HomeMy WebLinkAboutSpringmill Suite1200 - Combined Setwww.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
COVER SHEET 10300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290DRAWING LIST
# Sheet Name
ARCHITECTURE
A000 COVER SHEET
A001 INFORMATION SHEET
A002 ACCESSIBILITY GUIDELINES
A003 GENERAL SPECIFICATIONS
A004 LIFE SAFETY PLAN
A050 DEMOLITION PLAN
A100 FLOOR PLAN
A120 REFLECTED CEILING PLAN
A600 INTERIOR ELEVATIONS
A702 CASEWORK DETAILS
VICINITY MAPPROJECT TEAM
PROJECT LOCATION
10300 N. Illinois St
Indianapolis, IN 46290
IU HEALTH SPRINGMILL
CONSTRUCTION DOCUMENTS
705 Riley Hospital Dr,
Indianapolis, IN 46202
Contact: CHARLENE WILDER
Email: cwilder1@iuhealth.org
Phone: 317.962.4698
Owner:
RILEY HOSPITAL FOR CHILDREN
INDIANAPOLIS, IN 46250
8604 ALLISONVILLE ROAD, SUITE 330
Contact: HEATHER LESLIE
Email: hleslie@studio3design.net
Phone: (317) 595.1000
Architect:
STUDIO 3 DESIGN, INC.
91 S MAIN ST #200
ZIONSVILLE, IN 46077
Contact: WILLIAM MALTBY
Email: wmaltby@genesis-engineering.com
Phone: 317.847.7480
Engineer:
GENESIS ENGINEERING GROUP
1850 WEST 15TH STREET
INDIANAPOLIS, IN 46202
Contact: NATE LAGRANGE
Email: NLAGRANGE@PEPPERCONSTRUCTION.COM
Phone: (317) 775.9527
General Contractor:
PEPPER CONSTRUCTION
# Revision Description
Date
Issued
MECHANICAL
H001 MECHANICAL SYMBOLS AND GENERAL NOTES
H002 HVAC SPECIFICATIONS
H003 HVAC SPECIFICATIONS
H004 HVAC SPECIFICATIONS
H101 FIRST FLOOR HVAC PLANS
H801 HVAC SCHEDULES AND DETAILS
PLUMBING
P001 PLUMBING SYMBOLS AND GENERAL NOTES
P003 PLUMBING SPECIFICATIONS AND SCHEDULES
P100 PLUMBING LOBBY PLANS
P101 FIRST FLOOR PLUMBING PLANS
ELECTRICAL
E001 ELECTRICAL SYMBOLS AND GENERAL NOTES
E002 ELECTRICAL SPECIFICATIONS
E101 FIRST FLOOR ELECTRICAL PLANS
E801 ELECTRICAL SCHEDULES AND DETAILS
06/08/21
BUILDING / EXTERIOR ELEVATION REFERENCE
ELEVATION REF.
SHEET REF.
WINDOW REFERENCE
A
ELEVATION OR WORK POINT
?NORTH
ORIENTATION REFERENCE
DOOR SYMBOL
?
?ROOM IDENTIFICATION
WALL TYPE
1 PLAN KEY NOTE
DEMOLITION PLAN KEY NOTE
NEW DOOR / RELOCATED DOOR
EXISTING DOOR
DEMO DOOR / WALL DEMO
EXISTING WALL
NEW WALL
EXISTING WALL TO BE REMOVED
PARTIAL HEIGHT WALL
5C
A600
DETAIL REFERENCE
1
A
1E
A200
3E
A600 INTERIOR ELEVATION REFERENCE
ELEVATION REF.
SHEET REF.
NEW WALL IN RENOVATION PROJECT
SECTION REFERENCE
ELEVATION REF.
SHEET REF.
1E
A200
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
INFORMATION
SHEET 10300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290GENERAL PROJECT NOTES
CONTRACTOR'S RESPONSIBILITIES:
1. SHOULD THERE BE ANY QUESTIONS REGARDING THE CONTRACT DOCUMENTS, EXISTING CONDITIONS, AND/OR DESIGN INTENT, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR OBTAINING A CLARIFICATION FROM THE ARCHITECT PRIOR TO BID SUBMITTAL PRIOR TO PROCEEDING WITH ANY WORK, OR RELATED WORK IN
QUESTION.
2. THESE CONTRACT DOCUMENTS ARE INTENDED TO DESCRIBE ONLY THE SCOPE AND APPEARANCE OF THE REAL PROPERTY IMPROVEMENTS, INCLUDING THE
PERFORMANCE AND LEVEL OF QUALITY EXPECTED OF ITS COMPONENTS. IT IS INCUMBENT UPON THE CONTRACTOR TO INSURE THAT ALL WORK COMPLETED AND
MATERIALS INSTALLED BE IN FULL COMPLIANCE, AS A MINIMUM STANDARDS, WITH ALL APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING JURISDICTION.
3. THESE CONTRACT DOCUMENTS DO NOT ATTEMPT TO INSTRUCT THE CONTRACTOR IN THE DETAILS OF HIS TRADE. THEY ARE PERFORMANCE SPECIFICATIONS IN
THAT THEY DO REQUIRE THAT ALL MANUFACTURED ITEMS, MATERIALS AND EQUIPMENT BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDED SPECIFICATIONS, EXCEPT IN THE CASE WHERE THE CONTRACT DOCUMENTS ARE MORE STRINGENT. ANY MISCELLANEOUS ITEMS OR MATERIALS
NOT SPECIFICALLY NOTED, BUT REQUIRED FOR PROPER INSTALLATION SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR(S) RESPONSIBLE FOR THE
AFFECTED PORTION OF WORK.
4. ALL WORK SHALL BE WARRANTED SATISFACTORY, IN MATERIALS AND WORKMANSHIP, FOR A MINIMUM PERIOD OF ONE (1) YEAR, OR FOR THE PERIOD OF WARRANTY
CUSTOMARY, OR STIPULATED FOR, THE TRADE, CRAFT, OR PRODUCT, WHICHEVER IS LONGER. THEREFORE, ONLY COMPETENT MECHANICS CAPABLE OF
PRODUCING GOOD WORKMANSHIP CUSTOMARY TO THE TRADE SHALL BE USED.
5. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER, OR THE AUTHORIZED, AGENT, TO DETERMINE ALL EXISTING MATERIALS TO BE SALVAGED AND RETAINED
BY THE OWNER. THE CONTRACTOR SHALL REMOVE SALVAGEABLE MATERIALS FROM THE SPACE AND STORE IN A LOCATION AS DIRECTED BY THE OWNER. ALL
OTHER MATERIALS, RUBBISH, AND DEBRIS, SHALL BE REMOVED AND PROMPTLY DISPOSED OF BY THE CONTRACTOR AT AN OFFSITE LOCATION. THE CONTRACTOR
SHALL TAKE ALL NECESSARY PRECAUTIONS TO ASSURE THAT ALL PROPERTY IMPROVEMENTS (I.E. PARTITIONS, DOORS, FRAMES, CABINETS, CEILING GRID, CEILING
TILE, AND THE ELECTRICAL AND MECHANICAL DEVICES, ETC.) WHICH ARE TO REMAIN, ARE PROTECTED FROM DAMAGE OF ANY KIND.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING WORK WHICH IS TO REMAIN, AND DETERMINING WHETHER OR NOT IT CAN BE
REPAIRED AND/OR RECONDITIONED TO MATCH AND BLEND WITH NEW MATERIALS AND COMPONENTS. THEY SHALL OBTAIN THE OWNER'S APPROVAL OF THE SCOPE
AND LIMIT OF SAID WORK PRIOR TO STARTING CONSTRUCTION AND RECOMMEND AN ALLOWANCE IF NECESSARY. NO CHANGE ORDERS SHALL BE ACCEPTED FOR
COMPLETED WORK THAT DOES NOT CONFORM TO THE STANDARDS ESTABLISHED AT THE TIME OF BID ACCEPTANCE.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING HIMSELF WITH THE PROJECT SCOPE OF WORK, BUILDING STANDARDS, SCHEDULE AND DEADLINES.
THE CONTRACTOR SHALL FURTHER BE RESPONSIBLE FOR ADVISING THE OWNER OF ALL LONG LEAD TIME ITEMS AFFECTING THE PROJECT SCHEDULE AND SHALL,
UPON REQUEST FROM THE OWNER, SUBMIT ORDER CONFIRMATIONS AND DELIVERY DATES FOR SUCH LONG LEAD TIME ITEMS TO THE OWNER.
8. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER ACCESS TO THE SPACE AND THE ONGOING CONSTRUCTION WORK. DISRUPTIVE OR
POTENTIALLY HAZARDOUS CONSTRUCTION ACTIVITIES OCCURRING WITHIN OR ADJACENT TO OCCUPIED SPACE SHALL BE COORDINATED TO OCCUR AFTER NORMAL
OFFICE HOURS, SO AS TO MINIMIZE DISTURBANCE TO BUILDING OCCUPANTS.
9. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER FOR DELIVERY TO THE SPACE OF ALL BUILDING MATERIALS, AND SHALL ARRANGE FOR USAGE
OF THE FREIGHT ELEVATOR (OR SUCH ELEVATOR DESIGNATED IF APPLICABLE). IF DELIVERY OF BUILDING MATERIALS INVOLVES THE USE OF OTHER FACILITIES, THE
CONTRACTOR SHALL COORDINATE SUCH ACTIVITIES IN SUCH A MANNER WHICH POSES NO HAZARD TO ANY PERSONNEL WITHIN OR AROUND THE BUILDING OR
BUILDING SITE.
10. ALL CONTRACTOR OR SUPPLIER REQUESTS FOR SUBSTITUTIONS OF SPECIFIED ITEMS SHALL BE SUBMITTED IN WRITING ACCOMPANIED BY THE ALTERNATIVE
PRODUCT INFORMATION TO THE ARCHITECT. ALL SUBSTITUTIONS SHALL BE SUBMITTED TO THE ARCHITECT, NO LATER THAN (10) WORKING DAYS PRIOR TO BID
OPENING DATE. SUBSTITUTIONS SHALL ONLY BE CONSIDERED IF THEY DO NOT SACRIFICE QUALITY, APPEARANCE, AND FUNCTION. UNDER NO CIRCUMSTANCES
WILL THE OWNER BE REQUIRED TO PROVE THAT A PRODUCT PROPOSED FOR SUBSTITUTION IS OR IS NOT EQUAL QUALITY TO THE PRODUCT SPECIFIED.
11. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR SCALE THE DRAWINGS TO DETERMINE THE DIMENSIONS. SEE FLOOR PLAN FOR DIMENSION LOCATIONS.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF ALL SELECTED MATERIALS WHICH SHALL BE COMPLETE IN ALL RESPECTS PRIOR TO THE
FINAL ACCEPTANCE, UNLESS OTHERWISE NOTED.
13. THE CONTRACTOR SHALL BE PRESERVE ALL PRINTED INSTRUCTIONS AND WARRANTIES THAT ARE PROVIDED WITH EQUIPMENT OR MATERIALS USED, AND DELIVER
SAID IN PRINTED MANNER TO THE OWNER AT THE TIME(S) DESIGNATED FOR O & M MANUAL DISBURSEMENTS. THE CONTRACTOR SHALL INSTRUCT THE OWNER OR
OWNERS REPRESENTATIVE IN THE PROPER USE OF THE EQUIPMENT FURNISHED BY THEIR TRADE.
14. GENERAL CONTRACTOR IS TO PROVIDE A THOROUGH CONSTRUCTION CLEAN-UP AT CLOSE-OUT, INCLUDING VACUUMING AND CLEANING ALL CARPETING.
15. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF CUSTOM MILLWORK, CUSTOM FABRICATION OR MANUFACTURE, AND PHYSICAL SAMPLES OF ALL FINISH
MATERIALS SPECIFIED TO THE ARCHITECT FOR REVIEW AND APPROVAL BY THE OWNER. SEE SPECIFICATIONS.
16. REVIEWED SHOP DRAWINGS AND SCHEDULES PREPARED BY OTHERS SHALL NOT BE CONSTRUED TO BE PART OF THE CONTRACT DOCUMENTS, AS THE ARCHITECT
ASSUMES NO RESPONSIBILITY FOR DRAWINGS, SCHEDULES, AND/OR SPECIFICATIONS FOR WORK ON THE PROJECT PREPARED OR ACCOMPLISHED BY OTHERS.
17. THE ARCHITECT WILL REVIEW THE DRAWINGS AND SAMPLES SUBMITTED BY THE CONTRACTOR (FOLLOWING A REVIEW BY THE GENERAL CONTRACTOR) FOR
CONFORMITY WITH THE INFORMATION CONTAINED IN THE CONSTRUCTION DOCUMENTS.
18. CONTRACTOR TO FOLLOW ALL BUILDING STANDARDS, INTERIM LIFE SAFETY MEASURES AND COORDINATE SCHEDULING OF WORK WITH AFFECTED OCCUPANTS (IF
APPLICABLE) PRIOR TO STARTING.
19. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS AND NOTIFY ARCHITECT, IN WRITING, OF ALL DISCREPANCIES. CONTRACTOR TO
REVIEW AND RECORD EXISTING CEILING FIELD CONDITIONS, LIGHT FIXTURE AND MEP SUPPLY/RETURN LOCATIONS, SPRINKLER HEADS, AND ALL OTHER CEILING
ITEMS LOCATIONS PRIOR TO CONSTRUCTION. DISCREPANCIES IN THIS INFORMATION SHALL BE RECORDED IN THE CONSTRUCTION FIELD SET.
20. THE GENERAL CONTRACTOR AND EACH TRADE IS RESPONSIBLE FOR REVIEWING AND COORDINATING ALL NEW WORK WITH ALL EXISTING CONDITIONS AND WITH
ALL OTHER TRADES.
21. ALL CONSTRUCTION TO MEET CURRENT NATIONAL, STATE AND LOCAL CODES, ORDINANCES AND ADA REGULATIONS.
22. PREP ALL WALL SURFACES TO RECEIVE NEW PAINT OR WALL COVERING FINISH. PATCH ALL EXISTING HOLES IN AREAS TO RECEIVE NEW FINISHES. SAND ALL NEW
TO EXISTING TRANSITIONS SMOOTH PRIOR TO PAINTING. PATCH ALL AREAS WHERE RECEPTACLE OR FIXTURES ARE REMOVED. REMOVE EMERGENCY LIGHTS,
SIGNAGE, THERMOSTATS, FIRE STROBES, ETC. PRIOR TO PAINTING AND REINSTALL WHEN COMPLETE.
23. UNLESS NOTED OTHERWISE, THE TERM "PROVIDE" INDICATES TO SUPPLY AND INSTALL COMPLETE, FOLLOWING MANUFACTURER'S INSTRUCTIONS AND
RECOMMENDATIONS AND SUPPLYING AND INSTALLING ALL ASSOCIATED ITEMS AND ACCESSORIES AS REQUIRED FOR COMPLETE INSTALLATION.
24. GENERAL CONTRACTOR SHALL ACCOMMODATE TENANTS VENDORS DURING CONSTRUCTION AND WORK WITH THE OWNER TO SCHEDULE INSTALLATION OF OWNER
SUPPLIED AND INSTALLED ITEMS.
25. WHERE RATED WALLS ARE INDICATED, ENTIRE WALL ASSEMBLY SHALL BE CONTINUOUS AS SHOWN OR IMPLIED ON THE CONTRACT DOCUMENTS.
26. WHERE GAUGE OF METAL STUDS ARE NOT SPECIFICALLY SHOWN OR NOTED, PROVIDE GAUGE AS INDICATED IN THE GENERAL WALL TYPE NOTES.
27. CONTRACTOR TO REVISE, ADD OR RELOCATE FIRE STROBES, SPRINKLERS, AND OTHER LIFE SAFETY DEVICES AS NECESSARY TO MEET ALL APPLICABLE CODES,
MAINTAIN LIFE SAFETY AND/OR AS STIPULATED BY THE CONTRACT DOCUMENTS.
28. COMMENCEMENT OF WORK BY A CONTRACTOR OR SUBCONTRACTOR, CONSTITUTES ACCEPTANCE OF THE CONDITIONS AND SURFACES IN QUESTION. IF ANY SUCH
CONDITIONS/SURFACES ARE UNACCEPTABLE, THE GENERAL CONTRACTOR SHOULD BE NOTIFIED AT ONCE BY THE SUBCONTRACTOR AND NO WORK DONE UNTIL
CONDITIONS ARE ACCEPTABLE.
29. CONTRACTORS ARE TO FOLLOW ALL MANUFACTURERS RECOMMENDATIONS FOR INSTALLATION OF EQUIPMENT, MATERIALS, AND FINISHES.
31. CONTRACTOR TO PROVIDE DUST WALLS AT NECESSARY LOCATIONS.
32. TRANSPORT OF MATERIALS AND DEBRIS SHALL BE COORDINATED WITH THE FACILITY'S REPRESENTATIVES PRIOR TO THE START OF CONSTRUCTION.
33. CONTRACTOR TO MAINTAIN ALL MCOR REQUIREMENTS INCLUDING NEGATIVE AIR PRESSURE, ANTE ROOMS, AND WALK-OFF MATS.
34. CONTRACTOR TO PROVIDE AND MAINTAIN INFECTION CONTROL REQUIREMENTS PER FACILITY'S INFECTION CONTROL PRACTITIONER.
GENERAL NOTES
1. CONTRACTOR TO VISIT SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS PRIOR TO START OF WORK. CONTRACTOR TO FIELD VERIFY
ALL DIMENSIONS AND EXISTING CONDITIONS AND NOTIFY ARCHITECT, IN WRITING, OF ALL DISCREPANCIES. CONTRACTOR TO DOCUMENT
EXISTING FIELD CONDITIONS, LIGHT FIXTURE AND MEP SUPPLY/RETURN LOCATIONS, SPRINKLER HEADS, AND ALL OTHER CEILING ITEM
LOCATIONS PRIOR TO CONSTRUCTION. THIS INFORMATION SHALL BE PROVIDED TO ARCHITECT FOR INCORPORATION INTO A
CONSTRUCTION SET.
2. THE GENERAL CONTRACTOR AND EACH TRADE IS RESPONSIBLE FOR REVIEWING AND COORDINATING ALL NEW WORK WITH ALL EXISTING
CONDITIONS AND WITH ALL OTHER TRADES.
3. CONTRACTOR IS RESPONSIBLE TO PATCH/REPAIR/SEAL ALL NEW & EXISTING PENETRATIONS INTO RATED WALLS TO MAINTAIN RATED
ASSEMBLY.
4. ALL PENETRATIONS IN AND THROUGH FIRE AND SMOKE RATED WALLS SHALL BE SLEEVED AND FIRE STOPPED AS NECESSARY TO MAINTAIN
RATINGS.
5. UNLESS NOTED OTHERWISE, THE TERM "PROVIDE" INDICATES TO SUPPLY AND INSTALL COMPLETE, FOLLOWING MANUFACTURER'S
INSTRUCTIONS AND RECOMMENDATIONS AND SUPPLYING AND INSTALLING ALL ASSOCIATED ITEMS AND ACCESSORIES AS REQUIRED FOR
COMPLETE INSTALLATION.
6. GENERAL CONTRACTOR SHALL COORDINATE ALL PHASES AND TIMING OF CONSTRUCTION WITH ARCHITECT, TENANT, AND BUILDING OWNER.
7. ALL COSTS ASSOCIATED WITH THE PROTECTION OF EXISTING FACILITIES, UTILITIES, AND STRUCTURES WITHIN THE WORK ZONE AND OR
WITHIN THE PATH ESTABLISHED BY THE CONTRACTOR TO EXECUTE THE WORK SHALL BE INCORPORATED IN THE CONTRACTOR'S BASE BID.
FIELD VERIFICATION PRIOR TO BID
THE CONTRACTOR AND HIS SUBCONTRACTORS ARE REQUIRED TO VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS PRIOR TO
THE ISSUANCE OF A BID. ALL COSTS ASSOCIATED WITH THE PROTECTION OF EXISTING FACILITIES, UTILITIES, AND STRUCTURES (BOTH ABOVE
AND BELOW GRADE AND AREA OF WORK) WITHIN THE WORK ZONE AND OR WITHIN THE PATH ESTABLISHED BY THE CONTRACTOR TO EXECUTE
THE WORK SHALL BE INCORPORATED IN THE CONTRACTORS BASE BID.
THE CONTRACTOR SHALL NOTIFY OWNER/DESIGN PROFESSIONAL (PRIOR TO BID) OF ANY ITEMS DISCOVERED DURING FIELD VERIFICATION THAT
THE CONTRACTOR FEELS REQUIRE ADDITIONAL CLARIFICATION FROM THE OWNER/DESIGN PROFESSIONAL IN ORDER TO APPROPRIATELY BID THE
PROJECT.
ABBREVIATIONS
LAV LAVATORY
MAS MASONRY
MAX MAXIMUM
MB MARKER BOARD
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MO MASONRY OPENING
O.D. OUTSIDE DIAMETER
O.H. OPPOSITE HAND
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
P LAM PLASTIC LAMINATE
PLWD PLYWOOD
QT QUARRY TILE
R RISER
R.O. ROUGH OPENING
RA RETURN AIR
REF REFERENCE
REQ REQUIRED
SA SUPPLY AIR
SCH SCHEDULE
SEC SECTION
SF SQUARE FOOT
SIM SIMILAR
SPECS SPECIFICATIONS
SS STAINLESS STEEL
STD STANDARD
STL STEEL
SUSP SUSPENDED
T.B.D. TO BE DETERMINED
T.O. TOP OF
TEL TELEPHONE
TV TELEVISION
TYP TYPICAL
U.O.N. UNLESS OTHERWISE NOTED
UR URINAL
V.I.F. VERIFY IN FIELD
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VT VINYL TILE
W/ WITH
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WH WATER HEATER
WP WORKING POINT
ABBREVIATIONS
A.F.F. ABOVE FINISHED FLOOR
ACT ACOUSTICAL CEILING TILE
APP APPROXIMATE
AWT ACOUSTICAL WALL TREATMENT
B.O. BOTTOM OF
BD BOARD
BLKG BLOCKING
BOT BOTTOM
C.J. CONTROL JOINT
CAB CABINET
CL CENTER LINE
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CW COLD WATER
D.F. DRINKING FOUNTAIN
DET DETAIL
DIM DIMENSION
DTL DETAIL
DWC DRINKING WATER COOLER
DWG DRAWING
EA EACH
EIFS EXTERIOR INSULATION FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ETR EXISTING TO REMAIN
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FIN FINISH
FL FLOOR
FT FEET
GA GAUGE
GYP GYPSUM
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HVAC HEATING, VENTILATING & AIR COND.
HW HOT WATER
I.D. INSIDE DIAMETER
JST JOIST
JT JOINT
KIT KITCHEN
LAM LAMINATE
DRAFTING SYMBOLS
# Revision Description
Date
Issued
06/08/21
8"MIN.9"MIN.
11"27" MIN.34" MAX.30" MIN.25" MAX.
NOTES:
1. HOT WATER & DRAIN PIPES UNDER THE LAVATORY SHALL BE INSULATED OR CONFIGURED TO PROTECT AGAINST
CONTACT. THERE SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER THE LAVATORY.
2. FAUCETS SHALL BE LEVER OPERATED, PUSH TYPE, OR ELECTRONICALLY CONTROLLED MECHANISMS. SELF-CLOSING
VALVES SHALL REMAIN OPEN FOR AT LEAST 10 SECONDS.
3. MIRRORS SHALL BE MOUNTED WITH THE BOTTOM EDGE OF THE REFLECTING SURFACE NO HIGHER THAN 40" A.F.F.
CLEAR FLOOR SPACE17" MIN.48" MIN.30" MIN.34" MAX.PROTECTED PIPING W/ CASWORK
OF INSULATED PIPE COVER19" MAX.8" MIN. TO REFLECTIVE SURFACE40" MAX.11" MIN. 6"29" MAX.MIN.9"MIRROR
17" MIN.
19" MAX.40" MAX.NOTE: SEE SPECIFICATIONS FOR
ADDITIONAL MOUNTING HEIGHTS.
TELEPHONE MIRROR
TO BOTTOM OFREFLECTINGSURFACEDIAPER DISPENSER OR
SANITARY NAPKIN
DISPENSER
SOAP
DISPENSER
FIRE
EXTINGUISHER
CABINET (MAX.
4" PROJECTION)48" MAX.27" MIN.*SEE GUIDELINES FOR MOUNTING
HEIGHTS AT GRAB BARS.
NOTE: MOUNT ALL NON-HANDICAP ACCESSORIES
ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.WHEELCHAIRACCESSIBLEELECTRIC
WATER COOLER
34" MAX.SURFACE33" TO CHANGINGSTANDING HGT.38" - 43"GRAB BAR
33" - 36"ELECTRIC HAND
DRYER
SANITARY
NAPKIN
DISPOSAL*
WASTE RECEPTACLE /
PAPER TOWEL DISPENSER
S T
E
15" MIN.TO OPERABLE PARTS44" - 48"TO OPERABLE PARTS48".E 46" MAX.THERMOSTAT
SWITCH
ELEC. OUTLET
ABOVE 25"
DEEP
COUNTER
BABY CHANGING
STATION
TRANSFER
SIDE
FLUSH VALVE
ON OPEN SIDE
33" - 36" 17" - 19"24" MIN. 12" MIN.
36" MIN.
16" - 18"33" - 36"MAX.
12"
MIN.
42"
54" MIN.18" MIN. 39" - 41" 39"-41"17" - 19"AREA OF
REFUGE
5' - 0" TO CENTER OF SIGNNOTE:
ALL SIGNAGE SHALL BE INSTALLED ON THE WALL
ADJACENT TO THE LATCH SIDE OF THE DOOR
EXCEPT SIGNS W/ TACTILE CHARACTERS ON
PUSH SIDE OF DOORS WITH CLOSERS.
PICTOGRAM SIGNS SHALL BE A MIN. OF 6"
HEIGHT. SEE SECTION 703 OF THE ADA.
TRANSFER
SIDE
FLUSH VALVE
ON OPEN SIDE
33" - 36"17" - 19"24" MIN. 12" MIN.
36" MIN.
16" - 18"33" - 36"MAX.
12"
MIN.
42"
54" MIN.18" MIN.39" - 41" 39"-41"17" - 19"NOTE:
CONTROLS & OPERATING MECHANISMS SHALL BE OPERABLE W/ ONE HAND & SHALL NOT REQ. TIGHT
GRASPING, PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL
BE NO GREATER THAN 5 LBF (22.2 N) FAUCETS LEVER-OPERATED, PUSH-TYPE & ELECTRONICALLY SHALL
COMPLY WITH 4.27.4 CONTROLLED MECHANISMS ARE EXAMPLES OF ACCEPTABLE DESIGNS. IF SELF-CLOSING
VALVES ARE USED THE FAUCET SHALL REMAIN OPEN FOR AT LEAST 10 SECONDS.
3' - 0" 6" 2' - 10"REAR GRAB BAR
3' - 6" 1' - 0"2' - 10"SIDE GRAB BAR 1 2A VERTICAL GRAB BAR2B
GRAB BAR 2B
GRAB BAR 2A
3' - 4" 1' - 6"3' - 3"
TYP. & HC
ROLL TOILET
PAPER HOLDER
(RTPH)
3
FRONT OF
TOILET
RTPH
7" 1' - 7"2' - 6"TYP. & HC SANITARY
NAPKIN DISPOSAL
(SND)
4 2' - 6"SND
HC
TOILET SEAT COVER
DISPENSER (TSCD)
5 4' - 0" TSCD
MAX.
PROTRUSION 4"
TYP. & HC
SOAP DISPENSER
(SD)
6 3' - 6"SD
PAPER TOWEL
DISPENSER
(PTD)
7 4' - 0" PTD
MAX.
PROTRUSION 4"
T.O. DISPENSER
CONTROL60" MIN.18"
FRONT APPROACH, PULL SIDE 48" MIN.12"
MIN.*
NOTE:
* IF BOTH CLOSER AND
LATCH ARE PROVIDED YX
HINGE APPROACH, PUSH SIDE
NOTE:
X = 36" MIN. IF Y = 60";
X = 42" MIN. IF Y = 54"48" MIN.*24" MIN.
NOTE:
* 54" MIN. IF CLOSER
IS PROVIDED
42" MIN.**12"
MIN.*
NOTE:
* IF BOTH CLOSER AND
LATCH ARE PROVIDED.
** 48" MIN. IF BOTH CLOSER
AND LATCH PROVIDED 42" MIN.*24"
MIN.
22"
MIN.
NOTE:
* 48" MIN. IF CLOSER
IS PROVIDED
HINGE APPROACH, PULL SIDE
FRONT APPROACH, PUSH SIDE LATCH APPROACH, PUSH SIDE
LATCH APPROACH, PULL SIDE
1 1/2"1 1/2"
2X6 ANCHORING BACK
PLATE SECURE 2X6 TO
3-5/8" MTL. STUDS OR 2X
WD. FRAMED STUDS
SCREW
1-1/2" O.D. S.S. GRAB BAR - SEE
RESTROOM FIXTURE
ACCESSORIES SPECIFICATION FOR
MFG. & MODEL NUMBER
METAL WALL FLANGE
NOTE:
INSTALLATION MUST WITHSTAND
300 LBS. DOWNWARD PULL.
VERTICAL SECTION
PLAN VIEW
1-1/2" O.D. S.S. GRAB BAR - SEE
RESTROOM FIXTURE
ACCESSORIES SPECIFICATION
FOR MFG. & MODEL NUMBER
SCREW
METAL WALL FLANGE
2X6 ANCHORING BACK PLATE
SECURE 2X6 TO 3-5/8" MTL. STUDS
OR 2X WD. FRAMED STUDS
60" MIN.56" MIN.OTHER FIXTURES
NOT ALLOWED
WITHIN THIS AREA www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
ACCESSIBILITY
GUIDELINES 10300 N. ILLINOIS ST.INDIANAPOLIS, IN 462901/2" = 1'-0"A002
ADA KNEE & TOE CLEARANCE16A
1/2" = 1'-0"A002
ADA LAVATORY11E
12" = 1'-0"A002
ADA MOUNTING HEIGHTS4D
1/2" = 1'-0"A002
ADA REAR WALL GRAB BARS @
TOILET12D
1/2" = 1'-0" A002
ADA SIDE WALL GRAB BARS @
TOILET1 1D
3/4" = 1'-0"A002
ADA SIGNAGE16C1/2" = 1'-0"A002
ADA TOILET FIXTURES11C
1/2" = 1'-0" A002
ADA WASHROOM ACCESSORIES13E
12" = 1'-0"A002
ADA APPROACH LEGEND4C
1 1/2" = 1'-0" A002
ADA GRAB BAR - PLAN/SECTION1 4A
1/4" = 1'-0" A002
TOILET FIXTURE CLEARANCE 2A
# Revision Description
Date
Issued
06/08/21
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
GENERAL
SPECIFICATIONS10300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290INSTRUCTIONS
GENERAL REQUIREMENTS - SUMMARY OF WORK
ALL SUBSTITUTION FOR SPECIFIED PRODUCTS SHALL BE BY WRITTEN APPROVAL OF THE ARCHITECT.
BIDDING PROCEDURE AND CONSIDERATION OF BIDS SHALL BE PROVIDED BY THE PROJECT MANAGER.
STUDIO 3 DESIGN TO PROVIDE ADDITIONAL INSTRUCTIONS.
THE PROJECT CONSISTS OF AN INTERIOR CLINIC RENOVATION.
CONSTRUCTION ACTIVITIES AND OPERATIONS SHALL BE LIMITED TO THE PROJECT AREA INDICATED ON THE DRAWINGS.
PORTIONS OF THE SITE BEYOND AREAS IN WHICH CONSTRUCTION OPERATIONS ARE INDICATED ARE NOT TO BE DISTURBED.
ACCESS TO SITE IS TO BE AVAILABLE TO PM/ARCHITECT AT ALL TIMES.
THE INTENT IS FOR A COMPLETE AND FINISHED JOB. SOME FINISHES MAY HAVE TO OCCUR BEYOND THE LIMITS DEFINED IN THE
DRAWINGS TO PROVIDE A COMPLETE PRODUCT.
GENERAL CONSTRUCTION SPECIFICATIONS
THESE SPECIFICATIONS COVER CERTAIN PARTS OF THE GENERAL CONSTRUCTION PORTION OF THE PROJECT AS DESIGNED
BY STUDIO 3 DESIGN, 8604 ALLISONVILLE ROAD SUITE 330, INDIANAPOLIS, IN 46250.
INCLUDED IN THE SCOPE OF WORK COVERED BY THESE DRAWINGS AND SPECIFICATIONS IS THE BUILD OUT OF HANCOCK
REGIONAL HOSPITAL PARKWAY MEDICAL CENTER BLOOD LAB AND IMAGING SUITE RENOVATIONS.
THE PROJECT GENERAL CONTRACTOR IS PEPPER CONSTRUCTION.
INVITATION TO BID WILL BE PERFORMED BY THE PROJECT MANAGER.
CONTRACT REQUIREMENTS
THE CONTRACT DOCUMENTS INDICATE THE GENERAL ARRANGEMENT AND SCOPE AND IF ANY DEVIATIONS ARE NECESSARY,
SUCH DEVIATIONS SHALL BE MADE IN WRITING TO THE ARCHITECT FOR APPROVAL.
THE ARCHITECT RESERVES THE RIGHT TO MAKE MINOR CHANGES (MAX 10'-0") IN LOCATION OF DEVICE SYSTEMS OR EQUIPMENT.
ALL WORK MUST BE IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL LAWS, ORDINANCES, AND RULES DEALING WITH THE
WORK. ALL SUCH LAWS, ORDINANCES, AND RULES ARE HEREBY MADE A PART OF THIS SPECIFICATION BY REFERENCE.
CONSTRUCTION SCHEDULE
INFORMATION TO BE PROVIDED BY GENERAL CONTRACTOR IN TANDEM WITH STUDIO 3 DESIGN.
OPERATING AND MAINTENANCE MANUAL
FURNISH OPERATING AND MAINTENANCE MANUAL FOR ALL EQUIPMENT, MATERIALS, AND SYSTEMS INSTALLED IN A 3 RINGED
HARD BACK LOOSE LEAF BINDER.
CONTENTS
1. VENDORS AND LISTING INCLUDING NAMES, ADDRESSES AND PHONE
2. MANUFACTURERS PUBLISHED LITERATURE
3. LISTS AND LOCATIONS OF CIRCUITS, VALVES, DAMPERS, ETC.
4. INDEX
5. INSTRUCTIONS ON OPERATIONS AND MAINTENANCE
6. REPLACEMENT PART INFORMATION
7. GUARANTEES AND WARRANTIES ISSUED
8. SHOP DRAWINGS
SCHEDULE OF VALUES
INFORMATION TO BE PROVIDED BY CONTRACTOR.
PROJECT CLOSE OUT
WHEN THE CONTRACTOR CONSIDERS THE WORK SUBSTANTIALLY COMPLETE, THEY SHALL SEND STUDIO 3 DESIGN AND THE
OWNER NOTICE OF SUBSTANTIAL COMPLETION. ATTACH TO THE NOTICE THE CONTRACTOR PUNCH LIST. UPON RECEIPT THE
ARCHITECT SHALL SCHEDULE A PRELIMINARY INSPECTION. AFTER UNACCEPTABLE OF INCOMPLETE WORK HAS BEEN CORRECTED
CONTRACTOR SHALL NOTIFY ARCHITECT WHO WILL SCHEDULE A FINAL INSPECTION. SHOULD THE ARCHITECT DETERMINE THE
WORK IS SUBSTANTIALLY COMPLETE A CERTIFICATE OF SUBSTANTIAL COMPLETION. THE OWNER MAY ASSUME OCCUPANCY UPON
RECEIPT OF CERTIFICATE OF SUBSTANTIAL COMPLETION.
CUTTING AND PATCHING
PROVIDE LABOR AND MATERIAL TO CUT AND PATCH AS SHOWN OR IMPLIED ON DRAWINGS. OPENINGS MADE IN EXISTING
CONCRETE CONSTRUCTION FLOOR INSTALLATIONS OF NEW PIPING, ETC, SHALL BE DIAMOND CUT. RESTORE WORK WHICH HAS
BEEN CUT OR REMOVED AND INSTALL NEW PRODUCTS TO PROVIDE COMPLETED WORK. REFINISH ENTIRE SURFACES AS
NECESSARY TO PROVIDE EVEN FINISH.
CLEANING
PROVIDE ALL REQUIRED PERSONNEL EQUIPMENT AND MATERIAL NECESSARY TO MAINTAIN THE SPECIFIED STANDARD OF
CLEANLINESS, WEEKLY, AND MORE OFTEN IF NECESSARY INSPECT AND PICK UP SCRAP, DEBRIS, AND WASTE MATERIAL. DUST
CONTROLS MUST BE MAINTAINED THROUGHOUT CONSTRUCTION. SWEEP ALL INTERIOR SPACES. CLEAN IMMEDIATELY PRIOR TO
THE DATE SET FOR THE ARCHITECT'S PRELIMINARY INSPECTION. REMOVE ALL DEBRIS, VACUUM ALL FLOORS AND LEAVE OTHER
SURFACES DUST FREE AND CLEAN. FINAL CLEANING, CONTRACTOR SHALL PROVIDE A LEVEL OF CLEANLINESS GENERAL
PROVIDED BY COMMERCIAL BUILDING MAINTENANCE SUBCONTRACTORS.
CAST-IN-PLACE CONCRETE
CONCRETE WORK SHALL CONFORM TO THE FOLLOWING CODES, SPECIFICATIONS AND STANDARDS.
· ACI 301 "Specifications for Structural Concrete".
· ACI 318 "Building Code Requirements for Structural Concrete".
· Concrete Reinforcing Steel Institute (CRSI), "Manual of Standard Practice".
· ACI 311 "Standard Specifications for Tolerances for Concrete Construction and Materials".
· Portland Cement Association "Positioning Welded Wire Fabric".
· ASTM C1116, Type III "Standard Specifications for Fiber-Reinforced Concrete and Shotcrete".
THE FOLLOWING ITEMS ARE ADDITIONS AND/OR MODIFICATIONS TO THE CODES, SPECIFICATIONS AND STANDARDS NOTED
ABOVE.
CONCRETE FOR SLABS TO BE 3500 PSI, FOUNDATIONS AND OTHER WORK SHALL BE MINIMUM 3,000 PSI AT 28 DAY TEST WITH 4
INCH MAXIMUM SLUMP. CONCRETE FOR EXTERIOR WALLS AND FLAT WORK SHALL BE MINIMUM 4,000 PSI AT 28 DAY TEST WITH 4
INCH MAXIMUM SLUMP AND 6% AIR-ENTRAINMENT, PLUS OR MINUS 1% CEMENT FOR ALL CONCRETE SHALL BE TYPE I, MAXIMUM
COURSE AGGREGATE SIZE SHALL BE 1 INCH. EXCEPT FOR AIR-ENTRAINMENT, ADMIXTURES SHALL NOT BE USED.
PROVIDE THE MINIMUM THICKNESS OF COMPACTED GRANULAR FILL SHOWN ON THE DRAWINGS UNDER ALL INTERIOR FLOOR
SLABS PLACED ON GRADE. FILL SHALL BE COMPACTED TO 95% OF ITS MAXIMUM DENSITY AT OPTIMUM MOISTURE CONTENT, AS
DETERMINED BY THE MODIFIED PROCTOR TEST, ASTM D-1557. ALL GRANULAR FILL MATERIAL PLACED UNDER FLOOR SLABS SHALL
BE GOOD, CLEAN MATERIAL WITH LESS THAN 5% PASSING A 200 SIEVE . A 6 MIL POLYETHYLENE VAPOR BARRIER SHALL BE
PLACED ON TOP OF THE GRANULAR FILL IN ALL INTERIOR SLAB AREAS. LAPS SHALL BE A MINIMUM OF 6 INCHES. TURN UP VAPOR
BARRIER AT ALL VERTICAL SURFACES. ELECTRICAL CONDUITS OR OTHER UNDERFLOOR PIPES, DUCTS OR RACEWAYS SHALL BE
PLACED WITHIN THE GRANULAR FILL SUCH THAT A MINIMUM 2 INCH DEEP COVER IS PROVIDED.
REINFORCING STEEL SHALL CONFORM TO ASTM A-615, GRADE 60. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A 1064 AND
SHALL BE PLACED IN ALL SLABS, EXTENDING THROUGH ALL CONSTRUCTION AND CONTROL JOINTS UNLESS OTHERWISE SHOWN.
NYCON IS AN APPROVED EQUIVALENT.
EXPANSION MATERIALS SHALL BE NON-EXTRUDING TYPE FOR ALL INTERIOR AND EXTERIOR WORK, 1/2 INCH THICK X WIDTH
REQUIRED, AGAINST ALL VERTICAL SURFACES AND WHERE OTHERWISE SHOWN.
CONSTRUCTION JOINTS IN SLABS SHALL BE OF 24 GAUGE GALVANIZED STEEL WITH KEY WAY, INSTALLED FOR PERMANENT
INSTALLATION. AN EQUIVALENT TO A FORMED KEY WAY SHALL BE # 4 SMOOTH DOWELS, 12" LONG, AT 24' ON CENTER. CONTROL JOINTS
IN SLABS SHALL BE A CONTINUOUS 1/8 INCH WIDE X 1 INCH DEEP CONTINUOUS SAW CUT. THICKEN SLABS AT ALL CONTROL JOINTS.
INTERIOR AND EXTERIOR FLAT WORK SHALL BE CURED USING A COMPOUND EQUAL TO SONNEBORN "KURE-N-SEAL", COMPATIBLE WITH
FINISH MATERIALS APPLIED TO FINISHED FLOOR SLABS. APPLY CURING COMPOUND IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS AND RECOMMENDATIONS. INTERIOR FLAT WORK SHALL RECEIVE STEEL TROWEL FINISH, EXTERIOR FLAT WORK SHALL
RECEIVE A LIGHT BROOM FINISH.
METAL SCREW TYPE STUDS FOR INTERIOR WALLS SHALL BE AS SHOWN ON PLANS X 25 GAUGE STUDS AT 16 OR 24 INCHES ON CENTER,
AS SHOWN. STANDARD FLOOR AND CEILING TRACKS SHALL BE USED. WALLS SHALL BE BRACED AS REQUIRED OR SHOWN TO MAINTAIN
STRAIGHTNESS.
PROVIDE ALL MISCELLANEOUS STEEL SHOWN ON THE DRAWINGS FOR INJECTOR SUPPORT. INSTALL PER MANUFACTURER'S
RECOMMENDATIONS AND ALL APPLICABLE CODES.
METALS
CONSTRUCTION LUMBER SHALL BE EQUAL TO DOUGLAS FIR, OR #2 HEM FIR KILN DRIED TO A MOISTURE CONTENT OF 19% OR LESS,
DRESSED LUMBER SHALL BE RED OAK, POPLAR, CLEAR WHITE PINE OR BIRCH, KILN DRIED TO A MOISTURE CONTENT OF 15% OR LESS
AND FIRE TREATED.
LUMBAR USED FOR BLOCKING, CURBS, CANTS, ETC., SHALL BE FIRE TREATED OR WHERE IN CONTACT WITH THE ELEMENTS SHALL BE
EQUAL TO #2 SOUTHERN PINE (15% MOISTURE CONTENT) PRESERVATIVE TREATED.
PLYWOOD FOR BLOCKING SHALL BE FIRE RETARDANT TREATED C-C INT APA WITH EXTERIOR GLUE OR OTHER MISCELLANEOUS
FASTENINGS.
PROVIDE BLOCKING AS REQUIRED IN WALL, PARTITIONS, ETC., TO RECEIVE HARDWARE, OR OTHER MISCELLANEOUS FASTENINGS.
MILLWORK TO COMPLY WITH ALL PERTINENT CODES AND REGULATIONS, ALSO COMPLY WITH "ARCHITECTURAL WOODWORK QUALITY
STANDARDS, GUIDE SPECIFICATION AND QUALITY CERTIFICATION PROGRAM" PUBLISHED BY THE ARCHITECTURAL WOODWORK
INSTITUTE. ALL INTERIOR WORK SHALL CONFORM TO PREMIUM GRADE. INTERIOR AWI QUALITY GRADE: PREMIUM GRADE FOR
TRANSPARENT FINISH, EXTERIOR: AWI QUALITY GRADE: ECONOMY GRADE FOR OPAQUE FINISH.
CUSTOM CASEWORK SHALL BE FABRICATED IN ACCORDANCE WITH ARCHITECTURAL WOODWORKING INSTITUTE'S PREMIUM GRADE
QUALITY STANDARD. CONTRACTOR SHALL COORDINATE LOCATION OF BLOCKING BEHIND ALL CASEWORK MOUNTING. IT IS
SUBCONTRACTOR'S RESPONSIBILITY TO FIELD MEASURE TO ASSURE PROPER FIT. FINISH AS NOTED IN MATERIALS LIST. GENERAL
PURPOSE-150 GRADE 10/HGS, .048" THICKNESS. VERTICAL SURFACING- 150 GRADE 55/VGS .048" THICKNESS. CABINET LINER TO BE 150
GRADE 72/CLS: .02" THICKNESS. CORE BOARD SHALL BE 3/4" THREE-PLY, FINE-SURFACED, MEDIUM-DENSITY FIBER BOARD. BACK AND
DRAWER BOTTOM TO 1/4", SHELVES OVER 36" TO BE 1" FLUSH OVER LAY DESIGN. COLORS AS SPECIFIED IN MATERIALS LIST.
HARDWARE- HEAVY DUTY INSTITUTIONAL QUALITY
1. DRAWER SLIDES: ACCURIDE 3832
2. FILE DRAWER SLIDES ACCURIDE 3640
3. KEYBOARD SLIDES ACCURIDE 2009
4. SHELF STANDARDS HAFELE "EX-CELLENT H" #282.23.725- CABINET MOUNTED
5. SHELF STANDARDS K&V 186ANO OR 187ANO- 87 STANDARDS- WALL MOUNT
6. GROMMETS HAFELE 429.99.32
7. HINGES, CONCEALED GRASS 3900 SERIES
8. PULLS, BAR
9. CATCH, MAGNETIC STANLEY SP46
10. CATCH, SPRING HAFELE 245.55.913
11. BRACKET, COUNTER STANLEY 796
12. CLOTHES ROD K&V 7705 AND 764 CHR FLANGES
TWO HINGES PER DOOR UP TO 35 1/2" H
THREE HINGES PER DOOR 35 1/2" H TO 63" H
CARPENTRY
FIBERGLASS WALL INSULATION SHALL BE 3-5/8" (R-11) THICK BATTS AS SHOWN, UNFACED FRICTION-FIT, SOUND BATTS. CONSULT
ARCHITECT FOR ALL OTHER WALL SIZES.
