOR SOIL AND WASTE DRAINAGE AND VENT PIPING
USING APPROPRIATE BRANCHES, BENDS, AND LONG-SWEEP BENDS. SANITARY TEES
AND SHORT-SWEEP 1/4 BENDS MAY BE USED ON VERTICAL STACKS IF CHANGE IN
DIRECTION OF FLOW IS FROM HORIZONTAL TO VERTICAL. USE LONG-TURN, DOUBLE Y-
BRANCH AND 1/8-BEND FITTINGS IF TWO FIXTURES ARE INSTALLED BACK TO BACK OR
SIDE BY SIDE WITH COMMON DRAIN PIPE. STRAIGHT TEES, ELBOWS, AND CROSSES
MAY BE USED ON VENT LINES. DO NOT CHANGE DIRECTION OF FLOW MORE THAN 90
DEGREES. USE PROPER SIZE OF STANDARD INCREASERS AND REDUCERS IF PIPES OF
DIFFERENT SIZES ARE CONNECTED. REDUCING SIZE OF DRAINAGE PIPING IN
DIRECTION OF FLOW IS PROHIBITED.
K. LAY BURIED BUILDING DRAINAGE PIPING BEGINNING AT LOW POINT OF EACH SYSTEM.
INSTALL TRUE TO GRADES AND ALIGNMENT INDICATED, WITH UNBROKEN CONTINUITY
OF INVERT. PLACE HUB ENDS OF PIPING UPSTREAM. INSTALL REQUIRED GASKETS
ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS FOR USE OF LUBRICANTS,
CEMENTS, AND OTHER INSTALLATION REQUIREMENTS. MAINTAIN SWAB IN PIPING AND
PULL PAST EACH JOINT AS COMPLETED.
L. INSTALL SOIL AND WASTE DRAINAGE AND VENT PIPING AT THE FOLLOWING MINIMUM
SLOPES UNLESS OTHERWISE INDICATED:
1. BUILDING SANITARY DRAIN: 2 PERCENT DOWNWARD IN DIRECTION OF FLOW FOR
PIPING NPS 3 AND SMALLER; DOWNWARD IN DIRECTION OF FLOW FOR PIPING
NPS 4 AND LARGER.
2. HORIZONTAL SANITARY DRAINAGE PIPING: 2 PERCENT DOWNWARD IN DIRECTION
OF FLOW.
3. VENT PIPING: 1 PERCENT DOWN TOWARD VERTICAL FIXTURE VENT OR TOWARD
VENT STACK.
M. INSTALL CAST-IRON SOIL PIPING ACCORDING TO CISPI'S "CAST IRON SOIL PIPE AND
FITTINGS HANDBOOK," CHAPTER IV, "INSTALLATION OF CAST IRON SOIL PIPE AND
FITTINGS."
1. INSTALL ENCASEMENT ON UNDERGROUND PIPING ACCORDING TO ASTM A 674 OR
AWWA C105/A21.5
O. INSTALL ABOVEGROUND PVC PIPING ACCORDING TO ASTM D 2665.
P. INSTALL UNDERGROUND PVC PIPING ACCORDING TO ASTM D 2321.
Q. DO NOT ENCLOSE, COVER, OR PUT PIPING INTO OPERATION UNTIL IT IS INSPECTED
AND APPROVED BY AUTHORITIES HAVING JURISDICTION.
R. INSTALL SLEEVES FOR PIPING PENETRATIONS OF WALLS, CEILINGS, AND FLOORS.
COMPLY WITH REQUIREMENTS FOR SLEEVES SPECIFIED IN DIVISION 22 SECTION
"SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING."
S. INSTALL SLEEVE SEALS FOR PIPING PENETRATIONS OF CONCRETE WALLS AND SLABS.
COMPLY WITH REQUIREMENTS FOR SLEEVE SEALS SPECIFIED IN DIVISION 22 SECTION
"SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING." INSTALL ESCUTCHEONS FOR
PIPING PENETRATIONS OF WALLS,.
3.7 FIELD QUALITY CONTROL
A. DURING INSTALLATION, NOTIFY AUTHORITIES HAVING JURISDICTION AT LEAST 24
HOURS BEFORE INSPECTION MUST BE MADE. PERFORM TESTS SPECIFIED BELOW IN
PRESENCE OF AUTHORITIES HAVING JURISDICTION.
1. ROUGHING-IN INSPECTION: ARRANGE FOR INSPECTION OF PIPING BEFORE
CONCEALING OR CLOSING-IN AFTER ROUGHING-IN AND BEFORE SETTING
FIXTURES.
2. FINAL INSPECTION: ARRANGE FOR FINAL INSPECTION BY AUTHORITIES HAVING
JURISDICTION TO OBSERVE TESTS SPECIFIED BELOW AND TO ENSURE
COMPLIANCE WITH REQUIREMENTS.
