Loading...
HomeMy WebLinkAboutS101 DEMO & FOUNDATION PLANSL1L1 L1 L1 L2 L1L1 L1E1 E2 EA EB EC ED EE 40' - 0" 170' - 0"40' - 0" 40' - 0" 40' - 0" 50' - 0"A A REFERENCE ARCH DWGS FOR CMU DEMOLITION INFORMATION EX FTG TO REMAIN, TYP EX STL COL TO REMAIN, TYP EX PRECAST WALL PANEL, TYP APPROX LOCATION OF EX FIRE RISER APPROX LOCATION OF EX WATER RISER EX FTG BELOW EX FTG EX CMU WALL EX FTG TO REMAIN T/FTG = T/SLAB TYP A TYP TYP B 6 S302 1 E1 E2 EA EB EC ED EE 40' - 0"170' - 0"40' - 0" 40' - 0" 40' - 0" 50' - 0"A.8 B.4 B.9 C.3 C.6 1.1 1.3 A.1 2' - 4 1/4" FV 10' - 1 5/8" 12' - 4 3/8" 15' - 1 3/4" FV CMU W1 EX CONC FTG, TYP EX STL COL, TYP F2.0x5.5 APPROX LOCATION OF EX FIRE RISER F2.0x5.5 F2.0B F6.0 F2.0B B TYP EX PRECAST WALL PANEL, TYP 1.6 F2.0A 6 S301 2' - 3 11/16" 2' - 3 11/16" 1 2 D E C B A A F7.0 F8.0 EX FTG T/FTG 100' - 0" T/FTG 100' -0" B B 2' - 6"1' - 3" 1' - 3"2' - 6"1' - 3" 1' - 3"F4C C C C C D 3' - 4 1/4" FV 35' - 10 3/4" 9" FV13' - 9 1/2" 15' - 7 5/8" 10' - 6 7/8" FV 12' - 6 1/4" FV 14' - 4" 13' - 1 3/4" FVALIGN FACE OF NEW CMU TO EX FACE OF CMU WF303 S301 TYP 9 S301 TB2 TB2 TB2 TB1 TB1 TYP EX T/FTG 99' -4" (FV) EX T/FTG 97' -4" (FV) 5 S302 4 S302 4 S302 F4C 4 S302 SIM 6 S302 4 S302 SIM 4 S302 SIM E E B TYP POST FOR INTERMEDIATE LANDING, TYP. COORDINATE ALL SUPPORT LOCATIONS WITH STAIR SUPPLIER PRIOR TO DEMOLITION. SELF-SUPPORTING STEEL PAN STAIR BY STAIR CONTRACTOR 1 10 S302 1' - 6"Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 05/20/2021 5/19/2021 2:11:25 PMS101 DEMOLITION AND FOUNDATION PLANS 2021.00173 05/03/2021 CONSTRUCTION DOCUMENTS ARTISTIC COMPOSITE PALLETS -PHASE 2 4518 WEST 99TH STREET CARMEL, IN 46032 N 3/32" = 1'-0"S101 1 FOUNDATION DEMOLITION PLAN 3/32" = 1'-0"S101 2 FOUNDATION PLAN N GENERAL PLAN NOTES: 1. REFERENCE TOP OF SLAB (T/SLAB) = 100'-0" UNO. 2. TOP OF INTERIOR FOOTING ELEVATION = 99'-0" UNO. 3. TOP OF EX PERIMETER FOOTING ELEVATION = 99'-0" UNO (FIELD VERIFY). 4. REFER TO STRUCTURAL GENERAL NOTES, LEGEND, SCHEDULES, TYPICAL DETAILS, AND SPECIAL INSPECTION REQUIREMENTS FOR ADDITIONAL INFORMATION. 5. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION AND DIMENSIONS. 6. PROVIDE ADDITIONAL SLAB ON GRADE REINFORCEMENT AT RE-ENTRANT CORNERS PER THE "TYPICAL ADDITIONAL SLAB ON GRADE REINFORCEMENT AT RE-ENTRANT CORNERS" DETAIL. 7. COORDINATE LOCATIONS OF ALL EMBEDS / OPENINGS / SLEEVES WITH MEP, WALL SYSTEMS, EQUIPMENT SUPPLIERS, AND ALL OTHER AFFECTED TRADES PRIOR TO PLACING CONCRETE. 