THERMAL PROTECTION
GYPSUM WALLBOARD SHALL BE EQUAL TO USG "SHEET ROCK", 48" WIDE X THICKNESS, FIRE RATING, AND LEAD BACKED AS SHOWN,
WITH TAPERED EDGES. USE WALLBOARD OF MAXIMUM LENGTH TO MINIMIZE END JOINTS. END JOINTS SHALL OCCUR OVER STUDS OR
BLOCKING. APPLY WALLBOARD WITH LENGTH OF BOARDS HORIZONTAL. APPLY JOINT TAPE AND SPACKLING COMPOUND IN
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. SAND JOINTS SMOOTH SURROUNDING WALLBOARD SURFACE.
SCREW GYPSUM WALLBOARD TO STUDS OR OTHER FRAMING MEMBERS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
JOINT CEMENT AND REINFORCING TAPE SHALL BE MANUFACTURER'S STANDARD. METAL TRIM SHALL BE EQUAL TO USG METAL TRIM AS
NOTED BELOW:
CORNER BEAD: USG "DUR-A-BEAD"
METAL TRIM (SPACKLE-IN TYPE): USG #200-B
METAL TRIM (J-MOULD TYPE): USG #400
CONTROL JOINT: USG #1093 AT 32 FEET ON CENTER MAX.
GYPSUM WALL BOARD
MEET REQUIREMENTS OF ASTM E-814-13a THROUGH PENETRATION FIRE TEST BY A NATIONALLY RECOGNIZED TESTING AGENCY.
INSTALLER SHALL SPECIALIZE IN FIRE STOPPING WITH NO LESS THAN ONE YEAR EXPERIENCE AND APPROVED BY THE MANUFACTURER.
WORK SHALL BE COORDINATED WITH ALL OTHER TRADES. CONTRACTOR TO VERIFY OWNER'S SYSTEM PREFERENCE PRIOR TO
RELEASING CONTRACTS.
ACCEPTABLE MANUFACTURERS:
A. PENETRATION SEALANTS
1. DOW CORNING FIRE STOP FOAM AND FIRE STOP SEALANT
2. 3M BRAND FIRE BARRIER CAULK
3. HILTI FIRESTOPP MATERIALS
B. INTUMESCENT SEALANTS
1. DOW CORNING FIRE STOP INTUMESCENT WRAP STRIP
2. 3M BRAND FIRE CAULK
3. HILTI INTUMESCENT FIREPROOFING
FIRE STOPPING
HOLLOW METAL FRAMES SHALL BE COLD ROLLED STEEL, OF GAUGES LISTED, HAVING ADJUSTABLE BASE ANCHORS AND THREE STUD
ANCHORS PER JAMB. FRAMES SHALL BE MORTISED AND REINFORCED TO RECEIVE REQUIRED HARDWARE. STRIKE JAMBS SHALL HAVE
THREE RUBBER SILENCERS. FRAMES SHALL BE BONDERIZED AND SHALL RECEIVE ONE SHOP COAT OF PRIMER.
INTERIOR FRAMES: 18 GAUGE EXTERIOR FRAMES: 16 GAUGE
HOLLOW METAL KNOCK DOWN FRAMES WILL BE ACCEPTABLE WHERE SHOWN ON DRAWINGS.
DOOR HARDWARE, SPECIALTY DOORS AND OVERHEAD DOORS SHALL BE AS SPECIFIED ON DRAWINGS.
HOLLOW METAL DOORS AND FRAMES
FLUSH INTERIOR WOOD DOORS TO BE EQUAL TO MASONITE ASPIRO SERIES SELECT WOOD VENEER (5-PLY CONSTRUCTION): PREMIUM
SELECT VENEER, WITH HARDWOOD VENEER CROSSBAND. HARDWOOD TOP, SIDE AND BOTTOM EDGES TO MATCH FACE VENEER.
OPENINGS FOR LOUVERS OR GLASS LIGHTS SHALL BE SHOP MADE: USE WOOD MOLDINGS FOR GLASS LIGHT FRAMES. FACTORY OR
FIELD FINISH SATIN TOPCOAT PER THE MATERIALS LIST.
PROVIDE WARRANTY AGAINST WARPING OR TELEGRAPHING OF CORE CONSTRUCTION FOR THE LIFE OF THE INSTALLATION.
PRE-FINISHED DOORS MAY BE APPROVED EQUAL. SUBMIT COLOR SAMPLE TO ARCHITECT.
SEE MATERIALS LIST AND DOOR SCHEDULE FOR VENEER AND FINISH SELECTIONS.
FLUSH WOOD DOORS
COORDINATE THE FURNISHING AND INSTALLATION OF ALL HARDWARE ITEMS WITH DOORS, FRAMES, AND OTHER RELATED ITEMS TO
DETERMINE THE SUITABILITY OF ALL SPECIFIED HARDWARE.
ALL HARDWARE SHALL MEET FEDERAL, STATE AND LOCAL CODES. ANY HARDWARE PROVIDED THAT IS NOT IN CONFORMANCE WITH THE
CODES SHALL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER.
FINISHES SHALL BE US26D DULL CHROME UNLESS OTHERWISE NOTED.
FINISH HARDWARE
HARDWARE STANDARDS - U.N.O.
1. BUTTS & HINGES: HAGER, MCKINNEY, STANLEY
A. CONTINUOUS HINGES: PEMKO
2. LOCK SETS: BEST
3. CYLINDERS: BEST, SCHLAGE
4. HOSPITAL LATCHES: GLYNN JOHNSON, SERGEANT
5. ROLLER LATCHED: GLYNN JOHNSON
6. FLUSH BOLTS: HAGER, IVES, ROCKWOOD
7. PANIC EXIT DEVICES: VONDUPRIN, SERGEANT
8. CLOSERS & LIFE SAFETY HARDWARE: LCN, STANLEY
9. PULLS & PUSH PLATES: FORMS & SURFACES
10. ASTRAGALS: NATIONAL GUARD, PEMKO
11. DOOR ARMOR (PLASTIC): CONSTRICTION SPECIALTIES
12. DOOR ARMOR (STAINLESS): HAGER
13. STOPS: HAGER, HIAWATHA, IVES
14. COORDINATOR: DOOR CONTROL INTERNATIONAL
15. ELECTRONIC DOOR HOLDER: RIXON
16. SILENCERS: GLYNN JOHNSON
17. SLIDING DOOR LOCK: ADAMS RITE
18. THRESHOLDS: NATIONAL GUARD, PEMKO
19. WEATHER STRIPPING: NATIONAL GUARD, PEMKO
20. SWEEPS: NATIONAL GUARD,PEMKO
21. PIVOT HINGES: RIXON, MCKINNEY, STANLEY
22. FLOOR CLOSER/PIVOTS: RIXON
23. WALL TYPE HOLDER: MODRIC
24. ELECTROMAGNETIC LOCK: SARGENT
25. SMOKE SEAL: PEMKO
26. AUTOMATIC DOOR BOTTOMS: NATIONAL GUARD
27. ELECTROMAGNETIC HOLD OPEN: SARGENT
EXCEPT WHERE LABEL PROVISIONS REQUIRE LARGER OR HEAVIER HINGES OR WHERE SPECIFIED OTHERWISE HEREIN. PROVIDE
HINGES OF THE FOLLOWING SIZES AND WEIGHTS:
1. DOORS LESS THAN 3'-6" WIDE: 3 PAIR 4-1/2" X 4-1/2" OR CONTINUOUS (STANDARD)
2. DOORS 3'-6" WIDE TO 4'-0" WIDE: 3 PAIR 5" X 4-1/2" OR CONTINUOUS (EXTRA HEAVY)
3. DOORS 5'-0" HIGH AND NOT OVER 7'-6" HIGH: 1-1/2 PAIR OR CONTINUOUS
4. DOORS 7'-6" HIGH AND NOT OVER 10'-0" HIGH: 2 PAIR OR CONTINUOUS
5. AUTOMATIC DOORS: 5" X 4-1/2" (2 PAIR) OR CONTINUOUS
COORDINATION OF KEYS AND KEYING:
1. ALL LOCKS SHALL BE KEYED, MASTER KEYED, AND GRAND MASTER KEYED. AFTER AWARD OF CONTRACT, THE HARDWARE
SUPPLIER SHALL CONFER WITH THE OWNER TO DETERMINE KEYING SYSTEM. SUBMIT A KEYING DIAGRAM AFTER THIS
CONFERENCE.
2. SUPPLY (6) MASTER KEYS AND (3) GRAND MASTER KEYS. EACH LOCK SHALL HAVE (2) INDIVIDUAL KEYS.
3. KEYS SHALL BE STAMPED AS DIRECTED BY OWNER.
4. ALL MASTER KEYS AND GRAND MASTER KEYS SHALL BE SENT TO THE OWNER VIA REGISTERED MAIL SUPPLIER.
A. BLOCKING
I. COORDINATE BLOCKING IN WALL BEHIND WALL STOPS, ELECTROMAGNETIC DOOR HOLDERS.
MOUNTING HEIGHTS:
1. UNLESS SPECIFIED OTHERWISE, HARDWARE MOUNTING HEIGHTS SHALL BE AS FOLLOWS, MEASURED FROM FINISHED FLOOR
LINE (TO CENTER LINE OR AS STATED):
A. STRIKE: 40-5/16"
B. EXIT DEVICE CROSS BAR: 39-13/16"
C. PUSH PLATES: 46"
D. PULL: 46"
2. COMPLY WITH CURRENT STANDARDS FOR HANDICAPPED ACCESS, INCLUDING UNITED STATES ARCHITECTURAL AND
TRANSPORTATION BARRIERS COMPLIANCE BOARD (A&T BCB) "MINIMUM GUIDELINES AND REQUIREMENTS FOR ACCESSIBLE
DESIGN, FINAL RULE" AND ANSI A117.1 (2009).
INSTALL ALL JOINT SELANTS PER MANUFACTURER'S INSTRUCITONS. EQUAL SUBSTITUTIONS ALLOWED UPON REVIEW AND APPROVAL
BY ARCHITECT. SEALANT WORK SHALL BE PERFORMED BY A CONTRACTING SPECIALIZING IN PERFORMING SEALANT WORK WITH A
MINIMUM OF 3 YEARS OF EXPERIENCE.
TYPE A JOINTS IN CONCRETE AND TILE FLOORS AND PAVED SURFACES SUBJECT TO FOOT TRAFFIC:
MULTIPLE COMPONENT, SELF-LEVELING POLYURETHANE BASED SEALANT CONFORMING TO ASTM C920,
TYPE M, GRADE P, CLASS 25.
A. MAMECO INTERNATIONAL “VULKEM 245”.
B. SIKA CORPORATION “SIKAFLEX 2C-SL”.
C. SONNEBORN BUILDING PRODUCTS “SONOLASTIC PAVING JOINT SEALANT”.
D. TREMCO “THC-900”.
E. PECORA CORPORATION “NR-200”.
TYPE B EXTERIOR JOINTS IN MASONRY AND EIFS AND AROUND METAL DOOR, WINDOW AND LOUVER FRAMES
PENETRATING THESE SURFACES. DO NOT USE SINGLE COMPONENT SEALANTS WHEN EXCESSIVE
MOVEMENT IS EXPECTED WITHIN THE CURING TIME OF THE SEALANT:
SINGLE OR MULTIPLE COMPONENT, NON-SAG, POLYURETHANE-BASED SEALANT CONFORMING TO ASTM C920, TYPE S OR
M, GRADE NS, CLASS 25.
A. MAMECO INTERNATIONAL, “VULKEM 116 OR 227”.
B. SIKA CORPORATION “SIKAFLEX 1A OR 2C-NS”.
C. SONNEBORN BUILDING PRODUCTS “SONOLASTIC NP I OR NP II”.
D. TREMCO “DYMONIC OR DYMERIC”.
E. PECORA CORPORATION “DYNATROL II”.
TYPE C INTERIOR WALL PENETRATIONS FOR PIPE AND CONDUIT THAT WILL BE CONCEALED BY ESCUTCHEONS AND
OTHER TRIM AND PLATE, AND FORLAP JOINTS IN SHEET METAL, FOR ALL PENETRATIONS IN THE
CONCESSION AREAS NOT EXPOSED TO VIEW:
BUTYL RUBBER BASED SEALANT CONFORMING TO FS TT-S-001657, TYPE 1.
A. ADCO SEAL “NO. B-100”.
B. PECORA CORPORATION “BC-158”.
C. PTI SEALANTS “NO 707”.
D. TREMCO “BUTYL SEALANT”.
TYPE D JOINTS, VOIDS AND PENETRATIONS NOT OTHERWISE SPECIFIED FOR INTERIOR SURFACES EXPOSED TO
VIEW AND REQUIRING PAINTING. FIXTURES, PARTITIONS, EQUIPMENT AND ACCESSORIES FASTENED TO WALLS
AND FLOORS, FLANGES, AND ESCUTCHEONS OF ITEMS PENETRATING SURFACES IN CONCESSIONS, TOILET ROOMS,
AND OTHER AREAS REQUIRING SANITARY CONDITIONS TO ELIMINATE ANY OPEN JOINTS BETWEEN CONTACT
SURFACES:
LATEX ACRYLIC BASED SEALANT CONFORMING TO ASTM C834.
A. DOW CORNING CORPORATION “NO. 795”.
B. GENERAL ELECTRIC COMPANY “SILPRUF”.
C. SONNEBORN BUILDING PRODUCTS “OMNISEAL”.
D. TREMCO “SPECREM 1”.
TYPE E EXTERIOR AND INTERIOR JOINTS IN CONTACT WITH ORGANICALLY-COATED ALUMINUM:
LOW MODULUS SILICONE SEALANT CONFORMING TO ASTM C920, TYPE S, GRADE NS, CLASS 25.
A. DOW CORNING “NO. 792”.
B. GENERAL ELECTRIC “SILPRUF”.
C. SONNEBORN “OMNISEAL”.
D. TREMCO “SPECREM 1”.
TYPE F PERIMETER AND TACK SEAT JOINTS AROUND SOUND-RETARDANT PARTITIONS AND ELECTRICAL BOXES
AND OTHER PENETRATIONS IN SUCH PARTITIONS:
COMPOUND: PERMANENTLY RESILIENT TYPE MANUFACTURED SPECIFICALLY FOR ACOUSTICAL APPLICATIONS.
A. USG – “ACOUSTICAL SEALANT”.
B. TREMCO “ACOUSTICAL SEALANT”.
BACKER ROD MATERIAL: CLOSED-CELL FOAM, NON-STAINING, RESILIENT MATERIAL SUCH AS NEOPRENE, BUTYL, OR POLYURETHANE,
COMPATIBLE WITH SEALANT TO BE USED. SIZED AND SHAPED TO CONTROL DEPTH OF SEALANT AND TO PROVIDE 20 TO 50 PERCENT
COMPRESSION UPON INSERTION.
SEALANT INSTALLATION, INCLUDING SURFACE PREPARATION, BACK-UP MATERIALS AND SEALANT CURING, SHALL BE IN ACCORDANCE
WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. CONTROL JOINTS IN ALL SURFACES AND MATERIALS SHALL HAVE
PROPER BACKER ROD, IN ACCORDANCE WITH SEALANT MANUFACTURER'S RECOMMENDATION, INSTALLED IN JOINTS BEFORE SEALANT
INSTALLATION.
SEALANT WORK FOR THE GLASS AND GLAZING WORK SHALL BE PERFORMED BY THE GLASS AND GLAZING CONTRACTOR.
PROVIDE 2 TUBES EA. COLOR AND TYPE UTLILZED FOR OWNER'S FUTURE USE.
CAULKING AND JOINT SEALANTS
ALL SURFACES TO BE PAINTED OR STAINED SHALL BE PROPERLY PREPARED BEFORE STARTING THE PAINTING WORK SHOP OR PRIME
COATS SHALL BE PUT IN GOOD ORDER BEFORE PAINTING BEGINS. WOOD SHALL BE SMOOTH AND FREE FROM RAISED GRAIN OR OTHER
SURFACE IMPERFECTIONS. METAL SURFACES SHALL BE WIRE BRUSHED TO REMOVE ALL RUST OR MILL SCALE. BEFORE PAINTING,
REMOVE OR PROTECT HARDWARE, ACCESSORIES, PLATES, LIGHT FIXTURES AND SIMILAR ITEMS AND REPLACE UPON COMPLETION OF
THE PAINTING OPERATION.
APPLY PAINT OR STAIN TO CLEAN, DRY AND SMOOTH SURFACES ONLY. DO NOT APPLY EXTERIOR PAINT OR STAIN IN DAMP, RAINY
WEATHER OR UNTIL ALL SURFACES HAVE THOROUGHLY DRIED. ALL WOOD AND METAL SURFACES SHALL BE SANDED SMOOTH BEFORE
AND BETWEEN COATS.
A SCHEDULE OF THE SURFACES TO BE PAINTED FOLLOWS:
SCHEDULE OF SURFACES
INTERIOR UNGALVANIZED FERROUS METAL
1 COAT NOXIDE ONE DAY PRIMER (IF UNPRIMED)
2 COATS CELLU-TONE SATIN
GYPSUM BOARD SOFFITS
1 COAT PVA PRIMER
2 COATS LATEX (EGGSHELL)
GYPSUM BOARD WALLS AND SOFFITS TO RECEIVE VWC
TO BE PRIMED
1 COAT PRIMER-SEALER
2 COATS FINISH COLOR
WOOD DOORS, WOOD CABINETWORK AND WOOD TRIM
UNLESS OTHERWISE NOTED, STAIN TO MATCH EXISTING.
SUBMIT FOR APPROVAL
1 COAT STAIN
3 COATS POLYURETHANE-LOW GLOSS
1 COAT LACQUER SEALER ON CONCEALED SURFACES OF WOOD TRIM.
SCHEDULE OF COLORS PER MATERIALS NOTED.
UNLESS NOTED OTHERWISE PAINT MISC.. METALS, ELECTRICAL AND TELEPHONE PANELS, FIRE EXTINGUISHER CABINETS (VERIFY),
EXPOSED EQUIPMENT SUPPORT, CASEWORK AND PLUMBING SUPPORT BRACKETS, CLEAN-OUT COVERS, COVERS, TO MATCH THE
SURFACE ON WHICH THEY OCCUR. PAINT EXPOSED PIPING IN FINISHED AREAS TO MATCH WALLS. PAINT ALL HOLLOW METAL FRAMES AS
NOTED IN FINISH SCHEDULE, UNLESS NOTED OTHERWISE.
PAINT METAL FRAMES AT VISION LITES IN DOORS TO MATCH DOOR FRAME FINISH, U.N.O.
PAINTED GYPSUM BOARD CEILINGS TO BE CEILING BRIGHT WHITE, U.N.O.
BOTTOMS OF SOFFITS IN PAINTED AREAS TO MATCH CEILING, U.N.O.
PAINT EXPOSED CUT EDGES OF ACM TO MATCH ACM.
PAINTING AND STAINING
ACOUSTICAL CEILING SYSTEM
IN ADDITION TO COMPLYING WITH ALL PERTINENT CODES AND REGULATIONS, CEILING INSTALLATION SHALL COMPLY WITH THE INDIANA
STATE BOARD OF HEALTH AND SHALL MEET CLASS A NFPA
REFERENCE STANDARD SUSPENSION SYSTEM
ARMSTRONG PRELUDE XL
REFERENCE STANDARD ACOUSTICAL CEILING PAD
USG SEE DRAWINGS
ERECT GRID SYSTEM SO THAT BORDERS WILL BE AS LARGE AS POSSIBLE, AVOIDING PERIMETER TILES LESS THAN 1/2 OF TILE SIZE, AND
CENTER GRID IN ROOM, U.N.O. SPACE HANGARS A MAX. OF 4 FEET APART, THERE SHALL BE NO VISIBLE GAPS AT WALL
ALL ACOUSTICAL CEILING PANELS: FLAME SPREAD OF 25 OR LESS PER ASTM E84.
FURNISH TO OWNER TWO UNOPENED CARTONS OF ACOUSTICAL CEILING PADS OF EACH TYPE DELIVERED
SEE CONTRACT DOCUMENTS FOR TYPES OF CEILING SYSTEMS.
PROVIDE MATERIALS AS INDICATED IN CONTRACT DOCUMENTS AND INSTALL ACCORDING TO ALL MANUFACTURER'S INSTRUCTIONS AND
RECOMMENDATIONS. CARPET SHALL COMPLY WITH DOC-FFI-70-PILL TEST, ASTM E648 (NFPA 253)-CRITICAL FLUX TEST MIN. .45 WATTS
PER SQUARE CORRIDORS AND EXITS AND .22 WATTS IN ALL OTHER AREAS. DIMENSIONAL STABILITY SHALL BE PLUS OR MINUS .02% WITH
THE AACHEN METHOD.
CARPET AND ADHESIVES SHALL COMPLY WITH STANDARDS FOR A CLASS II OR CLASS B FINISHES.
PROVIDE ATTIC STOCK EQUAL TO 3% OF TOTAL SHEET CARPET AND CARPET TILE IN EACH STANDARD COLOR TO OWNER.
PROVIDE METAL EDGE AND TRANSITION STRIPS AT ALL CHANGE OF MATERIALS.
CARPET
WALL COVERING SHALL COMPLY WITH ASTM E-84 FOR CLASS A, FS CCC-W-408A TYPE II. PROVIDE ONE ROLL OF WALLCOVERING OF
EACH COLOR FROM ORIGINAL STOCK FOR OWNER'S USE. ALL ADHESIVES SHALL BE ONLY THOSE RECOMMENDED BY THE
MANUFACTURER OF THE WALL COVERING. ALL WALL SEALER SHALL BE ONLY THAT RECOMMENDED BY THE MANUFACTURER OF THE
WALL COVERING. SEAL ALL SURFACE TO RECEIVE WALL COVERING. APPLY EVENLY SO THAT NO DEPOSITS OR IRREGULARITIES
TELEGRAPH THROUGH. INSTALL WALL COVERING IN CONSECUTIVE SEQUENCE. WRAP FABRIC 6' BEYOND INSIDE AND OUTSIDE CORNERS
AND NO CUTTING AT CORNERS UNLESS FOR COLOR SEPARATION OR PATTERN MATCH. NO HORIZONTAL SEAMS SHALL BE PERMITTED.
INSTALL WALLCOVERING BEFORE THE INSTALLATION OF PLUMBING FIXTURES, CASINGS BASES, CABINETS, AND SEALANTS.
WALL COVERING
AS NOTED IN CONTRACT DOCUMENTS. INSTALL PER MANUFACTURER'S RECOMENDATIONS.
WALL AND CORNER GUARDS, HANDRAILS
FIRE EXTINGUISHERS, CABINET AND ACCESSORIES
FIRE EXTINGUISHERS: UL LISTED AND LABELED, EQUAL TO J.L. INDUSTRIES, MULTI-PURPOSE DRY CHEMICAL.
TYPE CABINET-EQUAL TO J.L. INDUSTRIES SEMI-RECESSED (VERIFY WITH EXISTING), FULL GLASS PANEL BRUSH SATIN TRIM, BOX STEEL
WITH BAKED ENAMEL FINISH.
FIRE EXTINGUISHERS SERVING MRI AREAS MUST BE WITHIN 75' TO BE MRI SAFE.
ELECTROMAGNETIC AND RADIO SHIELDING
THE SUPPLIER/MANUFACTURER OF THE ELECTROMAGNETIC AND RADIO SHIELDING SHALL BE PRE-APPROVED BY THE MEDICAL
EQUIPMENT SUPPLIER/MANUFACTURER THAT THEIR INSTALLATION CONFORMS WITH THE STANDARDS REQUIRED FOR PROPER
OPERATION OF THE EQUIPMENT BEING SUPPLIED. COMPLETELY DESIGN, FURNISH AND INSTALL THE COMPLETE SHIELDED ENCLOSURE
SYSTEM FOR THE ROOM, INCLUDING ALL SUBFRAMING, ANCHORS, JOINTING, SUBFLOORS, ACCESSORIES, DOORS, AND WINDOWS, AS
WELL AS PENETRATIONS FOR EQUIPMENT. GROUNDING OF THE R-F ENCLOSURE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
OWNER SHALL BE RESPONSIBLE FOR ALL TESTING AND CONFIRMATION OF SHIELDING COMPLIANCE, U.N.O. ALL WALL AND CEILING
SHIELDING MATERIALS ARE FRAMED OR LAMINATE PANELS MEETING THE MINUMUM REQUIREMENTS STATED IN THE PHYSICIST
SHEILDING REPORT. FLOOR SHIELDING TO HAVE A 6 MIL VAPOR BARRIERS. WOOD FRAMING SHALL BE KILN DRIED AND FIRE RETARDANT.
ALL SEAMS CONTINUOUSLY SOLDERED TOGETHER. ALL SEAMS COVERED WITH APPROPRIATE FOIL TAPE. FASTENERS TO BE NON-
FERROUS, NON-OXIDIZING TYPE INSTALLED PER SHIELDING MANUFACTURER'S CRITERIA.
DOOR UNITS SHALL CONSIST OF REQUIRED LEAVES, FRAMES, THRESHOLD, HARDWARE, AND CONTACT STRIPS. DOOR FRAME TO MEET
REQUIREMENTS NOTED IN PHYSICIST REPORT WITH SPECIFIED WOOD VENEER OR GLASS. DOOR TO HAVE REMOVABLE SWEEP.
WINDOWS TO BE COMPLETE WITH FRAME, RF SCREEN, GLASS, GLASS STOPS AND RF GASKETS. PROVIDE ALL REQUIRED FILTERS AND
WAVE GUIDES FOR ELECTRICAL, HVAC, SPRINKLERS, AND CRYOGEN VENTS SHOWN ON THE DRAWINGS. SUPPLIER/MANUFACTURER TO
PROVIDE WARRANTY THAT THE ENCLOSURE SHALL RETAIN ITS SHIELDING CHARACTERISTICS FOR 5 YEAR PERIOD AFTER TESTING. THE
SHIELD ENCLOSURE SHALL PROVIDE THE REDUCTION OF RF WAVES FROM EXTERNAL TRANSMITTERS AS SPECIFIED BY THE EQUIPMENT
MANUFACTURER AND PHYSICIST REPORT.
TOILET ACCESSORIES
TO BE EQUAL TO BOBRICK, U.N.O.
SHOP DRAWINGS
IF INCLUDED IN THE PROJECT SCOPE, SHOP DRAWINGS AND/OR PRODUCT LITERATURE ON THE FOLLOWING ITEMS SHALL BE
SUBMITTED TO THE ARCHITECT FOR APPROVAL INCLUDING BUT NOT LIMITED TO:
- DOORS AND DOOR HARDWARE - EXTERIOR FINISH MATERIALS
- CASEWORK - WATERPROOFING
- FIRE STOPPING - STEEL (FRAMING, MISC STEEL, STAIRS, REBAR, ETC)
- ACOUSTICAL CEILINGS - ROOFING AND RELATED COMPONENTS
- INTERIOR FINISHES - GLAZING AND STOREFRONT/CURTAIN WALL
- FIRE EXTINGUISHER AND CABINETS - LOCKERS
- ELECTROMAGNETIC AND RADIO SHIELDING - PLUMBING EQUIPMENT / FINISHES
- LIGHT FIXTURES - TOILET ACCESSORIES AND PARTITIONS
- HVAC EQUIPMENT, GRILLES, REGISTERS & DIFFUSERS
SUBSTITUTIONS
GENERAL CONTRACTOR TO SUBIT DATA TO ARCHITECT FOR REVIEW AND CONFIRMAITON OF EQUAL COMPLIANCE PRIOR TO
ALLOWING SUBSTITUIONS. ALL SUBSTITUTION FOR SPECIFIED PRODUCTS SHALL BE BY WRITTEN APPROVAL OF THE
ARCHITECT
CAST-IN-PLACE CONCRETE (CONT'D)
# Revision Description
Date
Issued
06/08/21
> >> >
M
H KCRCR
M
H
H HWAP 442 2
D
DD
D
D
D
D
OC OC2 2 VV
V V
VVV4 44 4 22
> >> >>> >> > > > >> > > >> >> > >> > > >> > >>
EXISTING BUILDING AREA
FIRE EXTINGUISHER LOCATIONS
(SEE SHEET A100)
EXISTING BUILDING OF
RENOVATION
EXT
E EXISTING BUILDING EXIT
EXT
A BUILDING ADDITION EXIT
FEC
1 HOUR SMOKE BARRIER
2 HOUR SMOKE BARRIER/FIRE BARRIER
2 HOUR FIRE BARRIER
PATH OF EGRESS
SMOKE RESISTANT CORRIDOR
1 HOUR CORRIDOR
2 HOUR CORRIDOR
SMOKE RESISTANT SHAFT
1 HOUR SHAFT
2 HOUR SHAFT
SMOKE RESISTANT HAZAROUS ROOM
2 HOUR EXIT ENCLOSURE
B.6
B.9
D.3
4.14122.2 2.4 2.6 2.8 3
D
D.5
E
E.5
F
G
F.9
C
C.1
D.4
G.1
B.95
B.7
.9
WAITING
001RECEPTION
003
MD NURSE
004
W&M
005
WORK ALCOVE
012
EXAM 4
011
PATIENT RR
006
STORAGE
010
EXAM 3
009
EXAM 2
008
EXAM 1
007
OFFICE
002
L1
L1
L1
L2
L2
L3
EXT
E
EXT
E
B.6
B.9
D.3
44.1 2 2.2 2.4 2.6 1
F
G
F.9
G.1
.9
D.5
E
E.5
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
LIFE SAFETY
PLAN 10300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290LIFE SAFETY PLAN LEGEND
LIFE SAFETY PLAN NOTES
L1 PATH OF EGRESS.
L2 EXISTING EXIT LOCATION
L3 NEW FIRE EXTINGUISHER LOCATION
APPLICABLE CODES:2014 INDIANA BUILDING CODE (2012 INTERNATIONAL BUILDING CODE)
2010 INDIANA ENERGY CONSERVATION CODE (675-ISE 19-4)
2014 INDIANA FIRE CODE (2012 INTERNATIONAL FIRE CODE)
2012 INDIANA PLUMBING CODE (2006 INTERNATIONAL PLUMBING CODE
WITH 2012 AMENDMENTS)
2009 INDIANA ELECTRICAL CODE (2008 NFPA 70)
2014 INDIANA MECHANICAL CODE (2012 INTERNATIONAL MECHANICAL
CODE)
2014 INDIANA FUEL GAS CODE (2012 INTERNATIONAL FUEL GAS CODE)
PROJECT LOCATION:
OCCUPANCY:
SQUARE FOOTAGE:
HEIGHT:
CONSTRUCTION TYPE:
WIDTH OF EXITS:
FIRE SUPPRESSION
SYSTEM:
FIRE RESISTIVE
CORRIDORS:
SMOKE RESISTIVE
CORRIDORS:
HAZARDOUS ROOMS:
EXIT ACCESS TRAVEL
DISTANCE:
OCCUPANT LOAD:
CODE REVIEW SUMMARY
PLUMBING COUNT:
ALARMS / FIRE
DETECTION:
ACCESSIBILITY:PER BUILDING OCCUPANCY / ANSI REQUIREMENTS
10300 N. Illinois St, Suite 1200
Indianapolis, IN 46290
TYPE B OCCUPANCY
1631 SF EXISTING
1631 SF REMODELED
BUILDING IS 2 STORIES
TYPE II-B
NOT REQUIRED
PROJECT AREA: FULL SPRINKLER SUPPRESSION SYSTEM
EXISTING BUILDING: FULLSPRINKLER SUPPRESSION SYSTEM
NOT REQUIRED
CONSTRUCTED AS SMOKE RESISTANT ASSEMBLIES: CLEAN ROOM, SOILED
UTILITY ROOM, EQUIPMENT STORAGE
EXIT ACCESS TRAVEL DISTANCE: NOT TO EXCEED 300 FEET
DEAD END EXIT ACCESS: NOT TO EXCEED 50 (OR 20 IN I OCC.) FEET
100 SF PER OCCUPANT REQUIRED.
1631 SQUARE FEET
17 OCCUPANTS
1 OCCUPANTS
1 REQUIRED PER 25 OCCUPANTS; 1 REQUIRED
1 REQUIRED PER 40 OCCUPANTS; 1 REQUIRED
AUTOMATIC FIRE DETECTION IS/NOT REQUIRED
ALARM SYSTEM PER SECTION 907.2.6.2
EXIT DOOR WIDTH PROVIDED AT THE RATE OF 0.15 INCHES PER
OCCUPANT. (SEC. 1005.2.3)
NORTH
1/8" = 1'-0"A004
LEVEL 1 - LIFE SAFETY PLAN - GI
CLINIC1
NORTH
KEY PLAN - NOT TO SCALE
AREA
OF
WORK
# Revision Description
Date
Issued
06/08/21
1 2
E.5
F
G
F.9
G.1
.9
D1
D1
D1
D1
D2
D2
D2D2
D2
D2
D2
D2
D2
D3
TYP.
D3
TYP.
D3D3
D3
TYP.
D3
D3D3
D3D3
D3 D3D3D3
D3D3
D3D3
D4D4
D5
D5
D5
D5
D6ETRLVT1 ETRLVT1
ETRLVT1
D12
D1
D2
D5D8
D8
D8
D8
D8
D9D9
D10
D11
D11 D7D7
D16
1 2
E.5
F
G
F.9
G.1
.9
R1R1
R1R1
R1
R1
R2
R1
R1
R1
R1
R2
R2R2
R3
R3
R3
R4R4
R4R4
R4R4
R4R4R4R4 R4R4
R4
R3
R3
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
DEMOLITION
PLAN 10300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290GENERAL DEMOLITION NOTES
A. SEE GENERAL NOTES ON CUTTING AND PATCHING OUTLINED ON SHEET
A001 FOR ADDITIONAL INFORMATION.
B. PERFORM ALL WORK UNDER ESTABLISHED PROJECT GUIDELINES.
C. FIELD VERIFY EXISTING CONDITIONS AND COORDINATE DEMOLITION OR
REMOVAL WORK WITH CORRESPONDING NEW CONSTRUCTION WORK AND
APPROPRIATE TRADES PRIOR TO STARTING DEMOLITION WORK. IF
DISCREPANCIES ARE FOUND BETWEEN CONTRACT DOCUMENTS AND
ACTUAL FIELD CONDITIONS, NOTIFY ARCHITECT IMMEDIATELY.
D. DASHED LINES INDICATE EXISTING ITEMS TO BE REMOVED. UNLESS
OTHERWISE NOTED, CONTRACTOR SHALL BE RESPONSIBLE FOR THE
OFF-SITE DISPOSAL OF ALL DEMOLITION ITEMS.
E. REMOVE ALL CONSTRUCTION DEBRIS FROM SITE DAILY. DO NOT ALLOW
REFUSE TO BLOCK CORRIDORS, STAIRS, OR ANY OTHER TRAFFIC AREAS.
F. PROVIDE TEMPORARY FIRE AND LIFE SAFETY PROTECTION THROUGHOUT
DURATION OF PROJECT.
G. PATCH AND REPAIR ALL ADJACENT SURFACES DISTURBED/DAMAGED BY
CONSTRUCTION. CLEAN ALL FLOOR SURFACES OF ADHESIVE AND OR
GROUT RESIDUE PRIOR TO INSTALLATION OF NEW FLOORING MATERIAL.
H. PROTECT ADJACENT EXISTING TO REMAIN CONSTRUCTION THROUGHOUT
DURATION OF PROJECT. PROVIDE SHORING, BRACING OR SUPPORT AS
REQUIRED TO PREVENT MOVEMENT OR SETTLEMENT OF EXISTING
CONSTRUCTION.
I. PROVIDE CONSTRUCTION BARRIER PARTITIONS BETWEEN AREAS OF WORK
AND OCCUPIED SPACES (IF APPLICABLE). PARTITIONS TO REMAIN INTACT
THROUGHOUT CONSTRUCTION, INCLUDING COMPLETED WORK AND WORK
UNDER CONSTRUCTION.
J. NEGATIVE PRESSURE MONITORED CONTINUOUSLY, SHALL BE PROVIDED AT
ALL DUST BARRIERS WHEN REQUIRED BY BUILDING/PROJECT STANDARDS
AND OR MANDATED INFECTION CONTROL REQUIREMENTS.
K. WHERE BLOCKING AND/OR ELECTRICAL WORK IS REQUIRED IN EXISTING
WALL CONSTRUCTION, CONTRACTOR TO CAREFULLY CUT-OUT GYPSUM
BOARD AT APPROPRIATE LOCATION. PATCH AND FINISH AREA PER CUTTING
AND PATCHING/FINISHING NOTES ON SHEET A001.
L. REMOVE ALL EXISTING CONSTRUCTION ITEMS AND FINISHES MADE
OBSOLETE BY OR IN CONFLICT WITH NEW CONSTRUCTION. VERIFY WITH
ARCHITECT AND/OR OWNER'S REPRESENTATIVE. REMOVE WIRING BACK TO
SOURCE AT ALL OUTLETS, ETC. MADE OBSOLETE BY WALL REMOVAL OR
ANY OTHER NEW CONSTRUCTION.
M. REMOVE ALL ITEMS IN THEIR ENTIRETY UNLESS OTHERWISE NOTED.
DESCRIPTION OF PRIMARY ITEMS TO BE REMOVED IS GENERAL IN NATURE,
AND REMOVAL OF SECONDARY COMPONENTS SUCH AS BLOCKING,
SUPPORTS, ANCHORS, TRIM, ADHESIVE, PIPING, WIRING, ETC., RELATED TO
PRIMARY ITEMS SHALL BE INCLUDED.
N. RELOCATED ITEMS SHALL BE CLEANED AND PLACED IN STORAGE PER
OWNER'S DIRECTIONS UNTIL ITEMS ARE READY TO BE REINSTALLED. IF
ITEM IS DAMAGED DURING DEMOLITION OR RELOCATION, IT SHALL BE
REPAIRED WITH NEW ITEM AS APPROVIDED BY OWNER AT NO EXPENSE TO
OWNER.
O. AT OWNER'S REQUEST, SALVAGED ITEMS SHALL BE TURNED OVER TO THE
OWNER OR STORED IN AN AREA DESIGNATED BY THE OWNER.
P. IF EXISTING ITEMS TO BE REMOVED OR DISTURBED ARE SUSPECTED OR
DISCOVERED TO CONTAIN ASBESTOS OR OTHER HAZARDOUS MATERIALS,
STOP DEMOLITION AND NOTIFY OWNER IMMEDIATELY.
Q. SEE M.E.P. DOCUMENTS FOR EXTENT OF DEMOLITION/REMOVAL OF
PIPING/DUCTWORK/ELECTRICAL THAT WILL OCCUR IN PREPARATION FOR
NEW CONSTRUCTION.
DEMO PLAN NOTES
D9 REMOVE EXISTING TOILET, GRAB BARS, WALL MOUNTED SINK, MIRROR, SOAP AND
PAPER TOWEL DISPENSER. SALVAGE FOR REINSTALLATION.
D10 REMOVE EXISTING WINDOW AND TRANSACTION COUNTER COMPLETE.
D11 REMOVE PORTION OF WALL AS REQUIRED FOR INSTALLATION OF NEW TRANSACTION
WINDOW. SEE NEW PLAN AND ELEVATIONS.
D12 REMOVE PORTION OF WALL UP TO 7'-8". PREP TO BECOME NEW BULKHEAD. SEE NEW
REFLECTED CEILING PLAN.
D16 REMOVE PORTION OF WALL AS INDICATED TO CREATE NEW OPENING.
DEMO PLAN NOTES
D1 REMOVE PORTION OF WALL COMPLETE AS INDICATED
D2 REMOVE CASEWORK AND COUNTERTOP COMPLETE.
D3 REMOVE EXISTING FLOOR FINISH, WALL BASE, ADHESIVES, ETC, COMPLETE. PREP
FLOOR TO RECIEVE NEW FINISH AS SCHEDULED
D4 REMOVE EXISTING WALL PANELING COMPLETE. PREP WALL TO RECEIVE NEW FINISH
AS SCHEDULED.
D5 REMOVE EXISTING DOOR, FRAME AND HARDWARE COMPLETE. SALVAGE FOR
REINSTALLATION WHEREVER POSSIBLE. ANY DOORS, FRAMES OR HARDWARE NOT
REINSTALLED SHALL BE DISPOSED OF BY CONTRACTOR.
D6 REMOVE PORTION OF WALL AS SHOWN FOR INSTALLATION OF NEW DOOR AND
FRAME. SEE NEW FLOOR PLAN AND DOOR SCHEDULE.
D7 REMOVE WALLCOVERING. PREP WALL TO RECEIVE NEW FINISH AS SCHEDULED
D8 REMOVE PLUMBING FIXTURE. COORDINATE WITH MEP DRAWINGS.
NORTH
3/16" = 1'-0"A050
LEVEL 1 - DEMOLITION PLAN - GI
CLINIC1
NORTH
3/16" = 1'-0"A050
LEVEL 1 - DEMO REFLECTED
CEILING PLAN - GI CLINIC2
NORTH
KEY PLAN - NOT TO SCALE
AREA
OF
WORK
# Revision Description
Date
Issued
DEMO RCP NOTES
R1 REMOVE EXISTING CEILING GRID AND TILE COMPLETE. COORDINATE WITH MEP
DRAWINGS. SALVAGE CEILING TILES FOR REINSTALLATION.
R2 REMOVE PORTION OF CEILING TO ALLOW FOR NEW WALL CONSTRUCTION. SEE NEW
PLAN.
R3 REMOVE EXISTING DRYWALL BULKHEAD COMPLETE.
R4 EXISTING TO REMAIN CEILING
06/08/21
A600 2
A600 12
A600 5 3
4
A600 8 9
A600 10
A600 1
WAITING
001
LVT1
B1
P1
RECEPTION
003
LVT1
B1
P1
MD NURSE
004
LVT1
B1
P1
W&M
005
LVT1
B1
P1
PATIENT RR
006
LVT1
B1
P1
EXAM 1
007
LVT1
B1
P1
EXAM 2
008
LVT1
B1
P1
EXAM 3
009
LVT1
B1
P1
STORAGE
010
LVT1
B1
P1
EXAM 4
011
LVT1
B1
P1
WORK ALCOVE
012
LVT1
B1
P1
6
7
A60011
EQ EQ
etr card
reader
A600
1 A600
1
A6002
A600 2
001a001c002a
003a004a 009a011a010a 006a 001b002b
OFFICE
002
ETR
ETR
ETR
ETRLVT1ETRLVT1 ETRLVT1
1
1
1
2
2
3
3
4
4
4 5
6
6
6
6
6
6
6
6
6
66
6
6
77
88
88
88
8888 8 5' - 0"2' - 5"
2' - 0"
2
2
A
A
A
A
CG1
CG1
CG1 7' - 3"9
10
1212
13
1212
4 4
8
11
14
15
Room Name
Room Number
Floor Finish
Base Finish
Typ. Wall Finish
Finish Remarks
FINISH TAG:
GRAIN / FLOORING DIRECTION:
CORNER GUARD:
FLOORING TRANSITION:
CORNER GUARD END CAP:
FLOOR
TYPE 2
FLOOR
TYPE 1
TRANSITION
DETAIL
F-1
HOLLOW METAL - WELDED4"7' - 0" 7' - 4"2" 3' - 0" 2"
VARIES
A
INSULATED HOLLOW
METAL (IHM)
VARIES
VARIES3-5/8" STUD WALL - TO CEILINGB
BASE AS SCHED.
PLAN VIEW
SUSPENDED CEILING -
REFER TO
REFLECTED CEILING
PLAN.
3-5/8" STEEL STUDS
@ 16" O.C.
STEEL STUD RUNNER
TRACK. STUDS
SCREWED ON EA. SIDE
AT BOTTOM.
ONE LAYER 5/8"
GYP. BD. EA. SIDE.
FLOOR
SLAB
3" ROCKWOOL SAFE-N-
SOUND
BATT INSULATION TO
DECK WITH INSULATION
SUPPORTS AS REQUIRED
5/8" 3 5/8" 5/8"3/8"DECK
4 7/8"
ELIMINATOR TRACK TO
RECEIVE WALL STUDS.
SECURE TRACT TO
CEILING WITH PAN-HEAD
SCREWS SUPPLIED BY
TRACK MANUFACTURER
TYPICAL 3-5/8" STUD
WALL - NON-RATED
A 3-5/8" STUD WALL TO 6" ABOVE CEILING W/
ROCKWOOL SAFE-N-SOUND BATT INSULATION
BASE AS SCHED.
PLAN VIEW
SUSPENDED CEILING -
REFER TO
REFLECTED CEILING
PLAN.
3-5/8" STEEL STUDS
@ 16" O.C.
STEEL STUD RUNNER
TRACK. STUDS
SCREWED ON EA. SIDE
AT BOTTOM.
ONE LAYER 5/8"
GYP. BD. EA. SIDE.
FLOOR
SLAB
3" ROCKWOOL SAFE-N-SOUND
BATT INSULATION TO DECK WITH
INSULATION SUPPORTS AS
REQUIRED
5/8" 3 5/8" 5/8"3/8" DECK 6"4 7/8"
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
FLOOR PLAN 10300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290GENERAL FLOOR PLAN NOTES
A. CONTRACTOR TO FOLLOW ALL BUILDING/PROJECT STANDARDS. PROVIDE INTERIM LIFE SAFETY
MEASURES AND FOLLOW ALL STATE AND LOCAL BUILDING CODES. IF CONTRARY INSTRUCTIONS ARE
CONTAINED HEREIN, REQUEST CLARIFICATION FROM OWNER/ARCHITECT.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL DIMENSIONS, JOB CONDITIONS,
ETC.
C. SEE FLOOR PLAN FOR ADDITIONAL NOTES.
D. ALL DIMENSIONS ARE FROM FACE OF STUD FRAMING TO FACE OF STUD FRAMING UNLESS OTHERWISE
NOTED.