B. REINSPECTION: IF AUTHORITIES HAVING JURISDICTION FIND THAT PIPING WILL NOT
PASS TEST OR INSPECTION, MAKE REQUIRED CORRECTIONS AND ARRANGE FOR
REINSPECTION.
C. REPORTS: PREPARE INSPECTION REPORTS AND HAVE THEM SIGNED BY AUTHORITIES
HAVING JURISDICTION.
D. TEST SANITARY DRAINAGE AND VENT PIPING ACCORDING TO PROCEDURES OF
AUTHORITIES HAVING JURISDICTION. OR, IN ABSENCE OF PUBLISHED PROCEDURES,
AS FOLLOWS:
1. TEST FOR LEAKS AND DEFECTS IN NEW PIPING AND PARTS OF EXISTING PIPING
THAT HAVE BEEN ALTERED, EXTENDED, OR REPAIRED. IF TESTING IS PERFORMED
IN SEGMENTS, SUBMIT SEPARATE REPORT FOR EACH TEST, COMPLETE WITH
DIAGRAM OF PORTION OF PIPING TESTED.
2. LEAVE UNCOVERED AND UNCONCEALED NEW, ALTERED, EXTENDED, OR
REPLACED DRAINAGE AND VENT PIPING UNTIL IT HAS BEEN TESTED AND
APPROVED. EXPOSE WORK THAT WAS COVERED OR CONCEALED BEFORE IT WAS
TESTED.
3. ROUGHING-IN PLUMBING TEST PROCEDURE: TEST DRAINAGE AND VENT PIPING
EXCEPT OUTSIDE LEADERS ON COMPLETION OF ROUGHING-IN. CLOSE OPENINGS
IN PIPING SYSTEM AND FILL WITH WATER TO POINT OF OVERFLOW, BUT NOT LESS
THAN 10-FOOT HEAD OF WATER. FROM 15 MINUTES BEFORE INSPECTION STARTS
TO COMPLETION OF INSPECTION, WATER LEVEL MUST NOT DROP. INSPECT
JOINTS FOR LEAKS.
4. FINISHED PLUMBING TEST PROCEDURE: AFTER PLUMBING FIXTURES HAVE BEEN
SET AND TRAPS FILLED WITH WATER, TEST CONNECTIONS AND PROVE THEY ARE
GASTIGHT AND WATERTIGHT. PLUG VENT-STACK OPENINGS ON ROOF AND
BUILDING DRAINS WHERE THEY LEAVE BUILDING. INTRODUCE AIR INTO PIPING
SYSTEM EQUAL TO PRESSURE OF 1-INCH WG. USE U-TUBE OR MANOMETER
INSERTED IN TRAP OF WATER CLOSET TO MEASURE THIS PRESSURE. AIR
PRESSURE MUST REMAIN CONSTANT WITHOUT INTRODUCING ADDITIONAL AIR
THROUGHOUT PERIOD OF INSPECTION. INSPECT PLUMBING FIXTURE
CONNECTIONS FOR GAS AND WATER LEAKS.
5. REPAIR LEAKS AND DEFECTS WITH NEW MATERIALS AND RETEST PIPING, OR
PORTION THEREOF, UNTIL SATISFACTORY RESULTS ARE OBTAINED.
6. PREPARE REPORTS FOR TESTS AND REQUIRED CORRECTIVE ACTION.
3.8 CLEANING AND PROTECTION
A. CLEAN INTERIOR OF PIPING. REMOVE DIRT AND DEBRIS AS WORK PROGRESSES.
B. PROTECT DRAINS DURING REMAINDER OF CONSTRUCTION PERIOD TO AVOID
CLOGGING WITH DIRT AND DEBRIS AND TO PREVENT DAMAGE FROM TRAFFIC AND
CONSTRUCTION WORK.
C. PLACE PLUGS IN ENDS OF UNCOMPLETED PIPING AT END OF DAY AND WHEN WORK
STOPS.
SANITARY WASTE AND VENT SYSTEMS PIPING
PART 1 -GENERAL
1.1 SUMMARY
A. SECTION INCLUDES:
1. PLUMBING SYSTEMS TO BE INSTALLED AND UTILIZED FOR SANITARY WASTE AND
VENT AND STORM WATER DRAINAGE SYSTEMS.
1.2 PERFORMANCE REQUIREMENTS
A. COMPONENTS AND INSTALLATION SHALL BE CAPABLE OF WITHSTANDING THE
FOLLOWING MINIMUM WORKING PRESSURE UNLESS OTHERWISE INDICATED:
1. SOIL, WASTE, AND VENT PIPING: 10-FOOT HEAD OF WATER
1.3 QUALITY ASSURANCE
A. PIPING MATERIALS SHALL BEAR LABEL, STAMP, OR OTHER MARKINGS OF SPECIFIED
TESTING AGENCY.
