Loading...
HomeMy WebLinkAboutS102 MEZZANINE & ROOF FRAMINGE1 E2 EA EB EC ED EE 40' - 0" 170' - 0"40' - 0" 40' - 0" 40' - 0" 50' - 0"EX 32LH EX 32LH EX 32LH EX 32LH EX 32LH EX 32LH EX 32LH EX 32LH EX 32LH EX 32LH 1' - 7 3/4" EOS A.8 B.4 B.9 C.3 C.6 1.1 1.3 A.1 3' - 4 1/4" FV 35' - 10 3/4"9" FV13' - 9 1/2" 15' - 7 5/8" 10' - 6 7/8" FV 12' - 6 1/4" FV 14' - 4" 13' - 1 3/4" FVS11/S504 2/S504 EX STL COL, TYP 2 S501 EX CMU WALL BELOW EX PRECAST WALL NEW CMU WALL BELOW 2 S501 3 S502 2 S501 1' - 9 1/4" EOS1' - 9 1/4" EOS1' - 9 1/4" EOS 1.6 1' - 4 1/2" EOS 2' - 4 1/4" FV 10' - 1 5/8" 12' - 4 3/8" 15' - 1 3/4" FV W16X26 W16X26 W16X26 W16X26 W16X26 W16X26 W16X26 W16X26 W16X26 W16X26 W16X26 W21X55 W16X26 W16X26 W21X55 W16X26 W16X26 W16X26 W16X26W21X55 W16X26 W16X26 W16X26 W16X26 W16X26 W16X26 W16X26 W16X26 W16X26 W16X26 W16X26 W16X26W21X55 W24X84 W27X114 W27X129 W27X84 W21X559"6 EQ SPA 5 EQ SPA30' - 2 1/8"3 EQ SPA23' - 1 1/8" 2 EQ SPA22' - 6" 15' - 1 3/4" 7' - 11 1/4" 6" EOS2 EQ SPA2' - 7 3/4" EOS6" EOS EX CMU WALL BELOW EX PRECAST WALL 28k 27k 30k42k23k33k 21k 30k 42k 23k 33k 21kA A B B 6 S502 W21X55 W21X55W16X26 W16X26 W21X55 W16X26W16X26 W21X55 1 S502 TYP 5 S502 TYP TYP SELF-SUPPORTING STEEL PAN STAIR BY STAIR CONTRACTOR 1 E1 E2 EA EB EC ED EE 40' - 0"170' - 0"40' - 0" 40' - 0" 40' - 0" 50' - 0"EX 30KEX 30KEX 30KEX 30KEX 30KEX 30KEX 30KEX 30KEX 40G EX 28KEX 28KEX 28KEX 28KEX 28KEX 28KEX 28KEX 48G EX 28KEX 28KEX 28KEX 28KEX 28KEX 28KEX 28KEX 30KEX 30KEX 30KEX 30KEX 30KEX 30KEX 30KEX 30KEX 40G NEW RTU BY MEP CONTRACTOR (1,500 LBS) EX PRECAST WALL EX PRECAST WALL EX STL COL, TYP EX PRECAST WALL 500 LBS (NOTE 3)300 LBS (NOTE 3) 1 Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 05/20/2021 5/19/2021 2:11:25 PMS102 MEZZANINE AND ROOF FRAMING PLANS 2021.00173 05/03/2021 CONSTRUCTION DOCUMENTS ARTISTIC COMPOSITE PALLETS -PHASE 2 4518 WEST 99TH STREET CARMEL, IN 46032 N 3/32" = 1'-0"S102 1 MEZZANINE FRAMING PLAN GENERAL PLAN NOTES: 1. TOP OF SLAB (T/SLAB) ELEVATION = 114' -0" UNO. 2. TOP OF STEEL (T/STL) ELEVATION = 113' - 8" UNO. 3. REFER TO STRUCTURAL GENERAL NOTES, LEGEND, SCHEDULES, TYPICAL DETAILS, AND SPECIAL INSPECTION REQUIREMENTS FOR ADDITIONAL INFORMATION. 4. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION AND DIMENSIONS. 5. MECHANICAL CONTRACTOR SHALL COORDINATE LOCATION OF ALL OPENINGS IN FLOOR WITH STRUCTURAL FRAMING. NOTIFY STRUCTURAL ENGINEER OF ANY CONFLICTS. 3/32" = 1'-0"S102 2 EXISTING ROOF FRAMING PLAN GENERAL PLAN NOTES: 1. REFER TO STRUCTURAL GENERAL NOTES, LEGEND, SCHEDULES, TYPICAL DETAILS, AND SPECIAL INSPECTION REQUIREMENTS FOR ADDITIONAL INFORMATION. 2. PROVIDE L4x4x1/4 RTU SUPPORT FRAMING SIM TO "TYPICAL SLAB ON METAL DECK OPENING (EXISTING FRAMING)" DETAIL AND "TYPICAL RTU SUPPORT" DETAIL. PROVIDE JOIST REINFORCING FOR CONCENTRATED LOADS AT THE NEW RTU PER TYPICAL DETAIL PROVIDED ON S503. COORDINATE LOAD LOCATIONS WITH MECHANICAL UNIT SUPPLIER. N KEYED PLAN NOTES: PROVIDE 1" CLEAR BETWEEN EXISTING PIPE AND BEAM FLANGE. FIELD VERIFY LOCATION OF PIPE PRIOR TO FABRICATION OF NEW MATERIAL. PROVIDE 1/2" EXPANSION JOINT MATERIAL AROUND EXISTING PIPES SLEEVED THROUGH NEW SLAB. PROVIDE 1/2" EXPANSION JOINT MATERIAL AROUND EXISTING COLUMN A B CONTRACTOR NOTES: 1. FLOOR OPENING, ROOF OPENING, RTU SUPPORT, AND JOIST REINFORCING FOR MECHANICAL SYSTEMS AND EQUIPMENT WILL BE ISSUED AFTER THE MEP SYSTEMS DESIGN IS COMPLETED BY THE DESIGN BUILD CONTRACTOR FOR THOSE ITEMS. 1 REVISION SCHEDULE NO. DESCRIPTION DATE 1 ADDENDUM 1 05/20/2021 06/08/21