E. SEE WALL TYPES, DOORS AND HARDWARE SCHEDULES FOR ADDITIONAL INFORMATION.
F. WHERE DISSIMILAR FLOOR MATERIALS MEET, THEY SHOULD DO SO UNDER THE CENTERLINE OF THE
DOOR, UNLESS OTHERWISE NOTED.
G. SEE TYPICAL DETAILS FOR LOCATION OF HINGE SIDE OF DOOR JAMBS FROM ADJACENT WALLS IN METAL
STUD WALLS UNLESS OTHERWISE NOTED.
H. PROVIDE BLOCKING IN NEW AND EXISTING WALLS FOR ALL WALL SUPPORTED ITEMS. SEE PLANS FOR
CASEWORK LOCATIONS.
I. ALL MATERIALS TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND STANDARD
SPECIFICATIONS.
J. REFER TO ROOM FINISH SCHEDULE FOR ALL REQUIRED FINISH INFORMATION.
K. WHERE NEW WALL CONSTRUCTION IS REQUIRED ADJACENT TO OR ABUTTING EXISTING CONSTRUCTION,
ALIGN FACE OF NEW CONSTRUCTION WITH FACE OF EXISTING CONSTRUCTION. SKIM ENTIRE WALL
SURFACE AS REQUIRED TO PROVIDE SMOOTH, FLUSH TRANSITIONS.
L. PROVIDE CONTROL JOINTS IN ALL RUNS OF GYPSUM BOARD. WALLS OVER 30 FEET IN LENGTH.
COORDINATE WITH ARCHITECT PRIOR TO INSTALLATION FOR COMPLIANCE WITH DESIGN INTENT.
M. PREP ALL WALL SURFACES TO RECEIVE NEW PAINT OR WALL COVERING FINISH. PATCH ALL EXISTING
HOLES IN AREAS TO RECEIVE NEW FINISHES. SAND WALLS SMOOTH PRIOR TO PAINTING. PROVIDE BLANK
COVER PLATES WHERE NEEDED. REMOVE EMERGENCY LIGHTS, SIGNAGE, THERMOSTATS, FIRE
STROBES, ETC. PRIOR TO PAINTING AND REINSTALL WHEN COMPLETE.
N. ALL PENETRATIONS IN AND THROUGH FIRE AND SMOKE RATED WALLS SHALL BE SLEEVED AND FIRE
STOPPED AS NECESSARY TO MAINTAIN RATINGS.
O. SEE MEP DRAWINGS FOR RELATED LEGENDS AND SCOPE OF WORK.
FLOOR PLAN NOTES
1 ALIGN NEW WALL CONSTRUCTION WITH EXISTING TO REMAIN.
2 INFILL WALL TO MATCH EXISTING CONSTRUCTION. PROVIDE SMOOTH TRANSITION.
3 NEW TRANSACTION WINDOW WITH SOLID SURFACE SILL. SEE ELEVATIONS AND DETAILS.
4 PATCH/REPAIR WALL AT LOCATION OF DEMOLITION IN PREP FOR NEW FINISH, AS SCHEDULED
5 EXISTING TO REMAIN CASEWORK.
6 PROVIDE NEW CASEWORK PER ELEVATION.
7 INSTALL RELOCATED PLUMBING FIXTURES AND ACCESSORIES. SEE ACCESSABILITY GUIDELINES ON A002
FOR MOUNTING HEIGHTS AND LOCATIONS.
8 PROVIDE ACCENT PAINT THIS WALL ONLY. COLOR TBD.
9 INTALL NEW TOILET FIXTURE. SEE ACCESSABILITY GUIDELINES AND MEP FOR DIMENSIONS.
10 NEW WALL HUNG FIRE EXTINGUISHER
11 PROVIDE NEW VERTICAL SIDE AND REAR GRAB BARS. SEE ACCESSIBILITY GUIDELINES A002 FOR
INSTALLATION HEIGHTS AND LOCATIONS.
12 SKIM COAT EXISTING WALLS TO PROVIDE SMOOTH FINISH AND PREP FOR PAINT, TYP.
13 EXISTING PARTIAL HEIGHT WALL. PROVIDE NEW WALL CONSTRUCTION FROM TOP OF EXISTING PARTIAL
HEIGHT WALL TO CEILING, WALL TYPE B.
14 INSTALL ROLL TOILET PAPER HOLDER AND SANITARY NAPKIN DISPENSER. SEE A002 ACCESSIBILITY
GUIDELINES FOR MOUNTING HEIGHTS AND LOCATIONS.
15 INTALL PAPER TOWEL AND SOAP DISPENSER AT SINK LOCATION. SEE A002 FOR MOUNTING HEIGHTS AND
LOCAITONS.
NORTH
1/4" = 1'-0"A100
LEVEL 1 - NEW FLOOR PLAN - GI
CLINIC1
FINISH MATERIAL LIST - GI
REV.
# MARK MANUFACTURER STYLE MODEL NUMBER COLOR SIZE
CORNER GUARDS
CG1 INPRO 2" SURFACE APPLIED CORNER GUARD TBF FULL HEIGHT
LUXURY VINYL TILE
LVT1 TBD
PAINT
P1 / EP1 TBD
P2 TBD
P3 TBD
PLASTIC LAMINATE
PL1 TBD
PL2 TBD
RESILIENT BASE
B1 TBD
SOLID SURFACE
SS1 TBD
PLAN LEGEND
DOOR SCHEDULE
MARK
DOOR FRAME
HEAD JAMB SILL FIRE RATING HARDWARE COMMENTSWIDTH HEIGHT TYPE MATERIAL FINISH TYPE MATERIAL FINISH
001a 6' - 0" 8' - 0" ETR ETR ETR ETR ETR ETR ETR ETR ETR N/A ETR CARD READER EXISTING TO REMAIN
001c 3' - 0" 8' - 0" ETR ETR ETR ETR ETR ETR ETR ETR ETR N/A 2
002b 3' - 0" 8' - 0" ETR ETR ETR ETR ETR ETR ETR ETR ETR N/A 2
003a 3' - 0" 8' - 0" A TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR N/A 2 REUSE SALVAGED DOOR WHEN
POSSIBLE WITH HANDING
004a 3' - 0" 8' - 0" A TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR N/A 2 REUSE SALVAGED DOOR WHEN
POSSIBLE WITH HANDING
006a 3' - 0" 8' - 0" A TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR N/A 1 REUSE SALVAGED DOOR WHEN
POSSIBLE WITH HANDING
009a 3' - 0" 8' - 0" A TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR TO MATCH ETR N/A 3 REUSE SALVAGED DOOR WHEN
POSSIBLE WITH HANDING
011a 3' - 0" 8' - 0" ETR ETR ETR ETR ETR ETR ETR ETR ETR N/A 3
NORTH
KEY PLAN - NOT TO SCALE
AREA
OF
WORK
# Revision Description
Date
Issued
HARDWARE SET #1
· (3) PAIR 4-1/2" HINGES
· PRIVACY LOCKSET
· DOOR SILENCERS
· (1) WALL BUMPER
HARDWARE SET #2
· (3) PAIR 4 1/2" HINGES
· OFFICE LOCKSET
· DOOR SILENCERS
· (1) WALL BUMPER
HARDWARE SET #3
· (3) PAIR 4 1/2" HINGES
· PASSAGE LOCKSET
· DOOR SILENCERS
· (1) WALL BUMPER
1/4" = 1'-0"A100
DOOR FRAME ELEVATIONS2
1/4" = 1'-0"A100
DOOR ELEVATIONS3
1 1/2" = 1'-0"A100
WALL TYPES4
06/08/21
RECESSED LIGHT
NEW 2' X 4' RECESSED FIXTURE
NEW CEILING GRID
EXISTING CEILING GRID
WALL MOUNTED EXIT SIGN
CEILING MOUNTED EXIT SIGN
HVAC SUPPLY DIFFUSER
HVAC RETURN GRILLE
SMOKE DETECTORSD
EXISTING 2' X 4' RECESSED FIXTURECEILING TYPE
MATERIAL/DETAIL VARIATION
CEILING HEIGHT
CLG1 1' - 0"
1 2
E.5
F
G
F.9
G.1
.9
ETRX2 ETRX
ETRX2
ETRX
M.E. CLG1
M.E.CLG1
M.E.CLG1 ETRX2
M.E.CLG1
ETRX2
ETRX2
ETRX2
ETRCLG1
RECEPTION
003
WAITING
001
MD NURSE
004
W&M
005
PATIENT RR
006 EXAM 4
011
WORK ALCOVE
012
EXAM 3
009
EXAM 2
008
EXAM 1
007
STORAGE
010
C1
X 8' - 0"
C2
C3
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
REFLECTED
CEILING PLAN 10300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290GENERAL REFLECTED CEILING NOTES
A. DIMENSIONS ON REFLECTED CEILING PLAN ARE TAKEN FINISHED FACE TO FINISHED FACE.
B. SEE ELECTRICAL FOR SWITCHING OPERATION AND LOCATION.
C. COORDINATE ALL DUCTWORK AND LIGHTING WITH STRUCTURE, BULKHEAD AND CEILING TO DECK
CLEARANCES PRIOR TO STARTING WORK.
D. LIGHTS AND DIFFUSERS SHOWN FOR LOCATION. SEE ELECTRICAL AND HVAC PLANS FOR FIXTURE
COUNTS AND TYPES.
E. UNLESS OTHERWISE NOTED/SHOWN - CENTER NEW GRID EACH DIRECTION IN ROOM. MAINTAIN
MINIMUM EDGE TILE AT 6".
F. UNLESS OTHERWISE NOTED/SHOWN - PLASTER / GYP. BOARD BULKHEAD SIDES AND UNDERNEATH
TO BE PAINTED, PAINT TO BE GENERAL CEILING WHITE.
MEP DESIGN BUILD NOTES
A. GENERAL CONTRACTOR SHALL COORDINATE ALL TRADES, INCLUDING DESIGN BUILD CONTRACTORS,
AND ENSURE MEP SUBCONTRACTORS MEET WITH OWNER, DESIGNER, AND OTHERS TO ENGINEER
SYSTEMS TO MEET OWNER'S NEEDS.
B. GENERAL CONTRACTOR SHALL PROVIDE MEP DESIGN DOCUMENTS AND DRAWINGS TO OWNER AND
DESIGNER FOR REVIEW, COMMENT AND APPROVAL.
C. GENERAL CONTRACTOR SHALL ENSURE MEP DESIGN BUILD DOCUMENTS ARE SUBMITTED TO THE
STATE AND LOCAL CODE OFFICIAL AS REQUIRED BY STATE STATUE/LAW.
D. HVAC SYSTEMS TO BE VENDOR ENGINEERED UNDER SEPERATE CONTRACT.
E. ELECTRICAL POWER & DATA SYSTEMS ARE TO BE VENDOR ENGINEERED UNDER SEPERATE
CONTRACT.
F. LIGHTING SYSTEMS ARE TO BE VENDOR ENGINEERED UNDER SEPERATE CONTRACT.
G. PLUMBING SYSTEMS ARE TO BE VENDOR ENGINEERED UNDER SEPERATE CONTRACT.
H. G.C. IS RESPONSIBLE TO PROVIDE ALL COORDINATION OF DESIGN AND CONSTRUCTION DISCIPLINES.
I. G.C. IS RESPONSIBLE TO PROVIDE ALL DESIGN, MATERIAL AND LABOR UNDER SEPERATE VENDOR
CONTRACT AS REQUIRED FOR A COMPLETE INSTALLATION IN COMPLIANCE WITH ALL STATE, LOCAL
AND HEALTH DEPARTMENT BUILDING CODES.
J. ARCHITECTURAL DOCUMENTS PROVIDE SUGGESTED LIGHTING LOCATIONS AND FIXTURE TYPES. ALL
CIRCUITING TO BE VENDOR ENGINEERED BY CONTRACTOR.
K. CONTRACTOR SHALL DESIGN AND PROVIDE EMERGENCY LIGHTING AS REQUIRED BY STATE AND
LOCAL CODE.
L. CONTRACTOR SHALL DESIGN AND INSTALL SALVAGED BUILDING STANDARD FIXTURES AT LOCATIONS
INDICATED TO MATCH BUILDING STANDARD FIXTURES AND ONLY PROVIDE NEW FIXTURES WHERE
REQUIRED.
M. CONTRACTOR SHALL PROVIDE INDEPENDANT SWITCHING FOR EACH AREA AND AT A LOGICAL AREA
ENTRY. IN CORRIDORS AND LARGE PUBLIC AREAS, PROVIDE MULTIPLE SWITCH LOCATIONS.
N. PROVIDE DIMMABLE SWITCHES AT ALL FIXTURES THAT ARE DIMMABLE.
O. CONTRACTOR SHALL DESIGN AND PROVIDE EXIT LIGHTING TO MATCH BUILDING STANDARD AND TO
MEET STATE AND LOCAL CODES.
REFLECTED CEILING PLAN
LEGEND
REFLECTED CEILING PLAN NOTES
C1 PROVIDE NEW LAYER OF GYP BOARD AT AREA OF DEMOLITION TO CREATE NEW BULKHEAD.
C2 INFILL BULKHEAD TO WALL. HEIGHT, SIZE AND FINISH TO MATCH EXISTING.
C3 PATCH AND REPAIR CEILING AS REQUIRED TO PROVIDE NEW WALL CONSTRUCTION ABOVE EXISTING
TO REMAIN 6'-0"AFF PARTIAL HEIGHT WALL.
CEILING TYPE SCHEDULE
TAG MANUFACTURER STYLE # COLOR SIZE COMMENTS
CLG1 ARMSTRONG .75 NRC MINERAL FIBERBOARD, 35
CAC, ULTIMA, STRAIGHT EDGE
1910HRC WHITE 2'X2' 15/16" GRID
X EXISTING TO REMAIN GRID AND
TILE
X2 EXISTING TO REMAIN GRID WITH
NEW TILE TO MATCH CLG1
NORTH
1/8" = 1'-0"A120
LEVEL 1 - NEW REFLECTED
CEILING PLAN - GI CLINIC1
NORTH
KEY PLAN - NOT TO SCALE
AREA
OF
WORK
# Revision Description
Date
Issued
06/08/21
2' - 6"2' - 6"
PLAM WORKSURFACE
FULL HEIGHT
SUPPORT PANEL
PENCIL DRAWER BELOW
WINDOW BEYOND
WINDOW BEYOND
SUPPORT CLEAT ON
SIDE WALL PAINTED
TO MATCH WALL
6C
A702
ADA SINK BASE WITH
FINISHED END
PLAM COUNTERTOP
WITH SINK
BASE AS SCHEDULED 2' - 6"1' - 8" 2' - 10" 2' - 6"7' - 0"2' - 6"
FILLER
PLAM WALL CABINET
WITH FINISHED END
6E
A702
6E
A702
2' - 6" 2' - 0" 2' - 6" 2' - 6" 2' - 6"
EQ EQ
PLAM WORKSURFACE
SUPPORT BRACKET
BASE AS SCHEDULED
PLAM WALL CABINETS
FILLER
FINISHED END
4E
A702
6C
A702
2' - 6"2' - 6" 2' - 0" 3' - 6"2' - 9"2' - 9" 2' - 9" 3' - 0"
PLAM WORKSURFACE
SUPPORT BRACKET
BASE AS SCHEDULED
PLAM WALL CABINETS
FILLER
4E
A702
6C
A702
EQEQ EQ EQ 2' - 6"3' - 8" 2' - 3" 3' - 8"
WINDOW BEYOND
PLAM WORKSURFACE
FULL HEIGHT
SUPPORT PANEL
SUPPORT CLEAT ON
SIDE WALL PAINTED
TO MATCH WALL
SUPPORT BRACKET
WINDOW BEYOND
6C
A7022' - 6"1' - 10" 2' - 6" 2' - 6"2' - 6"
MAX
3' - 8"
PLAM WORKSURFACE
SUPPORT BRACKET
BASE AS SCHEDULED
CASEWORK LOCK, TYP
PLAM WALL CABINETS
FILLER
FINISHED END
4E
A702
6C
A702
2' - 6" 2' - 0" 2' - 6" 7' - 0"2' - 6"2' - 6"
3' - 8"
5' - 0"
PLAM WORKSURFACE
SUPPORT BRACKET
BASE AS SCHEDULED
CASEWORK LOCK, TYP
PLAM WALL CABINETS
FILLER
FINISHED END
4E
A702
6C
A702
2' - 6"WINDOW BEYOND WINDOW BEYOND
6' - 6"
PLAM WORKSURFACE
FULL HEIGHT
SUPPORT PANEL
SUPPORT CLEAT ON
SIDE WALL PAINTED
TO MATCH WALL
SUPPORT BRACKET
6C
A702
2' - 6"2' - 10"EQ
MAX
3' - 8"
MAX
3' - 8"
MAX
3' - 8" EQ
4' - 0" 4' - 0"
SOLID SURFACE SILL
SLIDING TRANSACTION WINDOW
FINISHED FLOOR
BASE AS SCHEDULED
PLAM WORKSURFACE
SUPPORT BRACKET
6C
A702
4C
A702
3' - 6"2' - 6"
PLAM WORKSURFACE
SUPPORT CLEAT ON
SIDE WALL PAINTED
TO MATCH WALL
SUPPORT BRACKET
OWNER PROVIDED
SCALE, PROVIDE
POWER SEE MEP
6C
A702
4' - 0" 7' - 0"4' - 2"2' - 10" 4' - 0"
SOLID SURFACE SILL
SLIDING TRANSACTION WINDOW
FINISHED FLOOR
BASE AS SCHEDULED
4C
A702
2' - 6" 2' - 0" 2' - 6"EQ EQ 2' - 0" 1"
PLAM WORKSURFACE
SUPPORT BRACKET
BASE AS SCHEDULED
1' - 6" 2' - 9" 2' - 9" 1"
PRINTER CABINET WITH
ROLL OUT DRAWER,
FINISHED ENDS AND
INSIDE
CASEWORK LOCK, TYP
PLAM WALL CABINETS
FILLER
6C
A702
6B
A702
4E
A702
GENERAL CASEWORK...
A. CONTRACTOR SHALL BE RESPONSIBLE FOR THE
FIELD VERIFICATION OF ALL DIMENSIONS, ROUGH
OPENINGS AND JOB CONDITIONS PRIOR TO THE
BEGINNING OF FABRICATION OF ANY WORK SHOWN
OR NOTED ON THIS DRAWING. CONTRACTOR TO
CONTACT ARCHITECT WITH ANY DISCREPANCIES
BETWEEN WHAT IS SHOWN OR NOTED ON THIS
DRAWING AND ACTUAL FIELD VERIFIED
CONDITIONS. CONTRACTOR TO SUBMIT SHOP
DRAWINGS TO ARCHITECT FOR FINAL REVIEW.
B. ALL DRAWER PULLS TO BE CONTRACTOR SUPPLIED
AND INSTALLED. SEE SPECIFICATIONS.
C. PROVIDE FILLER PANELS AT ALL CASEWORK
LOCATIONS BUTTING INTO WALL CONSTRUCTION.
MINIMUM FILLER SIZE TO BE 1" WIDE. MAXIMUM
FILLER SIZE TO BE 3" WIDE. FIELD VERIFY.
D. STANDARD COUNTERTOP DEPTH 25" INCLUDING
BACKSPLASH, UNLESS OTHERWISE NOTED.
PROVIDE BACKSPLASH AND SIDESPLASH AS
SHOWN ON ELEVATION AT WALL JUNCTIONS.
E. APPLY CLEAR SEALANT AT ALL COUNTERTOP AND
BACKSPLASH JUNCTURES AND PLUMBING FIXTURE
WALL JUNCTURES.
F. INSTALL CASEWORK AND FINISH CARPENTRY
PLUMB. LEVEL, TRUE AND STRAIGHT WITH NO
DISTORTIONS.
G. PROVIDE GROMMET SLEEVE AND CAP AT ALL
GROMMET LOCATIONS AS SHOWN ON ELEVATIONS
AND CASEWORK DRAWINGS.
H. ALL WORKSURFACES / COUNTERTOPS TO RECEIVE
EASED EDGE U.O.N.
I. ALL EXPOSED SURFACES OF CABINETS TO BE
FINISHED TO MATCH FACE.
J. ALL SOLID SURFACE SINK BOWLS SHALL BE SSK-1
K. DISTANCE BETWEEN WORKSURFACE SUPPORT
PANELS TO BE A MAXIMUM OF 3'-8", UNLESS
SPECIFICALLY DIMENSIONED OTHERWISE.
L. ALL COUNTERTOPS SHALL HAVE 2" RADIUS
CORNERS UNLESS OTHERWISE NOTED.
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
INTERIOR
ELEVATIONS 10300 N. ILLINOIS ST.INDIANAPOLIS, IN 462901/2" = 1'-0"A600
EXAM WORKCOUNTER1
1/2" = 1'-0"A600
EXAM SINK CASEWORK2
1/2" = 1'-0"A600
MD NURSE EAST3
1/2" = 1'-0"A600
MD NURSE SOUTH4
1/2" = 1'-0"A600
MD NURSE WEST5
1/2" = 1'-0"A600
RECEPTION NORTH6
1/2" = 1'-0"A600
RECEPTION SOUTH7
1/2" = 1'-0"A600
RECEPTION WEST8
1/2" = 1'-0"A600
REGISTRATION EAST9
1/2" = 1'-0"A600
W&M10
1/2" = 1'-0"A600
WAITING WEST11
1/2" = 1'-0"A600
WORK ALCOVE12
# Revision Description
Date
Issued
06/08/21
RESILIENT WALL BASE
3/4" P. LAM. APRON
SEE FLOOR PLAN FOR WALL TYPE.
BACK SPLASH AND SIDE SPLASH AS
INDICATED IN ELEVATIONS
STAINLESS STEEL SINK.
SEE MEP DRAWINGS.
COUNTERTOP WITH RADIUSED
EDGE, SEE ELEVATIONS FOR
FINISHES. SUBSTRATE TO BE
MARINE-GRADE PLYWOOD
2X4 FIRE RETARDANT TREATED
WOOD BLOCKING BETWEEN STUDS,
AT ALL MOUNTING POINTS, TYP.
WOOD FRAMING AS REQ'D TO PROVIDE
FOR SOLID SURFACE COUNTERTOP
OVER CASEWORK UNIT, TYP.
REMOVABLE 3/4" P.
LAM. FRONT PANEL
FOR ACCESS TO
PLUMBING, ANCHORED
TO CABINET FRAME.
FAUCET, SEE MEP
3/4" P. LAM. BOTTOM
ANCHORED TO
CABINET FRAME.
1/4" PLYWOOD BACK PANEL.2' - 10 5/32" MIN.9"MIN.2' - 3"MIN.
8"
11"
MIN. SEE ELEV.HGT. VARIES2' - 1"1 1/2"2 X 6 BLOCKING CENTERED AT
MOUNTING HEIGHT OF
WORKSURFACE & ANCHORED
TO METAL STUDS
WALL BASE AS
SCHEDULEDVARIES2X4 BLOCKING
P-LAM WORKSURFACE W/
3MM PVC EDGE OR SOLID
SURFACE WITH EASED
EDGES, SEE ELVATIONS
RAKKS BRACKET
3/4" PLYWOOD
BACK PANEL
FULL DRAWER
EXTENSION, STOPS
AND SILENCERS
COUNTERTOP, BACKSPLASH, &
SIDESPLASH AS NOTED IN
ELEVATION
4" BRUSHED ALUMINUM
PULLS (TYP)
TOE-KICK WITH WALL
BASE AS SCHEDULED
PLASTIC LAMINATE PRINTER
SHELF W/ ROLL OUT
HARDWARE 1 1/2" 1 1/2"1' - 6" CLR.9" 4" BLOCKING AS
REQUIRED, TYP.2' - 10"2' - 0"
2' - 1" 4"PLASTIC LAMINATE VALANCE
PRINTER
INTERIOR OF CABINET TO BE
P.LAM TO MATCH CABINET
FRONT
ELECTRICAL BOX,
SEE MEP
HARDWARE AS SCHEDULED.
SEE SPECS.
GYPSUM BOARD
1/4" BACK
PANEL
3/4" ADJ. SHELF, WHITE
MALAMINE
3/4" PLASTIC LAMINATE
DOOR FRONT
NOTE:
WHITE MELAMINE
LAMINATED CABINET
INTERIOR (TYPICAL).
WALL BLOCKING
WALL BLOCKING2' - 6"3/4"
1' - 2"
PROVIDE CABINET DOOR HINGE
RESTRICTOR AT BASE CABINETS
ADJACENT TO WALLS AND/OR
CABINETS.
PLASTIC LAMINATE ON ALL
EXPOSED SURFACES, TYP.
NOTE: PROVIDE PLAM FASCIA TO CEILING
11"
4" 7"
2X WOOD BLOCKING
SOLID SURFACE MATERIAL
ALL EXPOSED EDGES
EASED (1/8") TYP.
K&V ROLL-EZY BALL
BEARING SLIDING TRACK
SYSTEM, RECESSED IN
TRANSACTION COUNTER.
3/8" TEMPERED GLASS
1/8"1 7/8" 3 5/8" METAL STUD
GYP. BOARD W/ PAINTED
FINISH - SEE FINISH PLAN
FOR SCHEDULED FINISH
PLAM. BACKSPLASH AT WORK
COUNTER
1X WOOD SUBSTRATE. PAINTED
TO MATCH WALL
SOLID SURFACE APRON
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
CASEWORK
DETAILS 10300 N. ILLINOIS ST.INDIANAPOLIS, IN 462903/4" = 1'-0"A702
CASEWORK DETAIL - ADA SINK6E
3/4" = 1'-0"A702
COUNTERTOP/WORKSURFACE6C
3/4" = 1'-0"A702
PRINTER BASE CABINET6B
3/4" = 1'-0" A702
TYPICAL UPPER CABINET 4E
3" = 1'-0"A702
TRANSACTION TOP W/ SLIDING
GLASS4C
# Revision Description
Date
Issued
06/08/21
ALL SYMBOLS AND ABBREVIATIONS MAY NOT BE USED ON THIS PROJECTT
SENSOR (T=TEMP H=HUMIDITY)
(P=PRES V=VAC T=TEMP) GAUGE
THERMOMETER
PRESSURE AND
TEMPERATURE PLUG
WATER PRESSURE
REDUCING/REGULATING VALVE
AUTOMATIC AIR VENT
MANUAL AIR VENT
FLOOR DRAIN
FLOW METER
CLEANOUT
TEMPERATURE CONTROL 3-WAY
2-POSITION VALVE
MECHANICAL VALVE
AND FITTING SYMBOLS
DESCRIPTIONSYMBOL
TEMPERATURE CONTROL
2-WAY MODULATING VALVE
TEMPERATURE CONTROL
2-WAY 2-POSITION VALVE
TEMPERATURE CONTROL
3-WAY MODULATING VALVE
CALIBRATED BALANCING VALVE
PIPING FLEXIBLE CONNECTION
PIPE TURNED UP (UNLESS NOTED
OTHERWISE)
PIPE TURNED DOWN
PIPE OUT TOP
PIPE OUT BOTTOM
THREADED/FLANGED CAP
CONCENTRIC REDUCER
CHECK VALVE
UNION
STRAINER
SAFETY RELIEF VALVE
BUTTERFLY VALVE
BALL VALVE
GATE VALVE
PLAN VIEW DETAIL VIEW
R OR D
FD
SD
F/SD
MD
DESCRIPTIONSYMBOL DESCRIPTION
MECHANICAL DUCTWORK SYMBOLS
SYMBOL
WITH FLEX DUCT
SECTION
PLAN VIEW
STANDARD RADIUS ELBOW WITH CENTER RADIUS
EQUAL TO 1-1/2 TIMES WIDTH OF DUCT UNLESS
OTHERWISE INDICATED
FLAT OVAL SPIRAL DUCT (FIRST DIMENSION,
SIDE SHOWN)
RECTANGULAR DUCT (FIRST DIMENSION,
SIDE SHOWN)
SPIN-IN FITTING WITH MANUAL VOLUME DAMPER AND
FLEXIBLE DUCT CONNECTION
TYPICAL TERMINAL UNIT WITH REHEAT COIL
GRILLE/REGISTER/DIFFUSER
CONNECTION
SIDEWALL SUPPLY, RETURN OR
EXHAUST GRILLE
DIFFUSER (NO AIRFLOW IN SHADED DIRECTION)
INSULATED METAL PANEL
45 DEGREE LATERAL (ROUND OR FLAT OVAL ONLY)
90 DEGREE TEE (ROUND OR FLAT OVAL ONLY)
SQUARE-TO-ROUND TRANSITION
CONICAL FITTING
ROUND SPIRAL DUCT
90 DEGREE ELBOW WITH TURNING VANES
FLEXIBLE CONNECTION
BEVELED ENTRY FITTING
MANUAL VOLUME DAMPER
FIRE DAMPER WITH ACCESS DOOR
SMOKE DAMPER WITH ACCESS DOOR
FIRE/SMOKE DAMPER WITH ACCESS DOOR
DUCT TURNED UP (SOLID LINES)
DUCT TURNED DOWN (DASHED LINES)
R(RISE), D(DROP)
SUPPLY DIFFUSER OR SUPPLY GRILLE
RETURN GRILLE
EXHAUST GRILLE
SUPPLY, RETURN, OR EXHAUST
SLOT DIFFUSER
W" X H" DIA"ø
AUTOMATIC MOTOR OPERATED DAMPER
W "X H"ø
DIA"ø
W" X H"
CD
CPD
CHWR
CR
CS
CHWS
HWS
HWR
DIRECTION OF PIPE SLOPE (DOWN)
CONDENSATE & EQUIPMENT DRAIN
CONDENSATE PUMP DISCHARGE
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
HVAC PIPING SYMBOLS
LINE SYMBOLS
SCREENED LINES INDICATE EXISTING TO REMAIN
HEAVY CONTINUOUS LINES INDICATE NEW WORK
HEAVY DASHED LINES INDICATE EXISTING TO BE REMOVED
AD ACCESS DOOR
Ø
°F
A/E
ACC
ACCU
AD
ADJ
AFCV
AFF
AFMS
AGA
AHU
AL
ANSI
AO
AP
APD
ARI
AS
ASHRAE
ASME
ASPE
ASTM
ATM
AUTO
AWWA
B
BCU
BD
BDD
BHP
BI
BOD
BOP
BTUH
CA
CAP
CAV
CB
CD
CO2
CFM
CH
CHWP
CHWR
CHWS
CO
COMP
COND
CONV
CP
CPD
CR
CS
CT
CUH
CWP
dB
DD
DDC
DEG
DIA
DISC
DWH
DWV
DX
EA
EAT
EC
ECG
EDR
EER
EF
EFF
EFT
EG
EMG
EOM
ESP
ET
EWT
EXH
F
F&T
FCO
FCU
FD
FM
FPB
FPM
FPS
PHASE
DEGREES FAHRENHEIT
ARCHITECT/ENGINEER
AIR COOLED CONDENSER
AIR COOLED CONDENSING UNIT
AREA DRAIN, ACCESS DOOR
ADJUSTABLE, ADJACENT
AIRFLOW CONTROL VALVE
ABOVE FINISHED FLOOR
AIRFLOW MEASURING STATION
AMERICAN GAS ASSOCIATION
AIR HANDLING UNIT
ALUMINUM
AMERICAN NATIONAL STANDARDS INSTITUTE
ANALOG OUTPUT
ACID PROOF, ACCESS PANEL
AIR PRESSURE DROP (IN. WC)
AIR CONDITIONING REFRIGERATION INSTITUTE
AIR SEPARATOR
AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND
AIR CONDITIONING ENGINEERS
AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AMERICAN SOCIETY OF PLUMBING ENGINEERS
AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATMOSPHERE
AUTOMATIC
AMERICAN WATER WORKS ASSOCIATION
BOILER
BLOWER COIL UNIT
BALANCE DAMPER
BACK-DRAFT DAMPER
BRAKE HORSEPOWER OR BOILER HORSEPOWER
BINARY INPUT, BACKWARD INCLINED
BOTTOM OF DUCT
BOTTOM OF PIPE
BRITISH THERMAL UNITS PER HOUR
COMPRESSED AIR
CAPACITY
CONSTANT AIR VOLUME
CATCH BASIN OR CHILLED BEAM
CONDENSATE DRAIN
CARBON DIOXIDE
CUBIC FEET PER MINUTE
CHILLER
CHILLED WATER PUMP
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CLEANOUT
COMPRESSOR
CONDENSER
CONVECTOR
CONDENSATE PUMP
CONDENSATE PUMP DISCHARGE
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
COOLING TOWER
CABINET UNIT HEATER
CONDENSER WATER PUMP
DECIBEL
DUAL DUCT
DIRECT DIGITAL CONTROL
DEGREE (°F)
DIAMETER
DISCONNECT SWITCH
DOMESTIC WATER HEATER
DRAIN, WASTE, AND VENT
DIRECT EXPANSION
EXHAUST AIR
ENTERING AIR TEMPERATURE (°F)
ELECTRICAL CONTRACTOR
EGG-CRATE GRILLE
EQUIVALENT DIRECT RADIATION
ENERGY EFFICIENCY RATIO
EXHAUST FAN
EFFICIENCY
ENTERING FLUID TEMPERATURE (°F)
EXHAUST GRILLE
EXTRUDED METAL GRILLE (WELDED WIRE MESH)
END OF MAIN DRIP
EXTERNAL STATIC PRESSURE (IN. WC.)
EXPANSION TANK
ENTERING WATER TEMPERATURE (°F)
EXHAUST
FURNACE
FLOAT AND THERMOSTATIC STEAM TRAP
FLOOR CLEANOUT
FAN COIL UNIT
FLOOR DRAIN
FACTORY MUTUAL
FAN POWERED TERMINAL UNIT
FEET PER MINUTE
FEET PER SECOND
ABBREVIATIONS AND TERMS
FLOOR SINK
FIRE/SMOKE DAMPER
FINNED TUBE RADIATION
GAGE OR GUAGE
GALLON
GENERAL CONTRACTOR
GALLONS PER DAY
GALLONS PER HOUR
GALLONS PER MINUTE
HEAD (FT.)
HORSEPOWER
HIGH PRESSURE STEAM RETURN
HIGH PRESSURE STEAM SUPPLY
HOT WATER PUMP
HEATING WATER RETURN
HEATING WATER SUPPLY
HEAT EXCHANGER
INTEGRAL FACE/BYPASS
LEAVING AIR TEMPERATURE (°F)
LOW PRESSURE STEAM RETURN
LOW PRESSURE STEAM SUPPLY
LEAVING WATER TEMPERATURE (°F)
MIXED AIR
MIXED AIR TEMPERATURE (°F)
THOUSAND BTU PER HOUR
MECHANICAL CONTRACTOR
MINIMUM CIRCUIT AMPACITY
MOTOR CONTROL CENTER
MOTORIZED DAMPER
MEDIUM PRESSURE STEAM RETURN
MEDIUM PRESSURE STEAM SUPPLY
NOISE CRITERIA, NORMALLY CLOSED
NATIONAL ELECTRIC CODE
NATIONAL FIRE CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
OUTSIDE AIR
OUTSIDE AIR TEMPERATURE (°F)
OPPOSED BLADE DAMPER
OUTSIDE DIAMETER
OWNER FURNISHED/CONTRACTOR INSTALLED
PUMP
PLUMBING CONTRACTOR
PRESSURE DROP
PRE-FILTER
PROPYLENE GLYCOL WATER
PREHEAT COIL
PARTS PER MILLION
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH (ABSOLUTE)
POUNDS PER SQUARE INCH (GAUGE)
PACKAGED TERMINAL AIR CONDITIONER
RETURN AIR
RETURN AIR TEMPERATURE (°F)
RETURN FAN
RETURN GRILLE
RELATIVE HUMIDITY
REHEAT COIL
RADIANT PANEL
ROOFTOP UNIT
SUPPLY AIR
SUPPLY AIR TEMPERATURE (°F)
SUPPLY DIFFUSER
SEASONAL ENERGY EFFICIENCY RATIO
SUPPLY GRILLE
SHEETMETAL AND AIR CONDITIONING CONTRACTORS
ASSOCIATION
STATIC PRESSURE
SUPPLY REGISTER
SAFETY RELIEF VALVE
STEAM VENT
THERMOSTAT
TEMPERATURE CONTROL CONTRACTOR
TEMPERATURE DIFFERENCE
TOTAL STATIC PRESSURE
THERMAL EXPANSION VALVE
TYPICAL
UNIT HEATER
UNDERWRITER'S LABORATORIES
VARIABLE AIR VOLUME
VOLUME DAMPER
VARIABLE FREQUENCY CONTROLLER (SAME AS VFD,
VSC)
VARIABLE FREQUENCY DRIVE (SAME AS VFC, VSC)
VARIABLE SPEED CONTROLLER (SAME AS VFC, VFD)
WITH
WITHOUT
WET BULB TEMPERATURE (°F)
WATER PRESSURE DROP (FT. HD)
WATER SOURCE HEAT PUMP
FS
FSD
FTR
GA
GAL
GC
GPD
GPH
GPM
HD
HP
HPR
HPS
HWP
HWR
HWS
HX
IFB
LAT
LPR
LPS
LWT
MA
MAT
MBH
MC
MCA
MCC
MD
MPR
MPS
NC
NEC
NFC
NFPA
NIC
NO
NTS
OA
OAT
OBD
OD
OF/CI
P
PC
PD
PF
PGW
PHC
PPM
PRV
PSI
PSIA
PSIG
PTAC
RA
RAT
RF
RG
RH
RHC
RP
RTU
SA
SAT
SD
SEER
SG
SMACNA
SP
SR
SRV
SV
T
TCC
TD
TSP
TXV
TYP
UH
UL
VAV
VD
VFC
VFD
VSC
W/
W/O
WB
WPD
WSHP
ECCENTRIC REDUCER
GLOBE VALVE
T STEAM TRAP
VACUUM BREAKER
SHEET SYMBOLS
EXTENT OF DEMOLITION
CONNECT TO EXISTING
GENERAL MECHANICAL DEMOLITION NOTES
A. CONTRACTOR TO FIELD VERIFY EXISTING DUCTWORK LOCATION, SIZE, AND ELEVATION PRIOR TO
REMOVAL. COORDINATE ANTICIPATED ROUTING WITH EXISTING AND NEW DUCTWORK, PIPING,
AND CONDUITS. CONTACT ENGINEER IF FIELD CONDITIONS REQUIRE ALTERNATIVE ROUTING.
VERIFY THAT ALL SERVICES TO BE REMOVED DO NOT SERVE AREAS OUTSIDE INDICATED SCOPE
OF WORK.
B. PIPE AND DUCT ROUTINGS AND CLEARANCES INDICATED ARE BASED ON BEST AVAILABLE
INFORMATION. CONTRACTOR SHALL VERIFY PIPING, DUCTWORK, ELECTRICAL, AND STRUCTURAL
DETAILS OF EXISTING AND NEW INSTALLATIONS DURING AND AFTER DEMOLITION (PRIOR TO NEW
INSTALLATIONS) TO DETERMINE WORK NECESSARY TO INSTALL WORK AS SHOWN AND INTENDED.
CONTRACTOR SHALL CONTACT THE ENGINEER WITH ANY CONCERNS UPON COMPLETION OF THIS
EFFORT.
C. COORDINATE OUTAGES WITH OTHER CONTRACTORS, OWNER, AND MAINTENANCE STAFF.
PROVIDE SUFFICIENT ADVANCE SCHEDULING TO MEET OCCUPANTS AND FACILITY PERSONNELS
REQUIREMENTS FOR PLANNING AND COORDINATING FOR SYSTEMS WHICH MAY NOT BE EASILY
INTERRUPTED.
D. WHERE MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION WORK IS DETERMINED TO
PENETRATE EXISTING FLOORS, WALLS, CEILING, OR ROOF, THE OPENING THROUGH WHICH THE
ABOVE DESCRIBED ITEM IS TO PASS MUST BE REPAIRED OR BUILT BACK BY THE CONSTRUCTION
TRADE SKILLED IN THE WORK TO BE PERFORMED. SUBCONTRACTOR SHALL BE RESPONSIBLE FOR
PROCURRING THE SERVICES OF SKILLED CONTRACTOR.
E. PROVIDE TEMPORARY PATCHING AS REQUIRED FOR INFECTION CONTROL AS DETERMINED BY
HOSPITAL INFECTION CONTROL DEPARTMENT AND MAINTAIN EXISTING FIRE AND SMOKE RATINGS.
F. WHERE PRE-DEMOLITION AIRFLOW READINGS ARE NOTED, TAKE READINGS PRIOR TO BEGINNING
ANY DEMOLITION WORK OR CONSTRUCTING NEGATIVE AIR PRESSURE BARRIERS. PRE-
DEMOLITION TAB WORK WILL LIKELY OCCUR AFTER NORMAL HOURS, CONFIRM WITH OWNER.
G. ALL DUCTWORK, PIPING, AND EQUIPMENT INDICATED BY DASHED LINETYPE SHALL BE REMOVED AS
DESCRIBED BY PLAN NOTES. REMOVE OR REUSE ASSOCIATED HANGERS. DO NOT LEAVE UNUSED
EQUIPMENT ABANDONED ABOVE CEILING. ALL TERMINAL UNITS TO BE REMOVED SHALL ALSO
HAVE SUPPLY DUCTS REMOVED BACK TO MAIN DUCTS AS INDICATED AND CAP SUITABLE FOR +4"
W.G. REMOVE PIPING RUNOUTS BACK TO MAIN AND CAP. FOR PIPING RUNOUTS THAT ARE TO BE
REUSED, REMOVE ALL CONTROL VALVES, BALANCE VALVES, STRAINERS , AND PIPING
ACCESSORIES TO BRANCH SHUT-OFF VALVES. ALL EXISTING TERMINAL UNITS, DDC
CONTROLLERS, ROOM PRESSURE MONITORS, AND HARDWARE TO BE REMOVED SHALL BE DONE
SO IN A MANNER TO MINIMIZE DAMAGE AND OFFERED TO THE OWNER. CONTRACTOR SHALL
DISCARD ALL DEVICES NOT WISHED TO BE RETAINED BY THE OWNER.
GENERAL MECHANICAL NOTES
A. CONTRACTOR TO INSTALL ACCESS PANELS AT ALL FIRE DAMPERS. REFER TO DETAILS AND
SPECIFICATIONS FOR MINIMUM ACCESS PANEL SIZES. COORDINATE LOCATIONS TO ENSURE ACCESS
PANELS ARE NOT OBSTRUCTED.
B. REFER TO SCHEDULES FOR DIFFUSER AND TERMINAL UNIT RUNOUT SIZES.
C. UNLESS NOTED OTHERWISE, TERMINAL UNIT DISCHARGE DUCT SHALL BE THE SAME SIZE AS THE
TERMINAL UNIT DISCHARGE CONNECTION.
D. LOCATE ALL TERMINAL UNITS, DAMPERS, VALVES, AND EQUIPMENT REQUIRING ACCESS IN AN
UNOBSTRUCTED LOCATION ABOVE LAY-IN CEILING. COORDINATE THE INSTALLATION OF A CEILING
ACCESS PANEL WITH GENERAL CONTRACTOR.
E. FIELD VERIFY LOCATION OF ALL FLOOR PENETRATIONS PRIOR TO CUTTING TO ASSURE THAT NO
FLOOR PENETRATION CONFLICTS WITH EXISTING BEAMS OR JOISTS. FLOOR PENETRATIONS SHALL
BE ONLY THROUGH THE SLAB. DO NOT CUT THROUG BEAMS OR JOISTS. NOTIFY ARCHITECT AND
ENGINEER FOR ANY REQUIRED MODIFICATIONS PRIOR TO CUTTING.
F. REFER TO TERMINAL UNIT SCHEDULE FOR PIPE RUNOUT SIZES.
G. MINIMUM PIPE SIZE SHALL NOT BE LESS THAN 3/4".
H. ALL NEW AIR-HANDLING SYSTEMS AND ASSOCIATED DISTRIBUTION SHALL COMPLY WITH NFPA-90A.
I. ALL DUCTWORK AND PIPE INSULATION SHALL BE INSTALLED CONTINUOUSLY THROUGH WALLS.
OPENINGS SHALL BE FRAMED LARGE ENOUGH TO ACCOMMODATE INSULATED PIPE/DUCT. ALLOW
ENOUGH ANNULAR SPACE FOR PROPER SEALANT. NON-RATED WALLS SHALL HAVE NON-
COMBUSTIBLE SEALANT. RATED BARRIERS SHALL HAVE A UL-LISTED FIRESTOPPING ASSEMBLY.
INSTALL FIRESTOPPING ASSEMBLY IN COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTALLATION
INSTRUCTIONS AND IN COMPLIANCE WITH UL-LISTED ASSEMBLY.
J. COORDINATE THERMOSTATS, HUMIDISTATS, DIFFERENTIAL PRESSURE SENSORS, AND ALL OTHER
WALL MOUNTED DEVICES WITH ALL DISCIPLINES PRIOR TO ROUGHING IN.
K. REFER TO H801 DRAWING FOR DETAILS. WHERE APPROPRIATE, SPECIFIC DETAILS HAVE BEEN
REFERENCED ON THE PLANS. IN ORDER TO MAINTAIN DRAWING CLARITY, NOT ALL DETAILS HAVE
BEEN CALLED OUT BUT DO PERTAIN TO THE SCOPE OF THIS PROJECT.
L. CONTRACTOR SHALL DRAIN SYSTEM PIPING AS NECESSARY. BUILDING WILL REMAIN IN OPERATION
DURING CONSTRUCTION.
M. PROTECT ALL SUPPLY, RETURN, AND EXHAUST AIR OPENINGS THROUGHOUT CONSTRUCTION FROM
DAMAGE, DIRT, AND DEBRIS.
N. CLEAN ALL SUPPLY DIFFUSERS, RETURN AIR GRILLES THAT ARE EXISTING TO REMAIN PRIOR TO
PROJECT COMPLETION TO REMOVE ANY DIRT OR DEBRIS.