8. LOCATE ALL EXISTING BELOW GRADE UTILITIES PRIOR TO EXCAVATION AND INSTALLATION OF NEW WORK. NOTIFY ENGINEER OF ANY INTERFERENCES. GENERAL PLAN NOTES: 1. REFER TO STRUCTURAL GENERAL NOTES, LEGEND, SCHEDULES, TYPICAL DETAILS, AND SPECIAL INSPECTION REQUIREMENTS FOR ADDITIONAL INFORMATION. 2. REFERENCE ARCHITECTURAL DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION 3. EXCAVATION EXTENTS SHALL BE MINIMIZED AS PRACTICAL TO INSTALL NEW WORK. 4. UNDERPINNING OF EXISTING FOUNDATIONS PER THE CONTRACTOR AS REQUIRED FOR INSTALLATION OF NEW WORK. 5. VERIFY ALL EXISTING CONDITIONS PRIOR TO PROCEEDING WITH NEW WORK. NOTIFY ENGINEER OF ANY DISCREPANCIES. 6. PROTECT ALL ITEMS TO REMAIN. KEYED PLAN NOTES: SAWCUT AND REMOVE EXISTING SLAB AS REQUIRED TO INSTALL NEW WORK. EXCAVATE EXISTING SUBGRADE AS REQUIRED TO INSTALL NEW WORK. DO NOT UNDERMINE EXISTING FOUNDATIONS. DEMOLISH EXISTING WALL FOOTING AS REQUIRED TO INSTALL NEW WORK. EXCAVATE EXISTING SUBGRADE AS REQUIRED TO INSTALL NEW WORK. DO NOT UNDERMINE EXISTING FOUNDATIONS. A KEYED PLAN NOTES: APPROXIMATE LOCATION OF EXISTING WATER RISER. CONTRACTOR TO LOCATE UNDERGROUND PIPE PRIOR TO NEW WORK. NOTIFY ENGINEER IF PIPE INTERFERES WITH NEW WORK. PROVIDE NEW SLAB ON GRADE TO MATCH EXISTING TO REPLACE DEMOLISHED SLAB, TYPICAL. REFER TO TYPICAL DETAILS FOR ADDITIONAL INFORMATION. PROVIDE TOOLED CONTROL JOINTS AT LOCATIONS OF EXISTING SLAB JOINTS AND AT A SPACING SUCH THAT NO PANEL EXCEEDS A 2:1 RATIO. DO NOT PROVIDE JOINTS IN TIE BEAMS. INDICATES HELICAL PILE. DESIGN FOR WORKING LOADS OF 31 KIP COMPRESSION. INDICATES HELICAL PILE. DESIGN FOR WORKING LOADS OF 40 KIP COMPRESSION. FTG STEP. SEE "TYPICAL STEPPED FOOTING" DETAIL. A B CONTRACTOR NOTES 1. DOCUMENTATION OF HIDDEN AND SUBGRADE EXISTING CONSTRUCTION WAS NOT AVAILABLE DURING THE DESIGN PHASE. EXISTING FOUNDATIONS AND OTHER HIDDEN EXISTING ELEMENTS SHOWN ON THESE DOCUMENTS ARE BASED ON ASSUMED SIZES, CONFIGURATIONS AND ELEVATIONS AND ARE PROVIDED FOR REFERENCE ONLY. 2. CONTRACTOR SHALL FIELD VERIFY AND PRESENT FINDINGS TO THE A/E FOR REVIEW IDENTIFYING THE EXACT CONFIGURATION OF EXISTING CONSTRUCTION PRIOR TO FABRICATION AND INSTALLATION OF NEW STRUCTURAL ELEMENTS. 3. CONTRACTOR SHALL ALERT THE A/E OF ANY REQUIRED REVISIONS TO THE DESIGN NECESSARY TO ACCOMMODATE EXISTING CONDITIONS THAT DIFFER FROM THE ASSUMPTIONS DEPICTED HEREIN. C D B E REVISION SCHEDULE NO. DESCRIPTION DATE 1 ADDENDUM 1 05/20/2021 06/08/21