B. COMPLY WITH NSF/ANSI 14, "PLASTICS PIPING SYSTEMS COMPONENTS AND RELATED
MATERIALS," FOR PLASTIC PIPING COMPONENTS. INCLUDE MARKING WITH "NSF-DWV"
FOR PLASTIC DRAIN, WASTE, AND VENT PIPING AND "NSF-SEWER" FOR PLASTIC SEWER
PIPING.
PART 2 -PRODUCTS
2.1 HUB-AND-SPIGOT, CAST-IRON SOIL PIPE AND FITTINGS
A. PIPE AND FITTINGS: ASTM A 74, SERVICE CLASS.
B. GASKETS: ASTM C 564, RUBBER.
2.2 HUBLESS, CAST-IRON SOIL PIPE AND FITTINGS
A. PIPE AND FITTINGS: ASTM A 888 OR CISPI 301.
B. CISPI, HUBLESS-PIPING COUPLINGS:
1. STANDARDS: ASTM C 1277 AND CISPI 310.
2. DESCRIPTION: STAINLESS-STEEL CORRUGATED SHIELD WITH STAINLESS-STEEL
BANDS AND TIGHTENING DEVICES; AND ASTM C 564, RUBBER SLEEVE WITH
INTEGRAL, CENTER PIPE STOP.
2.4 PVC PIPE AND FITTINGS
A. SOLID-WALL PVC PIPE: ASTM D 2665, DRAIN, WASTE, AND VENT.
B. CELLULAR-CORE PVC PIPE: ASTM F 891, SCHEDULE 40.
C. PVC SOCKET FITTINGS: ASTM D 2665, MADE TO ASTM D 3311, DRAIN, WASTE, AND VENT
PATTERNS AND TO FIT SCHEDULE 40 PIPE.
D. ADHESIVE PRIMER: ASTM F 656.
2.5 ENCASEMENT FOR UNDERGROUND METAL PIPING
A. STANDARD: ASTM A 674 OR AWWA C105/A 21.5.
PART 3 -EXECUTION
3.1 EARTH MOVING
A. COMPLY WITH REQUIREMENTS FOR EXCAVATING, TRENCHING, AND BACKFILLING
SPECIFIED IN DIVISION 31 SECTION "EARTH MOVING."
3.3 JOINT CONSTRUCTION
A. JOIN HUBLESS, CAST-IRON SOIL PIPING ACCORDING TO CISPI 310 AND CISPI'S "CAST
IRON SOIL PIPE AND FITTINGS HANDBOOK" FOR HUBLESS-PIPING COUPLING JOINTS.
C. PLASTIC, NONPRESSURE-PIPING, SOLVENT-CEMENT JOINTS: CLEAN AND DRY JOINING
SURFACES. JOIN PIPE AND FITTINGS ACCORDING TO THE FOLLOWING:
1. COMPLY WITH ASTM F 402 FOR SAFE-HANDLING PRACTICE OF CLEANERS,
PRIMERS, AND SOLVENT CEMENTS.
2. PVC PIPING: JOIN ACCORDING TO ASTM D 2855 AND ASTM D 2665 APPENDIXES.
3.4 HANGER AND SUPPORT INSTALLATION
A. COMPLY WITH REQUIREMENTS FOR PIPE HANGER AND SUPPORT DEVICES AND
INSTALLATION SPECIFIED IN DIVISION 22 SECTION "HANGERS AND SUPPORTS FOR
PLUMBING PIPING AND EQUIPMENT."
1. INSTALL CARBON-STEEL PIPE HANGERS FOR HORIZONTAL PIPING IN
NONCORROSIVE ENVIRONMENTS.
2. INSTALL CARBON-STEEL PIPE SUPPORT CLAMPS FOR VERTICAL PIPING IN
NONCORROSIVE ENVIRONMENTS.
3. VERTICAL PIPING: MSS TYPE 8 OR TYPE 42, CLAMPS.
4. INSTALL INDIVIDUAL, STRAIGHT, HORIZONTAL PIPING RUNS:
A. 100 FEET AND LESS: MSS TYPE 1, ADJUSTABLE, STEEL CLEVIS HANGERS.
B. LONGER THAN 100 FEET: MSS TYPE 43, ADJUSTABLE ROLLER HANGERS.
B. SUPPORT VERTICAL PIPING AND TUBING AT BASE AND AT EACH FLOOR.
C. ROD DIAMETER MAY BE REDUCED ONE SIZE FOR DOUBLE-ROD HANGERS,
WITH 3/8-INCH MINIMUM RODS.