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
Mechanical
Symbols and
General Notes
H00110300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290# Revision Description
Date
Issued
06/08/21
SECTION 23 05 00 - COMMON WORK RESULTS FOR MECHANICAL
PART 1 - GENERAL
1.2 SUBMITTALS
A. Operations Manual: Include the following:
1. Final processed submittals of all Division 23 specification sections.
2. Subcontractor contact list including name, phone number and e-mail contact information.
3. Field reports, including ductwork leakage testing and piping pressure testing.
4. Certifications of piping systems, equipment or systems if specified in the individual specification section.
5. Testing, adjusting and balancing reports.
6. Operations and maintenance information for all equipment.
C. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Engineer’s receipt of submittal.
1. Initial review: Allow 15 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent
submittals. Engineer will advise Contractor when a submittal must be delayed for coordination.
2. Concurrent review: Where concurrent review of submittals by Architect/Engineer’s Consultants, Owner or other parties is required, allow 21 days for initial review of
each submittal.
D. Submittal Schedule:
1. Contractor shall submit all submittals to the Engineer for initial review within 30 days of award of contract, or within the first 10% of the duration of the project,
whichever is less. Submittals which require processing completion prior to 45 days after award of contract shall be scheduled with the Engineer at least 14 days in
advance of their requested due date.
1.3 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store and install materials and equipment (including supports and hangers) such that they are maintaining “as-new”condition (e.g. no rust) upon installation and
up through the date of Substantial Completion. Account for environmental conditions of the construction site and schedule work accordingly.
B. Do not allow any materials nor equipment to be stored in standing water.
1.4 COORDINATION
A. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction, to allow for HVAC installations.
B. Coordinate installation of required supporting devices.
C. Coordinate requirements with all trades for the location and size of access doors and frames necessary to gain access to HVAC items. Coordinate these requirements
for all HVAC items that are concealed behind finished surfaces.
D. Existing Utilities: Do not interrupt utilities serving facilities occupied or partially occupied by the Owner or others unless specifically allowed under the following conditions
and then only after arranging to provide temporary utility services according to requirements indicated.
1. Notify Owner at least seven days in advance of proposed utility interruptions. Identify extent and duration of utility interruptions.
2. Indicate method of proposed utility interruptions in detail.
3. Do not proceed with proposed utility interruptions without Owner’s permission.
E. Coordinate new installations with the existing installations which will remain in place and be reutilized or those that are abandoned in place. Provide transitions and
fittings in ductwork and piping as well as extra lengths of ductwork and piping as required to route around these existing installations. Illustrate all such ductwork fittings
on the sheet metal duct shop drawing submittal. Existing installations include plumbing, piping, electrical and other building systems components including, but not
limited to, roof drain piping, sanitary piping, plumbing piping, fire protection piping, fire protection heads, heating and cooling water piping, condensate drains, steam and
condensate return piping, conduit, cable tray, electrical pull boxes, projectors, booms, etc. Coordinate installation of above ceiling components and devices such that
maintenance access is achieved at the completion of the project when all ceiling mounted components are installed. Coordinate with all trades. Ultimate responsibility for
any rework required to achieve maintenance access is the responsibility of the Contractor responsible for coordination as noted in Division 1 Sections.
F. Provide temporary connections to maintain existing systems in service during the construction. This may include ductwork, piping, power, controls, water, as well as
other connections as required.
G. Provide the Owner a schedule prior to the start of demolition with phased selected demolition identified by system and by floor. Identify required outages on the schedule
and any temporary measures required to maintain existing systems in service.
H. Coordinate the HVAC demolition with all aspects of demolition and temporary construction (including dust barriers) by other trades.
1.5 CONTRACT DOCUMENTS
A. The drawings indicate the general arrangement and scope of the systems and shall be followed insofar as possible. If deviations from the layout are necessitated by field
conditions, detailed layouts of the proposed departures shall be submitted in writing to the Engineer for approval before proceeding with the Work.
B. The drawings are not intended to show every vertical offset or horizontal offset that may be necessary to complete the system or clear obstructions and/or the Work of
other Contractors and other trades. Contractors shall anticipate during bidding that additional offsets may be required and include same in their proposals.
C. The Drawings, Schedules and Specifications shall be considered to be cooperative and anything appearing in the Specifications that may not be indicated on the
Drawings or vice-versa, shall be considered as part of the Contract and must be executed by the Contractor the same as though indicated by both. Clarify conflicting
statements with the Engineer prior to submitting a bid.
D. Measurements: Contractor shall make all his own measurements in the field and shall be responsible for correct fitting. He shall coordinate this Work with all other
branches and trades in such a manner as to cause a minimum of conflict or delay. The Contractor shall coordinate his work in advance with all other trades and report
immediately any difficulty which can be anticipated and propose solutions to resolve the potential difficulty.
E. Adjustments to Work in the Field:
1. The Engineer reserves the right to make minor adjustments (maximum of 10’-0”) in location of sensors, valving, ductwork, dampers, conduit, \drains, piping,
hangers and/or equipment at no additional charge if so directed prior to their installation.
2. Where the Drawings show equipment, casework, structure, fire rated construction, or the like, Contractors shall lay out the work to avoid conflicts.
3. Where offsets in piping, additional fittings, necessary drains, minor valves, traps and devices are required to complete the installation, to clear obstructions, or for
the proper operation of the system (including air vents and drains), these shall be deemed to be included in the Contract and shall be furnished and installed
complete by the Contractor at no additional charge.
4. Where offsets in ductwork, additional fittings, necessary transitions, minor fittings, dampers, accessories and devices are required to complete the installation, to
clear obstructions, or for the proper operation of the system, these shall be deemed to be included in the Contract and shall be furnished and installed complete by
the Contractor at no additional charge.
F. Clearances: All installations shall be made to maintain maximum headroom and clearance around equipment. When space and/or headroom appear inadequate, the
Contractor shall notify the Engineer prior to proceeding with the installation. No claims for additional compensation will be approved for failure on the part of the
Contractor or his Subcontractor to comply with this requirement.
PART 2 - PRODUCTS -NOT USED
PART 3 - EXECUTION
3.1 HVAC DEMOLITION
A. Disconnect, demolish, and remove HVAC systems, equipment, and components indicated to be removed. No equipment or components shall be abandoned in place
unless specifically noted on the drawings.
1. Piping to Be Removed: Remove portion of piping indicated to be removed and cap remaining piping with same or compatible piping material.
2. Ducts to Be Removed: Remove portion of ducts indicated to be removed and cap remaining ducts with same or compatible ductwork material. Seal remaining
ductwork to seal Class C. Duct tape is not permitted.
3. Equipment to Be Removed: Disconnect and remove services and remove equipment. Cap piping and ductwork as required.
4. Equipment Piping and Ductwork to Be Removed and Salvaged: Disconnect and cap services and remove equipment. Owner shall be given first right of refusal to
all items removed from the Owner’s facility or property. Deliver salvaged items to Owner at location requested by Owner.
5. When removing piping and ductwork components, all accessories, hangers, insulation and hanger rods shall be removed also.
6. Provide temporary hangers for any pipe or duct to remain which has had hangers removed such that hanger spacing does not exceed 10’-0”.
7. Provide temporary hangers for any pipe or duct which was supported by a wall which was removed.
8. Locate and identify mechanical systems passing through the affected demolition area which serves other areas outside the demolition limits. Provide information to
the Engineer directly of any questionable items.
9. Systems serving areas outside the work limits shall remain uninterrupted unless specifically authorized in writing by the Owner.
B. If pipe, insulation, or equipment is damaged in appearance or is unserviceable due to demolition work, remove damaged or unserviceable portions and replace with new
products of equal capacity and quality.
C. All caps installed shall be installed and located such that the pipe or duct may be reconnected to and extended without relocation of other components while utilizing
standard fittings. Coordinate with all trades such that any existing, temporary or new installations by other trades does not block access to caps.
D. Confirm with the Owner, which if any, supply, return or exhaust air openings associated with systems which serve the project area may remain in use during construction.
Cover all supply, return and exhaust air openings with synthetic air filter media, 1-inch thick, with non-oily tackified surface, with a dust holding capacity of at least 250
grams per square yard, an average dust spot arrestance of at least 85 percent, and a MERV rating of at least 6. Allow in the bid to replace the air filter media at least
once per month and more often as required for proper operation of the fan systems.
E. Removal of portions of systems which are energized or will be energized at any point during the construction project shall be accomplished by skilled trades who will be
contractually engaged in connecting new work (piping, ductwork or caps thereof) to these same systems.
3.2 PIPING SYSTEMS -COMMON REQUIREMENTS
A. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements were used to size pipe
and calculate friction loss, expansion, pump sizing, and other design considerations. Demo piping as indicated unless deviations to layout are approved on Coordination
Drawings.
3.3 CUTTING AND PATCHING
A. Refer to Division 2 for general cutting and patching requirements and procedures.
B. Cut, channel and drill floors, walls, partitions, shafts, ceiling sand other surfaces required to permit electrical installations and demolition. Perform cutting by skilled
mechanics of trades involved.
C. Repair and refinish disturbed finish materials and other surfaces to match adjacent undisturbed surfaces. Install new fireproofing where existing firestopping has been
disturbed. Repair and refinish materials and other surfaces by skilled mechanics of trades involved.
3.4 FIRESTOPPING
A. Apply firestopping to penetrations of fire-rated floor and wall assemblies for all installations to restore original fire-resistance rating of assembly. Apply firestopping to
structure where demolition exposes the structure. Firestopping materials and installation requirements are specified in Division 7 Section “Firestopping”.
B. Apply firestopping as indicated to seal penetrations in Paragraph “Penetration Sealing”.
C. Apply firestopping to all penetrations of smoke barriers. Provide an approved through penetration firestop system installed and tested in accordance with the
requirements of UL 1479 for air leakage. The L rating for each firestop system shall not exceed 5.0 cfm per square foot at 0.30 inches of water in both ambient and
elevated temperature tests.
3.5 PENETRATION SEALING
A. Horizontal assembly penetrations of all floors, floor/ceiling assemblies and ceiling membranes of roof/ceiling assemblies shall be sealed as follows:
1. Non-fire resistance rated assemblies with non-combustible penetrating items shall utilize annular space fill or penetration firestopping.
2. Fire resistance rated assemblies shall utilize penetration firestopping.
B. All enclosed spaces which house HVAC equipment shall have all penetrations of the horizontal and vertical membranes which separate the space from occupied and
unoccupied building spaces sealed.
C. Penetrations to be sealed shall include, at a minimum, all piping, ductwork, conduit and cabling penetrations installed.
3.6 CLEANING AND PROTECTION
A. On completion of installation, inspect exposed finish. Remove burrs, dirt, paint spots and construction debris. This requirement applies for components including
piping and ductwork which are located above lay-in and hard ceilings, especially their upper surfaces prone to collect dust and debris.
B. Protect equipment and installations and maintain conditions to ensure that coatings, finishes, and cabinets are without damage or deterioration at time of Substantial
Completion. Repair all coatings, finishes and cabinets to “as-new”conditions prior to turning project over to owner.
END OF SECTION 23 05 00
SECTION 230529 -HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
PART 1 -GENERAL
1.1 SUMMARY
A. Section Includes:
1. Metal pipe hangers and supports.
2. Trapeze pipe hangers.
3. Thermal-hanger shield inserts.
4. Fastener systems.
5. Equipment supports.
PART 2 -PRODUCTS
2.1 METAL PIPE HANGERS AND SUPPORTS
A. Copper Pipe and Tube Hangers:
1. Description: MSS SP-58, Types 1 through 58, copper-plated steel, factory-fabricated components.
2. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainless steel.
2.2 TRAPEZE PIPE HANGERS
A. Description: MSS SP-58, Type 59, shop-or field-fabricated pipe-support assembly made from structural carbon-steel shapes with MSS SP-58 carbon-steel hanger
rods, nuts, saddles, and U-bolts.
2.3 THERMAL-HANGER SHIELD INSERTS
A. Insulation-Insert Material for Cold Piping: ASTM C552, Type II cellular glass with 100-psi (688-kPa) or ASTM C591, Type VI, Grade 1 polyisocyanurate with 125-psi
(862-kPa) minimum compressive strength and vapor barrier.
B. For Trapeze or Clamped Systems: Insert and shield shall cover entire circumference of pipe.
C. For Clevis or Band Hangers: Insert and shield shall cover lower 180 degrees of pipe.
D. Insert Length: Extend 2 inches (50 mm) beyond sheet metal shield for piping operating below ambient air temperature.
2.4 FASTENER SYSTEMS
A. Mechanical-Expansion Anchors: Insert-wedge-type, [zinc-coated ] [stainless-]steel anchors, for use in hardened portland cement concrete; with pull-out, tension, and
shear capacities appropriate for supported loads and building materials where used.
2.5 EQUIPMENT SUPPORTS
A. Description: Welded, shop-or field-fabricated equipment support made from structural carbon-steel shapes.
PART 3 -EXECUTION
3.1 APPLICATION
A. Comply with requirements in Section 078413 "Penetration Firestopping" for firestopping materials and installation for penetrations through fire-rated walls, ceilings, and
assemblies.
B. Strength of Support Assemblies: Where not indicated, select sizes of components so strength will be adequate to carry present and future static loads within specified
loading limits.
3.2 HANGER AND SUPPORT INSTALLATION
A. Metal Pipe-Hanger Installation: Comply with MSS SP-58. Install hangers, supports, clamps, and attachments as required to properly support piping from the building
structure.
B. Metal Trapeze Pipe-Hanger Installation: Comply with MSS SP-58. Arrange for grouping of parallel runs of horizontal piping, and support together on field-fabricated
trapeze pipe hangers.
1. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size or install intermediate supports for smaller diameter pipes as specified for
individual pipe hangers.
2. Field fabricate from ASTM A36/A36M, carbon-steel shapes selected for loads being supported. Weld steel according to AWS D1.1/D1.1M.
C. Metal Framing System Installation: Arrange for grouping of parallel runs of piping, and support together on field-assembled strut systems.
D. Thermal-Hanger Shield Installation: Install in pipe hanger or shield for insulated piping.
E. Fastener System Installation:
1. Install mechanical-expansion anchors in concrete after concrete is placed and completely cured. Install fasteners according to manufacturer's written instructions.
F. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.
G. Equipment Support Installation: Fabricate from welded-structural-steel shapes.
H. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to
facilitate action of expansion joints, expansion loops, expansion bends, and similar units.
I. Install lateral bracing with pipe hangers and supports to prevent swaying.
J. Install building attachments within concrete slabs or attach to structural steel
K. Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.
L. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services
piping.
M. Insulated Piping:
1. Attach clamps and spacers to piping.
a. Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.
2. Install MSS SP-58, Type 39, protection saddles if insulation without vapor barrier is indicated. Fill interior voids with insulation that matches adjoining insulation.
3. Install MSS SP-58, Type 40, protective shields on cold piping with vapor barrier. Shields shall span an arc of 180 degrees.
4. Shield Dimensions for Pipe: Not less than the following:
a. NPS 1/4 to NPS 3-1/2 (DN 8 to DN 90): 12 inches (305 mm) long and 0.048 inch (1.22 mm) thick.
5. Thermal-Hanger Shields: Install with insulation same thickness as piping insulation.
3.3 EQUIPMENT SUPPORTS
A. Fabricate structural-steel stands to suspend equipment from structure overhead or to support equipment above floor.
B. Grouting: Place grout under supports for equipment and make bearing surface smooth.
C. Provide lateral bracing, to prevent swaying, for equipment supports.
3.4 METAL FABRICATIONS
A. Cut, drill, and fit miscellaneous metal fabrications for trapeze pipe hangers and equipment supports.
B. Fit exposed connections together to form hairline joints. Field weld connections that cannot be shop welded because of shipping size limitations.
C. Field Welding: Comply with AWS D1.1/D1.1M procedures for shielded, metal arc welding; appearance and quality of welds; and methods used in correcting welding
work; and with the following:
1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.
2. Obtain fusion without undercut or overlap.
3. Remove welding flux immediately.
4. Finish welds at exposed connections so no roughness shows after finishing and so contours of welded surfaces match adjacent contours.
3.5 ADJUSTING
A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.
B. Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches (40 mm).
3.6 HANGER AND SUPPORT SCHEDULE
A. Specific hanger and support requirements are in Sections specifying piping systems and equipment.
B. Comply with MSS SP-58 for pipe-hanger selections and applications that are not specified in piping system Sections.
C. Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finish.
D. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.
E. Use copper-plated pipe hangers and stainless-steel attachments for copper piping and tubing.
F. Use padded hangers for piping that is subject to scratching.
G. Use thermal-hanger shield inserts for insulated piping and tubing.
H. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of noninsulated or insulated, stationary pipes NPS 1/2 to NPS 30 (DN 15 to DN 750).
2. Yoke-Type Pipe Clamps (MSS Type 2): For suspension of up to 1050 deg F (566 deg C), pipes NPS 4 to NPS 24 (DN 100 to DN 600), requiring up to 4 inches
(100 mm) of insulation.
3. Carbon-or Alloy-Steel, Double-Bolt Pipe Clamps (MSS Type 3): For suspension of pipes NPS 3/4 to NPS 36 (DN 20 to DN 900), requiring clamp flexibility and up
to 4 inches (100 mm) of insulation.
I. Hanger-Rod Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel Clevises (MSS Type 14): For 120 to 450 deg F (49 to 232 deg C) piping installations.
2. Swivel Turnbuckles (MSS Type 15): For use with MSS Type 11, split pipe rings.
3. Malleable-Iron Sockets (MSS Type 16): For attaching hanger rods to various types of building attachments.
4. Steel Weldless Eye Nuts (MSS Type 17): For 120 to 450 deg F (49 to 232 deg C) piping installations.
J. Building Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel or Malleable Concrete Inserts (MSS Type 18): For upper attachment to suspend pipe hangers from concrete ceiling.
2. Center-Beam Clamps (MSS Type 21): For attaching to center of bottom flange of beams.
K. Saddles and Shields: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel-Pipe-Covering Protection Saddles (MSS Type 39): To fill interior voids with insulation that matches adjoining insulation.
2. Protection Shields (MSS Type 40): Of length recommended in writing by manufacturer to prevent crushing insulation.
3. Thermal-Hanger Shield Inserts: For supporting insulated pipe.
L. Comply with MSS SP-58 for trapeze pipe-hanger selections and applications that are not specified in piping system Sections.
M. Use mechanical-expansion anchors instead of building attachments where required in concrete construction.
END OF SECTION 230529
SECTION 230553 -IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
PART 2 - PRODUCTS
2.1 LABELS
A. Equipment Labels: Engraved, color-coded, multi-layer, multi-color laminated plastic for mechanical engraving. Include contact-type, permanent adhesive suitable for
surface temperature of equipment.
1. Terminology: Match Owner’s numbering scheme or drawing schedules with unique equipment number.
2. Size: Length and width vary for required label content, but not less than 4-1/2” by 6” for equipment.
3. Thickness: Minimum 1/8”thick
4. Letters: Minimium ½”.
B. General Requirements for Manufactured Pipe Labels: Preprinted, color-coded, with lettering indicating service, and showing flow direction.
1. Self-Adhesive Pipe Labels: Printed plastic with contact-type, permanent-adhesive backing.
2. Pipe Label Contents: Include identification of piping service using same designations or abbreviations as used on Drawings, pipe size, and an arrow indicating
flow direction.
a. Flow-Direction Arrows: Integral with piping system service lettering to accommodate both directions, or as separate unit on each pipe label to indicate flow
direction.
b. Lettering Size: At least 1-1/2 inches (38 mm) high.
C. Duct Labels: Preprinted, color-coded with lettering indicating service. Include direction of airflow and duct service (supply, return, exhaust, etc.). Include contact-type,
permanent adhesive.
D. Valve Tags: Stamped or engraved with 1/4-inch (6.4-mm) letters for piping system abbreviation and 1/2-inch (13-mm) numbers.
1. Tag Material: Brass, 0.032-inch (0.8-mm) minimum thickness, and having predrilled or stamped holes for attachment hardware.
2. Fasteners: Brass wire-link or beaded chain; or S-hook.
PART 3 - EXECUTION
3.1 LABEL INSTALLATION
A. Install or permanently fasten labels on each major item of mechanical equipment.
B. Locate equipment labels where accessible and visible.
C. Install self-adhesive duct labels with permanent adhesive on air ducts in the following color codes:
1. Blue: For cold-air supply ducts.
2. Yellow: For hot-air supply ducts.
3. Green: For exhaust-, outside-, relief-, return-, and mixed-air ducts.
D. Locate labels near points where ducts enter into concealed spaces and at maximum intervals of 50 FT in each space where ducts are exposed or concealed by
removable ceiling system.
END OF SECTION 230553
SECTION 230593 -TESTING, ADJUSTING, AND BALANCING FOR HVAC
PART 1 - GENERAL
1.1 PROJECT CONDITIONS
A. Full Owner Occupancy: Owner will occupy the site and existing building during entire TAB period. Cooperate with Owner during TAB operations to minimize conflicts
with Owner's operations.
PART 3 - EXECUTION
3.1 PREPARATION
A. Prepare a TAB plan that includes strategies and step-by-step procedures.
B. Complete system-readiness checks and prepare reports.
3.2 GENERAL PROCEDURES FOR TESTING AND BALANCING
A. Cut insulation, ducts, pipes, and equipment cabinets for installation of test probes to the minimum extent necessary for TAB procedures.
1. After testing and balancing, patch probe holes in ducts with same material and thickness as used to construct ducts.
2. Install and join new insulation that matches removed materials. Restore insulation, coverings, vapor barrier, and finish according to Division 23 Section "HVAC
Insulation."
B. Mark equipment and balancing devices, including damper-control positions, valve position indicators, fan-speed-control levers, and similar controls and devices, with
paint or other suitable, permanent identification material to show final settings.
3.3 GENERAL PROCEDURES FOR BALANCING AIR SYSTEMS
A. Prepare schematic diagrams of systems' "as-built" duct layouts.
B. Determine the best locations in main and branch ducts for accurate duct-airflow measurements.
C. Locate start-stop and disconnect switches, electrical interlocks, and motor starters.
D. Check dampers for proper position to achieve desired airflow path.
E Check for airflow blockages.
F. Verify that air duct system is sealed as specified in Division 23 Section "Metal Ducts."
3.5 TOLERANCES
A. Set HVAC system's air flow rates and water flow rates within the following tolerances:
1. Air Outlets and Inlets: Plus or minus 5 percent.
2. Heating Hot-Water Flow Rate: Plus or minus 5 percent.
3.6 FINAL REPORT
A. General: Prepare a certified written report; tabulate and divide the report into separate sections for tested systems and balanced systems.
1. Include a certification sheet at the front of the report's binder, signed and sealed by the certified testing and balancing engineer.
2. Include a list of instruments used for procedures, along with proof of calibration.
B. Final Report Contents: In addition to certified field-report data, include the following:
1. Field test reports prepared by system and equipment installers.
2. Other information relative to equipment performance; do not include Shop Drawings and product data.
C. General Report Data: In addition to form titles and entries, include the following data:
1. Title page, Name and address of the TAB contractor, Project name, Project location, Engineer's name and address, Contractor's name and address, Report date,
Signature of TAB supervisor who certifies the report.
10. Table of Contents with the total number of pages defined for each section of the report. Number each page in the report.
11. Summary of contents including the following:
a. Indicated versus final performance.
b. Notable characteristics of systems.
12. Data for terminal units, including manufacturer's name, type, size, and fittings.
13. Notes to explain why certain final data in the body of reports vary from indicated values.
D. Round, Flat-Oval, and Rectangular Duct Traverse Reports: Include a diagram with a grid representing the duct cross-section and record the following:
1. Report Data:
a. System and air-handling-unit number.
b. Location and zone.
c. Traverse air temperature in deg F (deg C).
d. Duct static pressure in inches wg (Pa).
e. Duct size in inches (mm).
f. Duct area in sq. ft. (sq. m).
g. Indicated air flow rate in cfm (L/s).
h. Indicated velocity in fpm (m/s).
i. Actual air flow rate in cfm (L/s).
j. Actual average velocity in fpm (m/s).
k. Barometric pressure in psig (Pa).
E. Air-Terminal-Device Reports:
1. Unit Data:
a. System and air-handling unit identification.
b. Location and zone.
c. Apparatus used for test.
d. Area served.
e. Make.
f. Number from system diagram.
g. Type and model number.
h. Size.
i. Effective area in sq. ft. (sq. m).
2. Test Data (Indicated and Actual Values):
a. Air flow rate in cfm (L/s).
b. Air velocity in fpm (m/s).
c. Preliminary air flow rate as needed in cfm (L/s).
d. Preliminary velocity as needed in fpm (m/s).
e. Final air flow rate in cfm (L/s).
f. Final velocity in fpm (m/s).
g. Space temperature in deg F (deg C).
h. Entering-water temperature in deg F (deg C).
i. Leaving-water temperature in deg F (deg C).
j. Water flow in GPM.
k. Balance valve position.
l. Water pressure drop in feet of head or psig (kPa).
m. Entering-air temperature in deg F (deg C).
n. Leaving-air temperature in deg F (deg C).
3.7 ADDITIONAL TESTS
A. Within 90 days of completing TAB, perform additional TAB to verify that balanced conditions are being maintained throughout and to correct unusual conditions.
B. Seasonal Periods: If initial TAB procedures were not performed during near-peak summer and winter conditions, perform additional TAB during near-peak summer
and
winter conditions.
END SECTION 230593
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
HVAC
Specifications
H00210300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290# Revision Description
Date
Issued
06/08/21
SECTION 23 07 13 -DUCT INSULATION
PART 1 - GENERAL
1.1 SUBMITTALS
A. Product Data: For each type of product indicated. Include thermal conductivity, water-vapor permeance thickness, and jackets (both factory-and field-applied if any).
Submit detail application of protective shields, saddles, and inserts at hangers for each type of insulation, hangers, elbows, fittings, dampers, specialties and flanges for
each type of insulation.
1.2 QUALITY ASSURANCE
A. Surface-Burning Characteristics: For insulation and related materials, as determined by testing identical products according to ASTM E 84, by a testing agency
acceptable to authorities having jurisdiction.
1. Insulation Installed Indoors: Flame-spread index of 25 or less, and smoke-developed index of 50 or less.
2. Insulation Installed Outdoors: Flame-spread index of 75 or less, and smoke-developed index of 150 or less.
PART 2 - PRODUCTS
2.1 INSULATION MATERIALS
A. Mineral-Fiber Blanket Insulation: Mineral or glass fibers bonded with a thermosetting resin. Comply with ASTM C 553, Type III with factory-applied FSK jacket.
Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article.
1. Products: Subject to compliance with requirements, provide one of the following:
a. CertainTeed Corp.; SoftTouch Duct Wrap.
b. Johns Manville; Microlite.
c. Knauf Insulation; Friendly Feel Duct Wrap.
e. Owens Corning; SOFTR All-Service Duct Wrap.
B. Mineral-Fiber Board Insulation: Mineral or glass fibers bonded with a thermosetting resin. Comply with ASTM C 612, Type IA or Type IB. For duct and plenum
applications, provide insulation with factory-applied FSK jacket. Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article.
1. Products: Subject to compliance with requirements, provide one of the following:
a. CertainTeed Corp.; Commercial Board.
b. Fibrex Insulations Inc.; FBX.
c. Johns Manville; 800 Series Spin-Glas.
d. Knauf Insulation; Insulation Board.
e. Owens Corning; Fiberglas 700 Series.
PART 3 - EXECUTION
3.1 PREPARATION
A. Surface Preparation: Clean and dry surfaces to receive insulation. Remove materials that will adversely affect insulation application. Ensure all systems to be insulated
have been tested and operating satisfactorily according to the requirements listed in the document prior to proceeding.
3.2 GENERAL INSTALLATION REQUIREMENTS
A. Seal joints, seams, and penetrations in insulation at hangers, supports, anchors, and other projections with vapor-barrier mastic.
1. Install insulation continuously through hangers and around anchor attachments.
2. For insulation application where vapor barriers are indicated, extend insulation on anchor legs from point of attachment to supported item to point of attachment to
structure. Taper and seal ends at attachment to structure with vapor-barrier mastic.
3. Install insert materials and install insulation to tightly join the insert. Seal insulation to insulation inserts with adhesive or sealing compound recommended by
insulation material manufacturer.
B. Repair damaged insulation facings by applying same facing material over damaged areas. Extend patches at least 4 inches (100 mm) beyond damaged areas.
Adhere, staple, and seal patches similar to butt joints.
C. Insulation Installation at Interior Wall and Partition Penetrations (That Are Not Fire Rated): Install insulation continuously through walls and partitions.
D. Insulation Installation at Fire-Rated Wall and Partition Penetrations (with Fire or Fire/Smoke dampers): Terminate insulation at fire damper sleeves for fire-rated wall and
partition penetrations. Externally insulate damper sleeves to match adjacent insulation and overlap duct insulation at least 2 iinches (50 mm). Walls that are not required
to have dampers shall be treated the same as non-rated wall and have continuous duct insulation.
1. Comply with requirements in Division 07 Section "Penetration Firestopping" firestopping and fire-resistive joint sealers.
E. Blanket Insulation Installation on Ducts and Plenums: Secure with adhesive and insulation pins.
1. Install either capacitor-discharge-weld pins and speed washers or cupped-head, capacitor-discharge-weld pins on sides and bottom of horizontal ducts and sides of
vertical ducts as follows:
a. On duct sides with dimensions 18 inches (450 mm) and smaller, place pins along longitudinal centerline of duct. Space 3 inches (75 mm) maximum from
insulation end joints, and 16 inches (400 mm) o.c.
b. On duct sides with dimensions larger than 18 inches (450 mm), place pins 16 inches (400 mm) o.c. each way, and 3 inches (75 mm) maximum from insulation
joints. Install additional pins to hold insulation tightly against surface at cross bracing.
c. Pins may be omitted from top surface of horizontal, rectangular ducts and plenums.
d. Do not over-compress insulation during installation.
e. Impale insulation over pins and attach speed washers.
f. Cut excess portion of pins extending beyond speed washers or bend parallel with insulation surface. Cover exposed pins and washers with tape matching
insulation facing.
2. For ducts and plenums with surface temperatures below ambient, install a continuous unbroken vapor barrier. Create a facing lap for longitudinal seams and end
joints with insulation by removing 2 inches (50 mm) from one edge and one end of insulation segment. Secure laps to adjacent insulation section with 1/2-inch
(13-mm) outward-clinching staples, 1 inch (25 mm) o.c. Install vapor barrier consisting of factory-or field-applied jacket, adhesive, vapor-barrier mastic, and sealant
at joints, seams, and protrusions.
a. Repair punctures, tears, and penetrations with tape or mastic to maintain vapor-barrier seal.
b. Install vapor stops for ductwork and plenums operating below 50 deg. F (10 deg. C) at 18-foot (5.5-m) intervals. Vapor stops shall consist of vapor-barrier
mastic applied in a Z-shaped pattern over insulation face, along butt end of insulation, and over the surface. Cover insulation face and surface to be insulated
a width equal to two times the insulation thickness, but not less than 3 inches (75 mm).
3. Insulate duct stiffeners, hangers, and flanges that protrude beyond insulation surface with 6-inch-(150-mm-) wide strips of same material used to insulate duct.
Secure on alternating sides of stiffener, hanger, and flange with pins spaced 6 inches (150 mm) o.c.
3.3 INDOOR DUCT AND PLENUM INSULATION SCHEDULE
A. Concealed supply-air duct insulation shall be one of the following:
1. Mineral-Fiber Blanket: 2 inches thick and 1.0-lb/cu. ft. nominal density. Increase thickness or density as required to achieve R-6.0 installed.
2. Mineral-Fiber Board: 2 inches thick and 2-lb/cu. ft. nominal density. Increase thickness or density as required to achieve R-6.0 installed.
B. Concealed return-air duct insulation shall be the following:
1. Mineral-Fiber Blanket: 1-1/2 inches thick and 0.75-lb/cu. ft. nominal density. Increase thickness or density as required to achieve R-4.5 installed.
2. Mineral-Fiber Board: 1-1/2 inches thick and 2-lb/cu. ft. nominal density. Increase thickness or density as required to achieve R-4.5 installed.
END SECTION 23 07 13
SPECIFICATION 230900 - INSTRUMENTATION AND CONTROL FOR HVAC
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes control equipment for HVAC systems and components, including control components for terminal heating and cooling units not supplied with
factory-wired controls.
1.3 SYSTEM PERFORMANCE
A. Comply with the following performance requirements:
1. Existing Building Management System: System to remain. New devices shall tie-into existing system. Communication speed shall be consistent with existing
system capabilities.
2. Reporting Accuracy and Stability of Control: Report values and maintain measured variables within tolerances as follows:
a. Water Temperature: Plus or minus 1 deg. F (0.5 deg.C).
b. Water Flow: Plus or minus 5 percent of full scale.
c. Water Pressure: Plus or minus 2 percent of full scale.
d. Space Temperature: Plus or minus 1 deg. F (0.5 deg. C).
e. Ducted Air Temperature: Plus or minus 1 deg. F (0.5 deg. C).
f. Airflow (Measuring Stations): Plus or minus 5 percent of full scale.
j. Airflow (Terminal): Plus or minus 10 percent of full scale.
k. Air Pressure (Ducts): Plus or minus 0.1-inch wg (25 Pa).
1.4 SUBMITTALS
A. Product Data: Include manufacturer's technical literature for each control device. Indicate dimensions, capacities, performance characteristics, electrical characteristics,
finishes for materials, and installation and startup instructions for each type of product indicated.
1. DDC System Hardware: Bill of materials of equipment indicating quantity, manufacturer, and model number. Include technical data for operator workstation
equipment, interface equipment, control units, transducers/transmitters, sensors, actuators, valves, relays/switches, control panels, and operator interface
equipment.
2. Controlled Systems: Instrumentation list with element name, type of device, manufacturer, model number, and product data. Include written description of
sequence of operation including schematic diagram.
B. Shop Drawings: Detail equipment assemblies and indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and
size of each field connection.
1. Bill of materials of equipment indicating quantity, manufacturer, and model number.
2. Schematic flow diagrams showing fans, pumps, coils, dampers, valves, and control devices.
3. Wiring Diagrams: Power, signal, and control wiring.
4. Details of control panel faces, including controls, instruments, and labeling.
5. Written description of sequence of operation.
6. Schedule of dampers including size, leakage, and flow characteristics.
7. Schedule of valves including flow characteristics.
8. DDC System Hardware:
a. Wiring diagrams for control units with termination numbers.
b. Schematic diagrams and floor plans for field sensors and control hardware.
c. Schematic diagrams for control, communication, and power wiring, showing trunk data conductors and wiring between operator workstation and control unit
locations.
SPECIFICATION 230900 -INSTRUMENTATION AND CONTROL FOR HVAC (cont.)
9. Controlled Systems:
a. Schematic diagrams of each controlled system with control points labeled and control elements graphically shown, with wiring.
b. Scaled drawings showing mounting, routing, and wiring of elements including bases and special construction.
c. Written description of sequence of operation including schematic diagram.
d. Points list.
1.5 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For HVAC instrumentation and control system to include in emergency, operation, and maintenance manuals. In addition to items
specified in Division 01 Section "Operation and Maintenance Data," include the following:
1. Interconnection wiring diagrams with identified and numbered system components and devices.
1.6 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having
jurisdiction, and marked for intended use.
B. Comply with ASHRAE 135 BACnet for DDC system components. Provide LONworks where the existing facility utilizes that communication protocol.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Factory-Mounted Components: Where control devices specified in this Section are indicated to be factory mounted on equipment, arrange for shipping of control
devices to equipment manufacturer.
B. System Software: Update to latest version of software at Project completion.
1.8 COORDINATION
A. Coordinate location of thermostats, humidistats, and other exposed control sensors with plans and room details before installation.
B. Coordinate equipment with Division 26 Section "Panelboards" to achieve compatibility with starter coils and annunciation devices.
C. Coordinate equipment with Division 26 Section "Motor-Control Centers" to achieve compatibility with motor starters, variable frequency drives, and annunciation devices.
PART 2 - PRODUCTS
2.1 CONTROL SYSTEM
A. Manufacturers: Confirm allowable manufacturer/installer with owner. Manufacturer is based on the facility where the work is to occur:
B. Control system shall consist of sensors, indicators, actuators, final control elements, interface equipment, other apparatus, and accessories to control mechanical
systems.
C. Control system shall consist of sensors, indicators, actuators, final control elements, interface equipment, other apparatus, accessories, and software connected to
distributed controllers operating in multiuser, multitasking environment on token-passing network and programmed to control mechanical systems. An operator
workstation permits interface with the network via dynamic color graphics with each mechanical system, building floor plan, and control device depicted by
point-and-click graphics.
2.2 DDC EQUIPMENT
A. Control Units: Modular, comprising processor board with programmable, nonvolatile, random-access memory; local operator access and display panel; integral interface
equipment; and backup power source.
1. Units monitor or control each I/O point; process information; execute commands from other control units, devices, and operator stations; and download from or
upload to operator workstation or diagnostic terminal unit.
2. Stand-alone mode control functions operate regardless of network status. Functions include the following:
a. Global communications.
b. Discrete/digital, analog, and pulse I/O.
c. Monitoring, controlling, or addressing data points.
d. Software applications, scheduling, and alarm processing.
e. Testing and developing control algorithms without disrupting field hardware and controlled environment.
3. Standard Application Programs:
a. Electric Control Programs: Demand limiting, duty cycling, automatic time scheduling, start/stop time optimization, night setback/setup, on-off control with
differential sequencing, staggered start, anti-short cycling, PID control, DDC with fine tuning, and trend logging.
b. HVAC Control Programs: Optimal run time, supply-air reset, and enthalpy switchover.
d. Programming Application Features: Include trend point; alarm processing and messaging; weekly, monthly, and annual scheduling; run-time totalization.
e. Remote communications.
f. Maintenance management.
g. Units of Measure: Inch-pound and SI (metric).
4. Local operator interface provides for download from or upload to operator workstation or diagnostic terminal unit.
5. ASHRAE 135 BACnet Compliance: Control units shall use ASHRAE 135 protocol and communicate using ISO 8802-3 (Ethernet) datalink/physical layer protocol.
Utilize LONworks where the existing facility utilizes that communication protocol.
B. Local Control Units: Modular, comprising processor board with electronically programmable, nonvolatile, read-only memory; and backup power source.
1. Units monitor or control each I/O point, process information, and download from or upload to operator workstation or diagnostic terminal unit.
2. Stand-alone mode control functions operate regardless of network status. Functions include the following:
a. Global communications.
b. Discrete/digital, analog, and pulse I/O.
c. Monitoring, controlling, or addressing data points.
3. Local operator interface provides for download from or upload to operator workstation or diagnostic terminal unit.
4. ASHRAE 135 BACnet Compliance: Control units shall use ASHRAE 135 protocol and communicate using ISO 8802-3 (Ethernet) datalink/physical layer protocol.
Utilize LONworks where the existing facility utilizes that communication protocol.
C. I/O Interface: Hardwired inputs and outputs may tie into system through controllers. Protect points so that shorting will cause no damage to controllers.
1. Binary Inputs: Allow monitoring of on-off signals without external power.
2. Pulse Accumulation Inputs: Accept up to 10 pulses per second.
3. Analog Inputs: Allow monitoring of low-voltage (0-to 10-V dc), current (4 to 20 mA), or resistance signals.
4. Binary Outputs: Provide on-off or pulsed low-voltage signal, selectable for normally open or normally closed operation.
5. Analog Outputs: Provide modulating signal, either low voltage (0-to 10-V dc) or current (4 to 20 mA).
D. Power Supplies: Transformers with Class 2 current-limiting type or overcurrent protection; limit connected loads to 80 percent of rated capacity. DC power supply shall
match output current and voltage requirements and be full-wave rectifier type with the following:
1. Output ripple of 5.0 mV maximum peak to peak.
2. Combined 1 percent line and load regulation with 100-mic.sec. response time for 50 percent load changes.
3. Built-in overvoltage and overcurrent protection and be able to withstand 150 percent overload for at least 3 seconds without failure.
E. Power Line Filtering: Internal or external transient voltage and surge suppression for workstations or controllers with the following:
1. Minimum dielectric strength of 1000 V.
2. Maximum response time of 10 nanoseconds.
3. Minimum transverse-mode noise attenuation of 65 dB.
4. Minimum common-mode noise attenuation of 150 dB at 40 to 100 Hz.
2.3 ELECTRONIC SENSORS
A. Description: Vibration and corrosion resistant; for wall, immersion, or duct mounting as required.
B. Temperature Sensors:
1. Duct sensors shall utilize averaging elements, 1000 OHM nickel Resistance Temperature Detectors (RTD) having an accuracy of ±0.5 deg. F.
C. Space Sensors:
1. Space sensors located in private offices, conference rooms, other areas deemed “non-public” or as noted on the drawings shall have exposed external set-point
adjustment and digital LCD display capable of displaying setpoint and actual sensed temperature.
2. Set-point adjustment to be a maximum plus and minus 4 degrees from the null setpoint programmed through the DDC system. Comply with facility standard for
existing facilities.
3. Space sensors may be (RTD) 1,000 Ohm nickel with an accuracy of ±0.5 deg. F.
4. Space sensor shall be of a neutral color (white, or other customer approved color) unless noted otherwise on the Drawings. Coordinate and match other devices
in the vicinity.
5. Provide insulating bases for all sensors located on exterior walls and on exterior column wraps. Foam seal cavity and junction box prior to installing insulating base.
6. Space sensors with occupant set-point adjustment shall be adjustable from the operator’s work station as to the deadband of adjustability allowed to the occupants.
2.4 ACTUATORS
A. Electric Motors: Size to operate with sufficient reserve power to provide smooth modulating action or two-position action.
1. Comply with requirements in Division 23 Section "Common Motor Requirements for HVAC Equipment."
2. Permanent Split-Capacitor or Shaded-Pole Type: Gear trains completely oil immersed and sealed. Equip spring-return motors with integral spiral-spring
mechanism in housings designed for easy removal for service or adjustment of limit switches, auxiliary switches, or feedback potentiometer.
3. Non-spring-Return Motors for Dampers Larger Than 25 Sq. Ft. (2.3 sq. m): Size for running torque of 150 in. x lbf (16.9 N x m) and breakaway torque of 300 in. x
lbf (33.9 N x m).
4. Spring-Return Motors for Dampers Larger Than 25 Sq. Ft. (2.3 sq. m): Size for running and breakaway torque of 150 in. x lbf (16.9 N x m).
B. Electronic Actuators: Direct-coupled type designed for minimum 60,000 full-stroke cycles at rated torque.
1. Manufacturers:
a. Belimo, Inc.
b. Honeywell
c. Johnson Controls, Inc.
d. Siemens
2. Control valve actuators:
a. Size for valve close off at 150 percent of total system (head) pressure for two-way valves and 100 percent of pressure differential across the valve or 100
percent of total system (pump) head differential pressure for three-way valves. Chilled water pressure is approximately 150 psig. Size valves and actuators
accordingly.
b. Coupling: Directly couple and mount to valve stem and shaft ISO style direct-coupled mounting pad.
c. Shall meet all the requirements of 2.15.B Electronic Actuators.
3. Coupling: V-bolt dual nut clamp with a V-shaped, toothed cradle.
4. Mounting: Actuators shall be direct shaft mount type. Actuators shall be capable of being mechanically and electrically paralleled to increase torque if required.
5. Overload protected electronically throughout rotation.
6. Fail safe operation: Mechanical, spring return mechanism.
7. Power requirements (spring return): 24 VAC, maximum 15 VA at 24 VAC or 8 W at 24 VDC.
8. Proportional actuators shall be fully programmable through an EEPROM without the use of actuator mounted switches.
9. Temperature rating: -22 deg. F to +122 deg. F.
10. Housing: Minimum requirement NEMA Type 2/IP54 mounted in any orientation. NEMA 4/4X (IP67) required for outdoor applications.
11. Agency listings: ISO 9001 or UL.
12. The manufacturer shall warrant all components for a period of 5 years from the date of production with the first two years unconditional.
13. All actuators shall have external adjustable stops to limit the travel in either direction and a gear release to allow manual positioning.
SPECIFICATION 230900 -INSTRUMENTATION AND CONTROL FOR HVAC (cont.)
2.5 CONTROL CABLE
A. Electronic and fiber-optic cables for control wiring are specified in Division 27 Section "Communications Horizontal Cabling."
B. All wiring shall be plenum rated cabling.
PART 3 - EXECUTION
END of SECION 2309000
SECTION 233113 - METAL DUCTS
PART 1 - GENERAL
1.1 SUBMITTALS
A. Product Data: For each type of the following products:
1. Sealants and gaskets.
2. Seismic-restraint devices.
B. Shop Drawings:
1. Fabrication, assembly, and installation, including plans, elevations, sections, components, and attachments to other work.
2. Factory-and shop-fabricated ducts and fittings.
3. Duct layout indicating sizes, configuration, liner material, and static-pressure classes.
4. Elevation of top of ducts.
5. Dimensions of main duct runs from building grid lines.
6. Fittings.
7. Reinforcement and spacing.
8. Seam and joint construction.
9. Penetrations through fire-rated and other partitions.
10. Equipment installation based on equipment being used on Project.
11. Locations for duct accessories, including dampers, turning vanes, and access doors and panels.
12. Hangers and supports, including methods for duct and building attachment[, seismic restraints,] and vibration isolation.
C. Coordination Drawings: Plans, drawn to scale, on which the following items are shown and coordinated with each other, using input from installers of the items involved:
1. Duct installation in congested spaces, indicating coordination with general construction, building components, and other building services. Indicate proposed
changes to duct layout.
2. Suspended ceiling components.
3. Structural members to which duct will be attached.
4. Size and location of initial access modules for acoustical tile.
5. Penetrations of smoke barriers and fire-rated construction.
6. Items penetrating finished ceiling including the following:
a. Lighting fixtures.
b. Air outlets and inlets.
c. Speakers.
d. Sprinklers.
e. Access panels.
f. Perimeter moldings.
2.1 SINGLE-WALL RECTANGULAR DUCTS AND FITTINGS
A. General Fabrication Requirements: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" based on indicated static-pressure class unless
otherwise indicated.
D. Elbows, Transitions, Offsets, Branch Connections, and Other Duct Construction: Select types and fabricate according to SMACNA's "HVAC Duct Construction
Standards -Metal and Flexible," Chapter 4, "Fittings and Other Construction," for static-pressure class, applicable sealing requirements, materials involved, duct-support
intervals, and other provisions in SMACNA's "HVAC Duct Construction Standards -Metal and Flexible."
2.2 SINGLE-WALL ROUND AND FLAT-OVAL DUCTS AND FITTINGS
A. General Fabrication Requirements: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Chapter 3, "Round, Oval, and Flexible Duct,"
based on indicated static-pressure class unless otherwise indicated.
2.3 SHEET METAL MATERIALS
A. General Material Requirements: Comply with SMACNA's "HVAC Duct Construction Standards -Metal and Flexible" for acceptable materials, material thicknesses, and
duct construction methods unless otherwise indicated. Sheet metal materials shall be free of pitting, seam marks, roller marks, stains, discolorations, and other
imperfections.
B. Galvanized Sheet Steel: Comply with ASTM A 653/A 653M.
1. Galvanized Coating Designation: G90 (Z275).
2. Minimum sheetmetal gauge used shall not be less than 26 gauge.
2.4 SEALANT AND GASKETS
A. General Sealant and Gasket Requirements: Surface-burning characteristics for sealants and gaskets shall be a maximum flame-spread index of 25 and a maximum
smoke-developed index of 50 when tested according to UL723; certified by an NRTL.
B. Water-Based Joint and Seam Sealant:
1. Application Method: Brush on or spray on.
2. Solids Content: Minimum 65 percent.
3. Shore A Hardness: Minimum 20.
4. Water resistant.
5. Mold and mildew resistant.
6. VOC: Maximum 75 g/L (less water).
7. Maximum Static-Pressure Class: 10-inch wg (2500 Pa), positive and negative.
8. Service: Indoor or outdoor.
9. Substrate: Compatible with galvanized sheet steel (both PVC coated and bare), stainless steel, or aluminum sheets.
C. Flanged Joint Sealant: Comply with ASTM C 920.
1. General: Single-component, acid-curing, silicone, elastomeric.
2. Type: S.
3. Grade: NS.
4. Class: 25.
5. Use: O.
6. For indoor applications, sealant shall have a VOC content of 250 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).
7. Sealant shall comply with the testing and product requirements of the California Department of Health Services' "Standard Practice for the Testing of Volatile
Organic Emissions from Various Sources Using Small-Scale Environmental Chambers."
D. Flange Gaskets: Butyl rubber, neoprene, or EPDM polymer with polyisobutylene plasticizer.
2.5 HANGERS AND SUPPORTS
A. Hanger Rods for Noncorrosive Environments: Cadmium-plated steel rods and nuts.
B. Hanger Rods for Corrosive Environments: Electrogalvanized, all-thread rods or galvanized rods with threads painted with zinc-chromate primer after installation.
C. Strap and Rod Sizes: Comply with SMACNA's "HVAC Duct Construction Standards -Metal and Flexible," Table 5-1 (Table 5-1M), "Rectangular Duct Hangers Minimum
Size," and Table 5-2, "Minimum Hanger Sizes for Round Duct."
D. Duct Attachments: Sheet metal screws, blind rivets, or self-tapping metal screws; compatible with duct materials.
PART 3 - EXECUTION
3.1 DUCT INSTALLATION
A. Drawing plans, schematics, and diagrams indicate general location and arrangement of duct system. Indicated duct locations, configurations, and arrangements were
used to size ducts and calculate friction loss for air-handling equipment sizing and for other design considerations. Install duct systems as indicated unless deviations to
layout are approved on Shop Drawings and Coordination Drawings.
B. Install ducts according to SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" unless otherwise indicated.
C. Install round and flat-oval ducts in maximum practical lengths.
D. Install ducts with fewest possible joints.
E. Install factory-or shop-fabricated fittings for changes in direction, size, and shape and for branch connections.
F. Unless otherwise indicated, install ducts vertically and horizontally, and parallel and perpendicular to building lines.
G. Install ducts close to walls, overhead construction, columns, and other structural and permanent enclosure elements of building.
H. Install ducts with a clearance of 1 inch (25 mm), plus allowance for insulation thickness.
I. Route ducts to avoid passing through transformer vaults and electrical equipment rooms and enclosures.
J. Where ducts pass through non-fire-rated interior partitions and exterior walls and are exposed to view, cover the opening between the partition and duct or duct
insulation with sheet metal flanges of same metal thickness as the duct. Overlap openings on four sides by at least 1-1/2 inches (38 mm).
K. Where ducts pass through fire-rated interior partitions and exterior walls, install fire dampers. Comply with requirements in Division 23 Section "Air Duct Accessories"
for fire and smoke dampers.
L. Protect duct interiors from moisture, construction debris and dust, and other foreign materials. Comply with SMACNA's "IAQ Guidelines for Occupied Buildings Under
Construction," Appendix G, "Duct Cleanliness for New Construction Guidelines."
M. Maintain covers on all installed and stored ductwork when not being actively worked on.
3.2 DUCT SEALING
A. Seal ducts for duct static-pressure, seal classes, and leakage classes specified in "Duct Schedule" Article according to SMACNA's "HVAC Duct Construction
Standards -Metal and Flexible."
B. Seal ducts to the following seal classes according to SMACNA's "HVAC Duct Construction Standards -Metal and Flexible":
1. Comply with SMACNA's "HVAC Duct Construction Standards -Metal and Flexible."
2. All ductwork -SMACNA Seal Class A.
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
HVAC
Specifications
H00310300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290# Revision Description
Date
Issued
06/08/21
SECTION 233113 - METAL DUCTS (cont)
3.3 HANGER AND SUPPORT INSTALLATION
A. Comply with SMACNA's "HVAC Duct Construction Standards -Metal and Flexible," Chapter 5, "Hangers and Supports."
B. Building Attachments: Concrete inserts, powder-actuated fasteners, or structural-steel fasteners appropriate for construction materials to which hangers are being
attached.
1. Where practical, install concrete inserts before placing concrete.
2. Install powder-actuated concrete fasteners after concrete is placed and completely cured.
3. Use powder-actuated concrete fasteners for standard-weight aggregate concretes or for slabs more than 4 inches (100 mm) thick.
4. Do not use powder-actuated concrete fasteners for lightweight-aggregate concretes or for slabs less than 4 inches (100 mm) thick.
5. Do not use powder-actuated concrete fasteners for seismic restraints.
C. Hanger Spacing: Comply with SMACNA's "HVAC Duct Construction Standards -Metal and Flexible," Table 5-1 (Table 5-1M), "Rectangular Duct Hangers Minimum
Size," and Table 5-2, "Minimum Hanger Sizes for Round Duct," for maximum hanger spacing; install hangers and supports within 24 inches (610 mm) of each elbow and
within 48 inches (1200 mm) of each branch intersection.
D. Hangers Exposed to View: Threaded rod and angle or channel supports.
E. Support vertical ducts with steel angles or channel secured to the sides of the duct with welds, bolts, sheet metal screws, or blind rivets; support at each floor and at a
maximum intervals of 16 feet (5 m).
F. Install upper attachments to structures. Select and size upper attachments with pull-out, tension, and shear capacities appropriate for supported loads and building
materials where used.
3.4 CONNECTIONS
A. Make connections to equipment with flexible connectors complying with Division 23 Section "Air Duct Accessories."
B. Comply with SMACNA's "HVAC Duct Construction Standards -Metal and Flexible" for branch, outlet and inlet, and terminal unit connections.
3.7 START UP
A. Air Balance: Comply with requirements in Division 23 Section "Testing, Adjusting, and Balancing for HVAC."
3.8 DUCT SCHEDULE
A. Fabricate ducts with galvanized sheet steel:
B. Supply Ducts:
1. Ducts Connected to Constant-Air-Volume Air-Handling Units
a. Pressure Class: Positive 4-inch wg
b. Minimum SMACNA Seal Class: A.
c. SMACNA Leakage Class for Rectangular: 3.
d. SMACNA Leakage Class for Round and Flat Oval: 3.
B. Return Ducts:
1. Ducts Connected to Air-Handling Units
a. Pressure Class: Positive or negative 2-inch wg.
b. Minimum SMACNA Seal Class: A
c. SMACNA Leakage Class for Rectangular: 6.
d. SMACNA Leakage Class for Round and Flat Oval: 6.
C. Elbow Configuration:
1. Rectangular Duct: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 4-2, "Rectangular Elbows."
a. Radius Type RE 1 with minimum 1.5 radius-to-diameter ratio.
b. Radius Type RE 3 with minimum 1.0 radius-to-diameter ratio and two vanes.
c. Mitered Type RE 2 with vanes complying with SMACNA's "HVAC Duct Construction Standards -Metal and Flexible," Figure 4-3, "Vanes and Vane Runners,"
and Figure 4-4, "Vane Support in Elbows."
2. Rectangular Duct: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 4-2, "Rectangular Elbows."
a. Radius Type RE 1 with minimum 1.5 radius-to-diameter ratio.
b. Radius Type RE 3 with minimum 1.0 radius-to-diameter ratio and two vanes.
c. Mitered Type RE 2 with vanes complying with SMACNA's "HVAC Duct Construction Standards -Metal and Flexible," Figure 4-3, "Vanes and Vane Runners,"
and Figure 4-4, "Vane Support in Elbows."
3. Round Duct: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 3-4, "Round Duct Elbows."
a. Minimum Radius-to-Diameter Ratio and Elbow Segments: Comply with SMACNA's "HVAC Duct Construction Standards -Metal and Flexible," Table 3-1,
"Mitered Elbows." Elbows with less than 90-degree change of direction have proportionately fewer segments.
1) Radius-to Diameter Ratio: 1.5.
b. Round Elbows, 12 Inches (305 mm) and Smaller in Diameter: Stamped or pleated.
c. Round Elbows, 14 Inches (356 mm) and Larger in Diameter: Standing seam.
D. Branch Configuration:
1. Rectangular Duct: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 4-6, "Branch Connection."
a. Rectangular Main to Rectangular Branch: 45-degree entry.
b. Rectangular Main to Round Branch: Spin in.
2. Round and Flat Oval: Comply with SMACNA's "HVAC Duct Construction Standards -Metal and Flexible," Figure 3-5, "90 Degree Tees and Laterals," and Figure
3-6, "Conical Tees." Saddle taps are permitted in existing duct.
a. Velocity 1000 fpm (5 m/s) or Lower: 90-degree tap.
b. Velocity 1000 to 1500 fpm (5 to 7.6 m/s): Conical tap.
c. Velocity 1500 fpm (7.6 m/s) or Higher: 45-degree lateral.
END OF SECTION 233113
SECTION 233300 - AIR DUCT ACCESSORIES
PART 1 - GENERAL
1.1 SUBMITTALS
A. Product Data: For each type of product.
1.2 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For air duct accessories to include in operation and maintenance manuals.
PART 2 - PRODUCTS
2.1 MANUAL VOLUME DAMPERS
A. Standard Manual Volume Dampers:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Air Balance Inc.; a division of Mestek, Inc.
b. American Warming and Ventilating; a division of Mestek, Inc.
c. Flexmaster U.S.A., Inc.
d. Greenheck.
e. METALAIRE, Inc.
f. McGill AirFlow LLC.
g. Nailor Industries Inc.
h. Ruskin Company.
2. Standard leakage rating with linkage outside the airstream.
3. Suitable for horizontal or vertical applications.
4. Frames:
a. Frame: Hat-shaped, Minimum 0.052-inch-thick.
b. Mitered and welded corners.
c. Flanges for attaching to walls and flangeless frames for installing in ducts.
5. Blades:
a. Multiple or single blade.
b. Parallel- or opposed-blade design.
c. Stiffen damper blades for stability.
d. Minimum 0.064 inch (1.62 mm) thick.
6. Blade Axles: Galvanized or stainless to match duct construction.
7. Bearings:
a. Molded synthetic.
b. Dampers in ducts with pressure classes of 3-inch wg (750 Pa) or less shall have axles full length of damper blades and
bearings at both ends of operating shaft.
8. Tie Bars and Brackets: Galvanized steel.
9. Pressure classes of 3-inch w.g. or higher or for dampers larger than 14”x14”:
a. Muliple opposed blade design
b. Suitable for 2,000 FPM duct velocity
c. End bearings or other seals for ducts with axles running the full length of the damper blades.
d. Jackshaft to operate multiple section dampers from one side.
e. Provide a lacking hand quadrant with 2”stand-off mounting bracket.
10. Provide stainless or aluminum materials where dampers are shown in stainless or aluminum ductwork
2.9 FLEXIBLE DUCTS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Flexmaster U.S.A., Inc.
2. McGill AirFlow LLC.
3. Ward Industries, Inc.; a division of Hart & Cooley, Inc.
B. Low Pressure, Insulated, Flexible Duct: UL 181, Class 1, 2-ply vinyl film supported by helically wound, spring-steel wire; fibrous-glass
insulation; polyethylene fire retardant vapor-barrier film.
1. Pressure Rating: 4-inch wg (1000 Pa) positive and 0.5-inch wg (125 Pa) negative.
2. Maximum Air Velocity: 4000 fpm (20 m/s).
3. Temperature Range: Minus 20 to plus 175 deg F (Minus 29 to plus 79 deg C).
4. Insulation R-value: Minimum R-6 or greater to comply with ASHRAE/IESNA 90.1.
C. Insulated, Flexible Duct: UL 181, Class 1, 2-ply vinyl film supported by helically wound, spring-steel wire; fibrous-glass insulation;
polyethylene fire retardant vapor-barrier film.
1. Pressure Rating: 10-inch wg (2500 Pa) positive and 1.0-inch wg (250 Pa) negative.
2. Maximum Air Velocity: 4000 fpm (20 m/s).
3. Temperature Range: Minus 20 to plus 175 deg F (Minus 29 to plus 79 deg C).
4. Insulation R-Value: Minimum R-6 or greater to comply with ASHRAE/IESNA 90.1.
SECTION 233300 -AIR DUCT ACCESSORIES (cont)
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install duct accessories according to applicable details in SMACNA's "HVAC Duct Construction Standards -Metal and Flexible" for metal
ducts and in NAIMA AH116, "Fibrous Glass Duct Construction Standards," for fibrous-glass ducts.
B. Install duct accessories of materials suited to duct materials; use galvanized-steel accessories in galvanized-steel and fibrous-glass
ducts, stainless-steel accessories in stainless-steel ducts, and aluminum accessories in aluminum ducts.
C. Install volume dampers at points on supply, return, and exhaust systems where branches extend from larger ducts. Where dampers are
installed in ducts having duct liner, install dampers with hat channels of same depth as liner, and terminate liner with nosing at hat channel.
D. Set dampers to fully open position before testing, adjusting, and balancing.
E. Install test holes at fan inlets and outlets and elsewhere as indicated.
F. Connect flexible ducts to metal ducts with draw bands. Tape flex duct vapor barrier continuously with FSK tape.
G. Install flexible ducts with elbow radius’ no less than 1.5 times the duct diameter.
H. Support flexible ducts from structure, no from sprinkler pipe, conduits, or other above ceiling utilities, to prevent sagging and crimping.
I. Install duct test holes where required for testing and balancing purposes.
3.2 FIELD QUALITY CONTROL
A. Tests and Inspections:
1. Operate dampers to verify full range of movement.
2. Inspect locations of access doors and verify that purpose of access door can be performed.
3. Inspect turning vanes for proper and secure installation.
END OF SECTION 233300
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
HVAC
Specifications
H00410300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290# Revision Description
Date
Issued
06/08/21
1
F
G
F.9
G.1
.9
1 1
1
1
2
1
1
4
3
TYP.
E.5
225 CFM
250 CFM 250 CFM 300 CFM
400 CFM
200 CFM
250 CFM
130 CFM
110 CFM
315 CFM
315 CFM
250 CFM
250 CFM
250 CFM
VAV-48
6
400 CFM
110 CFM
400 CFM
2
E-20
VAV-47
VAV-46
VAV-45
3
3
3
1
F
G
F.9
G.1
.9
5
TYP.
E.5
TT
T
T
T
E-20
VAV-47
VAV-45
VAV-48
5
5
8
7
5
5 5
1
F
G
F.9
G.1
.9
E.5
VAV-47
E-20
VAV-46
VAV-48
VAV-45
6
6
6
7
5
4
11
4
4
4
10
26
28
2 8 2 5 10
R1
D1-30
D1-70
6"ø
3
14
15
9
16
2
15
R1
1
F
G
F.9
G.1
.9
1
E.5 T
T
TT
1 1
1
1
1
12 12
12 12
T
13VAV-45
E-20
VAV-47
VAV-48
VAV-46
NORTH
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IKEY PLAN -NOT TO SCALE
AREA OF WORK
April 9, 2021
First Floor HVAC
Plans
H10110300 N. ILLINOIS ST.INDIANAPOLIS, IN 462901/8" = 1'-0"1 First Floor HVAC Ductwork Demolition Plan
1/8" = 1'-0"2 First Floor HVAC Piping Demolition Plan
DEMOLITION PLAN NOTES
1 PRIOR TO ANY DEMOLITION WORK CONDUCT AIRFLOW TESTING ON TERMINAL BOXES AND ASSOCIATED
DIFFUSERS.
2 DISCONNECT EXISTING LINEAR DIFFUSER AND PREPARE FOR RECONNECTION.
3 REMOVE EXISTING RETURN GRILLE WITH LINED TRANSFER AIR BOOT AND PREPARE FOR RECONNECTION.
4 DEMO EXISTING EXHAUST DUCT, CEILING GRILLE, AND ASSOCIATED HANGERS. PREPARE FOR NEW CONNECTION.
5 EXISTING FINNED TUBE RADIATION IS TO REMAIN AND NO WORK IN PROJECT SCOPE, PROTECT DURING
CONSTRUCTION FROM DAMAGE AND DEBRIS.
6 EXISTING TRANSFER DUCT TO REMAIN.
7 EXISTING TEMPERATURE SENSOR SHALL BE DISCONNECTED AND PREPARED FOR REINSTALLATION.
8 PROTECT EXISTING TEMPERATURE SENSOR DURING CONSTRUCTION.
1/8" = 1'-0"3 First Floor HVAC Ductwork Plan
1/8" = 1'-0"4 First Floor HVAC Piping Plan
PLAN NOTES
1 EXISTING FINNED TUBE RADIATION IS TO REMAIN AND NO WORK IN PROJECT SCOPE, PROTECT DURING
CONSTRUCTION FROM DAMAGE AND DEBRIS.
2 CLEAN LINEAR DIFFUSER AND REINSTALL IN NEW CEILING GRID. SEE DETAIL 2 ON H901 FOR LINEAR SLOT
DIFFUSER DETAIL.
3 EXHAUST GRILLE RELOCATED FROM DEMOLISHED PATIENT RESTROOM AND REINSTALL IN NEW CEILING GRID.
BALANCE TO 80 CFM.
4 CLEAN RETURN AIR GRILLE AND REINSTALL IN NEW CEILING GRID.
5 BALANCE DIFFUSER TO 260 CFM.
6 BALANCE DIFFUSER TO 250 CFM.
7 REVISE AIRFLOW SETPOINTS FOR TERMINAL BOX VAV-47 TO MAXIMUM: 1000 CFM, MINIMUM: 500 CFM.
8 BALANCE DIFFUSER TO 130 CFM.
9 REVISE AIRFLOW SETPOINTS FOR TERMINAL BOX VAV-46 TO MAXIMUM: 520 CFM AND MINIMUM: 370 CFM.
10 BALANCE DIFFUSER TO 300 CFM.
11 BALANCE DIFFUSER TO 140 CFM.
12 EXISTING TEMPERATURE SENSOR TO REMAIN. VERIFY CONTROL TEMPERAURE SETPOINTS AND ADJUST TO
HEATING SETPOINT: 70 DEG F AND COOLING SETPOINT TO 74 DEG F. SOME TEMPERATURE SENSORS WITHIN THE
GI SUITE HAD DEFAULT TEMPERATURE TO 76 DEG F AND CONTROL SETPOINTS WILL NEED CORRECTED WITHIN
THE SCOPE OF THIS PROJECT.
13 RELOCATE EXISTING TEMPERATURE SENSOR CONTROLLING TERMINAL BOX E-20. VERIFY CONTROL
TEMPERATURE SETPOINTS AND ADJUST HEATING SETPOINT TO 70 DEG F AND COOLING SETPOINT TO 74 DEG F.
14 24"X8" TRANSFER DUCT ABOVE FINISHED CEILING. LINE TRANSFER DUCT WITH 3/4" ARMAFLEX INSULATION. SIZE
NOTED IS FREE AREA IN TRANSFER DUCT.
15 SEE DETAIL 1 ON H901 FOR RETURN GRILLE WITH SOUND BOOT.
16 REVISE VAV-45 BOX AIRFLOWS, MAXIMUM: 600 CFM AND MINIMUM: 350 CFM.
17 VERIFY AIRFLOW SETPOINTS ON TERMINAL BOX VAV-48 MAXIMUM: 630 CFM, MINIMUM: 315 CFM.
18 VERIFY AIR FLOW SETPOINTS ON TERMINAL BOX E-20 HAS AIRFLOW SET TO CONSTANT VOLUME OF 240 CFM.
17
18
# Revision Description
Date
Issued
06/08/21
GRILLE SCHEDULE
TAG NOM SIZE NECK MAX NC TYPE MFR MODEL FINISH NOTES
R1 24 x 12 - 20 EGGCRATE GRILLE PRICE 80 WHITE 1 , 2
NOTES:
1.CONFIRM FINAL FINISHES WITH ARCHITECT.
2.PROVIDE FRAME STYLE APPROPRIATE FOR CEILING TYPE (I.E. LAY-IN, SURFACE MOUNT, SIDEWALL, ETC.) REFER TO DRAWINS AND ARCHITECTURAL CEILING
PLANS FOR LOCATIONS. COLOR AND FINISH TO BE APPROVED BY ARCHITECT.
AIR CHANGE SCHEDULE
ROOM NUMBER ROOM NAME
AREA
(SQ.
FT)
OCCUPANTS
CEILING
HEIGHT
(FT.)
% OA ROOM
CLASSIFICATION
ASHRAE 170 - 2017 2012 MECHANICAL CODE / ASHRAE 62.1
MINIMUM AIR VOLUME MAXIMUM AIR VOLUME
EXHAUSTMIN OA
ACH
REQ'D
MIN
AIRFLOW
ACH
REQUIRED
PRESSURE
RELATIONSHIP TO
ADJACENT AREAS
ALL
ROOM
EXHAUSTED
DIRECTLY
OUTDOORS
OUTDOOR
AIRFLOW
RATE
(CFM/PERSON)
OUTDOOR
AIRFLOW
RATE
(CFM/SQ FT)
MINIMUM
OUTSIDE AIR OA
SUPPLIED SPACE AIRFLOW OA ACH ACH AIRFLOW OA ACH ACH
1 WAITING 348 5 11 19% RECEPTION AREA - - - - 5 0.06 57 60 315 0.9 4.9 630 1.9 9.9
2 OFFICE 95 1 8.5 19% OFFICE - - - - 5 0.06 13 32 165 2.3 12.3 250 3.5 18.6
3 RECEPTION 175 4 11 19% RECEPTION AREA - - - - 5 0.06 38 47.8 250 1.5 7.8 500 3.0 15.6
4 MD NURSE 163 4 8.5 19% OFFICE - - - - 5 0.06 37 47.8 250 2.1 10.8 500 4.1 21.7
5 W&M 133 0 10 19% CORRIDOR - - - - 0 0.06 10 6.7 35 0.3 1.6 35 0.3 1.6
6 PATIENT RR 53 0 8.5 19% TOILET ROOM - 10 NEGATIVE YES - - - 15.3 80 - 10.7 - - - 80
7 EXAM 1 113 2 8.5 19% GENERAL EXAM 2 4 NR NR - - - 35.3 185 2.2 11.6 260 3.1 16.2
8 EXAM 2 122 2 8.5 19% GENERAL EXAM 2 4 NR NR - - - 35.3 185 2.0 10.7 260 2.9 15.0
9 EXAM 3 117 2 8.5 19% GENERAL EXAM 2 4 NR NR - - - 33.4 175 2.0 10.6 300 3.5 18.1
10 STORAGE 33 0 8.5 19% CLEAN LINEN STORAGE 0 2 POSITIVE NR 5 0.06 2 5.7 30 1.2 6.4 20 0.8 4.3
11 EXAM 4 94 2 8.5 19% GENERAL EXAM 2 4 NR NR - - - 26.7 140 2.0 10.5 140 2.0 10.5
12 WORK ALCOVE 90 1 8.5 19% OFFICE - - - - 5 0.06 13 13.0 68 1.0 5.3 70 1.0 5.5
1
2
DUCTWORK/DIFFUSER SHALL BE SUPPORTED
INDEPENDENTLY FROM STRUCTURE
(NOT SUPPORTED BY CEILING) INSIDE
OF PLENUM TO BE PAINTED FLAT BLACK.
INSULATED FLEXIBLE DUCTWORK
ADJUST AIR FLOW SLOTS
PER SCHEDULE AND PLANS.
PLAN NOTES
1. A MAXIMUM OF FIVE (5) FEET LENGTH OF FLEXIBLE DUCT SHALL BE PROVIDED TO EACH DIFFUSER. DUCTWORK
SHALL CONTAIN 180° OF BENDING. FLEX DUCT SHALL NOT CONTACT CEILING AND SHALL BE PROPERLY
SUPPORTED SO AS TO HAVE NO KINKS.
2. TIE-WRAP CONNECT FLEX DUCT HELICAL COIL TO ROUND METAL DIFFUSER NECK AND TO ROUND METAL
DUCTWORK AT OTHER END OF FLEX DUCT. PULL FLEX DUCT VAPOR BARRIER OVER LOWER TIE-WRAP AND
INSTALL SECOND TIE-WRAP OVER THE VAPOR BARRIER. INSULATE METAL DUCT OR DIFFUSER OVER TOP OF
SECOND TIE-WRAP AND INSTALL INSULATOR'S TAPE ON EDGES.
ROUND BRANCH DUCT TO MAIN
(SEE SCHEDULE FOR SIZE)
PLENUM BOX
HEIGHT = ROUND
DUCT DIAMETER + 4"
SLOT DIFFUSER
(THREE SLOT SHOWN)
EXTERNALLY
INSULATE PLENUM.
INTERNAL INSULATION
IS NOT ALLOWED.
RETURN GRILLE
8"
SHEETMETAL DUCT BOOT. COVER
INSIDE WITH 3/4" ARMAFLEX INSULATION.
CEILING
SUPPORT ROD
24"
SUPPORT RETURN GRILLE AND SOUND
BOOT FROM STRUCTURE ABOVE.
MINIMUM 8" OR HIGHER TO CLEAR
LIGHTS AND ASSOCIATED
ACCESS ABOVE LIGHTS.8"
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
HVAC Schedules
and Details
H80110300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290# Revision Description
Date
Issued
NO SCALE2LINEAR SLOT DIFFUSER DETAIL
NO SCALE3RETURN GRILLE WITH SOUND BOOT DETAIL
06/08/21
ALL SYMBOLS AND ABBREVIATIONS MAY NOT BE USED ON THIS PROJECTNT
CONNECTION OF NEW WORK TO EXISTING
DETAIL WITH TOP LETTER INDICATING DETAIL
DESIGNATION AND BOTTOM NUMBER INDICATING
DRAWING THAT DETAIL IS REFERENCED ON OR DRAWING
THAT DETAIL IS DRAWN ON
SECTION WITH TOP NUMBER INDICATING
SECTION DESIGNATION AND BOTTOM NUMBER
INDICATING DRAWING THAT SECTION IS CUT ON
OR DRAWING THAT SECTION IS DRAWN ON
A. GENERAL NOTE
1
FLOOR PLAN SYMBOLS
PLAN NOTE
THERMOSTAT -"N" INDICATING NIGHT SETBACK THERMOSTAT
H HUMIDISTAT
1. PLAN NOTE LIST
ABBREV.
A/E
AC OR ACU
ACCU
AD
ADJ
AFCV
AFF
AFMS
AHU
APD
APPROX
AR
ARCH
AS
ATM
AV
AVMS
AW
B
BCU
BDD
BHP
BI
BLDG
BOT
BP
BST
BTU
BTUH
CA
CAP
CAV
CC
CCP
CDS
CENTRIF
CFM
CFOI
CH
CI
CO
CO2
COL
COM
COMP
CONC
CONN
CONST
CONT
CP
CPD
CUH
CW
CWM
CWP
CWR
CWS
D
DB
DC
DCV
DCWBP
DD
DDC
DE
DEFL
DEG
DEPT
DHWBP
DI
DIA
DISC
DISCH
DS
DSWBP
DUC
DWG
DW
DWBP
DWH
EA
EAT
EBH
EC
ECC
ECG
ED
EDC
EER
EF
EFT
EG
ELEC
ELEV
EMER
EMG
ENCL
ENTR
EOM
EQA
EQAC
EQAI
EQUIP
EQV
EQVP
EQV V
ERP
ES
ESP
ET
EUH
EW
EWC
EWT
EXH
EXIST
EXT
F
F&B
F&T
F/A
F/SD
FC
FCU
FD
FH
ABBREV.
FHC
FIN
FLA
FLR
FODT
FOP
FOR
FOS
FOST
FOV
FP
FPB
FPC
FPM
FPS
FPST
FS
FT
FTG
FTR
G
GA
GAL
GALV
GC
GH
GPH
GPM
GV
H
HC
HCP
HD
HE
HGT
HO
HOA
HORZ
HOSP
HP
HPR
HPS
HR
HRC
HTR
HVAC
HW
HWC
HWCP
HWP
HWR
HWS
HX
HZ
IA
IAC
IAD
ID
IFB
IHOM
IN
INCL
INSUL
INT
INV
I.P.S.
ISOL
JT
KAIC
KEC
KW
L
LAC
LAD
LAN
LAT
LAV
LBD
LBS
LD
LF
LFD
LFT
LOC
LPR
LPS
LVG
LVP
LWT
MA
MAC
MAD
MAI
MAT
MAX
MB
MBH
MC
MCA
MCC
MD
MECH
MFR
MH
MIN
MISC
MOCP
MPSR
MPS
MTD
MV
MVP
N
NA
NC
NIC
NM
NO
NOM
NTS
O
OA
OAT
ABBREV.
OC
OD
OFCI
OFOI
OM
OPER
OPNG
OSD
P
PC
PD
PE
PF
PG
PHC
PIV
PLT
POC
PPH
PPM
PRD
PREFAB
PRES
PRV
PSI
PSIG
PVC
RA
RAD
RAT
R/H
RD
REC
RECIR
REF
RF
RG
RH
RHC
RLA
RM
ROM
ROP
ROST
RP
RPG
RPM
RPZ
REQ'D
RV
S
SA
SB
SC
SCC
SCCH
SCFM
SCH
SCW
SD
SEC
SENS
SEP
SF
SG
SHT
SHW
SK
SMBH
SMC
SP
SPEC
SQ
SQFT
SRV
ST
STD
STM
STR
STRUCT
SV
SW
SYS
SZ
T
TB
TCC
TDH
TDV
TEMP
THW
TLL
TMV
TMBH
TSP
TW
UH
UNO
UR
UVL
V
VAC
VAV
VB
VD
VEL
VSC
VTR
V V
W
WAGD
WB
W/
W/O
WC
WCO
WFMD
WG
WGT
WH
WM
WP
WPD
WS
#
DESCRIPTION
ARCHITECT AND ENGINEER
AIR CONDITIONING UNIT OR AIR COMPRESSOR
AIR COOLED CONDENSING UNIT
ACCESS DOOR
ADJUSTABLE OR ADJACENT
AIRFLOW CONTROL VALVE
ABOVE FINISHED FLOOR
AIR FLOW MEASURING STATION
AIR HANDLING UNIT
AIR PRESSURE DROP
APPROXIMATE
AIR RECEIVER
ARCHITECT
AIR SEPARATOR
ATMOSPHERE
ACID VENT
AIR VOLUME MEASURING STATION
ACID WASTE
BOILER
BLOWER COIL UNIT
BACKDRAFT DAMPER
BRAKE HORSEPOWER
BACKWARD INCLINED
BUILDING
BOTTOM
BRINE PUMP
BULK SALT STORAGE
BRITISH THERMAL UNIT
BTU PER HOUR
COMPRESSED AIR
CAPACITY
CONSTANT AIR VOLUME
COOLING COIL
COOLING COIL PUMP
CONDENSATE PUMP DISCHARGE
CENTRIFUGAL
CUBIC FEET PER MINUTE
CONTRACTOR FURNISHED/OWNER INSTALLED
CHILLER
CAST IRON
CLEAN OUT
CARBON DIOXIDE
COLUMN
CARBON DIOXIDE MANIFOLD
COMPRESSOR
CONCRETE
CONNECTION
CONSTRUCTION
CONTINUOUS
CONDENSATE PUMP
CONDENSATE PUMP DISCHARGE
CABINET UNIT HEATER
COLD WATER
COLD WATER MAKE-UP
CHILLED WATER PUMP
CHILLED WATER RETURN
CHILLED WATER SUPPLY
DIFFUSER OR DAMPER
DECIBELS OR DRY BULB
DUCT COIL
DOUBLE CHECK VALVE
DOMESTIC COLD WATER BOOSTER PUMP
DUAL DUCT
DIRECT DIGITAL CONTROL
DEAERATOR
DEFLECTION
DEGREE
DEPARTMENT
DOMESTIC HOT WATER BOOSTER PUMP
DEIONIZED WATER
DIAMETER
DISCONNECT
DISCHARGE
DOWNSPOUT
DOMESTIC SOFT WATER BOOSTER PUMP
DOOR UNDER CUT
DRAWING
DISTILLED WATER
DOMESTIC WATER BOOSTER PUMP
DOMESTIC WATER HEATER
EXHAUST AIR
ENTERING AIR TEMPERATURE
ELECTRIC BASEBOARD HEATER
ELECTRICAL CONTRACTOR
ENVIRONMENTAL CONTROL CONTRACTOR
EGG CRATE GRILLE
EXHAUST DIFFUSER
ELECTRIC DUCT COIL
ENERGY EFFICIENCY RATIO
EXHAUST AIR FAN
ENTERING FLUID TEMPERATURE
EXHAUST GRILLE OR ETHYLENE GLYCOL
ELECTRIC
ELEVATION
EMERGENCY
EXTRUDED METAL GRILLE
ENCLOSURE
ENTERING
END OF MAIN DRIP
EQUIPMENT AIR
EQUIPMENT AIR COMPRESSOR
EQUIPMENT AIR INTAKE
EQUIPMENT
EQUIPMENT VACUUM
EQUIPMENT VACUUM PUMP
EQUIPMENT VACUUM VENT
ELECTRIC RADIANT PANEL
EMERGENCY SHOWER
EXTERNAL STATIC PRESSURE OR ELEVATOR SUMP PUMP
EXPANSION TANK
ELECTRIC UNIT HEATER
EMERGENCY EYEWASH
ELECTRIC WATER COOLER
ENTERING WATER TEMPERATURE
EXHAUST
EXISTING
EXTERIOR
DEGREES FAHRENHEIT
FACE & BYPASS
FLOAT AND THERMOSTATIC TRAP
FIRE ALARM
FIRE AND SMOKE DAMPER
FLEXIBLE CONNECTION
FAN COIL UNIT
FLOOR DRAIN OR FIRE DAMPER
FIRE HOSE OR FUME HOOD
DESCRIPTION
FIRE HOSE CABINET
FINISH
FULL LOAD AMPS
FLOOR
FUEL OIL DAY TANK
FUEL OIL PUMP
FUEL OIL RETURN
FUEL OIL SUPPLY
FUEL OIL STORAGE TANK
FUEL OIL VENT
FIRE PROTECTION
FAN POWERED BOX
FIRE PROTECTION CONTRACTOR
FEET PER MINUTE
FEET PER SECOND
FIRE PROTECTION STORAGE TANK
FLOW SWITCH
FEET OR FLASH TANK
FOOTING OR FITTING
FIN TUBE RADIATION
GAS, NATURAL
GAUGE
GALLON
GALVANIZED
GENERAL CONTRACTOR
GRAVITY HOOD
GALLONS PER HOUR
GALLONS PER MINUTE
GAS NATURAL VENT
HUMIDIFIER, HUMIDITY OR HEIGHT
HEATING COIL
HEATING COIL PUMP (HOT WATER)
HEAD
HEAT EXCHANGER
HEIGHT
HUB OUTLET
HAND-OFF-AUTOMATIC
HORIZONTAL
HOSPITAL
HORSEPOWER OR HEATPUMP
HIGH PRESSURE CONDENSATE RETURN
HIGH PRESSURE STEAM
HOUR
HEAT RECOVERY COIL
HEATER
HEATING, VENTILATION AND AIR CONDITIONING
DOMESTIC HOT WATER
DOMESTIC HOT WATER RECIRC
HOT WATER CIRCULATING PUMP
HEATING HOT WATER PUMP
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
HEAT EXCHANGER
HERTZ
INSTRUMENT AIR
INSTRUMENT AIR COMPRESSOR
INSTRUMENT AIR DRYER, EQAD
INSIDE DIAMETER OR DIMENSION
INTEGRAL FACE AND BYPASS
IN-HOUSE OXYGEN MANIFOLD
INCHES
INCLUDE
INSULATED
INTERIOR
INVERT
INTERNATIONAL PIPE SIZING
ISOLATION
JOINT
SHORT CIRCUIT RATING
KITCHEN EQUIPMENT CONTRACTOR
KILOWATTS
LENGTH
LAB AIR COMPRESSOR
LAB AIR DRYER
LOCAL AREA NETWORK
LEAVING AIR TEMPERATURE
LAVATORY
LINEAR BAR DIFFUSER
POUNDS
LINEAR DIFFUSER
LINEAR FOOT
LAMINAR FLOW DIFFUSER
LEAVING FLUID TEMPERATURE
LOCATION
LOW PRESSURE CONDENSATE RETURN
LOW PRESSURE STEAM
LEAVING
LAB VACUUM PUMP
LEAVING WATER TEMPERATURE
MEDICAL AIR
MEDICAL AIR COMPRESSOR
MEDICAL AIR DRYER
MEDICAL AIR INTAKE
MIXED AIR TEMPERATURE
MAXIMUM
MOP BASIN
BTU/HR X 1000
MECHANICAL CONTRACTOR
MINIMUM CIRCUIT AMPACITY
MOTOR CONTROL CENTER
MOTORIZED DAMPER
MECHANICAL
MANUFACTURER
MANHOLE
MINIMUM
MISCELLANEOUS
MAXIMUM OVERCURRENT PROTECTION
MEDIUM PRESSURE CONDENSATE RETURN
MEDIUM PRESSURE STEAM
MOUNTED
MEDICAL VACUUM
MEDICAL VACUUM PUMP
NORTH OR NITROGEN
NOT APPLICABLE
NORMALLY CLOSED OR NOISE CRITERIA
NOT IN CONTRACT
NITROGEN MANIFOLD
NORMALLY OPEN, NITROUS OXIDE, OR NUMBER
NOMINAL OR NITROUS OXIDE MANIFOLD
NOT TO SCALE
OXYGEN
OUTSIDE AIR
OUTSIDE AIR TEMPERATURE
DESCRIPTION
ON CENTER
OUTSIDE DIAMETER
OWNER FURNISHED/CONTRACTOR INSTALLED
OWNER FURNISHED/OWNER INSTALLED
OXYGEN MANIFOLD
OPERATOR
OPENING
OPEN SITE DRAIN
PUMP, PNEUMATIC OR PRESSURE
PLUMBING CONTRACTOR
PRESSURE DROP OR PERFORATED DIFFUSER
PNEUMATIC ELECTRIC
PREFILTERS
PROPYLENE GLYCOL
PREHEAT COIL
POST INDICATOR VALVE
PLASTER TRAP
POINT OF CONNECTION
POUNDS PER HOUR
PARTS PER MILLION
PRESSURE RELIEF DOOR
PREFABRICATED
PRESSURE
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH GAUGE
POLYVINYL CHLORIDE
RETURN AIR OR RELIEF AIR
RADIATED
RETURN AIR TEMPERATURE
REHEAT
ROOF DRAIN
RECEIVER
RECIRCULATING
REFRIGERATOR
RETURN AIR FAN
RETURN GRILLE
RELIEF HOOD OR RELATIVE HUMIDITY
REHEAT COIL
RUNNING LOAD AMPS
ROOM
REVERSE OSMOSIS VENT
REVERSE OSMOSIS PUMP
REVERSE OSMOSIS STORAGE TANK
RADIANT PANELS
RETURN PERFORATED GRILLE
REVOLUTIONS PER MINUTE
REDUCED PRESSURE BACKFLOW
REQUIRED
ROOF VENTILATOR
SANITARY OR SEWER
SUPPLY AIR OR SOUND ATTENUATOR
STEAM BOILER
STEAM COIL
STEAM CONDENSATE COOLER
SUBCOOLED CHILLER
STANDARD CUBIC FEET PER MINUTE
SCHEDULE
SOFT COLD WATER (DOMESTIC)
SUPPLY DIFFUSER OR SMOKE DAMPER
SECTION
SENSIBLE
SEWAGE EJECTOR PUMP
SUPPLY AIR FAN
SUPPLY GRILLE
SHEET
SOFT HOT WATER
SINK
SENSIBLE MBH
SHEET METAL CONTRACTOR
STATIC PRESSURE OR STORM PUMP
SPECIFICATIONS
SQUARE
SQUARE FEET
SAFETY RELIEF VALVE
STEAM TRAP
STANDARD
STORM
STARTER
STRUCTURAL
STEAM VENT
SWITCH
SYSTEM
SPRINKLER ZONE
THERMOSTAT
TERMINAL BOX
TEMPERATURE CONTROL CONTRACTOR
TOTAL DISCHARGE HEAD
TRIPLE DUTY VALVE
TEMPERATURE
TEMPERED HOT WATER
TEMPERATURE LOW LIMIT
THERMOSTAT MIXING VALVE
TOTAL MBH
TOTAL STATIC PRESSURE
TEMPERED WATER
UNIT HEATER
UNLESS NOTED OTHERWISE
URINAL
ULTRA VIOLET LIGHT
VENT
VACUUM
VARIABLE AIR VOLUME
VACUUM BREAKER
VOLUME DAMPER (MANUAL)
VELOCITY
VARIABLE SPEED CONTROLLER
VENT THROUGH ROOF
VACUUM VENT
WASTE, WATTS OR WIDTH
WASTE ANESTHESIA GAS DISPOSAL PUMP
WET BULB
WITH
WITHOUT
WATER CLOSET OR WATER COLUMN
WALL CLEAN OUT
WATER FLOW MEASURING DEVICE
WATER GAUGE
WEIGHT
WALL HYDRANT
WATER METER
WEATHERPROOF
WATER PRESSURE DROP
WATER SOFTENER
POUND
ACD AIR CONDITIONING CONDENSATE DRAIN
MECHANICAL AND PLUMBING ABBREVIATIONS PLUMBING PIPING SYMBOLSVALVE AND FITTING SYMBOLS
CALIBRATED BALANCE VALVE
PIPING FLEXIBLE CONNECTION
PIPE TURNED UP (UNLESS NOTED OTHERWISE)
PIPE TURNED DOWN
PIPE OUT TOP
PIPE OUT BOTTOM
THREADED NIPPLE W/CAP
PIPE WITH BLIND FLANGE
CONCENTRIC REDUCER
ECCENTRIC REDUCER
CHECK VALVE
UNION
GATE VALVE
BALL VALVE
GLOBE VALVE
BUTTERFLY VALVE
TEMPERATURE CONTROL -2 WAY MODULATING VALVE
TEMPERATURE CONTROL -2 WAY 2 POSITION MODULATING VALVE
TEMPERATURE CONTROL -3 WAY MODULATING VALVE
TEMPERATURE CONTROL -3 WAY 2 POSITION MODULATING VALVE
SAFETY RELIEF VALVE
STRAINER
FLOW METER
FLOOR DRAIN
ZONE CONTROL VALVE (OS&Y)
AUTOMATIC FLOW CONTROL VALVE
FLOW MEASURING DEVICE
MANUAL AIR RELIEF VENT
AUTOMATIC AIR RELIEF VENT
LUBRICATED PLUG VALVE
STEAM PRESSURE REDUCING VALVE
ANGLE VALVE
GAS PRESSURE RELIEF VALVE
REFRIGERANT HOT GAS BY-PASS VALVE
SHUT-OFF COCK (HYDRONICS)
SOLENOID VALVE
REFRIGERANT EXPANSION VALVE
WATER PRESSURE REDUCING/REGULATING VALVE
COMBINATION WATER PRESSURE RELIEF AND REDUCING VALVE
STEAM TRAP
DIELECTRIC UNION BETWEEN STEEL AND COPPER
STRAINER (STEAM)
PRESSURE AND TEMPERATURE PLUG
REFRIGERANT SIGHT GLASS
THERMOMETER
(P=PRESS V=VAC T=TEMP) GAUGE
SENSOR (T-TEMP H-HUMIDITY)
FLOW SWITCH
CLEAN OUT
WATER HAMMER ARRESTOR OR ALARM PRESSURE/VACUUM SWITCH
INDICATED EXPANSION LOOP (COLD SPRUNG)
ANCHOR
GUIDE
REDUCED PRESSURE BACKFLOW PREVENTER
ATMOSPHERIC VACUUM BREAKER
PRESSURE VACUUM BREAKER
REFRIGERANT SHUT-OFF VALVE
DOMESTIC WATER TEMPERATURE REGULATING VALVE
EXPANSION JOINT
DIFFERENTIAL SWITCH∆T
P
A
T
T
A
NO
NCNO
NC
DETAIL
VIEW
PLAN VIEWS
A101
1
TYP
1
A101
TYP
TAGS
V1
V2
V3
V4
V5
V6
V7
V8
V9
V10
V11
V12
V13
V14
V15
V16
V17
V18
V19
V20
V21
V22
V23
V24
V25
V26
V27
V28
V29
V30
V31
V32
V33
V34
V35
V36
V37
V38
V39
V40
V41
V42
V43
V44
V45
V46
V47
V48
V49
V50
V51
V52
V53
V54
V55
V56
V57
V58
V59
V60
TYP TYPICAL
CV CENTRAL VACUUM
CENTRAL VACUUM OUTLETV61
GENERAL NOTES
1. ALL CONTRACT DOCUMENTS (SPECIFICATIONS AND DRAWINGS) ARE COMPLIMENTARY AND
MUST BE USED IN COMBINATION TO OBTAIN COMPLETE CONSTRUCTION INFORMATION.