B. INSTALL HANGERS FOR CAST-IRON SOIL PIPING WITH THE FOLLOWING MAXIMUM
HORIZONTAL SPACING AND MINIMUM ROD DIAMETERS:
1. NPS 1-1/2 AND NPS 2: 60 INCHES WITH 3/8-INCH ROD.
2. NPS 3: 60 INCHES WITH 1/2-INCH ROD.
3. NPS 4 AND NPS 5: 60 INCHES WITH 5/8-INCH ROD.
C. INSTALL SUPPORTS FOR VERTICAL CAST-IRON SOIL PIPING EVERY 15 FEET.
D. INSTALL HANGERS FOR PVC PIPING WITH THE FOLLOWING MAXIMUM HORIZONTAL
SPACING AND MINIMUM ROD DIAMETERS:
1. NPS 1-1/2 AND NPS 2: 48 INCHES WITH 3/8-INCH ROD.
2. NPS 3: 48 INCHES WITH 1/2-INCH ROD.
3. NPS 4: 48 INCHES WITH 5/8-INCH ROD.
E. INSTALL SUPPORTS FOR VERTICAL PVC PIPING EVERY 48 INCHES.
F. SUPPORT PIPING AND TUBING NOT LISTED ABOVE ACCORDING TO MSS SP-69 AND
MANUFACTURER'S WRITTEN INSTRUCTIONS.
3.5 CONNECTIONS
A CONNECT DRAINAGE AND VENT PIPING TO THE FOLLOWING:
1. PLUMBING FIXTURES: CONNECT DRAINAGE PIPING IN SIZES INDICATED, BUT NOT
SMALLER THAN REQUIRED BY PLUMBING CODE.
2. PLUMBING FIXTURES AND EQUIPMENT: CONNECT ATMOSPHERIC VENT PIPING IN
SIZES INDICATED, BUT NOT SMALLER THAN REQUIRED BY AUTHORITIES HAVING
JURISDICTION.
3. PLUMBING SPECIALTIES: CONNECT DRAINAGE AND VENT PIPING IN SIZES
INDICATED, BUT NOT SMALLER THAN REQUIRED BY PLUMBING CODE.
4. INSTALL TEST TEES (WALL CLEANOUTS) IN CONDUCTORS NEAR FLOOR AND
FLOOR CLEANOUTS WITH COVER FLUSH WITH FLOOR.
3.6 IDENTIFICATION
A. IDENTIFY EXPOSED SANITARY WASTE AND VENT PIPING. COMPLY WITH
REQUIREMENTS FOR IDENTIFICATION SPECIFIED IN DIVISION 22 SECTION
"IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT."
3.2 FIELD QUALITY CONTROL
A. PERFORM TESTS AND INSPECTIONS PER NFPA, STATE AND LOCAL REQUIRMENTS.
3.3 SPRINKLER SCHEDULE
A. USE SPRINKLER TYPES PER NFPA REQUIREMENTS.
B. PROVIDE SPRINKLER TYPES IN SUBPARAGRAPHS BELOW WITH FINISHES
INDICATED.
1. CONCEALED SPRINKLERS: ROUGH BRASS, WITH FACTORY-PAINTED COVER
PLATE TO MATCH THE ADJACENT SURFACE, REFER TO THE ARCHITECTURAL AND
OR INTERIOR FINISH PLANS.
2. FLUSH SPRINKLERS: BRIGHT CHROME, WITH PAINTED WHITE ESCUTCHEON.
3. RECESSED SPRINKLERS: BRIGHT CHROME, WITH BRIGHT CHROME
ESCUTCHEON.
4. UPRIGHT, PENDENT AND SIDEWALL SPRINKLERS: CHROME PLATED IN FINISHED
SPACES EXPOSED TO VIEW; ROUGH BRONZE IN UNFINISHED SPACES NOT
EXPOSED TO VIEW; WAX COATED WHERE EXPOSED TO ACIDS, CHEMICALS, OR
OTHER CORROSIVE FUMES.
B. USE SPRINKLER TYPES IN SUBPARAGRAPHS BELOW FOR THE FOLLOWING
APPLICATIONS:
1. ROOMS WITHOUT CEILINGS: UPRIGHT SPRINKLERS.
2. ROOMS WITH SUSPENDED CEILINGS: CONCEALED SPRINKLERS.
3. WALL MOUNTING: SIDEWALL SPRINKLERS.
4. SPACES SUBJECT TO FREEZING: SIDEWALL, DRY SPRINKLERS.
5. SPECIAL APPLICATIONS: EXTENDED-COVERAGE, FLOW-CONTROL, AND QUICK-
RESPONSE SPRINKLERS WHERE INDICATED.
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
Plumbing
Specifications
and Schedules
P00310300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290# Revision Description
Date
Issued
06/08/21