2. ALL CONFLICTS SHALL BE BROUGHT TO THE ARCHITECTS OR ENGINEERS ATTENTION IN
ORDER TO ALLOW A CLARIFICATION TO BE ISSUED. ANY WORK COMPLETED WITHOUT THE
CLARIFYING INFORMATION IS AT THE CONTRACTORS FINANCIAL RISK.
3. THE CONTRACTOR SHALL PROVIDE AND FURNISH ALL MATERIALS AND ACCESSORIES TO
CREATE A FULLY OPERATIONAL, CODE COMPLIANT AND TESTED SYSTEM. ALL MATERIALS
AND ACCESSORIES REQUIRED TO CREATE THE FULLY OPERATIONAL SYSTEM SHALL BE
INCLUDED IN THE COST OF THIS PROJECT.
4. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR MAY AT THEIR
OPTION MODIFY THE PIPE ROUTING IN ORDER TO CREATE A SYSTEM THAT MEETS THE
INTENT OF THIS SET OF CONSTRUCTION DOCUMENTS.
5. THE CONTRACTOR SHALL INCLUDE ALL ITEMS THAT ARE REQUIRED TO ENSURE THAT THE
ENTIRE SYSTEM IS FUNCTIONING IN COMPLIANCE WITH THE APPLICABLE CODES, AND
MANUFACTURES INSTALLATION RECOMMENDATIONS AND OR REQUIREMENTS.
6. ALL CUTTING, DRILLING AND PATCHING OF WALLS, FLOORS AND/OR STRUCTURAL
MEMBERS FOR THE INSTALLATION OF THE PLUMBING AND FIRE PROTECTION SYSTEMS
SHALL BE PROVIDED AS PART OF THE SCOPE OF THIS PROJECT.
7. STRUCTURAL COMPONENTS SHALL NOT BE CUT, DRILLED OR MODIFIED IN ANY WAY
WITHOUT THE STRUCTURAL ENGINEERS REVIEW AND PRIOR WRITTEN APPROVAL.
8. PROVIDE FIRE STOPPING WHERE PIPES PENETRATE FIRE RATED FLOORS AND WALLS.
FIRE STOPPING MATERIALS AND METHODS SHALL BE PER LOCAL AND STATE CODES AND
REQUIREMENTS.
9. ALL PLUMBING SYSTEMS SHALL BE INSTALLED PER THE CURRENT PLUMBING CODE FOR
THE LOCATION OF THE WORK BEING INSTALLED.
10. ALL PLUMBING EQUIPMENT, PIPING, FIXTURES, AND PIPE ACCESSORIES SHALL BE NSF 61,
ANNEX G COMPLIANT.
11. ALL PIPING LOCATED WITHIN A RETURN AIR PLENUM SHALL COMPLY WITH A 25/50 FLAME
SMOKE RATING. ANY EXISTING PIPING DISCOVERED WITHIN A RETURN AIR PLENUM THAT
DOES NOT COMPLY WITH THIS REQUIREMENT SHALL BE BROUGHT TO THE ATTENTION OF
THE ARCHITECT FOR FURTHER CLARIFICATION.
12. ALL EXTERIOR WALL PENETRATIONS SHALL BE SEALED WATER AND WEATHER TIGHT BY
THE APPROPRIATE TRADE COMPETENT IN COMPLETING THIS WORK. THE COST OF THIS
WORK SHALL BE INCLUDED IN THE SCOPE OF THIS PROJECT.
13. DO NOT ATTACH ANY CONSTRUCTION TO THE ROOF DECK JOIST BRIDGING, JOIST CROSS
BRACING, PIPING, CONDUIT, DUCTWORK OR ANY OTHER NON-STRUCTURAL ITEM.
14. DO NOT WELD OR DRILL INTO STRUCTURAL STEEL OR JOIST; INSTEAD USE CLAMPS, TIE
WIRE, THRU-BOLTS WITH WASHERS
15. DO NOT USE ANY PVC, PLASTIC, ETC. IN PLENUM OR DEMISING WALLS UNLESS FIRE
WRAPPED. ALL WOOD BLOCKING AND NAILERS, CONCEALED OR NOT SHALL BE FIRE
RETARDANT TREATED.
16. DO NOT PENETRATE BUILDING WALLS FOR ANY DUCTING OR VENTING; ROUTE THROUGH
ROOF USING GENERAL CONTRACTOR'S ROOFING CONTRACTOR.
17. VENT THROUGH ROOF INSTALLATION; ALL ROOFING WORK SHALL BE COMPLETED BY THE
GENERAL CONTRACTOR'S ROOFING CONTRACTOR. THE COST SHALL BE INCLUDED IN THE
SCOPE OF THIS PROJECT.
18. PIPING BELOW GROUND SHALL BE SERVICE-WEIGHT CAST IRON OR SCHEDULE 40 PVC. NO-
HUB PIPING OR FERNCO CONNECTIONS ARE NOT PERMITTED BELOW GRADE.
19 DOMESTIC WATER PIPING ABOVE GRADE SHALL BE TYPE "L" WATER TUBE.
20. ALL PIPING SHALL BE PROPERLY SUSPENDED BY THE STRUCTURE PER THE LOCAL CODES.
21. ALL SHUT-DOWN OF UTILITIES AND FIRE PROTECTION SYSTEMS SHALL BE ARRANGED WITH
NO LESS THAN SEVEN (7) DAYS NOTICE TO THE OWNER. WORK MAY NOT COMMENCE
UNLESS WRITTEN APPROVAL IS PROVIDED BY THE OWNER.
22. ALL DOMESTIC WATER BRANCH PIPES SERVING FIXTURES OR EQUIPMENT WITH FAST
ACTING OR ELECTRONIC VALVES SHALL BE PROVIDED WATER HAMMER ARRESTORS.
23. ALL BRANCH PIPES FROM DOMESTIC WATER MAINS SHALL BE PROVIDED QUARTER TURN
FULL PORT BALL VALVES ON THE BRANCH PIPE JUST ADJACENT TO THE MAIN.
(REQUIRED TO COMPLETE THE SCOPE OF WORK)
DOMESTIC COLD WATER
DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER
FIRE PROTECTION
NATURAL GAS
SANITARY
6" DCW
6" DHW
6" DHWR
6" FP
6" NG
VENT
6" S
6" V
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
Plumbing
Symbols and
General Notes
P00110300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290# Revision Description
Date
Issued
06/08/21
PLUMBING FIXTURE SCHEDULE
FIXTURE REFERENCE
MANUFACTURE REFERENCE MODEL WATER USAGE
CONNECTION SIZES
NOTES
WASTE VENT HOT
WATER
COLD
WATER
TEPID
WATER
WC-1 (FIXTURE)AMERICAN
STANDARD 3461.001 - 3" 2" - - -
AMERICAN DISABILITIES ACT (ADA)
INSTALL PER THE REQUIREMENTS OF THE ACCESSIBILITY
GUIDELINES
WC-1
(FLUSH VALVE)SLOAN 8111 1.6 GPM - - - 1" - -
PLUMBING SYSTEMS PIPING
PART 1 -GENERAL
1.1 SUMMARY
A. SECTION INCLUDES:
1. PLUMBING SYSTEMS TO BE INSTALLED AND UTILIZED FOR DOMESTIC WATER
SYSTEMS.
PART 2 -PRODUCTS
2.1 PIPING MATERIALS
A. POTABLE-WATER PIPING AND COMPONENTS SHALL COMPLY WITH NSF 14 AND NSF 61-
G. PLASTIC PIPING COMPONENTS SHALL BE MARKED WITH "NSF-PW.", WITH SOLDER
JOINTS.
2.2 COPPER TUBE AND FITTINGS -FOR DOMESTIC WATER SYSTEMS
A. HARD COPPER TUBE: ASTM B 88, TYPE L ASTM B 88M, TYPE B WATER TUBE, DRAWN
TEMPER.
B. SOLDER FILLER METALS: ASTM B 32, LEAD-FREE ALLOYS.
C. FLUX: ASTM B 813, WATER FLUSHABLE.
D. SAFETY VALVES: ASME BOILER AND PRESSURE VESSEL CODE: SECTION VIII,
"PRESSURE VESSELS," CONSTRUCTION; NATIONAL BOARD CERTIFIED, LABELED, AND
FACTORY SEALED
1. PRESSURE SETTINGS: HIGHER THAN DISCHARGE PRESSURE AND SAME OR
LOWER THAN RECEIVER PRESSURE RATING.
PART 3 -EXECUTION
3.1 PIPING INSTALLATION
A. ALL PLUMBING AND PIPING SYSTEMS SHALL BE INSTALLED PER THE LOCAL AND STATE
PLUMBING CODE, WITH NO EXCEPTIONS.
B. INSTALL COPPER TUBING ACCORDING TO CDA'S "COPPER TUBE HANDBOOK."
C. INSTALL ALL FIXTURES, DRAINS AND EQUIPMENT COMPLETE TO CREATE A COMPLETE
AND OPERATIONAL SYSTEM. THIS CONTRACTOR SHALL PROVIDE AND INSTALL ALL
MATERIALS AND ACCESSORIES AS REQUIRED AS PART OF THIS CONTRACT.
D WHEN INSTALLING PIPING ADJACENT TO EQUIPMENT AND MACHINES, ALLOW SPACE
FOR SERVICE AND MAINTENANCE.
E. CONNECT DOMESTIC WATER PIPING TO WATER-SERVICE PIPING WITH SHUTOFF
VALVE; EXTEND AND CONNECT TO THE FOLLOWING:
1. WATER HEATERS: COLD-WATER INLET AND HOT-WATER OUTLET PIPING IN SIZES
INDICATED, BUT NOT SMALLER THAN SIZES OF WATER HEATER CONNECTIONS.
3. PLUMBING FIXTURES: COLD-AND HOT-WATER-SUPPLY PIPING IN SIZES
INDICATED, BUT NOT SMALLER THAN THAT REQUIRED BY PLUMBING CODE.
4. EQUIPMENT: COLD-AND HOT-WATER-SUPPLY PIPING AS INDICATED,BUT NOT
SMALLER THAN EQUIPMENT CONNECTIONS. PROVIDE SHUTOFF VALVE AND UNION
FOR EACH CONNECTION. USE FLANGES INSTEAD OF UNIONS FOR NPS 2-1/2 AND
LARGER.
3.2 INDOOR PIPING INSULATION SCHEDULE
A. DOMESTIC HOT AND COLD WATER, PROCESS COLD AND PROCESS SOFT COLD WATER:
INSULATION SHALL BE ONE OF THE FOLLOWING:
1. REFER TO PLUMBING INSULATION SCHEDULE.
3.3 FIELD QUALITY CONTROL
A. PERFORM FIELD TESTS AND INSPECTIONS.
B. TESTS AND INSPECTIONS:
1. PIPING LEAK TESTS: TEST NEW AND MODIFIED PARTS OF EXISTING PIPING. CAP
AND FILL WITH WATER AT A PRESSURE OF 50 PSIG ABOVE SYSTEM OPERATING
PRESSURE, BUT NOT LESS GREATER THAN 125 PSIG. ISOLATE TEST SOURCE AND
LET STAND FOR THIRTY MINUTES; HOLD FOR TWO HOURS WITH NO DROP IN
PRESSURE.
2. REPAIR LEAKS AND RETEST UNTIL NO LEAKS EXIST.
4.1 CLEANING
A. CLEAN AND DISINFECT POTABLE DOMESTIC WATER PIPING AS FOLLOWS:
1. PURGE NEW PIPING AND PARTS OF EXISTING PIPING THAT HAVE BEEN ALTERED,
EXTENDED, OR REPAIRED BEFORE USING.
2. USE PURGING AND DISINFECTING PROCEDURES PRESCRIBED BY AUTHORITIES
HAVING JURISDICTION; IF METHODS ARE NOT PRESCRIBED, USE PROCEDURES
DESCRIBED IN EITHER AWWA C651 OR AWWA C652
B. SUBMIT WATER SAMPLES IN STERILE BOTTLES TO AUTHORITIES HAVING
JURISDICTION.
WET-PIPE SPRINKLER SYSTEM
PART 1 -GENERAL
1.1 SYSTEM DESCRIPTIONS
A. WET-PIPE SPRINKLER SYSTEM: AUTOMATIC SPRINKLERS ARE ATTACHED TO PIPING
CONTAINING WATER AND THAT IS CONNECTED TO WATER SUPPLY THROUGH ALARM
VALVE. WATER DISCHARGES IMMEDIATLEY FROM SPRINKLERS WHEN THEY ARE
OPENED. SPRINKLERS OPEN WHEN HEAT MELTS FUSIBLE LINK OR DESTROYS
FRANGIBLE DEVICE. HOSE CONNECTIONS ARE INCLUDED IF INDICATED.
B. DRY-PIPE SPRINKLER SYSTEM: AUTOMATIC SPRINKLERS ARE ATTACHED TO A DRY
PIPE FIRE SPRINKLER SYSTEM. THE DRY SYSTEM SHALL BE A UL LISTED, FM
APPROVED SYSTEM CONSISTING OF VALVE, AIR COMPRESSOR, TRIM, ACCESSORIES,
DETECTORS, AND ALL ASSOCIATED INTERCONNECTING WIRE.
1.2 PERFORMANCE REQUIREMENTS
A. STANDARD-PRESSURE PIPING SYSTEM COMPONENT: LISTED FOR THE EXISTING
MINIMUM WORKING PRESSURE OF THIS BUILDING.
B. DELEGATED DESIGN: DESIGN SPRINKLER SYSTEM(S), INCLUDING COMPREHENSIVE
ENGINEERING ANALYSIS BY A QUALIFIED PROFESSIONAL ENGINEER, USING
PERFORMANCE REQUIREMENTS AND DESIGN CRITERIA INDICATED.
C. CONTRACTOR SHALL PERFORM FIRE-HYDRANT FLOW TEST.
D. SPRINKLER SYSTEM DESIGN SHALL BE APPROVED BY AUTHORITIES HAVING
JURISDICTION.
E. SEISMIC PERFORMANCE: SPRINKLER PIPING SHALL WITHSTAND THE EFFECTS OF
EARTHQUAKE MOTIONS DETERMINED ACCORDING TO NFPA 13 AND ASCE/SEI 7.
1.3 ACTION SUBMITTALS
A. PRODUCT DATA: FOR EACH TYPE OF PRODUCT INDICATED.
B. SHOP DRAWINGS: FOR WET-PIPE SPRINKLER SYSTEMS. INCLUDE PLANS,
ELEVATIONS, SECTIONS, DETAILS, AND ATTACHMENTS TO OTHER WORK.
1. WIRING DIAGRAMS: FOR POWER, SIGNAL, AND CONTROL WIRING.
2. DELEGATED-DESIGN SUBMITTAL: FOR SPRINKLER SYSTEMS INDICATED TO
COMPLY WITH PERFORMANCE REQUIREMENTS AND DESIGN CRITERIA, INCLUDING
ANALYSIS DATA SIGNED AND SEALED BY THE QUALIFIED PROFESSIONAL
ENGINEER RESPONSIBLE FOR THEIR PREPARATION.
1.4 INFORMATIONAL SUBMITTALS
A. APPROVED SPRINKLER PIPING DRAWINGS: WORKING PLANS, PREPARED ACCORDING
TO NFPA 13, THAT HAVE BEEN APPROVED BY AUTHORITIES HAVING JURISDICTION,
INCLUDING HYDRAULIC CALCULATIONS IF APPLICABLE.
B. FIELD TEST REPORTS AND CERTIFICATES: INDICATE AND INTERPRET TEST RESULTS
FOR COMPLIANCE WITH PERFORMANCE REQUIREMENTS AND AS DESCRIBED IN NFPA
13. INCLUDING "CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR
ABOVEGROUND PIPING."
1.5 CLOSEOUT SUBMITTALS
A. OPERATION AND MAINTENANCE DATA.
1.6 QUALITY ASSURANCE
A. INSTALLER QUALIFICATIONS:
1. INSTALLER'S RESPONSIBILITIES INCLUDE DESIGNING, FABRICATING, AND
INSTALLING SPRINKLER SYSTEM AND PROVIDING PROFESSIONAL ENGINEERING
SERVICES NEEDED TO ASSUME ENGINEERING RESPONSIBILITY. BASE
CALCULATIONS ON RESULTS OF FIRE-HYDRANT FLOW TEST.
a. ENGINEERING RESPONSIBILITY: PREPARATION OF WORKING PLANS,
CALCULATIONS, AND FIELD TEST REPORTS BY A QUALIFIED PROFESSIONAL
ENGINEER.
B. ELECTRICAL COMPONENTS, DEVICES, AND ACCESSORIES: LISTED AND LABELED AS
DEFINED IN NFPA 70, BY A QUALIFIED TESTING AGENCY, AND MARKED FOR INTENDED
LOCATION AND APPLICATION.
C. NFPA STANDARDS: SPRINLER SYSTEM EQUIPMENT, SPECIALTIES, ACCESSORIES,
INSTALLATION, AND TESTING SHALL COMPLY WITH THE FOLLOWING:
1. NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS."
PART 2 -PRODUCTS
2.1 PIPING MATERIALS
A. COMPLY WITH ALL NFPA, STATE AND LOCAL REQUIREMENTS.
2.2 SPRINKLERS
A. GENERAL REQUIREMENTS:
1. STANDARD: UL'S "FIRE PROTECTION EQUIPMENT DIRECTORY" LISTING OR
"APPROVED GUIDE," PUBLISHED BY FM GLOBAL, LISTING.
2. PRESSURE RATING FOR AUTOMATIC SPRINKLERS: 175 PSIG MINIMUM.
3. PRESSURE RATING FOR HIGH-PRESSURE AUTOMATIC SPRINKLER: 250 PSIG.
PART 3 -EXECUTION
3.1 PIPING INSTALLATION
A. LOCATIONS AND ARRANGEMENTS: DRAWING PLANS, SCHEMATICS, AND DIAGRAMS
INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING. INSTALL PIPING AS
INDICATED, AS FAR AS PRACTICAL.
B. PIPING STANDARD: COMPLY WITH REQUIREMENTS FOR INSTALLATION OF SPRINKLER
PIPING IN NFPA 13.
C. INSTALL SEISMIC RESTRAINTS ON PIPING. COMPLY WITH REQUIREMENTS FOR
SEISMIC-RESTRAINT DEVICE MATERIALS AND INSTALLATION IN NFPA 13.
D. INSTALL SPRINKLER SYSTEMS PER NFPA, STATE AND LOCAL CODES.
3.2 PIPING INSTALLATION
A. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND
ARRANGEMENT OF PIPING SYSTEMS. INSTALL PIPING AS INDICATED UNLESS
DEVIATIONS TO LAYOUT ARE REQUIRED BY BUILDING CONSTRUCTION. INDICATE
DEVIATIONS ON COORDINATION DRAWINGS. SUBMIT AS-BUILT DRAWINGS TO BUILDING
OWNER PRIOR TO CERTIFICATE OF OCCUPANCY.
B. INSTALL PIPING IN CONCEALED LOCATIONS UNLESS OTHERWISE INDICATED AND
EXCEPT IN EQUIPMENT ROOMS AND SERVICE AREAS.
C. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND
SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL
RUNS ARE PROHIBITED UNLESS SPECIFICALLY INDICATED OTHERWISE.
D. INSTALL PIPING ABOVE ACCESSIBLE CEILINGS TO ALLOW SUFFICIENT SPACE FOR
CEILING PANEL REMOVAL.
E. INSTALL PIPING TO PERMIT VALVE SERVICING.
F. INSTALL PIPING AT INDICATED SLOPES.
G. INSTALL PIPING FREE OF SAGS AND BENDS.
H. INSTALL FITTINGS FOR CHANGES IN DIRECTION AND BRANCH CONNECTIONS.
I. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
J. MAKE CHANGES IN DIRECTION FOR SOIL AND WASTE DRAINAGE AND VENT PIPING
USING APPROPRIATE BRANCHES, BENDS, AND LONG-SWEEP BENDS. SANITARY TEES
AND SHORT-SWEEP 1/4 BENDS MAY BE USED ON VERTICAL STACKS IF CHANGE IN
DIRECTION OF FLOW IS FROM HORIZONTAL TO VERTICAL. USE LONG-TURN, DOUBLE Y-
BRANCH AND 1/8-BEND FITTINGS IF TWO FIXTURES ARE INSTALLED BACK TO BACK OR
SIDE BY SIDE WITH COMMON DRAIN PIPE. STRAIGHT TEES, ELBOWS, AND CROSSES
MAY BE USED ON VENT LINES. DO NOT CHANGE DIRECTION OF FLOW MORE THAN 90
DEGREES. USE PROPER SIZE OF STANDARD INCREASERS AND REDUCERS IF PIPES OF
DIFFERENT SIZES ARE CONNECTED. REDUCING SIZE OF DRAINAGE PIPING IN
DIRECTION OF FLOW IS PROHIBITED.
K. LAY BURIED BUILDING DRAINAGE PIPING BEGINNING AT LOW POINT OF EACH SYSTEM.
INSTALL TRUE TO GRADES AND ALIGNMENT INDICATED, WITH UNBROKEN CONTINUITY
OF INVERT. PLACE HUB ENDS OF PIPING UPSTREAM. INSTALL REQUIRED GASKETS
ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS FOR USE OF LUBRICANTS,
CEMENTS, AND OTHER INSTALLATION REQUIREMENTS. MAINTAIN SWAB IN PIPING AND
PULL PAST EACH JOINT AS COMPLETED.
L. INSTALL SOIL AND WASTE DRAINAGE AND VENT PIPING AT THE FOLLOWING MINIMUM
SLOPES UNLESS OTHERWISE INDICATED:
1. BUILDING SANITARY DRAIN: 2 PERCENT DOWNWARD IN DIRECTION OF FLOW FOR
PIPING NPS 3 AND SMALLER; DOWNWARD IN DIRECTION OF FLOW FOR PIPING
NPS 4 AND LARGER.
2. HORIZONTAL SANITARY DRAINAGE PIPING: 2 PERCENT DOWNWARD IN DIRECTION
OF FLOW.
3. VENT PIPING: 1 PERCENT DOWN TOWARD VERTICAL FIXTURE VENT OR TOWARD
VENT STACK.
M. INSTALL CAST-IRON SOIL PIPING ACCORDING TO CISPI'S "CAST IRON SOIL PIPE AND
FITTINGS HANDBOOK," CHAPTER IV, "INSTALLATION OF CAST IRON SOIL PIPE AND
FITTINGS."
1. INSTALL ENCASEMENT ON UNDERGROUND PIPING ACCORDING TO ASTM A 674 OR
AWWA C105/A21.5
O. INSTALL ABOVEGROUND PVC PIPING ACCORDING TO ASTM D 2665.
P. INSTALL UNDERGROUND PVC PIPING ACCORDING TO ASTM D 2321.
Q. DO NOT ENCLOSE, COVER, OR PUT PIPING INTO OPERATION UNTIL IT IS INSPECTED
AND APPROVED BY AUTHORITIES HAVING JURISDICTION.
R. INSTALL SLEEVES FOR PIPING PENETRATIONS OF WALLS, CEILINGS, AND FLOORS.
COMPLY WITH REQUIREMENTS FOR SLEEVES SPECIFIED IN DIVISION 22 SECTION
"SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING."
S. INSTALL SLEEVE SEALS FOR PIPING PENETRATIONS OF CONCRETE WALLS AND SLABS.
COMPLY WITH REQUIREMENTS FOR SLEEVE SEALS SPECIFIED IN DIVISION 22 SECTION
"SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING." INSTALL ESCUTCHEONS FOR
PIPING PENETRATIONS OF WALLS,.
3.7 FIELD QUALITY CONTROL
A. DURING INSTALLATION, NOTIFY AUTHORITIES HAVING JURISDICTION AT LEAST 24
HOURS BEFORE INSPECTION MUST BE MADE. PERFORM TESTS SPECIFIED BELOW IN
PRESENCE OF AUTHORITIES HAVING JURISDICTION.
1. ROUGHING-IN INSPECTION: ARRANGE FOR INSPECTION OF PIPING BEFORE
CONCEALING OR CLOSING-IN AFTER ROUGHING-IN AND BEFORE SETTING
FIXTURES.
2. FINAL INSPECTION: ARRANGE FOR FINAL INSPECTION BY AUTHORITIES HAVING
JURISDICTION TO OBSERVE TESTS SPECIFIED BELOW AND TO ENSURE
COMPLIANCE WITH REQUIREMENTS.
B. REINSPECTION: IF AUTHORITIES HAVING JURISDICTION FIND THAT PIPING WILL NOT
PASS TEST OR INSPECTION, MAKE REQUIRED CORRECTIONS AND ARRANGE FOR
REINSPECTION.
C. REPORTS: PREPARE INSPECTION REPORTS AND HAVE THEM SIGNED BY AUTHORITIES
HAVING JURISDICTION.
D. TEST SANITARY DRAINAGE AND VENT PIPING ACCORDING TO PROCEDURES OF
AUTHORITIES HAVING JURISDICTION. OR, IN ABSENCE OF PUBLISHED PROCEDURES,
AS FOLLOWS:
1. TEST FOR LEAKS AND DEFECTS IN NEW PIPING AND PARTS OF EXISTING PIPING
THAT HAVE BEEN ALTERED, EXTENDED, OR REPAIRED. IF TESTING IS PERFORMED
IN SEGMENTS, SUBMIT SEPARATE REPORT FOR EACH TEST, COMPLETE WITH
DIAGRAM OF PORTION OF PIPING TESTED.
2. LEAVE UNCOVERED AND UNCONCEALED NEW, ALTERED, EXTENDED, OR
REPLACED DRAINAGE AND VENT PIPING UNTIL IT HAS BEEN TESTED AND
APPROVED. EXPOSE WORK THAT WAS COVERED OR CONCEALED BEFORE IT WAS
TESTED.
3. ROUGHING-IN PLUMBING TEST PROCEDURE: TEST DRAINAGE AND VENT PIPING
EXCEPT OUTSIDE LEADERS ON COMPLETION OF ROUGHING-IN. CLOSE OPENINGS
IN PIPING SYSTEM AND FILL WITH WATER TO POINT OF OVERFLOW, BUT NOT LESS
THAN 10-FOOT HEAD OF WATER. FROM 15 MINUTES BEFORE INSPECTION STARTS
TO COMPLETION OF INSPECTION, WATER LEVEL MUST NOT DROP. INSPECT
JOINTS FOR LEAKS.
4. FINISHED PLUMBING TEST PROCEDURE: AFTER PLUMBING FIXTURES HAVE BEEN
SET AND TRAPS FILLED WITH WATER, TEST CONNECTIONS AND PROVE THEY ARE
GASTIGHT AND WATERTIGHT. PLUG VENT-STACK OPENINGS ON ROOF AND
BUILDING DRAINS WHERE THEY LEAVE BUILDING. INTRODUCE AIR INTO PIPING
SYSTEM EQUAL TO PRESSURE OF 1-INCH WG. USE U-TUBE OR MANOMETER
INSERTED IN TRAP OF WATER CLOSET TO MEASURE THIS PRESSURE. AIR
PRESSURE MUST REMAIN CONSTANT WITHOUT INTRODUCING ADDITIONAL AIR
THROUGHOUT PERIOD OF INSPECTION. INSPECT PLUMBING FIXTURE
CONNECTIONS FOR GAS AND WATER LEAKS.
5. REPAIR LEAKS AND DEFECTS WITH NEW MATERIALS AND RETEST PIPING, OR
PORTION THEREOF, UNTIL SATISFACTORY RESULTS ARE OBTAINED.
6. PREPARE REPORTS FOR TESTS AND REQUIRED CORRECTIVE ACTION.
3.8 CLEANING AND PROTECTION
A. CLEAN INTERIOR OF PIPING. REMOVE DIRT AND DEBRIS AS WORK PROGRESSES.
B. PROTECT DRAINS DURING REMAINDER OF CONSTRUCTION PERIOD TO AVOID
CLOGGING WITH DIRT AND DEBRIS AND TO PREVENT DAMAGE FROM TRAFFIC AND
CONSTRUCTION WORK.
C. PLACE PLUGS IN ENDS OF UNCOMPLETED PIPING AT END OF DAY AND WHEN WORK
STOPS.
SANITARY WASTE AND VENT SYSTEMS PIPING
PART 1 -GENERAL
1.1 SUMMARY
A. SECTION INCLUDES:
1. PLUMBING SYSTEMS TO BE INSTALLED AND UTILIZED FOR SANITARY WASTE AND
VENT AND STORM WATER DRAINAGE SYSTEMS.
1.2 PERFORMANCE REQUIREMENTS
A. COMPONENTS AND INSTALLATION SHALL BE CAPABLE OF WITHSTANDING THE
FOLLOWING MINIMUM WORKING PRESSURE UNLESS OTHERWISE INDICATED:
1. SOIL, WASTE, AND VENT PIPING: 10-FOOT HEAD OF WATER
1.3 QUALITY ASSURANCE
A. PIPING MATERIALS SHALL BEAR LABEL, STAMP, OR OTHER MARKINGS OF SPECIFIED
TESTING AGENCY.
B. COMPLY WITH NSF/ANSI 14, "PLASTICS PIPING SYSTEMS COMPONENTS AND RELATED
MATERIALS," FOR PLASTIC PIPING COMPONENTS. INCLUDE MARKING WITH "NSF-DWV"
FOR PLASTIC DRAIN, WASTE, AND VENT PIPING AND "NSF-SEWER" FOR PLASTIC SEWER
PIPING.
PART 2 -PRODUCTS
2.1 HUB-AND-SPIGOT, CAST-IRON SOIL PIPE AND FITTINGS
A. PIPE AND FITTINGS: ASTM A 74, SERVICE CLASS.
B. GASKETS: ASTM C 564, RUBBER.
2.2 HUBLESS, CAST-IRON SOIL PIPE AND FITTINGS
A. PIPE AND FITTINGS: ASTM A 888 OR CISPI 301.
B. CISPI, HUBLESS-PIPING COUPLINGS:
1. STANDARDS: ASTM C 1277 AND CISPI 310.
2. DESCRIPTION: STAINLESS-STEEL CORRUGATED SHIELD WITH STAINLESS-STEEL
BANDS AND TIGHTENING DEVICES; AND ASTM C 564, RUBBER SLEEVE WITH
INTEGRAL, CENTER PIPE STOP.
2.4 PVC PIPE AND FITTINGS
A. SOLID-WALL PVC PIPE: ASTM D 2665, DRAIN, WASTE, AND VENT.
B. CELLULAR-CORE PVC PIPE: ASTM F 891, SCHEDULE 40.
C. PVC SOCKET FITTINGS: ASTM D 2665, MADE TO ASTM D 3311, DRAIN, WASTE, AND VENT
PATTERNS AND TO FIT SCHEDULE 40 PIPE.
D. ADHESIVE PRIMER: ASTM F 656.
2.5 ENCASEMENT FOR UNDERGROUND METAL PIPING
A. STANDARD: ASTM A 674 OR AWWA C105/A 21.5.
PART 3 -EXECUTION
3.1 EARTH MOVING
A. COMPLY WITH REQUIREMENTS FOR EXCAVATING, TRENCHING, AND BACKFILLING
SPECIFIED IN DIVISION 31 SECTION "EARTH MOVING."
3.3 JOINT CONSTRUCTION
A. JOIN HUBLESS, CAST-IRON SOIL PIPING ACCORDING TO CISPI 310 AND CISPI'S "CAST
IRON SOIL PIPE AND FITTINGS HANDBOOK" FOR HUBLESS-PIPING COUPLING JOINTS.
C. PLASTIC, NONPRESSURE-PIPING, SOLVENT-CEMENT JOINTS: CLEAN AND DRY JOINING
SURFACES. JOIN PIPE AND FITTINGS ACCORDING TO THE FOLLOWING:
1. COMPLY WITH ASTM F 402 FOR SAFE-HANDLING PRACTICE OF CLEANERS,
PRIMERS, AND SOLVENT CEMENTS.
2. PVC PIPING: JOIN ACCORDING TO ASTM D 2855 AND ASTM D 2665 APPENDIXES.
3.4 HANGER AND SUPPORT INSTALLATION
A. COMPLY WITH REQUIREMENTS FOR PIPE HANGER AND SUPPORT DEVICES AND
INSTALLATION SPECIFIED IN DIVISION 22 SECTION "HANGERS AND SUPPORTS FOR
PLUMBING PIPING AND EQUIPMENT."
1. INSTALL CARBON-STEEL PIPE HANGERS FOR HORIZONTAL PIPING IN
NONCORROSIVE ENVIRONMENTS.
2. INSTALL CARBON-STEEL PIPE SUPPORT CLAMPS FOR VERTICAL PIPING IN
NONCORROSIVE ENVIRONMENTS.
3. VERTICAL PIPING: MSS TYPE 8 OR TYPE 42, CLAMPS.
4. INSTALL INDIVIDUAL, STRAIGHT, HORIZONTAL PIPING RUNS:
A. 100 FEET AND LESS: MSS TYPE 1, ADJUSTABLE, STEEL CLEVIS HANGERS.
B. LONGER THAN 100 FEET: MSS TYPE 43, ADJUSTABLE ROLLER HANGERS.
B. SUPPORT VERTICAL PIPING AND TUBING AT BASE AND AT EACH FLOOR.
C. ROD DIAMETER MAY BE REDUCED ONE SIZE FOR DOUBLE-ROD HANGERS,
WITH 3/8-INCH MINIMUM RODS.
B. INSTALL HANGERS FOR CAST-IRON SOIL PIPING WITH THE FOLLOWING MAXIMUM
HORIZONTAL SPACING AND MINIMUM ROD DIAMETERS:
1. NPS 1-1/2 AND NPS 2: 60 INCHES WITH 3/8-INCH ROD.
2. NPS 3: 60 INCHES WITH 1/2-INCH ROD.
3. NPS 4 AND NPS 5: 60 INCHES WITH 5/8-INCH ROD.
C. INSTALL SUPPORTS FOR VERTICAL CAST-IRON SOIL PIPING EVERY 15 FEET.
D. INSTALL HANGERS FOR PVC PIPING WITH THE FOLLOWING MAXIMUM HORIZONTAL
SPACING AND MINIMUM ROD DIAMETERS:
1. NPS 1-1/2 AND NPS 2: 48 INCHES WITH 3/8-INCH ROD.
2. NPS 3: 48 INCHES WITH 1/2-INCH ROD.
3. NPS 4: 48 INCHES WITH 5/8-INCH ROD.
E. INSTALL SUPPORTS FOR VERTICAL PVC PIPING EVERY 48 INCHES.
F. SUPPORT PIPING AND TUBING NOT LISTED ABOVE ACCORDING TO MSS SP-69 AND
MANUFACTURER'S WRITTEN INSTRUCTIONS.
3.5 CONNECTIONS
A CONNECT DRAINAGE AND VENT PIPING TO THE FOLLOWING:
1. PLUMBING FIXTURES: CONNECT DRAINAGE PIPING IN SIZES INDICATED, BUT NOT
SMALLER THAN REQUIRED BY PLUMBING CODE.
2. PLUMBING FIXTURES AND EQUIPMENT: CONNECT ATMOSPHERIC VENT PIPING IN
SIZES INDICATED, BUT NOT SMALLER THAN REQUIRED BY AUTHORITIES HAVING
JURISDICTION.
3. PLUMBING SPECIALTIES: CONNECT DRAINAGE AND VENT PIPING IN SIZES
INDICATED, BUT NOT SMALLER THAN REQUIRED BY PLUMBING CODE.
4. INSTALL TEST TEES (WALL CLEANOUTS) IN CONDUCTORS NEAR FLOOR AND
FLOOR CLEANOUTS WITH COVER FLUSH WITH FLOOR.
3.6 IDENTIFICATION
A. IDENTIFY EXPOSED SANITARY WASTE AND VENT PIPING. COMPLY WITH
REQUIREMENTS FOR IDENTIFICATION SPECIFIED IN DIVISION 22 SECTION
"IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT."
3.2 FIELD QUALITY CONTROL
A. PERFORM TESTS AND INSPECTIONS PER NFPA, STATE AND LOCAL REQUIRMENTS.
3.3 SPRINKLER SCHEDULE
A. USE SPRINKLER TYPES PER NFPA REQUIREMENTS.
B. PROVIDE SPRINKLER TYPES IN SUBPARAGRAPHS BELOW WITH FINISHES
INDICATED.
1. CONCEALED SPRINKLERS: ROUGH BRASS, WITH FACTORY-PAINTED COVER
PLATE TO MATCH THE ADJACENT SURFACE, REFER TO THE ARCHITECTURAL AND
OR INTERIOR FINISH PLANS.
2. FLUSH SPRINKLERS: BRIGHT CHROME, WITH PAINTED WHITE ESCUTCHEON.
3. RECESSED SPRINKLERS: BRIGHT CHROME, WITH BRIGHT CHROME
ESCUTCHEON.
4. UPRIGHT, PENDENT AND SIDEWALL SPRINKLERS: CHROME PLATED IN FINISHED
SPACES EXPOSED TO VIEW; ROUGH BRONZE IN UNFINISHED SPACES NOT
EXPOSED TO VIEW; WAX COATED WHERE EXPOSED TO ACIDS, CHEMICALS, OR
OTHER CORROSIVE FUMES.
B. USE SPRINKLER TYPES IN SUBPARAGRAPHS BELOW FOR THE FOLLOWING
APPLICATIONS:
1. ROOMS WITHOUT CEILINGS: UPRIGHT SPRINKLERS.
2. ROOMS WITH SUSPENDED CEILINGS: CONCEALED SPRINKLERS.
3. WALL MOUNTING: SIDEWALL SPRINKLERS.
4. SPACES SUBJECT TO FREEZING: SIDEWALL, DRY SPRINKLERS.
5. SPECIAL APPLICATIONS: EXTENDED-COVERAGE, FLOW-CONTROL, AND QUICK-
RESPONSE SPRINKLERS WHERE INDICATED.
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
Plumbing
Specifications
and Schedules
P00310300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290# Revision Description
Date
Issued
06/08/21
A. ALL CONTRACT DOCUMENTS (SPECIFICATIONS AND DRAWINGS) ARE
COMPLIMENTARY AND MUST BE USED IN COMBINATION TO OBTAIN
COMPLETE CONSTRUCTION INFORMATION. ALL CONFLICTS SHALL BE
BROUGHT TO THE ARCHITECTS OR ENGINEERS ATTENTION IN ORDER TO
ALLOW A CLARIFICATION TO BE ISSUED. ANY WORK COMPLETED
WITHOUT THE CLARIFYING INFORMATION IS AT THE CONTRACTORS
FINANCIAL RISK.
B. THE CONTRACTOR SHALL PROVIDE AND FURNISH ALL MATERIALS AND
ACCESSORIES TO CREATE A FULLY OPERATIONAL, CODE COMPLIANT
AND TESTED SYSTEM. ALL MATERIALS AND ACCESSORIES REQUIRED TO
CREATE THE FULLY OPERATIONAL SYSTEM SHALL BE INCLUDED IN THE
COST OF THIS PROJECT.
C. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR
MAY AT THEIR OPTION MODIFY THE PIPE ROUTING IN ORDER TO CREATE
A SYSTEM THAT MEETS THE INTENT OF THIS SET OF CONSTRUCTION
DOCUMENTS.
D. THE CONTRACTOR SHALL INCLUDE ALL ITEMS THAT ARE REQUIRED TO
ENSURE THAT THE ENTIRE SYSTEM IS FUNCTIONING IN COMPLIANCE
WITH THE APPLICABLE CODES, AND MANUFACTURES INSTALLATION
RECOMMENDATIONS AND OR REQUIREMENTS.
E. ALL CUTTING, DRILLING AND PATCHING OF WALLS, FLOORS AND/OR
STRUCTURAL MEMBERS FOR THE INSTALLATION OF THE PLUMBING AND
FIRE PROTECTION SYSTEMS SHALL BE PROVIDED AS PART OF THE
SCOPE OF THIS PROJECT.
F. STRUCTURAL COMPONENTS SHALL NOT BE CUT, DRILLED OR MODIFIED
IN ANY WAY WITHOUT THE STRUCTURAL ENGINEERS REVIEW AND PRIOR
WRITTEN APPROVAL.
G. PROVIDE FIRE STOPPING WHERE PIPES PENETRATE FIRE RATED
FLOORS AND WALLS. FIRE STOPPING MATERIALS AND METHODS SHALL
BE PER LOCAL AND STATE CODES AND REQUIREMENTS.
H. ALL PLUMBING SYSTEMS SHALL BE INSTALLED PER THE CURRENT
PLUMBING CODE FOR THE LOCATION OF THE WORK BEING INSTALLED.
I. ALL PLUMBING EQUIPMENT, PIPING, FIXTURES, AND PIPE ACCESSORIES
SHALL BE NSF 61, ANNEX G COMPLIANT.
J. ALL PIPING LOCATED WITHIN A RETURN AIR PLENUM SHALL COMPLY
WITH A 25/50 FLAME SMOKE RATING. ANY EXISTING PIPING DISCOVERED
WITHIN A RETURN AIR PLENUM THAT DOES NOT COMPLY WITH THIS
REQUIREMENT SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT FOR FURTHER CLARIFICATION.
K. ALL EXTERIOR WALL PENETRATIONS SHALL BE SEALED WATER AND
WEATHER TIGHT BY THE APPROPRIATE TRADE COMPETENT IN
COMPLETING THIS WORK. THE COST OF THIS WORK SHALL BE INCLUDED
IN THE SCOPE OF THIS PROJECT.
L. DO NOT ATTACH ANY CONSTRUCTION TO THE ROOF DECK JOIST
BRIDGING, JOIST CROSS BRACING, PIPING, CONDUIT, DUCTWORK OR
ANY OTHER NON-STRUCTURAL ITEM.
M. DO NOT WELD OR DRILL INTO STRUCTURAL STEEL OR JOIST; INSTEAD
USE CLAMPS, TIE WIRE, THRU-BOLTS WITH WASHERS
N. DO NOT USE ANY PVC, PLASTIC, ETC. IN PLENUM OR DEMISING WALLS
UNLESS FIRE WRAPPED. ALL WOOD BLOCKING AND NAILERS,
CONCEALED OR NOT SHALL BE FIRE RETARDANT TREATED.
O. DO NOT PENETRATE BUILDING WALLS FOR ANY DUCTING OR VENTING;
ROUTE THROUGH ROOF USING LANDLORDS ROOFING CONTRACTOR.
P. VENT THROUGH ROOF INSTALLATION; ALL ROOFING WORK SHALL BE
COMPLETED BY THE LANDLORDS ROOFING CONTRACTOR. THE COST
SHALL BE INCLUDED IN THE SCOPE OF THIS PROJECT.
Q. PIPING BELOW GROUND SHALL BE SERVICE-WEIGHT CAST IRON OR
SCHEDULE 40 PVC. NO-HUB PIPING OR FERNCO CONNECTIONS ARE NOT
PERMITTED BELOW GRADE.
R. DOMESTIC WATER PIPING ABOVE GRADE SHALL BE TYPE "L" WATER
TUBE.
S. ALL PIPING SHALL BE PROPERLY SUSPENDED BY THE STRUCTURE PER
THE LOCAL CODES.
T. ALL PIPING INSULATED SHALL BE WITH PLENUM RATED MATERIALS.
U. FLOOR DRAINS SHALL BE PROVIDED WITH TRAP PRIMERS. TRAP PRIMER
PIPES SHALL BE FIELD ROUTED AND FIELD INSTALLED.
V. ALL SHUT-DOWN OF UTILITIES AND FIRE PROTECTION SYSTEMS SHALL
BE ARRANGED WITH NO LESS THAN SEVEN (7) DAYS NOTICE TO THE
LANDLORD. WORK MAY NOT COMMENCE UNLESS WRITTEN APPROVAL IS
PROVIDED BY THE OWNER.
W. ALL DOMESTIC WATER BRANCH PIPES SERVING FIXTURES OR
EQUIPMENT WITH FAST ACTING OR ELECTRONIC VALVES SHALL BE
PROVIDED WATER HAMMER ARRESTORS.
X. ALL BRANCH PIPES FROM DOMESTIC WATER MAINS SHALL BE PROVIDED
QUARTER TURN FULL PORT BALL VALVES ON THE BRANCH PIPE JUST
ADJACENT TO THE MAIN.
Y. CONTRACTOR SHALL CAMERA INSPECT AND LOCATE ALL SANITARY PIPE
LOCATED BELOW SLAB, ADVISE OWNER OF ANY DEFECTS PRIOR TO
STARING ANY WORK. ALL CAMERA INSPECTION AND LOCATING SHALL
BE COMPLETED PRIOR TO INSTALLATION OF ANY PIPE. CONTRACTOR
MAY MODIFY ROUTING OF PIPE, KEEP AS-BUILT DOCUMENTS
THROUGHOUT THE ENTIRE PROJECT.
Z. CONTRACTOR SHALL REMOVE ONLY WASTE VENT, HOT AND COLD
WATER PIPE AS REQUIRED (BACK TO MAINS) TO ACCOMMODATE THE
NEW FLOOR PLANS. ALL EXISTING SANITARY AND WASTE PIPE SERVING
THE FLOOR ABOVE SHALL BE LEFT IN PLACE. THE CONTRACTOR SHALL
FIELD MODIFY ANY EXISTING SANITARY PIPE AS REQUIRED TO
ACCOMMODATE THE NEW FLOOR PLANS.
GENERAL NOTES
(REQUIRED TO COMPLETE THE SCOPE OF WORK)2
E.5
F
F.9
G.1
.9
3 3
3
3
4
4 4 5
2
E.5
F
F.9
G.1
.9
2
1
16
2
2
1
2
6
6
6
8
9
2
13
13
13
13
2
9
15
2
E.5
F
F.9
G.1
.9
Standard
3" S 3" S
2" V
2" V
2" S
2" S
10 2" S2" S 2" S
14
2
E.5
F
F.9
G.1
.9
1 1/2" DCW
1/2" DHW
3/4" DCW 2" V
1/2" DCW
1/2" DCW
1/2" DHW
1/2" DCW
WC-1
2" V
2" V
11
11
12
12
1/2" DHW
WAITING
001RECEPTION
003
OFFICE
002
MD NURSE
004
EXAM 1
007
EXAM 2
008 EXAM 3
009
EXAM 4
011
PATIENT RR
006
STORAGE
010
WORK ALCOVE
012
W&M
005
7 7 7
7
17
2" S
2" S
2" S
2" V
2" V 2" V
2" S
2" V
2" V
WC-1
2" V
2" V
3" S
2" V
3" S
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
First Floor
Plumbing Plans
P10110300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290PLAN NOTES
1 REMOVE EXISTING PLUMBING FIXTURE COMPLETE. REMOVE ALL
ROUGH-IN PIPING AND ASSOCIATED ACCESSORIES COMPLETE.
INCLUDING SANITARY WASTE AND VENT AND DOMESTIC WATER
RISERS.
2 PLUMBING CONTRACTOR SHALL REMOVE AND SALVAGE THE EXISTING
PLUMBING FIXTURE AND FACUET TO BE REINSTALLED IN NEW
CASEWORK IN THE NEW EXAM ROOMS.
3 REMOVE SANITARY PIPE THROUGH FLOOR JUST BELOW SLAB AND
PLUG.
4 REMOVE SECTION OF SANITARY PIPE AND PLUG BOTH ENDS.
5 CUT AND CAP EXISTING SANITARY PIPE.
6 CUT AND CAP EXISTING DHW & DCW PIPING.
7 PLUMBING CONTRACTOR SHALL SELECT FROM THE SALVAGED
FIXTURES AND FAUCETS WHICH ONES ARE OF THE BETTER
CONDITION AND REINSTALL AT THIS LOCATION. ANY FIXTURES AND
FAUCETS NOT REUSED MAY BE DISCARDED AT THE END OF THE
PROJECT. MODIFY EXISTING PLUMBING ROUGHINS AS NEEDED TO
ACCOMMODATE REINSTALLED PLUMBING FIXTURES.
8 CUT AND CAP EXISTING VENT PIPE.
9 CUT EXISTING VENT PIPE AND PREP FOR RECONNECTION.
10 CONNECT 3" S TO EXISTING SANITARY PIPING.
11 CONNECT 2" V TO EXISTING VENT PIPING.
12 CONNECT 1/2" DHW & DCW PIPING TO EXISTING DWH & DCW.
13 EXISTING AREA ALREADY HAS A SPRINKLER SYSTEM IN PLACE. FP
CONTRACTOR SHALL RELOCATE MAINS OR BRANCH PIPING TO
ACCOMMODATE NEW ARCHITECHTURAL FLOOR PLAN AND CEILING
GRID. FP CONTRACTOR SHALL PROVIDE COMPLETE AND
OPERATIONAL SYSTEM PER NFPA REQUIREMENTS.
14 CONNECT 2" S TO EXISTING SANITARY PIPING.
15 CUT EXISTING 2" S PIPE AND PREP FOR RECONNECTION. PLUMBING
CONTRACTOR SHALL VERIFY WHAT THIS LINE IS SERVING AND
RECONNECT TO THE SANITARY WASTE AND VENT SYSTEM AS
REQUIRED.
16 PLUMBING CONTRACTOR SHALL REMOVE AND SALVAGE THE EXISTING
PLUMBING FIXTURE AND FACUET TO BE REINSTALLED.
17 REINSTALL SALVAGED LAVATORY AT THIS LOCATION. INSTALL WALL
HUNG LAVATORY AT ADA HEIGHT WITH OFFSET TRAP TO ALLOW FOR
ADA CLEARANCE UNDERNEATH THE FIXTURE. PROVIDE PROTECTIVE
SHIELDING GUARDS TO COVER HOT AND COLD WATER SUPPLIES AND
TRAP AND DRAIN PIPING.
1/8" = 1'-0"1 Level Foundation Demolition Plan
1/8" = 1'-0"2 First Floor Plumbing Demolition Plan
1/8" = 1'-0"3 Level Foundation Sanitary Plan
1/8" = 1'-0"4 First Floor Plumbing Plan
5 SANITARY RISER DIAGRAM -GI CLINIC
# Revision Description
Date
Issued
06/08/21
A or AMP
AC
A/C
ACP
ACU
ADD
ADJ
AF
AFC
AFF
AFG
AHU
AIC
AL
AM
AMB
APPROX.
ARCH
ATS
AUTO
AVG
BC
BKR
BHP
BL
BLDG
BR
BTM
C
ºC
CAB
CB or C/B
C/C
CCTV
CKT
CL
CLG
COL
COMM
COMP
CONC
CONST
CONT
CONTR
CR
CT
CU
DB
DC
DEPT
DF
DIST
DM
DO
DRS
DWG
EC
EF
ELEC
ELEV
ELV
EMER
ENCL
EP
EQUIP
EWC
EX
EXH
EXP
EXT
ºF
FA
FAAP
FACP
FC
FCU
FFC
FFS
FHC
FIN
FIXT
FL
FLUOR
FLEX-CONN
FPC
FSS
FTG
FVR
FV
FVNR
G or GND
GALV
GC
GEN
GFCI
GFI
GFP
HGT
HH
HID
HO
HOA
HORZ
HP
HPS
HTR
HV
AMPERE
ALTERNATING CURRENT
AIR CONDITIONING
ACCESS PANEL
AIR CONDITIONING UNIT
ADDITION
ADJUSTABLE
AMPERE FRAME
ABOVE FINISHED CEILING
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AIR HANDLING UNIT
AMPERE INTERRUPTING CAPACITY
ALUMINUM
AMMETER
AMBIENT
APPROXIMATELY
ARCHITECT
AUTOMATIC TRANSFER SWITCH
AUTOMATIC
AVERGE
BARE COPPER
BREAKER
BRAKE HORSEPOWER
BUILDING LINE
BUILDING
BRANCH
BOTTOM
CONDUIT
DEGREES CELSIUS
CABINET
CIRCUIT BREAKER
CENTER TO CENTER
CLOSED CIRCUIT TELEVISION
CIRCUIT
CENTER LINE
CEILING
COLUMN
COMMUNICATION
COMPRESSOR
CONCRETE
CONSTRUCTION
CONTINUOUS
CONTRACTOR
CRITICAL
CURRENT TRANSFORMER
COPPER
DIRECT BURIAL
DIRECT CURRENT
DEPARTMENT
DRINKING FOUNTAIN
DISTRIBUTION
DEMAND METER
DRAWOUT
DOCTORS
DRAWING
ELECTRICAL CONTRACTOR
EXHAUST FAN
ELECTRIC
ELEVATOR
ELEVATION
EMERGENCY
ENCLOSURE
ELECTRIC PNEUMATIC
EQUIPMENT
ELECTRIC WATER COOLER
EXPLOSIONPROOF
EXHAUST
EXPANSION
EXTERIOR
DEGREES FAHRENHEIT
FIRE ALARM
FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
FLAT CABLE
FAN COIL UNIT
FOOD FACILITY CONTRACTOR
FOOD FACILITY SUPPLIER
FIRE HOSE CABINET
FINISH
FIXTURE
FLOOR
FLUORESCENT
FLEXIBLE CONNECTION
FIRE PROTECTION CONTRACTOR
FUSED SAFETY SWITCH
FOOTING
FILMVIEWER
FULL VOLTAGE
FULL VOLTAGE NON REVERSING
GROUND
GALVANIZED
GENERAL CONTRACTOR
GENERATOR
GROUND FAULT CKT. INTERRUPTER
GROUND FAULT INTERRUPTER
GROUND FAULT PROTECTION
HEIGHT
HANDHOLE
HIGH INTENSITY DISCHARGE
HAND OPERATED
HAND-OFF-AUTOMATIC
HORIZONTAL
HORSEPOWER
HIGH PRESSURE SODIUM
HEATER
HIGH VOLTAGE
HZ
IC
ID
INCAN
INCL
ISG
JB
JT
KEC
KT
KVA
KVAR
KW
LAB
LB
LF
LOC
LS
LT
LTG
LV
MATV
MAX
MC
MCB
MCC
MDP
MECH
MH
MIN
MISC
MLO
MTD
MTG HT
MU
OD
OFCI
OFOI
OPNG
OPP
OR
P
PB
PBOX
PE
PF
PH or Ø
PV
PNL
PL
PREFAB
PRES
PT
PTS
PW
PWR
RACU
RAD
RECEPT
REF or REFR
REINF
RGIP
RM
RPM
SA
SC
SG
SHT
SIG
SN
SPEC
SQ
SS
SSSS
STD
STN
STR
SUSP
SW
SWBD
SWGR
TCC
TELE
TEMP
TMH
TV
TYP
UC
U/C
UH
UV
V
VAC
VB
VC
VEL
VFD
VM
VOL
VP
VSD/VFC
W/
W/O
WTR
WP
WT
XFMR
Z
HERTZ
INTERCOMMUNICATION
INSIDE DIAMETER
INCANDESCENT
INCLUDE
ISOLATED GROUND SURGE GUARD
JUNCTION BOX
JOINT
KITCHEN EQUIPMENT CONTRACTOR
KITCHENETTE
KILOVOLT AMPERE
KILOVOLT AMPERE REACTIVE
KILOWATT
LABORATORY
POUND
LINEAR FEET
LOCATION
LIFE SAFETY
LIGHT
LIGHTING
LOW VOLTAGE
MASTER ANTENNA TELEVISION
MAXIMUM
MECHANICAL CONTRACTOR
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MAIN DISTRIBUTION PANEL
MECHANICAL
MANHOLE
MINIMUM
MISCELLANEOUS
MAIN LUGS ONLY
MOUNTED
MOUNTING HEIGHT
MEDICINE UNIT
OUTSIDE DIAMETER
OWNER FURNISHED-CONTRACTOR INSTALLED
OWNER FURNISHED-OWNER INSTALLED
OPENING
OPPOSITE
OPERATING ROOM
POLE
PUSHBUTTON
PULL BOX
PNEUMATIC ELECTRIC CONVERTER
POWER FACTOR
PHASE
POST INDICATOR VALVE
PANELBOARD
PILOT LIGHT
PREFABRICATED
PRESSURE
PNEUMATIC TUBE
PNEUMATIC TUBE STATION
PART WINDING
POWER
ROOM AIR CONDITIONING UNIT
RADIATION
RECEPTACLE
REFRIGERATOR
REINFORCED
REMOTE GROUND INDICATING PANEL
ROOM
REVOLUTIONS PER MINUTE
SUPPLY AIR
SHORT CIRCUIT
SURGE GUARD PROTECTION
SHEET
SIGNAL
SOLID NEUTRAL
SPECIFICATIONS
SQUARE
SAFETY SWITCH
SOLID STATE SOFT START
STANDARD
STATION
STRUCTURAL
SUSPENDED
SWITCH
SWITCHBOARD
SWITCHGEAR
TEMPERATURE CONTROL CONTRACTOR
TELECOMMUNICATION
TEMPERATURE
TOP OF MANHOLE
TELEVISION
TYPICAL
UNDER CARPET
UNDER CABINET or UNDER COUNTER
UNIT HEATER
UNIT VENTILATOR
VOLT
VACUUM
VACUUM BREAKER
VACUUM CLEANING
VELOCITY
VARIABLE FREQUENCY DRIVE
VOLTMETER
VOLUME
VAPORPROOF
VARIABLE SPEED DRIVE/CONTROLLER
WITH
WITHOUT
WATER
WEATHERPROOF
WEIGHT
TRANSFORMER
IMPEDANCE
ELECTRICAL ABBREVIATIONS
M
FIRE ALARM SYSTEM
SYMBOL DESCRIPTION
MANUAL SENDING STATION
PIV POST INDICATOR VALVE
SD CEILING SMOKE DETECTOR
TS SPRINKLER SYSTEM TAMPER SWITCH
FS SPRINKLER SYSTEM FLOW SWITCH
SD WALL SMOKE DETECTOR
SD WALL SMOKE DETECTOR WITH SOUNDER BASE
SD CEILING SMOKE DETECTOR WITH SOUNDER BASE
DD AUTOMATIC DUCT DETECTOR ("X" DENOTES AS FOLLOWS)
RT REMOTE DETECTOR TEST STATION
RI REMOTE DETECTOR INDICATOR STATION
AR FIRE ALARM ADDRESSABLE RELAY
X NONE -PHOTOELECTRIC TYPE
S - SUPPLY
R -RETURN
DR DOOR RELEASE
DU DOOR UNLOCK
J FIREMANS JACK
HD HEAT DETECTOR
FD FLAME DETECTOR
BD BEAM DETECTOR
H WALL HORN ONLY
H WALL HORN STROBE
CEILING HORN ONLY
CEILING HORN STROBE
H
H
S WALL SPEAKER ONLY
S WALL SPEAKER STROBE
CEILING SPEAKER STROBES
V WALL VISUAL ONLY
CEILING VISUAL ONLYV
FACP FIRE ALARM CONTROL PANEL
FAAP FIRE ALARM ANNUNCIATOR PANEL
ALL SYMBOLS AND ABBREVIATIONS MAY NOT BE USED ON THIS PROJECT3
ST -20 AMP, 125VAC, SAFETY TYPE
S -20 AMP, 125VAC, SURGE GUARD PROTECTION TYPE
WP - 20 AMP, 125VAC, WEATHERPROOF TYPE
HM - 20 AMP, 125VAC, HORIZONTAL MOUNT TYPE
IG -20 AMP, 125VAC, ISOLATED GROUND TYPE
NONE -20 AMP, 125VAC
ELECTRICAL RECEPTACLES
DUPLEX RECEPTACLE -NORMAL POWER CIRCUIT
DESCRIPTIONSYMBOL
DUPLEX RECEPTACLE -EMERGENCY POWER CIRCUIT
DUPLEX GFCI RECEPTACLE -NORMAL POWER CIRCUIT
DUPLEX GFCI RECEPTACLE -EMERGENCY POWER CIRCUIT
QUADRAPLEX RECEPTACLE -NORMAL POWER CIRCUIT
QUADRAPLEX RECEPTACLE -EMERGENCY POWER CIRCUIT
QUADRAPLEX GFCI RECEPTACLE -NORMAL POWER CIRCUIT
QUADRAPLEX GFCI RECEPTACLE -EMERGENCY POWER CIRCUIT
SIMPLEX RECEPTACLE -NORMAL POWER CIRCUIT
SIMPLEX RECEPTACLE -EMERGENCY POWER CIRCUIT
SPECIAL RECEPTACLE -NORMAL POWER CIRCUIT
SPECIAL RECEPTACLE -EMERGENCY POWER CIRCUIT
DUPLEX RECEPTACLE -TOP SWITCHED
"X" DENOTES AS FOLLOWS:
CEILING DUPLEX RECEPTACLE -NORMAL POWER CIRCUIT
CEILING DUPLEX RECEPTACLE -EMERGENCY POWER CIRCUIT
CEILING QUADRAPLEX RECEPTACLE -NORMAL POWER CIRCUIT
CEILING QUADRAPLEX RECEPTACLE -EMERGENCY POWER CIRCUIT
FLOOR BOX DUPLEX RECEPTACLE -NORMAL POWER CIRCUIT
FLOOR BOX DUPLEX RECEPTACLE -EMERGENCY POWER CIRCUIT
FLOOR BOX QUADRAPLEX RECEPTACLE -NORMAL POWER CIRCUIT
FLOOR BOX QUADRAPLEX RECEPTACLE -EMERGENCY POWER CIRCUIT
FLOOR BOX POWER AND TELECOM
FLOOR BOX BLANK
MULTI-OUTLET ASSEMBLY (POWER AND/OR TELECOM)
ELECTRICAL SWITCHES
DESCRIPTIONSYMBOL
TOGGLE SWITCH - 20 AMP, 120/277VAC
TOGGLE SWITCH -3 WAY
4 TOGGLE SWITCH -4 WAY
K TOGGLE SWITCH - KEY OPERATED
T
TOGGLE SWITCH - HORSE POWER RATED MANUAL
MOTOR STARTER WITH THERMAL OVERLOAD
PROTECTION
P TOGGLE SWITCH -PILOT LIGHT
D DIMMER SWITCH -20 AMP, 120/277VAC
D DIMMER SWITCH -3 WAY3
4D DIMMER SWITCH -4 WAY
OC1 WALL OCCUPANCY SENSOR - 1 BUTTON CONTROL
OC2 WALL OCCUPANCY SENSOR - 2 BUTTON CONTROL
OC3 WALL OCCUPANCY SENSOR -DUAL RELAY FOR
EXHAUST FAN CONTROL
OC CEILING OCCUPANCY SENSOR
VS1 WALL VACANCY SENSOR -1 BUTTON CONTROL
VS2 WALL VACANCY SENSOR -2 BUTTON CONTROL
LC LOW VOLTAGE LIGHTING CONTROLLER
T 0 -3 HOUR TIMER SWITCH -20 AMP, 120/277VAC
INFORMATION SYSTEMS
DESCRIPTIONSYMBOL
VOICE AND DATA ONLY OUTLET
WAP -WIRELESS ACCESS
POINT
FLOOR BOX -VOICE AND DATA
CEILING -VOICE AND DATA
TELECOMMUNICATIONS EQUIPMENT RACK
X
R -ROUGH-IN ONLY
# -QUANTITY OF JACK(S) AND CABLE(S)
"X" DENOTES AS FOLLOWS:
LIGHTING
DESCRIPTION
NO SHADING INDICATES NORMAL POWER
SYMBOL
24" x 24" LIGHTING FIXTURE
12" x 48" LIGHTING FIXTURE
HALF SHADED INDICATES LIFE SAFETY POWER
FULL SHADED INDICATES EMERGENCY POWER
12" x 96" LIGHTING FIXTURE
6" x 96" LIGHTING FIXTURE
6" x 48" LIGHTING FIXTURE
6" x 36" LIGHTING FIXTURE
6" x 24" LIGHTING FIXTURE
8" DOWNLIGHT
6" DOWNLIGHT
4" DOWNLIGHT
WALL MOUNTED LIGHT
CEILING EXIT LIGHT (DUAL FACED)
CEILING EXIT LIGHT (SINGLE FACE)
WALL EXIT LIGHT
EXIT LIGHT DIRECTIONAL ARROWS
WALL EMERGENCY BATTERY LIGHT
WALL EXIT WITH EMERGENCY LIGHTS
CEILING EMERGENCY BATTERY LIGHT
WALL EXIT WITH INTERIOR AND
EXTERIOR EMERGENCY LIGHTS
EXTERIOR POLE LIGHT (ONE HEAD)
EXTERIOR POLE LIGHT (TWO HEADS)
EXTERIOR POLE LIGHT (THREE HEADS)
EXTERIOR POLE LIGHT (FOUR HEADS)
EXTERIOR POLE LIGHT (TOP MOUNT)
EXTERIOR BOLLARD
NEUTRAL
GROUND
RACEWAY SYSTEM
DESCRIPTION
PHASE CONDUCTORS
SYMBOL
LIGHT/SCREENED SOLID OR DASHED LINES INDICATE EXISTING TO REMAIN
HEAVY CONTINUOUS LINES INDICATE NEW WORK
LINE SYMBOLS
HEAVY DASHED LINES INDICATE EXISTING TO BE REMOVED
J JUNCTION OR PULL BOX
PUSHBUTTON OR PUSH PLATE
PAD MOUNTED TRANSFORMER
BRANCH PANELBOARD -SURFACE MOUNT
COMBINATION MOTOR CONTROLLER / DISCONNECT
DISCONNECT SWITCH - NON-FUSED
MOTOR CONTROLLER
DISCONNECT SWITCH - FUSED
MOTOR ("X" DENOTES HORSEPOWER)
GROUND CONNECTION
ELECTRIC THERMOSTATT
DESCRIPTION
MOLDED CASE CIRCUIT BREAKER
ELECTRICAL EQUIPMENT
SYMBOL
GROUND POINT
GROUND ROD
X
PC PHOTO CELL
SUSPENDED TRANSFORMER
DISTRIBUTION PANELBOARD
BRANCH PANELBOARD -RECESSED MOUNT
AUTOMATIC TRANSFER SWITCHN E
L
TELECOM TERMINAL BOARD
GROUND BAR
GENERATOR
TV
AV
TV SYSTEM OUTLET
AUDIO/VISUAL CONTROLLER
CLOCK SYSTEM OUTLETC
M
M
MICROPHONE INPUT RECEPTACLE -WALL MOUNTED
SPEAKER -WALL MOUNTED
SPEAKER -CEILING MOUNTED
VOLUME CONTROL
MICROPHONE INPUT RECEPTACLE -CEILING MOUNTED
S
S
V
M
D
S
E
P
CB
CP
L
Z
W
R
A
N
NC
IC
X
MTV
CCTV
DR
ES
IC
MI
ML
CR
MD
DC
PB
K
BS
DS
SM
SS
DE
PC
PC
P
IR
RF
CL
WL
2X
NURSE ASSIST
NURSE ASSIST/CODE BLUE
DOOR SECURITY SYSTEM
SYMBOL DESCRIPTION
DOOR BUZZER
SECURITY DOOR ALARM MAGNETIC LOCK
CCTV MONITOR OUTLET
ELECTRIC DOOR OPENER
ELECTRIC DOOR STRIKE
INTERCOM UNIT FLUSH MTD.
MASTER INTERCOM AND DIRECTORY UNIT
MOTION DETECTOR
CCTV COAXIAL CABLE OUTLET AND POWER OUTLET
SECURITY CARD READER
SECURITY CONTROL PANEL
SECURITY DOOR CONTACTS
SECURITY EXIT PUSH BUTTON
SECURITY KEYPAD
BIOSCAN ACCESS PAD
CAMERA
DUTY STATION
DESCRIPTION
MASTER STATION
STAFF STATION
STAFF LOCATOR STATION
CODE BLUE STATION
SYMBOL
ROOM READY INDICATOR
REMOTE ANNUNCIATOR
NURSE STATION INPUT JACK
BED CONTROL CABLE/INTERCONNECT JACK
NURSE CALL SYSTEM
PATIENT STATION -SINGLE OUTLET
EMERGENCY/BATH STATION
ZONE LIGHT
WALL MOUNTED DOME LIGHT
CODE PINK STATION
NURSE AUXILIARY JACK
TELEMETRY ANTENNA LOCATION
CEILING MOUNTED DOME LIGHT
SECURITY DUTY STATION
SECURITY STAFF STATION
SECURITY MONITOR
SECURITY DOOR EGRESS
PULL CORD
PULL CORD WITH ALARMA
PATIENT STATION -SINGLE OUTLET WITH
CODE / STAFF ASSIST BUTTONE
TRACKING SENSOR (IR)
TRACKING SENSOR (RF)
DOUBLE NURSE AUXILIARY JACK
NAC FIRE ALARM NOTIFICATION APPLIANCE CONTROL PANEL
WAP
X
X
RECEPTACLE ABOVE COUNTERTOP AT +2" ABOVE
BACKSPLASH TO BOTTOM OF DEVICE. COORDINATE WITH
CASEWORK TO BE INSTALLED.
RECEPTACLE INSTALLED BELOW COUNTERTOP AT +18"
A.F.F. COORDINATE WITH CASEWORK TO BE INSTALLED.
X
RECEPTACLE LEGEND
DESCRIPTIONABBREVIATION ABBREVIATION DESCRIPTION
FXX
FEEDER SIZE. (REFER TO FEEDER
SCHEDULE FOR ADDITIONAL
INFORMATION
(APPLY TO ALL ELECTRICAL SHEETS)
1. PROVIDE SUPPORT WIRES FOR ALL LIGHT FIXTURES.
2. COORDINATE INSTALLATION OF LIGHT FIXTURES WITH ARCHITECTURAL REFLECTED CEILING PLAN, HVAC EQUIPMENT,
DUCTWORK, PIPING AND SUPPORTS.
3. ELECTRICAL CONTRACTOR SHALL VERIFY THE EXISTING CONDITIONS AT THE PROJECT SITE BEFORE SUBMITTING COST
PROPOSAL.
4. ELECTRICAL CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS TO FAMILIARIZE HIMSELF WITH EXTENT OF REMODELING
/ ALTERATION WORK.
5. ALL WORK SHALL CONFORM TO OR EXCEED THE MINIMUM REQUIREMENTS OF THE CURRENT ANSI / NFPA 70 WITH STATE
AMENDMENTS, ENERGY CODE, ANSI / IEEE C2 AND ALL FEDERAL, STATE, LOCAL AND MUNICIPAL CODES AND ORDINANCES. THE
ELECTRICAL SUBCONTRACTOR SHALL COMPLY WITH THE DIRECTIONS OF ALL AUTHORITIES HAVING JURISDICTION.
6. INSTALL WORK USING PROCEDURES DEFINES IN NECA STANDARDS OF INSTALLATION. ALL WORK SHALL PRESENT A NEAT
MECHANICAL APPEARANCE WHEN COMPLETED.
7. REFER TO THE ARCHITECTURAL DRAWINGS FOR CEILING WORK BY THE GENERAL CONTRACTOR. COORDINATE ALL ELECTRICAL
WORK.
8. THE ELECTRICAL SUBCONTRACTOR SHALL PROVIDE ALL FLOOR, WALL, AND CEILING PENETRATIONS TO COMPLETE HIS / HER
WORK. PROVIDE PROPER FIRE SAFEING FOR ALL PENETRATIONS MADE. PROVIDE APPROPRIATE SEALANT (I.E. FIRESAFEING) TO
MAINTAIN CONSTRUCTION INTEGRITY FOR ANY PENETRATIONS THROUGH FLOORS, STRUCTURAL CEILING, AND FIRE WALLS.
9. COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER TRADES TO ENSURE EFFECTIVE AND EFFICIENT OVERALL INSTALLATION.
10. COORDINATE ALL ELECTRICAL SYSTEM DOWNTIME WITH THE OWNER AND OTHER TRADES. IT IS MANDATORY THAT THE EXISTING
BUILDING REMAIN IN CONTINUOUS AND NON-INTERRUPTED OPERATION DURING THE REMODELING / ALTERING OF THE EXISTING
BUILDING. THE SPECIFIC AREA(S) BEING REMODELED / ALTERED AT ANY TIME ARE OBVIOUSLY EXCLUSIVE OF THE STATEMENT.
SERVICES TO EXISTING BUILDING SHALL BE KEPT ON CONTINUOUS OPERATION INCLUDING POWER, FIRE ALARM, LIGHTING,
TELEPHONE, ETC. DOWNTIME OF THESE SYSTEMS SHALL BE MINIMIZED. WEEKEND AND AFTER HOURS WORK MAY BE REQUIRED
TO PREVENT OR MINIMIZE INTERFERENCE WITH OWNERS OPERATION.
11. CONTRACTOR SHALL WORK CLOSELY WITH THE OWNER TO IDENTIFY ALL SYSTEMS WIRING, DEVICES, ETC. THAT MUST REMAIN
OPERATIONAL DURING CONSTRUCTION. COORDINATE ALL DEMOLITION WITH THE OWNER PRIOR TO ANY DEMOLITION WORK.
12. THE LOCATION OF NEW RECEPTACLES, PHONE / DATA JACKS, AND ROOM EQUIPMENT SHOWN ON THESE DRAWINGS ARE
APPROXIMATE. FINAL LOCATIONS WILL BE DETERMINED WITH THE ARCHITECT DURING THE CONSTRUCTION PHASE.
13. IN REMODELED / ALTERED AREA ANY FEEDERS, CONDUITS, BRANCH CIRCUITS, SIGNAL AND TELEPHONE CIRCUITS, ETC. PASSING
THROUGHOUT THE REMODELED / ALTERED AREAS TO SERVE (OR BE SERVED FROM EXISTING ADJACENT, REMOTE, OR
SURROUNDING THAT ARE TO REMAIN) SHALL BE RETAINED AND KEPT OPERATIONS AND SHALL BE REROUTED IN ALL CASES
WHERE THEY INTERFERE WITH ANY NEW WORK OR USAGE TO BE ACCOMPLISHED IN THE REMODELED / ALTERED AREA.
14. WHERE DEVICES ARE OMITTED FROM PRESENT BRANCH CIRCUITS, THE REMAINING DEVICE SHALL BE REWIRED. IF NEEDED AND
AS REQUIRED, TO REMAIN IN THEIR RESPECTIVE CIRCUITS AND IN OPERATING CONDITION.
15. ALL NEW EQUIPMENT SHALL BE SUBMITTED FOR APPROVAL PRIOR TO ORDERING.
16. PHYSICAL SIZES AND LOCATIONS OF ALL MECHANICAL EQUIPMENT SHOWN ON THESE DRAWINGS ARE APPROXIMATE.
COORDINATE ELECTRICAL WORK FOR THIS EQUIPMENT WITH THE OTHER TRADES.
17. ALL BRANCH CIRCUITS SHALL UTILIZE SEPARATE INDEPENDENT NEUTRAL CONDUCTORS. DO NOT COMBINE NEUTRAL
CONDUCTORS.
18. ALL FEEDER NEUTRAL / GROUNDED CONDUCTORS SHALL BE CONSIDERED CURRENT CARRYING. DERATE MULTIPLE CONDUCTORS
IN A RACEWAY ACCORDINGLY WITH NEC TABLES.
19. INSTALL ALL CONDUITS, RACEWAYS, AND CABLE TRAY FOR MAXIMUM HEAD CLEARANCE IN MECHANICAL AREAS.
20. ALL DEVICES SHOWN ON THESE DRAWINGS TO BE REMOVED SHALL BE REMOVED COMPLETE INCLUDING ALL ASSOCIATED
CONDUIT AND WIRING BACK TO SOURCE UNLESS OTHERWISE NOTED. ALL CIRCUIT BREAKERS OR EQUIPMENT MADE SPARE BY
THE DEMOLITION SHALL BE TURNED OFF AND MARKED SPARE. IT IS THE INTENT THAT ALL EXISTING ELECTRICAL DEVICES,
CONDUIT, WIRING, ETC. IN THIS SPACE THAT ARE NOT REUSED AND ARE ABANDONED SHALL BE REMOVED COMPLETE.
CONTRACTOR SHALL FIELD VERIFY EXACT REQUIREMENTS. NOT ALL DEVICES ARE SHOWN ON THIS DRAWING.
21. ALL DEVICES AND LIGHT FIXTURES SHOWN TO BE REMOVED FROM EXISTING BLOCK WALLS THAT ARE NOT REUSED SHALL HAVE
BLANK COVERS INSTALLED.
22. ALL DEVICES SHOWN TO BE REMOVED FROM EXISTING WALLS THAT REMAIN SHALL HAVE DEVICES AND ASSOCIATED CONDUIT
REMOVED AND WALL SHALL BE PATCHED.
23. REFER TO MECHANICAL DEMOLITION PLANS FOR ALL EQUIPMENT THAT IS TO BE REMOVED. REMOVE ALL ASSOCIATED CONDUIT
AND WIRING TO THESE DEVICES.
24. TELEVISION SYSTEM: REMOVE ALL TELEVISION SYSTEM DEVICES AND WIRING IN AREAS OF DEMOLITION THAT ARE INSTALLED IN
WALLS OR CEILINGS. ALL OTHER TELEVISION WIRING, EQUIPMENT AND DEVICES SHALL REMAIN. COORDINATE REMOVAL OF THIS
SYSTEM AND ITS COMPONENTS WITH THE OWNER PRIOR TO WORK.
25. TELEPHONE / DATA SYSTEM: REMOVE ALL TELEPHONE / DATA SYSTEM DEVICES AND WIRING IN AREAS OF DEMOLITION THAT ARE
INSTALLED IN WALLS OR CEILINGS. ALL OTHER TELEPHONE / DATA WIRING, EQUIPMENT AND DEVICES SHALL REMAIN.
COORDINATE REMOVAL OF THIS SYSTEM AND ITS COMPONENTS WITH THE OWNER PRIOR TO WORK.
26. CCTV SYSTEM: REMOVE ALL CCTV SYSTEM DEVICES AND WIRING IN AREAS OF DEMOLITION THAT ARE INSTALLED IN WALLS OR
CEILINGS. ALL OTHER CCTV WIRING, EQUIPMENT AND DEVICES SHALL REMAIN. COORDINATE REMOVAL OF THIS SYSTEM AND ITS
COMPONENTS WITH THE OWNER PRIOR TO WORK.
27. NURSE CALL SYSTEM: REMOVE ALL NURSE CALL SYSTEM DEVICES AND WIRING IN AREAS OF DEMOLITION THAT ARE INSTALLED
IN WALLS OR CEILINGS. ALL OTHER NURSE CALL WIRING, EQUIPMENT AND DEVICES SHALL REMAIN. COORDINATE REMOVAL OF
THIS SYSTEM AND ITS COMPONENTS WITH THE OWNER PRIOR TO WORK.
28. FIRE ALARM SYSTEM: REMOVE ALL FIRE ALARM SYSTEM DEVICES AND WIRING IN AREAS OF DEMOLITION THAT ARE INSTALLED IN
WALLS OR CEILINGS. ALL OTHER FIRE ALARM WIRING, EQUIPMENT AND DEVICES SHALL REMAIN. COORDINATE REMOVAL OF THIS
SYSTEM AND ITS COMPONENTS WITH THE OWNER PRIOR TO WORK.
29. ALL LIGHT FIXTURES SHOWN WITH EMERGENCY BATTERY BALLASTS SHALL HAVE UNSWITCHED "HOT" WIRE INSTALLED TO
BALLAST.
30. NEW DEVICES SHOWN TO BE INSTALLED ON EXISTING DRYWALL WALLS SHALL BE INSTALLED FLUSH IN WALL WITH CONDUIT AND
WIRING CONCEALED. CUT AND PATCH EXISTING WALLS AS REQUIRED.
31. NEW DEVICES SHOWN TO BE INSTALLED ON EXISTING BLOCK WALLS SHALL BE INSTALLED SURFACE MOUNTED AND IN SURFACE
MOUNTED WIREMOLD PAINTED TO MATCH WALL.
32. WIRING SHALL BE INSTALLED ABOVE ACCESSIBLE CEILINGS AND IN DRYWALL WALLS WHERE POSSIBLE.
33. WIRING THAT IS TO BE INSTALLED IN AREAS WHERE THERE ARE NO CEILINGS SHALL BE INSTALLED EXPOSED. CABLING SHALL BE
INSTALLED NEATLY AND AT RIGHT ANGLES TO STRUCTURE. WIRING SHALL BE INDEPENDENTLY SUPPORTED AS REQUIRED.
WIRING SHALL NOT LAY OVER OTHER TRADES.
34. NEW DEVICES SHALL MATCH EXISTING DEVICES AND COVERPLATES.
35. WHERE OCCUPANCY SENSORS ARE INDICATED ON PLANS, THE ENTIRE ROOM SHALL BE COVERED. MANUFACTURER IS
RESPONSIBLE FOR SENSOR LAYOUT. ADDITIONAL SENSORS REQUIRED DUE TO LACK OF COVERAGE SHALL BE THE
RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR. PROVIDE QUANTITY AS REQUIRED. CEILING AND WALL MOUNTED SENSORS
SHALL BE DUAL TECHNOLOGY TYPE. SENSORS SHALL INCLUDE ALL POWER SUPPLIES AND RELAYS NECESSARY TO CONTROL
LIGHT FIXTURES IN ROOM / AREA. SENSORS SHALL OPERATE IN "VACANCY" MODE -MANUAL ON / AUTO OFF. TYPE OC SQUARE -
INDICATES A WALL MOUNTED SINGLE CIRCUIT SENSOR WITH 1 SWITCH, TYPE ROUND OC INDICATES A CEILING MOUNTED SENSOR.
PROVIDE A SET OF AUXILIARY CONTACTS ON ALL WALL AND CEILING MOUNTED OCCUPANCY SENSORS FOR SENSOR STATUS FOR
TEMPERATURE CONTROL.
36. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN DEMOLITION, REMOVAL, CAPPING, STORING, ABANDONING,
DISCONNECTION, RELOCATING AND RECONNECTION OF EXISTING ELECTRICAL EQUIPMENT AND MATERIAL. ALL CUTTING,
PATCHING, REPAIRING, REPLACEMENT AND REFINISHING, SHALL MATCH THE EXISTING CONSTRUCTION AS NEARLY AS POSSIBLE.
37. ALL WIRING (POWER, LIGHTING) NOT REUSED FOR REMODELING AREAS SHALL BE COMPLETELY REMOVED BACK TO ASSOCIATED
PANELS.
38. THE OWNER SHALL HAVE THE FIRST CHOICE TO ACCEPT EXISTING DEVICES BEING REMOVED.
39. REMOVE ALL ABANDONED CONDUITS, BOXES AND WIRING WITHIN PROJECT AREA.
40. FIRE ALARM SYSTEM SHALL BE MAINTAINED DURING PROJECT.
41. CEILING MOUNTED DEVICES TO REMAIN SHALL BE SUPPORTED FROM STRUCTURE DURING CONSTRUCTION AND REINSTALLED IN
NEW CEILING.
42. ARRANGEMENTS SHALL BE MADE WITH OWNER REPRESENTATIVE TO COORDINATE FIRE ALARM SYSTEM OUTAGE.
43. CONTRACTOR SHALL PROTECT EXISTING CABLES DURING ALL PHASES OF CONSTRUCTION.
44. ALL DEVICES (EXIT SIGNS, FIRE ALARM, LIGHTING, ETC) THAT ARE TAKEN OUT OF SERVICE AND NOT REUSED SHALL BE RETURNED
TO THE OWNER.
45. ALL RECEPTACLES SHALL BE HOSPITAL GRADE AND SAFETY / TAMPERPROOF TYPE.
SCP
GENERAL NOTES
24" x 48" LIGHTING FIXTURE
12" x 36" LIGHTING FIXTURE
12" x 24" LIGHTING FIXTURE
12" x 12" LIGHTING FIXTURE
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
Electrical
Symbols and
General Notes
E00110300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290# Revision Description
Date
Issued
06/08/21
26 05 00 -BASIC MATERIALS AND METHODS
1. UTILITIES:
1.1. CONTRACTOR TO COORDINATE POWER, TELEPHONE, AND TELEVISION (CABLE) SERVICE REQUIREMENTS WITH LOCAL
UTILITIES PRIOR TO SUBMIITING BID PROPOSAL.
2. SHOP DRAWINGS:
2.1. SUBMIT SHOP DRAWINGS TO INCLUDE MANUFACTURER CURRENT SPECIFICATION AND LITERATURE, HIGHLIGHTED WITH
OPTIONS PROVIDED AS PART OF THIS PROJECT. PROVIDED SHOP DRAWINGS FOR WIRING DEVICES, STARTERS, CIRCUIT
BREAKERS, LIGHTS, LAMPS, ELECTRONIC BALLAST, PANEL BOARDS, AUTOMATIC TRANSFER SWITCH, AND FIRE ALARM.
3. ALL ELECTRICAL CONNECTORS, LUGS, BREAKERS, EQUIPMENT, ETC., SHALL BE RATED A MINIMUM OF 75 DEGREES C.
26 05 19 -LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
1. 600 VOLTS, 98% CONDUCTIVITY, STRANDED COPPER, CLASS B, THHN/THWN INSULATION EXCEPT FOR WIRING #10 AWG AND SMALLER SHALL BE SOLID
COPPER. NO ALUMINUM WIRING WILL BE ALLOWED.
26 05 33 -RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
2. ALL INDOOR CONDUIT SHALL BE ELECTRICAL METALLIC TUBING (EMT) AND SHALL BE A MINIMUM 3/4" UNLESS OTHERWISE
NOTED. UTILIZE COMPRESSION TYPE FITTINGS. USE FOR EQUIPMENT CONNECTION, FEEDERS AND BRANCH CIRCUIT WIRING.
ALL CONDUIT INSTALLED ABOVE GRADE OUTSIDE OF THE BUILDING SHALL BE RIGID STEEL. ALL CONDUIT INSTALLED
UNDERGROUND SHALL BE SCHEDULE 40 PVC UNLESS OTHERWISE NOTED. NO PVC CONDUIT SHALL BE USED ABOVE THE
FLOOR SLAB OR EXPOSED OUTSIDE THE BUILDING.
3.
26 27 26 -WIRING DEVICES
1. RECEPTACLES: NEMA 5-20R, DUPLEX, 20 AMP, 125 VAC, GROUNDING TYPE, HOSPITAL GRADE, COLOR TO MATCH EXISTING WITH FULL METAL STRAP. HUBBELL
HBL8300GY OR EQUAL. MOUNT AT 18" A.F.F. UNLESS NOTED OTHERWISE.
2.
DIMMER: FLUORESCENT DIMMER SHALL BE 1500 WATTS, THIN PROFILE, SIMILAR TO LUTRON NOVA-T SERIES.
3.
GFCI TYPE RECEPTACLE: NEMA 5-20R GFI, DUPLEX, 20 AMP, 125 VAC, GROUNDING TYPE, HOSPITAL GRADE, 5 MILLIAMP SENSITIVITY TRIP TYPE. HUBBELL
GFR8300SGGY OR EQUAL.
4.
TOGGLE SWITCHES: 20 AMP, 120 VAC RATED, QUIET TYPE, SPECIFICATION GRADE SPST, 3-WAY, OR 4-WAY TYPE AS INDICATED
ON THE DRAWINGS. HUBBELL 1221-I OR EQUAL.
5. COVER PLATES: INDOOR PLATES SHALL BE NYLONE TYPE TO MATCH THE EXISTING. WEATHERPROOF PLATES SHALL BE CAST ALUMINUM GASKETED,
RAINTIGHT WHILE-IN-USE TYPE.
26 05 26 -GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
1. GROUNDING AND BONDING SYSTEM SHALL MEET REQUIREMENTS OF NEC ARTICLE 250H. BOND WATER PIPE, BUILDING
STRUCTURE, AND GROUND ROD WITH BARE COPPER WIRE. GROUND ROD TO BE COPPER CLAD 3/ 4"D X 10'L. CONNECT BARE
COPPER CABLE TO MAIN SERVICE DISTRIBUTION BUS.
26 24 16 -PANELBOARDS
1. DISTRIBUTION:
1.1. MAIN BUS, NEUTRAL AND GROUND BAR SHALL BE 98% COPPER, NEMA-1 CABINET, GRAY PAINT, NAME PLATE, U.L.
LISTED. LISTED TO USE AS SERVICE ENTRANCE. AIC RATING TO BE 42,000 AMPS UNLESS OTHERWISE INDICATED. PANEL TO BE SIMILAR TO SQUARE "D" I-
LINE, G.E. SPECTRA, CUTLER HAMMER PRL4, SIEMENS S5.
26 09 23 -LIGHTING CONTROL DEVICES
1. WALL MOUNTED SINGLE-CIRCUIT OCCUPANCY SENSORS: DUAL TECHNOLOGY TYPE. WATTSTOPEER/LEGRAND PW-203-I OR
EQUIVALENT AS MANUFACTURED BY HUBBELL, SENSOR SWITCH, COOPER CONTROLS, OR PHILIPS.
2.
26 22 00 -LOW-VOLTAGE DRY TYPE TRANSFORMERS
1. TRANSFORMER HOUSING SHALL BE ENCLOSED IN VENTILATED, DRIP-PROOF CODE GAUGE STEEL HOUSING, REMOVABLE
ACCESS PANELS, RODENT BARRIERS ON OPENING, PHOSPHATIZED, AND FINISH WITH CORROSION INHIBITING UNDERCOAT AND
ANSI GRAY FINISH.
2. CORE AND COIL ASSEMBLY SHALL BE CONSTRUCTED OF CONTINUOUS COPPER WINDING, HIGH GRADE, NON-AGING, GRAIN
ORIENTED SILICON STEEL CORE, COMPLETELY ISOLATED FROM THE ENCLOSURE USING VIBRATION ABSORBING MOUNT,
FLEXIBLE GROUNDING STRAP.
3. TWO 2-1/ 2% FCAN AND FOUR 2-1/ 2% FCBN TAPS.
4. INSULATION SHALL BE 600 VAC, DRY TYPE, AIR COOLED, 150° C. RISE, 220° C INSULATION CLASS.
5. NOISE LEVEL SHALL BE LESS THAN ANSI STANDARD.
6. DRY TYPE TRANSFORMER SHALL BE SIMILAR TO SQUARE "D" WATCHDOG SERIES, GE QL SERIES, CUTLER-HAMMER D33/DT3
SERIES, AND SIEMENS EQUIVALENT.
26 51 00 -LIGHTING FIXTURES AND ACCESSORIES
1. LIGHTING:
1.1. FIXTURES AND ACCESSORIES SHALL BE U.L. LISTED AND LABELED.
1.2. FIXTURES SHALL BE CODE GAUGE STEEL WITH 85% REFLECTANCE BAKED ENAMEL FINISH, 660 WATTS RATED LAMP
HOLDER, BALLAST SHALL BE HIGH FREQUENCY 10% THD ELECTRONIC TYPE, LENSES SHALL BE 100% VIRGIN ACRYLIC
MATERIALS KSH-12, CLEAR.
1.3. OUTDOOR FIXTURE SHALL INCLUDE WEATHERPROOF HOUSING, WET/DAMP LABEL, AND -20°F COLD TEMPERATURE
BALLAST/DRIVER
1.4. LED FIXTURES:
1.5.1. FLUORESCENT BALLAST SHALL BE HIGH FREQUENCY TYPE, OPERATING LAMPS WITH LESS THAN 2% LAMP FLICKER. POWER FACTOR TO BE GREATER
THAN 95% AND TOTAL HARMONIC DISTORTION LESS THAN 10%. BALLASTS TO BE NON-PCB, COMPLY WITH EMI AND RFI LIMITS SET BY THE FCC PART
18, "A" SOUND RATING, AND MEET ANSI AND U.L. STANDARDS, CLASS, TYPE 1 OUTDOOR. BALLAST SHALL CARRY MINIMUM 5 YEAR WARRANTY.
BALLASTS TO BE MULTIVOLT TO OPERATE ON 120 VAC OR 277 VAC.
1.6.1. HID FIXTURES SHALL BE LISTED AND LABELED TO COMPLY WITH THERMAL PROTECTION, 600 VAC RATED LAMP HOLDER.
2. LAMPS/LIGHT SOURCE:
2.2. FLUORESCENT LAMPS SHALL BE LOW-MERCURY T8, TCLP-COMPLIANT, 3500°K WITH MINIMUM CRI OF 84 UNLESS OTHERWISE INDICATED.
2.3. COMPACT FLUORESCENT LAMPS SHALL BE LOW-MERCURY QUAD OR TRIPLE TUBE AS INDICATED, TCLP-COMPLIANT, 3500°K WITH MINIMUM CRI OF 84
UNLESS OTHERWISE INDICATED.
2.4. INTERIOR HID LAMPS SHALL BE PHOSPHOR COATED, 4000°K WITH SELF-EXTINGUISHING SAFETY ARC TUBE AND A MINIMUM CRI OF 70 AND UNLESS
OTHERWISE INDICATED.
MAIN BUS, NEUTRAL BUS, AND GROUND BAR SHALL BE 98% COPPER, NEMA-1 CABINET, GRAY PAINT, NAME PLATE,
BOLT-ON BREAKERS, DOOR AND TRIM WITH DOOR-IN-DOOR CONSTRUCTION, U.L. LISTED. AIC RATING TO BE 22,000 AMPS UNLESS OTHERWISE INDICATED.
PANEL DIRECTORY. PANEL TO BE SIMILAR TO CUTLER-HAMMER PRL-1, SQUARE "D" NQ, G.E. AQ, SIEMENS S1.
2.
2.1.
BRANCH PANEL:
2. ALL PANELBOARD FEEDERS AND BRANCH CIRCUIT WIRING SHALL BE INSTALLED IN CONDUIT.
3. ALL BRANCH CIRCUITS SHALL HAVE DEDICATED NEUTRALS CONDUCTORS PER CIRCUIT. SHARED NEUTRAL CONDUCTORS WILL
NOT BE ALLOWED.
2. PROVIDE SEPARATE INSULATED GREEN GROUND WIRE WITH EACH BRANCH CIRCUIT AS THE EQUIPMENT GROUNDING MEANS
FOR ALL ELECTRICAL DEVICES AND EQUIPMENT.
PROVIDE NAME PLATE LABEL (IDENTIFICATION) ON SERVICE EQUIPMENT, SWITCHBOARDS, PANELBOARDS, DISCONNECT
SWITCHES AND SIMILAR EQUIPMENT TO INCLUDE ENGRAVED PLASTIC LABEL IDENTIFYING THE EQUIPMENT AND WHERE IT IS
FED FROM. ALL BRANCH DEVICES IN SWITCHBOARDS SHALL HAVE AN ENGRAVED PLASTIC LABEL. ALL PANELBOARDS SHALL
INCLUDE A TYPEWRITTEN DIRECTORY.
PROVIDE LABEL TO IDENTIFY CIRCUIT NUMBERS AT JUNCTION BOXES AND DEVICE BOXES USING BLACK MARKER FOR NORMAL CIRCUITS AND RED MARKER FOR
EMERGENCY CIRCUITS.
26 05 53 -IDENTIFICATION FOR ELECTRICAL SYSTEMS
1.
2.
ALL SWITCHES AND RECEPTACLES SHALL HAVE CIRCUIT NUMBERS TYPEWRITTEN ON THE FRONT FACE OF THEIR COVERPLATES USING SELF-ADHESIVE,
THERMAL PRINTED LABELS. CLEAN FACEPLATES BEFORE APPLYING LABELS.
3.
WHERE MULTIPLE SWITCHES ARE GANGED TOGETHER THE SWITCHES SHALL BE IDENTIFIED AS TO WHAT EACH CONTROLS.4.
ALL CONDUIT INSTALLED ABOVE GRADE OUTSIDE OF THE BUILDING SHALL BE RIGID STEEL.
26 28 13 -FUSES
1. FUSES SHALL HAVE 200,000 RMS SYMMETRICAL AMPERES INTERRUPTING CAPACITY AT 600 VAC OR LESS, CURRENT LIMITING
TYPE, TIME DELAY CHARACTERISTICS, REJECTION FEATURE.
CEILING MOUNTED OCCUPANCY SENSORS: DUAL TECHNOLOGY TYPE. 360 DEGREE COVERAGE. HUBBELL OMNIDT TYPE OR EQUIVALENT AS MANUFACTURED
BY WATTSTOPPER, SENSOR SWITCH, COOPER CONTROLS, OR PHILIPS.
26 01 00 -GENERAL PROVISIONS
1. WORK CONSISTS OF FURNISHING LABOR, MATERIALS, EQUIPMENT, AND SERVICES REQUIRED FOR THE COMPLETE
INSTALLATION OF ELECTRICAL WORK SHOWN IN THE CONTRACT DOCUMENTS AND SPECIFIED IN DIVISIONS 26, 27 AND 28
GENERAL ELECTRICAL SPECIFICATIONS -APPLY TO ALL ELECTRICAL SHEETS
2. INCLUDE ALL PARTS AND LABOR, WHICH ARE INCIDENTAL AND NECESSARY, FOR A COMPLETE OPERABLE INSTALLATION EVEN
THOUGH NOT SPECIFICALLY MENTIONED IN THE CONTRACT DOCUMENTS. SUCH ITEMS INCLUDE NUTS, BOLTS, ANCHORS,
BRACKETS, SLEEVES, OFFSETS IN CONDUIT, FITTINGS, RELAYS, ETC.
4. OBTAIN ALL TEMPORARY AND PERMANENT PERMITS AND LICENSES REQUIRED IN CONNECTION WITH THE WORK OF
DIVISIONS 26, 27 AND 28. PAY ALL FEES AND EXPENSES REQUIRED FOR SUCH PERMITS AND LICENSES.
3. ARRANGE WITH THE OWNER OR LANDLORD TO PROVIDE TEMPORARY AND PERMANENT UTILITY SERVICES AS REQUIRED AND COORDINATE THEIR INSTALLATION
WITH CONSTRUCTION PROGRESS OF THIS PROJECT. PAY ALL FEES AND COSTS CHARGED BY UTILITY COMPANIES FOR UTILITY SERVICES.
5. REQUEST INSPECTIONS AS REQUIRED BY REGULATING AGENCIES AND/OR REGULATORS. PAY ALL CHARGES FOR INSPECTIONS
BY REGULATING AGENCIES OF INSTALLATIONS OF PLANS AND SPECIFICATIONS
6. INCLUDE STATE AND LOCAL SALES TAXES IN THE BID. KEEP ACCURATE RECORDS OF THESE TAXES AND FURNISH SUCH
RECORDS TO THE OWNER, TENANT, OR LANDLORD UPON REQUEST
7. MEET OR EXCEED ALL CURRENT APPLICABLE CODES, ORDINANCES, AND REGULATIONS FOR ALL INSTALLATIONS. PROMPTLY
NOTIFY THE ENGINEER, IN WRITING, IF THE CONTRACT DOCUMENTS APPEAR TO CONFLICT WITH GOVERNING CODES AND
REGULATIONS. CONTRACTOR ASSUMES ALL RESPONSIBILITY AND COSTS FOR CORRECTING NON-COMPLYING WORK
INSTALLED WITHOUT NOTIFYING THE ENGINEER
8. HIGHER QUALITY OF WORKMANSHIP AND MATERIALS INDICATED IN THE CONTRACT DOCUMENTS TAKES PRECEDENCE OVER
THAT ALLOWED IN REFERENCED CODES AND STANDARDS.
9. THE TERMS DEFINED BELOW APPLY TO ALL WORK INCLUDED IN DIVISIONS 26, 27 AND 28.
9.1. THE TERM 'WORK' MEANS THE CONSTRUCTION AND SERVICES REQUIRED BY THE CONTRACT DOCUMENTS AND
INCLUDES ALL OTHER LABOR, MATERIALS, EQUIPMENT, AND SERVICES PROVIDED OR TO BE PROVIDED BY THE
CONTRACTOR TO FULFILL THE CONTRACTOR'S CONTRACTUAL OBLIGATIONS.
9.2. FURNISH -TO OBTAIN IN NEW CONDITION READY FOR INSTALLATION INTO THE WORK.
9.3. INSTALL -TO STORE, SET IN PLACE, CONNECT AND PLACE INTO OPERATION IN THE THE WORK.
9.4. PROVIDE -TO FURNISH AND INSTALL.
9.5. CONNECT -TO BRING SERVICE TO THE EQUIPMENT AND MAKE FINAL ATTACHMENT INCLUDING NECESSARY SWITCHES, OUTLETS, BOXES, TERMINATIONS,
ETC.
9.6. CONDUIT -INCLUDES IN ADDITION TO CONDUIT, ALL FITTINGS, PULL BOXES, HANGERS, AND OTHER SUPPORTS AND ACCESSORIES RELATED TO SUCH
CONDUIT.
9.7. CONCEALED -HIDDEN FROM SIGHT IN CHASES, FURRED SPACES, SHAFTS, HUNG CEILINGS, EMBEDDED IN CONSTRUCTION, IN CRAWL SPACES, OR BURIED.
9.8. EXPOSED -NOT INSTALLED UNDERGROUND NOR CONCEALED AS DEFINED ABOVE.
4. WORKING SPACE AROUND ELECTRICAL EQUIPMENT TO BE MARKED OFF IN ACCORDANCE WITH APPLICABLE ELECTRICAL CODES, FIRE CODES, AND OTHER
APPLICABLE CODES.
1. ENCASE ALL CONDUCTORS IN A CONTINUOUS RACEWAY SYSTEM. PROVIDE PULL AND JUNCTION BOXES AS REQUIRED BY THE NATIONAL ELECTRICAL CODE
(NEC). SIZE ALL RACEWAYS PER THE NEC WITH OVERSIZE CONDUITS AS INDICATED. PROVIDE A MINIMUM 3/4-INCH CONDUIT.
4. ALL CONDUIT INSTALLED UNDERGROUND SHALL BE SCHEDULE 40 PVC UNLESS OTHERWISE NOTED. PROVIDE COATED RIGID STEEL ELBOWS FOR ALL
UNDERGROUND ELBOWS USED WITH PVC RACEWAY. NO PVC CONDUIT SHALL BE USED ABOVE THE FLOOR SLAB OR EXPOSED OUTSIDE THE BUILDING.
5. PROVIDE RIGID STEEL OR CONCRETE-ENCASED PVC CONDUIT FOR SERVICE ENTRANCE CONDUCTORS.
6. PROVIDE FLEXIBLE METAL CONDUIT FOR CONNECTIONS TO TRANSFORMERS, MOTORS, AND OTHER EQUIPMENT THAT VIBRATE. PROVIDE LIQUIDTIGHT
CONDUIT FOR ALL CONNECTIONS IN DAMP OR WET LOCATIONS. PROVIDE GROUNDING TYPE FITTINGS AND GROUNDING CONDUCTOR INSIDE ALL FLEXIBLE
CONDUITS. ADJUST CONDUIT SIZE AS REQUIRED.
7. PROVIDE EXPANSION FITTINGS WHERE RACEWAY CROSSES BUILDING EXPANSION JOINTS.
8. RUN ALL EXPOSED CONDUIT IN A NEAT, WORKMANLIKE MANNER PARALLEL TO THE BUILDING LINES, TIGHT TO THE WALL AND CEILING SURFACES, AND FIRMLY
SUPPORTED WITH CONDUIT CLAMPS OR HANGERS. PROVIDE TWO-HOLE MOUNTING STRAPS, MINIMUM OF THREE FEET ON CENTER FOR ALL SURFACE
CONDUIT MOUNTED ON WALLS LESS THAN SIX FEET ABOVE FINISHED FLOOR. PLACE CONDUITS AT LEAST 8 INCHES AWAY FROM ALL HOT PIPING AND
SURFACES INCLUDING DOMESTIC HOT WATER LINES.
9. PROVIDE GALVANIZED CODE GAUGE STEEL JUNCTION AND PULL BOXES WITH SCREW-ON COVERS OF TYPE, SHAPE, AND SIZE REQUIRED TO SUIT EACH
INSTALLATION. PROVIDE GASKETING IN DAMP AND DUSTY LOCATIONS. PROVIDE CAST BOXES IN WEATHERPROOF, VAPORTIGHT, AND EXPOLOSION-PROOF
ENVIRONMENTS.
10. BOXES TO BE GLAVANIZED STEEL, MINIMUM OF 4" SQUARE WITH ONE-GANG OR TWO-GANG PLASTER RING AS REQUIRED. MINIMUM DEPTH OF 3-1/ 2" DEEP
BOXES WHERE INSTALLED IN MASONRY WALLS; MINIMUM DEPTH OF 2-1 /8" ALL OTHER LOCATIONS.
11. MOUNT OUTLET BOXES IN EXPOSED MASONRY WALLS WITH THE BOTTOM OF THE BOX ON THE TOP OF THE MORTAR JOINT AND THE CENTER-LINE OF THE
BOX EITHER ON THE MORTAR JOINT OR ON THE CENTER-LINE OF THE MASONRY UNIT. PLUMB AND ACCURATELY ALIGN ALL WALL OUTLETS IN ROWS.
MOUNT CEILING BOXES SYMMETRICALLY WITH WALLS, BEAMS, AND/OR TILES. MOUNTING HEIGHTS INDICATED ON THE DRAWINGS ARE FROM THE CENTER
OF THE OUTLET BOX TO THE FINISHED FLOOR DIRECTLY BELOW THE OUTLET UNLESS NOTED OTHERWISE. EXTERIOR HEIGHTS ARE FROM INSIDE ADJACENT
DOOR, OR IF NO DOOR, FROM THE FIRST FLOOR ABOVE GRADE, UNLESS NOTED OTHERWISE.
12. COORDINATE THE LOCATIONS OF ALL OUTLETS WITH ARCHITECTURAL AND MECHANICAL DRAWINGS BEFORE INSTALLATION. COORDINATE ALL DOOR
SWINGS IN THE FIELD BEFORE LOCATING SWITCHES.
10. THE DRAWINGS AND SPECIFICATIONS CONSTITUTE THE CONTRACT DOCUMENTS. ANY ITEM NOTED IN THE SPECIFICATIONS OR SHOWN ON THE DRAWINGS IS
INCLUDED IN THE CONTRACT DOCUMENTS.
11. ALL ELECTRICAL DETAILS AND DRAWINGS ARE DIAGRAMMATIC, UNLESS SPECIFICALLY NOTED OTHERWISE. FIELD VERIFY ALL DIMENSIONS AND NOTIFY THE
ENGINEER OF ANY CONFLICTS OR DISCREPANCIES, IN WRITING, PRIOR TO INSTALLATION.
12. INITIATE, MAINTAIN, AND SUPERVISE ALL SAFETY PRECAUTIONS REQUIRED WITH THIS WORK IN ACCORDANCE WITH THE REGULATIONS OF THE OCCUPATIONAL
SAFETY AND HEALTH ADMINISTRATION (OSHA) AND OTHER GOVERNING AGENCIES.
13. DO NOT REMOVE OR DISTURB ANY ASBESTOS CONTAINING MATERIALS FROM THE PROJECT. IMMEDIATELY STOP WORK AND NOTIFY THE OWNER, TENANT, OR
LANDLORD IF ASBESTOS CONTAINING MATERIALS ARE SUSPECTED.
14. BEFORE SUBMITTING A PROPOSAL ON THE WORK CONTEMPLATED, EXAMINE THE SITE OF THE PROPOSED WORK AND BECOME THOROUGHLY FAMILIAR WITH
THE EXISTING CONDITIONS AND LIMITATIONS. NO EXTRA COMPENSATION WILL BE ALLOWED BECAUSE OF MISUNDERSTANDINGS AS TO THE AMOUNT OF WORK
INVOLVED NOR BIDDERS LACK OF KNOWLEDGE OF EXISTING CONDITIONS WHICH COULD HAVE BEEN DISCOVERED OR REASONABLY ANTICIPATED PRIOR TO
BIDDING.
15. CONDUITS, PIPES, DUCTS, LIGHTS, DEVICES, SPEAKERS, ETC., SHOWN ON THE DRAWINGS AS EXISTING HAVE BEEN BASED ON EXISTING PLANS AND MAY NOT BE
INSTALLED AS ORIGINALLY SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE AND MAKE EXACT DETERMINATION OF THE EXISTENCE,
LOCATION, AND CONDITION OF SUCH FACILITIES PRIOR TO SUBMITTING AS BID.
16. CONSULT THE DRAWINGS AND SPECIFICATIONS OF MECHANICAL AND OTHER TRADES FOR CORRELATING INFORMATION AND LAYOUT WORK SO THAT THE
ELECTRICAL WORK WILL COORDINATE WITH OTHER TRADES. VERIFY DIMENSIONS AND CONDITIONS (I.E. FINISHED CEILING HEIGHTS, FOOTING AND
FOUNDATION ELEVATIONS, BEAM DEPTHS, ETC.) WITH THE ARCHITECTURAL AND STRUCTURAL DRAWINGS. NOTIFY THE ARCHITECT/ENGINEER OF ANY
CONFLICTS THAT CANNOT BE RESOLVED, IN THE FIELD, BY AFFECTED TRADES. REPLACEMENT OF WORK DUE TO LACK OF COORDINATION AND FAILURE TO
VERIFY EXISTING CONDITIONS WILL BE COMPLETED AT NO COST TO THE OWNER, TENANT, OR LANDLORD.
17. INSTALL ALL CONDUITS, CABLE TRAY, BUS DUCT, EQUIPMENT, ETC., ALLOWING PROPER CODE AND MAINTENANCE CLEARANCES AND TO AVOID BLOCKING
PASSAGEWAYS AND ACCESS PANELS.
18. WHERE WORK MUST BE REPLACED DUE TO THE FAILURE OF THE CONTRACTOR TO VERIFY THE CONDITIONS EXISTING ON THE PROJECT, SUCH REPLACEMENT
MUST BE ACCOMPLISHED AT NO COST TO THE TENANT OR LANDLORD. THIS APPLIES TO SHOP FABRICATED WORK AS WELL AS TO WORK FABRICATED IN PLACE.
19. THROUGHOUT THE COURSE OF THE WORK, MINOR CHANGES AND ADJUSTMENTS TO THE INSTALLATION MY BE REQUESTED BY THE ENGINEER. THE
CONTRACTOR SHALL MAKE ADJUSTMENTS WITHOUT ADDITIONAL COST TO THE TENANT OR LANDLORD, WHERE SUCH ADJUSTMENTS ARE NECESSARY TO THE
PROPER INSTALLATION AND OPERATION WITHIN THE INTENT OF THE CONTRACT DOCUMENTS. THIS DOES NOT INCLUDED WORK ALREADY COMPLETED.
20. OBTAIN EXACT LOCATION OF CONNECTION TO EQUIPMENT FURNISHED BY OTHERS FROM THE PERSON FURNISHING THE EQUIPMENT.
21. DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY AND WHAT IS CALLED FOR IN EITHER ONE IS AS BINDING AS IF CALLED FOR IN BOTH.
22. PROVIDE THE BETTER QUALITY, GREATER QUANTITY, OR HIGHER COST FOR AN ITEM OR ARRANGEMENT WHERE A DISAGREEMENT EXISTS IN THE DRAWING AND
SPECIFICATIONS.
23. GUARANTEE AND MAINTAIN THE STABILITY OF WORK AND MATERIALS, AND KEEP SAME IN PERFECT REPAIR AND CONDITION FOR THE PERIOD OF ONE (1) YEAR
AFTER THE FINAL COMPLETION OF THE WORK.
24. DEFECTS OF ANY KIND DUE TO THE FAULTY WORK OR MATERIALS APPEARING DURING THE ABOVE MENTIONED GUARANTEE PERIOD MUST BE IMMEDIATELY
MADE GOOD BY THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE TENANT AND ARCHITECT AND ENGINEER. INCLUDE DAMAGE TO
THE FINISH OR THE BUILDING RESULTING FROM THE ORIGINAL DEFECT OR REPAIRS.
25. REPLACE ALL RECEPTACLES, SWITCHES, COVERPLATES, ETC., DAMAGED BY ANY CONTRACTOR DURING THE COURSE OF CONSTRUCTION.
26. MATERIALS FURNISHED FOR THE TEMPORARY LIGHTING AND POWER SYSTEM REMAIN THE CONTRACTOR'S PROPERTY. REMOVE WHEN THERE IS NO LONGER
ANY NEED FOR TEMPORARY LIGHTING AND POWER.
27. COORDINATE/SCHEDULE ALL WORK WITH THE OWNER, TENANT, OR LANDLORD TO MINIMIZE ANY DISRUPTIONS. CONFINE ALL INTERRUPTIONS TO THE
SMALLEST POSSIBLE AREA. PROVIDE TEMPORARY CONNECTIONS IF REQUIRED TO PROVIDE CONTINUITY OF SERVICE.
28. INSPECT ALL AREAS AFFECTED BY THE INTERRUPTIONS AND RETURN ALL AUTOMATICALLY CONTROLLED EQUIPMENT, ELECTRICALLY OPERATED EQUIPMENT TO
THE SAME OPERATING CONDITION PRIOR TO THE INTERRUPTION.
29. NO FIRE ALARM SYSTEMS ARE TO REMAIN INACTIVE AT THE END OF THE WORK DAY. ASSURE THAT THE FIRE ALARM SYSTEM IS OPERATIONAL AT THE END OF
EACH WORK DAY. COORDINATE WITH THE OWNER OR LANDLORD.
30. DO NOT DISTURB NORMAL USE OF THE FACILITY, EXCEPT WITH THE IMMEDIATE CONSTRUCTION AREA. KEEP WALKS, DRIVEWAYS, ENTRANCES, ETC., FREE AND
CLEAR OF EQUIPMENT, MATERIALS, AND DEBRIS.
31. STORE ALL EQUIPMENT AND MATERIALS IN A PLACE AND MANNER THAT MINIMIZES CONGESTION AND IS APPROVED BY THE OWNER, TENANT, AND LANDLORD.
32. PROVIDE NEW MATERIAL AND EQUIPMENT, UNLESS NOTED OTHERWISE. PROTECT EQUIPMENT AND MATERIAL FROM DAMAGE, DIRT, AND THE WEATHER.
33. PROVIDE THE HIGHEST QUALITY WORKMANSHIP, AND PERFORM ALL WORK ONLY BY SKILLED MECHANICS. INSTALL MATERIAL AND EQUIPMENT IN ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS, INSTRUCTIONS, AND CURRENT NECA STANDARDS.
34. THE OWNER, TENANT, AND LANDLORD RESERVES THE RIGHT TO REJECT MATERIAL, EQUIPMENT, OR WORKMANSHIP NOT IN ACCORDANCE WITH THE
SPECIFICATIONS, BEFORE OR AFTER INSTALLATION.
35. PERFORM ALL CUTTING AND PATCHING NECESSARY TO WORK, UNLESS SPECIFICALLY DELEGATED TO THE GENERAL CONTRACTOR. OBTAIN SPECIAL
PERMISSION FROM THE OWNER OR LANDLORD BEFORE CUTTING STRUCTURAL MEMBERS OR FINISHED MATERIAL. PERFORM ALL PATCHING IN SUCH AS
MANNER AS TO LEAVE NO VISIBLE TRACE AND RETURN THE AREA AFFECTED TO THE CONDITION OF UNDISTURBED WORK. PERFORM ALL PATCHING BY WORKS
EXPERIENCED, SKILLED, AND LICENSED FOR THE PARTICULARLY TYPE OF WORK INVOLVED. INFERIOR WORK WILL NOT BE ACCEPTED.
36. PATCH ALL HOLES LEFT AS A RESULT OF DEMOLITION OF ELECTRICAL EQUIPMENT AND DEVICES.
37. PREVENT THE SPREAD OF DUST, DEBRIS, AND OTHER MATERIAL INTO ADJACENT AREAS.
38. REPLACE ALL CEILING TILES DAMAGED DURING INSTALLATION OF THE WORK WITH NEW TILE MATCHING THE EXISTING.
39. REFINISH ALL ELECTRICAL EQUIPMENT DAMAGED DURING SHIPPING AND/OR INSTALLATION TO ITS ORIGINAL CONDITION. REMOVE ALL RUST, PRIME, AND PAINT
PER MANUFACTURER'S RECOMMENDATIONS FOR FINISH EQUAL TO ORIGINAL.
40. PAINT ALL NEW RACEWAY SYSTEMS IN EXPOSED FINISHED AREAS.
41. AFTER TESTS HAVE BEEN MADE AND ACCEPTED, CLEAN LIGHT FIXTURES, PANELS, AND OTHER EQUIPMENT INSTALLED BY THE CONTRACTOR, LEAVING THE
ENTIRE WORK AREA IN A CLEAN AND COMPLETE WORKING ORDER.
42. OPERATE EQUIPMENT AND SYSTEMS IN ALL THEIR OPERATING MODES TO VERIFY PROPER OPERATION PRIOR TO FINAL INSPECTION AND OWNER
INSTRUCTIONS. NOTIFY THE ENGINEER, IN WRITING, THAT ALL SYSTEMS HAVE BEEN TESTED AND ARE FUNCTIONING AND OPERATING PROPERLY.
43. INCLUDE DOCUMENTATION OF INSTRUCTIONS IN THE OPERATION AND MAINTENANCE MANUALS.
44. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO ELECTRICAL EQUIPMENT OR MATERIALS UNTIL FINAL ACCEPTANCE OF THE ENTIRE PROJECT BY THE
TENANT. KEEP ALL EQUIPMENT AND MATERIALS CLEAN UNTIL FINAL ACCEPTANCE OF THE ENTIRE PROJECT BY THE OWNER, TENANT, AND/OR LANDLORD.
45. ROOF PENETRATIONS: COORDINIATE WITH THE OWNER, TENANT, AND/OR LANDLORD.
46. MECHANICAL SUBSTITUTIONS: INVOICE MECHANICAL CONTRACTOR, NOT TENANT, FOR COSTS INCLUDED DUE TO SUBSTITUTION OF MECHANICAL
EQUIPMENT HAVING ELECTRICAL REQUIREMENTS DIFFERING FROM THOSE INDICATED ON PLANS.
6. PROVIDE ALL SWITCH AND RECEPTACLE WIRING DEVICES FROM A SINGLE MANUFACTURER. PROVIDE ALL DIMMERS FROM A SINGLE MANUFACTURER.
2. ACCEPTABLE MANUFACTURERS: BUSSMAN, MERSEN, LITTELFUSE, OR PRE-APPROVED EQUAL.
3. ALL FUSES FOR MAIN, FEEDER, AND BRANCH CIRCUITS SHALL BE BY THE SAME MANUFACTURER IN ORDER TO RETAIN SELECTIVITY AND ELECTRICAL
COORDINATION AS DESIGNED.
4. APPLY FUSE MANUFACTURER'S AMBIENT TEMPERATURE ADJUSTMENT FACTORS TO FUSE RATINGS WHERE AMBIENT TEMPERATURES TO WHICH FUSES ARE
DIRECTLY EXPOSED ARE LESS THAN 40 DEGREES f OR GREATER THAN 100 DEGREES 4.
1.6.2. HID BALLAST SHALL BE PULSE-START, CONSTANT WATTAGE SECONDARY SINGLE LAMP TYPE, 90% POWER FACTOR, BUILT-IN THERMAL
PROTECTION 10% VOLTAGE/WATTAGE REGULATOR, DUAL VOLTAGE, INCLUDE CORE AND COIL, CAPACITOR, IGNITER, ETC., IN A SINGLE PACKAGE.
1.5. FLUORESCENT FXITURES:
1.6. HIGH INTENSITY DISCHARGE (HID) FIXTURES:
1.4.1. LED ENGINE PACKAGE SHALL BE RATED FOR A MINIMUM OPERATIONAL LIFE OF 50,000 HOURS FOR 40 DEGREES C. AMBIENT TEMPERATURE UNLESS
OTHERWISE INDICATED..
1.4.2. RATED OPERATING TEMEPERATURE RANGE OF -30 DEGREES C TO +40 DEGREES C.
1.4.3. PHOTOMETRY TO BE COMPLIANT WITH IESNA-LEM-79 AND CONDUCTED AT 35 DEGREES C. AMBIENT TEMPERATURE.
1.4.4. DRIVER TO BE U.L. LISTED, HAVE CLASS "A" SOUND RATING, AND PROVIDE FLICKER-FREE PERFORMANCE, POWER FACTOR OF 0.90 OR GREATER,
TOTAL HARMONIC DISTORTION (CURRENT AND VOLTAGE) NOT TO EXCEED 20%, AND INTEGRAL SURGE SUPPRESSION.
2.1. LED SOURCES SHALL BE 3500°K WITH MINIMUM CRI OF 80 UNLESS OTHERWISE INDICATED
2.5. EXTERIOR HID LAMPS SHALL BE CLEAR ENVELOPE, 4000°K WITH SELF-EXTINGUISHING SAFETY ARC TUBE AND A MINIMUM CRI OF 65 UNLESS OTHERWISE
INDICATED.
2.6. INCANDESCENT LAMPS SHALL BE EXTENDED LIFE TYPE UNLESS OTHERWISE INDICATED.
27 05 00 -COMMON WORK RESULTS FOR COMMUNICATIONS SYSTEMS
1. PROVIDE SLEEVES FOR SYSTEM WIRING AND CABLING PENETRATIONS THROUGH WALLS, FLOORS, AND CEILINGS. USE PIPE SLEEVES UNLESS
PENETRATION ARRANGEMENT REQUIRES RECTANGULAR SLEEVE OPENING. EXTEND SLEEVES INSTALLED IN FLOORS TO 2 INCHES ABOVE FINISHED
FLOOR LEVEL. SEAL ANNULAR SPACE BETWEEN SLEEVE AND PATHWAY OR CABLE WITH JOINT SEALANT APPROPRIATE FOR SIZE, DEPTH, AND
LOCATION OF JOINT. FIRESTOP ALL FIRE RATED ASSEMBLY PENETRATIONS.
2. GIVE RIGHT-OF-WAY TO PIPING SYSTEMS INSTALLED THAT REQUIRE SLOPE.
27 15 00 -COMMUNICATIONS HORIZONTAL CABLING
1. ALL SYSTEM BACKBOARDS, PATHWAYS, HARDWARE, CONNECTORS, JACKS, AND CABLING SHALL BE IN ACCORDANCE I.U. HEALTH TELECOM STANDARDS.
2. INSTALL ALL TELECOMMUNICATIONS SYSTEM EQUIPMENT, HARDWARE, AND CABLING IN ACCORDANCE I.U. HEALTH TELECOM STANDARDS.
27 60 00 -COMMUNICATIONS SYSTEMS ROUGH-IN REQUIREMENTS
1. SYSTEM OUTLET BOXES TOTAL DEPTH, WITH PLASTER RING, TO BE A MINIMUM OF 2 5/8" DEEP .
2. RACEWAYS TO BE EMT WITH CONDUIT BUSHING AT BOTH ENDS. MINIMUM SIZES SHALL BE AS FOLLOWS:
COMMUNICATIONS HORIZONTAL CABLING: 1" TRADE SIZE.2.1
ACCESS CONTROL SYSTEMS: 3/4" TRADE SIZE.2.2
CATV AND VIDEO SURVEILLANCE SYSTEMS: 3/4" TRADE SIZE.2.3
28 05 00 -COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY SYSTEMS
1. PROVIDE SLEEVES FOR SYSTEM WIRING AND CABLING PENETRATIONS THROUGH WALLS, FLOORS, AND CEILINGS. USE PIPE SLEEVES UNLESS
PENETRATION ARRANGEMENT REQUIRES RECTANGULAR SLEEVE OPENING. EXTEND SLEEVES INSTALLED IN FLOORS TO 2 INCHES ABOVE FINISHED
FLOOR LEVEL. SEAL ANNULAR SPACE BETWEEN SLEEVE AND PATHWAY OR CABLE WITH JOINT SEALANT APPROPRIATE FOR SIZE, DEPTH, AND
LOCATOIN OF JOINT. FIRESTOP ALL FIRE RATED ASSEMBLY PENETRATIONS.
2. GIVE RIGH-OF-WAY TO PIPING SYSTEMS INSTALLED THAT REQUIRE SLOPE.
28 31 00 -FIRE ALARM SYSTEM
1. EXTEND/MODIFY THE EXISTING FIRE ALARM SYSTEM AS INDICATED FOR THE INDICATED RENOVATION WORK. MAINTAIN AND EXTEND ALL FEATURES
AND FUNCTIONS OF THE EXISTING SYSTEM FOR THE NEW WORK. INSTALLER SHALL BE AUTHORIZED TO PERFORM THE WORK BY THE EXISTING FIRE
ALARM SYSTEM MANUFACTURER.
3.1. NOTIFY THE LOCAL FIRE MARSHAL PRIOR TO ANY DISRUPTION OF THE SYSTEM.
2. ALL NEW SYSTEM EQUIPMENT AND WIRING SHALL BE COMPATIBLE WITH THE EXISTING SYSTEM AND SHALL BE APPROVED FOR USE WITH THE EXISTING
SYSTEM BY THE MANUFACTURER OF EXISTING SYSTEM.
3. KEEP THE EXISTING FIRE ALAM SYSTEM OPERATIONAL AT ALL TIMES DURING THE WORK, EXCEPT FOR APPROVED SHUTDOWNS REQUIRE FOR THE
INDICATED WORK.
3.2. MAKE ALL SYSTEM CHANGES OR SHUTDOWNS SO AS TO PROVIDE MINIMUM INTERFERENCE TO THE OPERATION OF THE FACILITY. NOTIFY THE
OWNER, TENANT, AND/OR LANDLORD NOT LESS THAN 24 HOURS IN ADVANCE OF A SHUTDOWN/CHANGEOVER, AND OBTAIN APPROVAL FROM THE
OWNER, TENANT, AND/OR LANDLORD.
4. INSTALL ALL SYSTEM WIRING AND CABLING IN CONDUIT OR FIRE ALAM ARMORED CABLE. MINIMUM OF #14 THHN WIRES.
5. GIVE RIGHT-OF-WAY TO PIPING SYSTEMS INSTALLED THAT REQUIRE SLOPE.
7. COLOR: DEVICES AND COVERPLATES SHALL MATCH EXISTING COLOR FOR NORMAL AND EMERGENCY.
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
Electrical
Specifications
E00210300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290# Revision Description
Date
Issued
06/08/21
M
H
CR
+4'WH HEE
VMM
EEEEWAP
TV WLWLWL WL WLWL
WLJJ
E
D
DD DD
D
D
OCOC
OC
OC
OC
OC OC
OC
OC
OC
OC
H HWAP42 2 2 2 VVV V
VVV4 44 4 2S
S
S
S
1 2
E.5
F
G
F.9
G.1
.9
NL
2 1
F
G
F.9
G.1
.9
2
TYP.
1
1
E.5
1 2
E.5
F
G
F.9
G.1
.9
X-RAY
VIEWER
X-RAY
VIEWER
21
F
G
F.9
G.1
.9
3
TYP.
1
TYP.
1
TYP.
1
TYP.
E.5
1 2
E
E.5
F
G
F.9
G.1
.9 21
F
G
F.9
G.1
.9
L1 4 L1 4
L1 4 L1 4
L1 4 L1 4 L1 4 L1 4
L2
4
L2
4
L2
4
L2
4
L2
5
L2
4
L2
4
L2
5
L2
4
L1
4
L1
4
L1
4
L1
4
L1
4
NL
NL
5
L2
4
E
E.5
NL
L3
L3
L3
L3
L3
L3
L3
4
L3
L3 L3
4
L3
4
L3
L3
4
4444
4
4
4
4
4
L3
WAITING
001
OFFICE
002
RECEPTION
003
MD NURSE
004
W&M
005
PATIENT RR
006
EXAM 4
011
EXAM 1
007
EXAM 2
008
EXAM 3
009
WORK ALCOVE
012
STORAGE
010
1 2
E.5
F
G
F.9
G.1
.9 21
F
G
F.9
G.1
.9
7TYP.
6
TYP.
8
TYP.29
E.5
OFFICE
002
RECEPTION
003
WAITING
001
MD NURSE
004
W&M
005
PATIENT RR
006
STORAGE
010
EXAM 4
011
WORK ALCOVE
012
EXAM 3
009
EXAM 2
008
EXAM 1
007
10
10
10
10
11
NORTH
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IKEY PLAN -NOT TO SCALE
AREA OF WORK
April 9, 2021
First Floor
Electrical Plans
E10110300 N. ILLINOIS ST.INDIANAPOLIS, IN 462901/8" = 1'-0"1 First Floor Lighting Demolition Plan
1/8" = 1'-0"2 First Floor Power and Systems Demolition Plan
1/8" = 1'-0"3 First Floor Lighting Plan
1/8" = 1'-0"4 First Floor Power and Systems Plan
PLAN NOTES
1 EXISTING TO REMAIN.
2 DISCONNECT AND REMOVE ALL LIGHT FIXTURES AND ASSOCIATED DEVICES SHOWN AS DASHED. REMOVE BACK
TO SOURCE OR NEAREST JUNCTION BOX TO REMAIN.
3 DISCONNECT AND REMOVE ALL ELECTRICAL DEVICES SHOWN AS DASHED, INCLUDING BUT NOT LIMITED TO
RECEPTACLES, FIRE ALARM DEVICES, NURSE CALL, DATA, ETC. REMOVE BACK TO SOURCE OR NEAREST
JUNCTION BOX TO REMAIN.
4 CONNECT NEW NORMAL POWER LIGHT FIXTURES IN THIS ROOM / AREA TO EXISTING 277V, 20A, 1P NORMAL
POWER CIRCUIT THAT WAS MAINTAINED DURING DEMOLITION. MAINTAIN EXISTING LIGHTING CONTROL. EXTEND /
MODIFY EXISTING WIRING / CONDUIT AS REQUIRED.
5 CONNECT NEW LIFE SAFETY POWER LIGHT FIXTURES IN THIS ROOM / AREA TO EXISTING 277V, 20A, 1P LIFE
SAFETY POWER CIRCUIT THAT WAS MAINTAINED DURING DEMOLITION. MAINTAIN EXISTING LIGHTING CONTROL.
EXTEND / MODIFY EXISTING WIRING / CONDUIT AS REQUIRED.
6 TELECOM RECEPTACLE LOCATION. PROVIDE BACK BOX AND CONDUIT AS REQUIRED. REFER TO DETAILS FOR
ADDITIONAL INFORMATION.
7 CONNECT NEW NORMAL POWER RECEPTACLE TO EXISTING 120V, 20A, 1P NORMAL CIRCUIT THAT WAS
MAINTAINED DURING DEMOLITION. EXTEND / MODIFY EXISTING WIRING / CONDUIT AS REQUIRED.
8 CONNECT FIRE ALARM DEVICE SHOWN RETAINED FROM LAB DEMOLITION. CONNECT FIRE ALARM DEVICE TO
EXISTING FIRE ALARM SYSTEM COMPLETE. PROVIDE MODIFICATION TO EXISTING SYSTEM INCLUDING BUT NOT
LIMITED TO PROGRAMMING, NAC PANELS AND POWER TO NAC PANELS.
9 PROVIDE DEDICATED CIRCUIT.
10 WHITE NOISE EMITTER. CONNECT TO HEADEND EQUIPMENT COMPLETE.
11 WHITE NOISE HEADEND EQUIPMENT. CONNECT TO RECEPTACLE IN STORAGE.
# Revision Description
Date
Issued
06/08/21
FACE PLATE
CONFIGURATION
DATA ONLY
(1) 1-1/4" EMT CONDUIT
WITH NYLON BUSHING
STUBBED TO ACCESSIBLE
CEILING
4-11/16" x 4-11/16"
SQUARE BOX
2-7/8" DEEP
5-8 DATA
OUTLETS
4-11/16" x 4-11/16"
SQUARE BOX
2-7/8" DEEP
2-GANG TILE
RING 1/2" DEEP
(2) 1-1/4" EMT CONDUITS WITH NYLON
BUSHING STUBBED TO ACCESSIBLE
CEILING
1-4 DATA
OUTLETS
1/2" DEEP
TILE RING
M
C
FFRDRA ST
V
A A
R
SF F
EXISTING
FIRE ALARM
CONTROL
PANEL
TYPICAL FOR EACH FLOOR
120V
FIRE ALARM
POWER
PROVIDE SIGNAL
EXPANDER/AMPLIFIER POWER
SUPPLY ON EACH FLOOR FOR
SIGNAL DEVICES. LOCATE
EQUIPMENT IN ELECTRICAL
ROOM.
PROVIDE SPARE CAPACITY TO
ADD (2) SIGNAL DEVICES (TYP.
OF EACH SIGNAL CIRCUIT)
ADDRESSABLE RELAY FOR CONTROL PROVIDE ONE
AT EACH AHU SUPPLY AND RETURN FAN
STARTERS, AT EACH FIRE/SMOKE DAMPER AND AT
EACH DOOR HOLD RELEASE DEVICE
PROVIDE SPARE CAPACITY
TO ADD 20% FUTURE DEVICES ON
EACH INITIATION LOOP
TYPICAL
FIRE/SMOKE
DAMPER
TYPICAL DOOR
HOLD/RELEASE
DEVICE
TYPICAL
HVAC UNIT
STARTER
PROVIDE CONTROL WIRING
IN CONDUIT AS REQUIRED
TO OTHER DEVICES
SEE
FLOOR PLANS
NOTES:
1. ALL FIRE ALARM SYSTEM WIRING SHALL BE INSTALLED IN CONDUIT
COMPLETE.
2. REFER TO FLOOR PLANS FOR DEVICE LOCATIONS AND QUANTITIES.
3. EXISTING FIRE ALARM PANEL WORK SHALL INCLUDE ALL NEW CARDS,
EQUIPMENT AND PROGRAMMING NECESSARY TO SUPPORT THE NEW
DEVICES AS INDICATED.
4. LABEL ALL FIRE ALARM DEVICES AS DIRECTED BY THE OWNER WITH
EXTERNAL TAGS AND LABELS ON DEVICE bASES.
TYPICAL SMOKE
DETECTOR WITH
SOUNDER BASE
ELECTRICAL 1012
SUPPORT STRUCTURE
NOTE: FOR STEEL STRUCTURAL SYSTEM
COMBINATION BEAM CLAMP AND
CONDUIT HANGER OR EQUIVALENT
CADDY SCREW
GUN BRACKET
NOTE: FOR METAL STUD WALL CONSTRUCTION ONLY.
4" SQUARE BOX
METAL STUDS
CONDUIT
BOX MOUNTING
BRACKET
REFER TO DETAIL ON THIS SHEET
FOR ADDITIONAL INFORMATION.
LOCATED AS SHOWN ON
DRAWINGS.
CAT 6A CABLE
1-1/4" CONDUIT TO CABLE
TRAY. TERMINATE CONDUITS
WITH BUSHING. (TYPICAL)
FIRST FLOOR
NOTES:
1. SUPPORTS FOR CABLE SHALL BE INDEPENDENTLY SUPPORTED. CABLE SHALL NOT LAY OVER CONDUIT,
DUCTWORK, PIPING,STRUCTURAL SUPPORT MEMBERS, ETC. CABLE SHALL BE NEATLY INSTALLED AT RIGHT
ANGLES TO THE BUILDING LINES. ENGINEER WILL REQUIRE CABLE TO BE REMOVED AND REINSTALLED IF IT
IS NOT INSTALLED IN AN ACCEPTABLE MANNER.
2. REFER TO FLOOR PLANS FOR DEVICE LOCATIONS AND QUANTITY.
3. PROVIDE PLENUM RATED WIRE / CABLE AS REQUIRED.
4. PROVIDE ALL REQUIRED EQUIPMENT AND MODIFICATIONS REQUIRED FOR A COMPLETE SYSTEM PER NEW
DEVICE QUANTITIES AND LOCATIONS.
EXISTING
DATA RACK
NUMBER INDICATES
QUANTITY OF CABLES TO
BE INSTALLED
2
EXISTING CABLE TRAY
TELECOMMUNICATIONS
CABLE TO BE TERMINATED
AT IDF BY CONTRACTOR.
TELECOM
EQUIPMENT
PROVIDED BY
OWNER AS
REQUIRED.
1
WAP
COMPUTER 1006
SUPPORT CONNECTED TO STRUCTURE ABOVE
12 GAUGE HANGER WIRE OR CHAIN FOR FIXTURE
LAY-IN CEILING
LAY-IN CEILING
JUNCTION BOX
W/#12 WIRE (6' MAX.)
FLEXIBLE CONDUIT
LAY-IN CEILING
LAY-IN CEILING
SEISMIC
CLIP
www.studio3design.net
Phone: (317) 595.1000
8604 Allisonville Road, Suite 330
Indianapolis, IN 46250
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
THESE DRAWINGS ARE THE PROPERTY
OF STUDIO 3 DESIGN, INC. ALL RIGHTS
RESERVED
PROJECT NUMBER:
DATE:
CERTIFICATION:
SHEET DESCRIPTION:
SHEET NUMBER:
REVISION SCHEDULE:
1 2 3 4 5 6 7
21019 IUH SPRINGMILLGI CLINIC RENOVATION: PHASE IApril 9, 2021
Electrical
Schedules and
Details
E80110300 N. ILLINOIS ST.INDIANAPOLIS, IN 46290LIGHT FIXTURE SCHEDULE - SUITE 1200
FIXTURE
TYPE FIXTURE NAME DESCRIPTION VOLTAGE WATTAGE LAMP LUMENS COLOR
TEMPERATURE
ACCEPTABLE
MANUFACTURERS
L1 FLAT PANEL 2' X 4' LED FLAT PANEL, WHITE HOUSING, WHITE FROSTED LENS, 0-10V DIMMING
277 V 61 W LED 6000 3500K
LITHONIA EPANL,
METALUX 24FP,
COLUMBIA CFP,
OR APPROVED EQUAL
L2 FLAT PANEL 2' X 2' LED FLAT PANEL, WHITE HOUSING, WHITE FROSTED LENS, 0-10V DIMMING
277 V 41 W LED 4000 3500K
LITHONIA EPANL,
METALUX 24FP,
COLUMBIA CFP,
OR APPROVED EQUAL
L3 DOWNLIGHT 8" APERTURE X 8" HIGH OPEN DOWNLIGHT, LOW IRIDESCENT SEMI SPECULAR CLEAR
ALUMINUM RELFECTOR, SELF TRIM WITH WHITE FLANGE. 0-10V DIMMING DRIVER
(1%-100%).277 V 28 W LED 1800 3500K
LITHONIA - LDN4
ELITE LIGHTING - HH4
HALO - HC4
PRESCOLITE - LF4LED
NO SCALE1FLUSH MOUNTED DATA OUTLET
NO SCALE2FIRE ALARM SYSTEM SCHEMATIC
NO SCALE32" AND SMALLER CONDUIT SUPPORT DETAIL
NO SCALE4WALL BOX INSTALLATION DETAIL
NO SCALE5TELECOM SYSTEM DETAIL
NO SCALE6LAY IN LIGHT FIXTURE DETAIL
# Revision Description
Date
Issued
06/08/21